Skip to main content
    Msikaba Water Supply Scheme Phase3b: Construction of 200mm X 100m Klambon Steel (class 25) Gravity Main From Msikaba Reservoirs to Betania and Construction of 6250m X 110mm to 75 Mm Upvc, Class 12, New Rituculation for the New Development at Nyandezulu and 62 N X 25mm House Connections (Awarded) | Contract Award