Skip to main content
ToolsForensic Analysiskeen group

keen group

Supplier Forensic Analysis · Scanned: 2026/05/13

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
6
Total Value
R 2,5M

Recent Awards

6 awards · Total: R 2 496 516

Showing 5 of 6
The establishment of an enabling agreement for a panel of 30 Contractors to cater for the provision of electrical works performed within the breakdown portfolio on an “As and When required basis, for a period of thirty – six (36) months in the KZN Operating Unit, Central East Cluster.
ESKOM
Ref: KZN142
R 100
07 Nov 2025
The Establishment of an Enabling Agreement with a maximum Panel of 30 Contractors for the Provision of Supervision, Labour, Equipment, Material (except the “Big Five” material: Meters, Poles/Cross Arms, Transformers, Cable & Conductor), Transport (as it will be required and authorised) for Electrification of Low Value New Household and Infills Connections (Below R3 000 000,00 per project) for a period of two (2) years and a further six (6) months for the close out of projects, for the Distribution Division in the KwaZulu-Natal Operating Unit, Central East Cluster on an as and when required.
ESKOM
Ref: KZN157
R 1
13 Oct 2025
An enabling agreement to establish contracts , with eleven (11) service providers ( One (1) service provider per area), for the Provision of LPU Meter Reading Services, SPU Check Reading, Disconnections, Reconnections and Meter Change Outs for the various areas in Kwa-Zulu Natal (Kokstad Sector, Margate Sector, PMB Sector, Ladysmith Sector, Newcastle Sector, Pongola Sector, Empangeni Sector, Stanger Sector) and Free State Operating Units (Central Free State, Northern Free State, Eastern Free State), Central East Cluster (on an as when required basis) for a period of thirty-six (36) months
ESKOM
Ref: KZN148
R 1
17 Apr 2025
An enabling agreement to establish a panel of 60 Contractors to execute Minor works Project on an “As and When required basis, for a period of 36 months in the KZN Operating Unit, Central East Cluster.
ESKOM
Ref: KZN103
R 2 496 413
01 Apr 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
ESKOM
Ref: KZN132
R 1
16 Jan 2025
KZN0127/YH
Unknown Department
R 0

1 More Awards

View complete award history with full tender details.
Pro access from R199/mo

or upgrade to Pro Subscription

Risk Assessment

0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →