Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISKCompliance
N/A/100
Awards
3
Total Value
R 19M
Recent Awards
3 awards · Total: R 18 702 909,00
Maintenance for Eskom and Broadband Infraco optic fibre network on an “as and when required” basis from the start date until 17 July 2025
Eskom
Ref: MWP1800TXR 18 702 909,00
17 Nov 2023
A panel or a list of technically pre-qualified contractors to install telecommunications equipment for Eskom’s Transmission Project Delivery
Eskom
Ref: MWP1702TXR 0,00
23 Oct 2023
Appointment of a panel of five (5) contractors for the construction and dismantling of High Voltage (HV) sub-transmission lines for voltages ranging from 66kV up to and including 132kV within Limlanga Cluster -Limpopo on an “as and when” required basis over a period of 36 months
Eskom
Ref: LP0067MMR 0,00
01 Jan 1900
AI Analysis
Powered by GeminiAI Forensic Analysis
Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo
or upgrade to Pro Subscription
Risk Assessment
Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISKBased on 0 forensic flags detected
Unlock Full Analysis
Get access to all forensic flags, evidence details, and AI-generated audit narratives.
View Full Intelligence Report
Get complete award history, director network, and compliance analysis.
View Report →