Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISKCompliance
N/A/100
Awards
2
Total Value
R 10M
Recent Awards
2 awards · Total: R 10 110 110,00
Upgrading of the Controls for the main curtain barriers smoke ventilator lighting bridges and replacement of the control desks for the stage machinery in the theatre
Artscape
Ref: ART03/2023R 5 055 055,00
12 Mar 2024
Upgrading of the Controls for the main curtain barriers smoke ventilator lighting bridges and replacement of the control desks for the stage machinery in the theatre
Artscape
Ref: ART03/2023R 5 055 055,00
12 Mar 2024
AI Analysis
Powered by GeminiAI Forensic Analysis
Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo
or upgrade to Pro Subscription
Risk Assessment
Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISKBased on 0 forensic flags detected
Unlock Full Analysis
Get access to all forensic flags, evidence details, and AI-generated audit narratives.
View Full Intelligence Report
Get complete award history, director network, and compliance analysis.
View Report →