Skip to main content
ToolsForensic Analysispuno harvest builders

puno harvest builders

Supplier Forensic Analysis · Scanned: 2026/06/01

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
3
Total Value
R 94M

Recent Awards

3 awards · Total: R 93 723 595,30

Showing 5 of 3
ESTABLISHMENT OF A PRE-APPROVED LIST OF SERVICE PROVIDERS (PANEL) FOR THE CONSTRUCTION OF INFRASTRUCTURE IN THE FORM OF CIVIL ENGINEERING WORKS AND GENERAL BUILDING WORKS (CONSTRUCTION) FOR A PERIOD OF THIRTY-SIX (36) MONTHS
Gauteng - Gauteng Department of Human Settlements
Ref: HLA 4/2/4-2023/10
R 1,00
17 Jun 2025
LINBRO WATER UPGRADE
Johannesburg Water
Ref: JW14301R
R 93 723 593,30
18 May 2025
APPOINTMENT OF A PANEL OF CONTRACTORS (8CE – 9CE) FOR THE INSTALLATION OF ENGINEERING SERVICES FOR THE FREE STATE DEPARTMENT OF HUMAN SETTLEMENTS TO BE APPOINTED ON “AS AND WHEN REQUIRED” BASIS FOR A PERIOD OF 36 MONTHS FROM THE DATE OF APPOINTMENT.
Free State - Human Settlement
Ref: HS-B02/2024-2027
R 1,00
09 May 2025

AI Analysis

Powered by Gemini

AI Forensic Analysis

Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo

or upgrade to Pro Subscription

Risk Assessment

Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →