Skip to main content
ToolsForensic Analysispower line africa

power line africa

Supplier Forensic Analysis · Scanned: 2026/06/10

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
1
Total Value
R 625M

Recent Awards

1 awards · Total: R 625 408 350,83

Showing 5 of 1
The Supply and Installation (Procurement and Construction) of the Aggeneis – Paulputs 400KV Line
Eskom
Ref: MWP2475TX
R 625 408 350,83
28 Feb 2025

AI Analysis

Powered by Gemini

AI Forensic Analysis

Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo

or upgrade to Pro Subscription

Risk Assessment

Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →