Skip to main content
ToolsForensic Analysisfabricated steel manufacturing company

fabricated steel manufacturing company

Supplier Forensic Analysis · Scanned: 2026/05/24

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
5
Total Value
R 0

Recent Awards

5 awards · Total: R 0

Showing 5 of 5
EXPRESSION OF INTEREST: TEMPORARY, RELOCATABLE OR MODULAR STRUCTURES AND RELATED SERVICES FOR VARIOUS INFRASTRUCTURE PROGRAMMES THROUGHOUT SOUTH AFRICA (FRAMEWORK AGREEMENTS)
Coega Development Cooperation
Ref: CDC/274/22
R 0
05 Apr 2023
IEC/GP-02/2021
Unknown Department
Ref: 2069
R 0
01 Jan 1900
EC129 - Alice/Raymond Mhlaba Prefabricated Office
Electoral Commission (IEC)
Ref: IEC/EC-01/2021
R 0
01 Jan 1900
NC075 - Renosterberg-Petrusville Prefab Office Accommodation
Electoral Commission (IEC)
Ref: IEC/NC-01/2021
R 0
01 Jan 1900
APPOINTMENT OF A CONTRACTOR FOR THE SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF PRE-MANUFACTURED COLLAPSABLE UNITS FOR THE PERIOD OF FIVE (05) YEARS TO THE SOUTH AFRICAN POLICE SERVICE: NATIONALLY
South African Police Service
Ref: 19/1/9/1/121TB(22)
R 0
01 Jan 1900

AI Analysis

Powered by Gemini

AI Forensic Analysis

Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo

or upgrade to Pro Subscription

Risk Assessment

Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →