Skip to main content
ToolsForensic Analysispgn civils

pgn civils

Supplier Forensic Analysis · Scanned: 2026/05/26

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
2
Total Value
R 2,1

Recent Awards

2 awards · Total: R 2

Showing 5 of 2
The supply and deliver of three (3) LPG plates and one (1) electric plate hybrid cooking stoves and LPG heaters with 9kg LPG cylinders x 2, supply, deliver and install ceiling insulation (SPF and ceiling boards), electrical re-wiring, asbestos removal for air quality offset phase 2 project, on and “as and when required basis” in Masakhane-Duvha,Thubelihle- Kriel, Emzinoni Plus-Matla, Silobela- Arnot , and Refengkgotso – Lethabo for a period of not more than sixty (60) months for houses up to nine thousand one hundred and nineteen (9 119) houses.
ESKOM
Ref: MWP2902GX
R 1
26 Jan 2026
Establishment of a Panel of CIDB Level (CE 6-9) CIVIL Engineering Contractors for a Period of 3 years
Gauteng - Roads and Transport
Ref: DRT 17/07/2019
R 1
21 Feb 2025

AI Analysis

Powered by Gemini

AI Forensic Analysis

Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo

or upgrade to Pro Subscription

Risk Assessment

Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →