Skip to main content
ToolsForensic Analysisk s n electrical

k s n electrical

Supplier Forensic Analysis · Scanned: 2026/05/24

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
2
Total Value
R 3,6M

Recent Awards

2 awards · Total: R 3 588 645

Showing 5 of 2
BREAKDOWN, MAINTENANCE & REPAIR FUNCTIONS ON SUB-TRANSMISSION LINES – (44-132KV) UNDER DEAD WORK CONDITION FOR A PERIOD OF 36 MONTHS IN THE FREE STATE OPERATING UNIT ON AN AS AND WHEN REQUIRED BASIS
ESKOM
Ref: KZN116- Tender validity.
R 3 588 645
02 May 2025
The Establishment of an Enabling Agreement with a maximum Panel of 15 Contractors for the Provision of Supervision, Labour, Equipment, Material (except the “Big Five” material), Transport (as it will be required and authorised) for Electrification Projects for Distribution Division in the Free State Operating Unit, Central East Cluster with BBBEE EME or QSE Level 1 or Level 2 companies on an as and when required basis for 36 months.
ESKOM
Ref: FS028
R 0
31 Jul 2023

AI Analysis

Powered by Gemini

AI Forensic Analysis

Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo

or upgrade to Pro Subscription

Risk Assessment

Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →