Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
Commission for Conciliation Mediation & ArbitrationLocation
Gauteng
Closing Date
04 Sept 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
CCMA National Office, 12 Floor JCI Building, 28 Harrison street - Johannesburg - Johannesburg - 2198
Organization Type
GOVERNMENT
Published
05 Aug 2026
OCDS Reference
ocds-9t57fa-164620
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 04 September 2026 - 11:00
Venue
virtual
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
IT is the responsibility of bidders to ensure that they can access the briefing link before the briefing session. Failure to attend the virtual briefing session will lead to disqualification of the bid
Categories
Request for Bid(Open-Tender)
CCMA National Office, 12 Floor JCI Building, 28 Harrison street - Johannesburg - Johannesburg - 2198
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: SAPVP Registration, REBOSA Membership
AI Document Analysis Stages
Important Dates
05 Aug
2026
Tender Published
Tender was published
04 Sept
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
BID DOCUMENT- PROVISIONING OF OFFICE AND SPACE ON A LEASE AGREEMENT FOR THE CCMA TSHWANE OFFICE FOR A PRIOD OF FIVE (5) YEARS.pdf
The CCMA is seeking a landlord to provide office and parking space in Tshwane CBD under a five-year lease. The required gross lettable area is 2133.5 m², with 35 parking bays (minimum 20 on-site, including 2 for disabled). The building must be within 2 km of public transport, secure, and compliant with OHS and SANS regulations. A compulsory virtual briefing session is on 12 August 2026, and bids close on 4 September 2026. The landlord must cover tenant installation, security, and maintenance costs.
To download these documents and access AI-powered analysis, visit the main tender page.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 589 257
Range
Based on 15 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
{"closingDate":"12 August 2026","closingTime":"10:00 AM","briefingSession":"{"date":"12 August 2026","time":"10:00 AM","venue":"e: 12 August 2026 at 10:00 AM Through Microsoft Teams (Virtual)","is_compulsory":true}"}
Contact Information
Source: BID DOCUMENT- PROVISIONING OF OFFICE AND SPACE ON A LEASE AGREEMENT FOR THE CCMA TSHWANE OFFICE FOR A PRIOD OF FIVE (5) YEARS.pdf (RFP){"name":"Ms. Sandra","email":"[email protected]","phone":"+27 11 377 6716","department":null,"address":"kind relative to this RFP should be"}
Evaluation Criteria
Source: BID DOCUMENT- PROVISIONING OF OFFICE AND SPACE ON A LEASE AGREEMENT FOR THE CCMA TSHWANE OFFICE FOR A PRIOD OF FIVE (5) YEARS.pdf (RFP)Bidders must attend the compulsory virtual briefing session on 12 August 2026. They must be registered on the CSD and have a valid Tax Clearance Certificate. The building must exist at bid close, not be a heritage building, and not share space with labour-related organizations. Bidders must submit all required documentation (SBD forms, company registration, ID, financial statements, BBBEE certificate). Joint ventures or consortia must provide a signed agreement. Failure to comply with mandatory requirements or provide complete information may lead to disqualification.
Technical Specifications
Source: BID DOCUMENT- PROVISIONING OF OFFICE AND SPACE ON A LEASE AGREEMENT FOR THE CCMA TSHWANE OFFICE FOR A PRIOD OF FIVE (5) YEARS.pdf (RFP)Scope of work means that the bidder understands the below requirements and will be expected to deliver as per
the requirements below:
Province Gauteng
The location of the facility must be within 2km walking distance of public transport
services, i.e. taxis, buses, and trains in the Tshwane CBD, clearly visible from major Tshwane (Pretoria) CBD
local traffic routes.
planning Annexure A) Including passages and public areas.
Term of Lease Five (5) years
Building must exist at the close of bid
a) Confirmation that the designated building is not a heritage building.
(“Heritage building” is a building possessing architectural, aesthetic, historic or cultural values which is declared as
heritage building by the Planning Authority/Heritage conservation committee or any other Competent Authority in
whose jurisdiction such building is situated).
b) Not sharing with any labour related organizations (including but not limited i.e., legal
14 | P a g e
firm/attorneys/lawyers/advocates doing labour disputes, union or federation, labour brokers, employer organisations;
intermediary institutions such as Insurance brokers) upon occupation and for the duration of the lease period.
c) The CCMA may share with a Bargaining council.
d) For convenience purposes, the floors to be leased must be consecutive for the CCMA occupation if the building is a
multi-tenant building. i.e., no other occupants in between the CCMA consecutive floors.
e) CCMA may share with medical facilities but limited to small doctors’ practices such as general practitioners and
specialists. This excludes hospitals, pathological laboratory, clinics and mortuaries.
maintained as per OHS regulatory requirements for the duration of the lease (and a combination of single units for
offices, hearing rooms, training rooms, boardrooms and central air-conditioning system for the public area and open
working area.
OFFICE/SPACE REQUIREMENTS – Annexure A
15 | P a g e
Qty designation workstation type wfh sq.M. Total
Finance
1 Accounts Administrator Open plan (1,8m desk) N 3,3 3,3
Administration
0 Admin Manager Open plan (1,8m desk) N 0,0 0,0
0 Administration Assistant Open plan (1,8m desk) N 0,0 0,0
1 Administration Clerk Open plan (1,8m desk) N 3,3 3,3
2 Archiving Administrator Open plan (1,8m desk) N 3,3 6,6
1 RSC Associate Open plan (1,8m desk) N 3,3 3,3
1 HR Regional Assistant Single closed office N 4,0 4,0
0 Mail Clerk Open plan (1,8m desk) N 0,0 0,0
1 Messenger Driver Open plan (1,8m desk) N 3,3 3,3
0 Personal Assistant Open plan (1,8m desk) N 0,0 0,0
1 Teamleader: Admin Single closed office N 10,0 10,0
1 Receptionist Reception N 13,0 13,0
0 Registry/Administration Open plan (1,8m desk) N 0,0 0,0
Experience & Qualifications
Source: BID DOCUMENT- PROVISIONING OF OFFICE AND SPACE ON A LEASE AGREEMENT FOR THE CCMA TSHWANE OFFICE FOR A PRIOD OF FIVE (5) YEARS.pdfcontract and whose bid is functionally acceptable and/or financially advantageous to the CCMA in line
with the bid specification.
8.3 The CCMA reserves the right to award this bid as a whole or in part.
8.4 The CCMA reserves the right to verify the validity of any submitted documents during the evaluation
process and to request clarification i.e., reference letter, certificates, or qualifications. Any document
that cannot be verified by the CCMA will not be considered for evaluation purposes, and no points will
be allocated in respect of such document.
6 | P a g e
8.5 The CCMA reserves the right to consider the guidelines for consultants as provided in the National
Treasury Instruction /2025: Cost Containment Measures, where relevant.
8.6 The CCMA reserves the right to request all relevant information, agreements and other documents to
verify information supplied in the bid response. The bidder hereby gives consent to the CCMA to
conduct background checks on the bidding entity and any of its directors / trustees / shareholders /
members.
8.7 Any bidder found to have submitted fraudulent, false, or misleading information may be disqualified
from the bid process. The CCMA reserves the right to report such matters to National Treasury in terms
of SCM Instruction No. /22 and may take further action, including referral for criminal
investigation where applicable.
Pricing Schedule
Source: BID DOCUMENT- PROVISIONING OF OFFICE AND SPACE ON A LEASE AGREEMENT FOR THE CCMA TSHWANE OFFICE FOR A PRIOD OF FIVE (5) YEARS.pdfPrepare two comprehensive Bill of Quantities (BOQ). The one BOQ must outline the landlord’s
base build cost and the second BOQ must outline the tenant allowance and tenant specific items.
The BOQ’s must be prepared and submitted by the landlord at the time of submitting the bid. The
prepared BOQ should be inline but not limited to the scope of work and tenant installation scope
of work.
Compliance Requirements
Source: BID DOCUMENT- PROVISIONING OF OFFICE AND SPACE ON A LEASE AGREEMENT FOR THE CCMA TSHWANE OFFICE FOR A PRIOD OF FIVE (5) YEARS.pdf (RFP)valid Tax Clearance Certificate with the tax compliance status PIN must be included in the bid
Valid tax clearance certificate(s), A tax compliance status PIN must be included in the bid response to
valid Tax Clearance Certificate with a tax compliance status PIN
tax compliance status PIN must be included in the bid
tax compliance status
Tax Compliance
tax compliance status PIN must be included in the bid response to
tax compliance status PIN
Central Supplier Database (CSD) prior to submitting bids and
Central Supplier Database Report
5.5 A valid Tax Clearance Certificate with the tax compliance status PIN must be included in the bid
response to verify bidders’ tax compliance status.
5.6 All bidders must be registered on the Central Supplier Database (CSD) prior to submitting bids and
verify the bidder’s tax status on CSD and other Governing compliances.
And parking space on a lease agreement for the ccma tshwane office for a
B-BBEE Details: 3 (duly completed and signed);
11.3.4 Annexure 4: SBD 4 (duly completed and signed);
11.3.5 Annexure 5: SBD 6.1 (duly completed and signed)
11.3.6 Annexure 6: SBD 7.2 (duly completed and signed);
11.3.7 Annexure 7: CCMA’s Standard Condition of bid and General Condition of Contract (signed)
11.3.8 Annexure 8: POPIA consent form (duly completed and signed)
11.3.9 Financial Statements for the latest financial year signed by an independent registered Accountant.
11.3.10 Copy of Joint Venture/ Consortium/ Subcontracting Agreement duly signed by all parties (if
applicable).
11.3.11 BBBEE Certificate
Note: If a bidder is a Consortium, Joint Venture or Prime Contractor with Subcontractor(s),
the documents listed above (11.3.1 - 11.3.6) must be submitted for each Consortium/ JV
member or Prime Contractor and Subcontractor(s).
11.4 Schedule 3:
11.4.1 Response to Section 2 of this document, in line with the format indicated in this RFP document.
9 | P a g e
Bids shall be screened in terms of the following process and conditions:
12.1 Initial Screening: During this phase, bid responses will be reviewed for the purposes of assessing
compliance with RFP requirements including the general bid conditions, which requirements include the
following:
this RFP.
10 | P a g e
Section 2: introduction and background
11 |
Health & Safety
Source: BID DOCUMENT- PROVISIONING OF OFFICE AND SPACE ON A LEASE AGREEMENT FOR THE CCMA TSHWANE OFFICE FOR A PRIOD OF FIVE (5) YEARS.pdf9.1 By submitting a bid in response to the RFP, the bidder will be taken to offer to render all or any of the
services described in the bid response submitted by it to the CCMA on the terms and conditions and in
accordance with the specifications stipulated in this RFP document.
9.2 The bidder may be required to attend an interview should CCMA require such and the bidder shall be
notified thereof in good time before the actual presentation date. Such interview may include a practical
demonstration of understanding products or services as called for in this RFP.
9.3 The bidder agrees that the offer contained in its bid shall remain binding upon him/her and receptive for
acceptance by the CCMA during the bid validity period indicated in the RFP and calculated from the bid
closing hour and date such offer and its acceptance shall be subject to the terms and conditions
contained in this RFP document read with the bid.
9.4 The bidder furthermore confirms that he/she has satisfied himself/herself as to the correctness and
validity of his/her bid response; that the price(s) and rate(s) quoted cover all the work/item(s) specified in
the bid response documents; and that the price(s) and rate(s) cover all his/her obligations under a
resulting contract for the services contemplated in this RFP; and that he/she accepts that any mistakes
regarding price(s) and calculations will be at his/her risk.
9.5 It is the responsibility of the bidder to ensure that all supporting documentation submitted as part of the
bid is valid and compliant with the requirements of this bid at the closing date.
9.6 The successful bidder accepts full responsibility for the proper execution and fulfilment of all obligations
and conditions devolving on him/her under the supply agreement and SLA to be concluded with CCMA,
as the principal(s) liable for the due fulfilment of such contract.
7 | P a g e
9.7 The bidder accepts that all costs incurred in the preparation, presentation and demonstration of the
solution offered by it shall be for the account of the bidder. All supporting documentation and manuals
submitted with its bid will become CCMA property unless otherwise stated by the bidder/s at the time of
submission.
Signage Inter-leading glass doors h) Board Room Aluminum notice
a) Compliance –OHS (fire, toilets, emergency numbering boards in foyers
evacuation plan etc. – Health and Safety i) SAT cubicle
requirements) numbering
b) Lift landing j) Directional
c) Frosted glass signage
d) No smoking Signage (The quantity will
e) Reception Signage depend on space
f) Waiting area Signage planning template,
g) Referral’s Signage floor plate,
building design
and layout)
Fire Detection a) Supply and installation of fire detection
system for all the areas in terms of the
Occupational Health and Safety (OHS) Act
17 | P a g e
(Landlords responsibility) allowance specific items
and Building Regulations.
b) Any fire protection systems (fire hose,
hydrants, sprinkle system, fire extinguishers)
exits. contract for all
It is the Landlord’s responsibility to link the entry and exit
emergency break glass unit with the fire alarm. points of the
leased premises.
issues relating to water pressure, drain blockages
etc.
(a) Toilets installed with integrated toilet
bowls (built in seats in porcelain)
(b) Sanitary facilities are compliant with the
building regulations.
(c) Toilets for people with disabilities.
(d) Provide wash basins
N.B: the Landlord will be responsible for all the
plumbing maintenance, replacement of spare
parts as and when required.
IT Infrastructure a) Cabling (double trunking/skirting a) Fireproof door
b) Racks/cable trays) when required. to the server
c) Smoke detectors. room
d) Server room air conditioner (24000BTU) to be b) Raised floor
maintained by the Landlord as part of the (200mm-
lease. 300mm off
e) Fire extinguisher outside the server room the ground)
(next to the entrance door) c) Anti-static
f) Server room evacuation plan (must be part of tiles or mat in
the building evacuation plan) the server
g) An approved electrical layout and floor plans room
h) Electrical/Generator calibration, distribution d) Server room -
board (DB) installation and all relevant cabling Red plugs for
in the server room to connect the 6kVA 230V all server
on-site, then a
minimum of
twenty (20) on-site
parking bays of
which two (2)
parking bays must
comply with the
disability
requirements and
fifteen (15) may
be off-site not
more that 100m
away.
Occupation Health and Safety (OHS)
OHS a. Roofs and ceilings: Leak free
b. Walls and flooring: Leak free (i.e. no cracks,
no peeling wallpaper, no tripping hazards, no
torn and peeling carpets and no peeling or
worn off paint, no leaks and/or slippery floors).
24 | P a g e
(Landlords responsibility) allowance specific items
c. Stairways, Ladders, and handrails: Safe (i.e.
not slippery, loose, unstable, no insufficient
lighting and/or obstructions).
d. Walkways (passages): Clear of all hazards
and Obstruction (i.e. the surface is not
slippery, carpet not peeling and/or there are
no protruding and tripping hazards like nails,
splinters, etc.)
e. Emergency Evacuation floor plans approved
by the fire department & displayed in view of
staff & public in all prominent places and must
be illuminated.
f. Assembly points to be clearly marked.
g. Emergency red arrows illustrating where you
are and the escape route, the alternative
route should also be indicated on the
emergency floor plan.
h. Emergency lights supported by an alternative
power supply.
i. Exit signs at fire escape doors fitted in green
fluorescent (SANS).
j. The building must have fire escape doors as
required by municipal bylaws.
k. Doors to accommodate people with
disabilities.
l. The building must comply with fire
regulations.
m. Lifts – inside & outside signage stating not to
be used in case of fire.
n. Lifts must be disability compliant (i.e. size
adequate for a wheelchair to turn; the height
of control panel within reach of wheelchair-
bound person to operate; and have voice
commands to indicate the floors for the
25 | P a g e
be connected to the generator in case of
power failure.
o. Fire hose reels and extinguishers clearly
marked and in full view with operation
instructions & emergency numbers.
p. All distribution boxes (DB) installed with locks
and clearly labeled.
q. Smoke detectors/ linked to fire alarm
(monitored by the landlord).
r. Automatic Sprinkler System/ Fire Division at
500m2 and must be monitored, maintained
and replaced as when required.
s. All OHS signs SANS approved and at
prominent places.
t. Natural light after alterations is completed
must be 400 LUX. The average-maintained
lighting level in a (Dependent on building and
windows with natural light coming in):
u. Noise level assessment/ monitoring, should
not be above 85dB, please refer to
(Landlords responsibility) allowance specific items
months.
y. The building must be disability friendly and
compliant (including entrance, ramps, rails,
lifts, toilets and parking, etc.).
z. Chemical storerooms must comply with light,
control of temperature and fire extinguisher
outside the door. Fluorescent tubes that are
low in ultraviolet light, should be used
wherever, possible in storage areas.
placed outside, the door.
aa. Archiving room must comply, with light,
windows, control of temperature and fire
extinguisher outside the door. Fluorescent tubes
that are low in ultraviolet, light should be used,
wherever possible in storage areas. Ultraviolet
light can be easily, measured with a light, meter,
and levels should, not exceed 75NW/lumen.
bb. Pest control- Landlord to fumigate the building
quarterly at its cost and provide written proof
thereof.
cc. The Landlord is responsible for providing
(Landlords responsibility) allowance specific items
employment and labour. months from
b) Fire Assessment Certificate issued by signing of the SLA
the local municipality’s Emergency for the submission
Management Services (EMS) of all the required
c) Occupancy Certificate issued by the local documents/
municipality as stipulated by the National certificates.
Contractual Terms
Source: BID DOCUMENT- PROVISIONING OF OFFICE AND SPACE ON A LEASE AGREEMENT FOR THE CCMA TSHWANE OFFICE FOR A PRIOD OF FIVE (5) YEARS.pdf22 Case Manager Officer Open plan (1,8m desk) N 3,3 72,6
Commissioner Single closed office N 0,0 0,0
0 Interpreter Single closed office N 10,0 0,0
1 Regional Senior Commissioner Single closed office N 10,0 10,0
Senior CMO Single closed office N 6,0 12,0
1 Senior Commissioner Single closed office N 10,0 10,0
DP Prevention
1 Dispute Management Administrator Open plan (1,8m desk) N 3,3 3,3
36 staff 86,1 154,7
Hearing rooms and general support space area allocation
Qty description space type sq.M. Total
0 Canteen Canteen 0,0 0,0
2 Kitchenette Kitchenettes 6,0 12,0
6 Ladies ablution Ladies ablution 13,0 78,0
5 Mens ablution Mens ablution 13,0 65,0
2 Paraplegic ablution Paraplegic ablutions 5,0 10,0
16 Hearing room Hearing room - 6 Seater
16,0 256,0
5 Hearing room Hearing room - 8 Seater 24,0 120,0
4 Hearing room Hearing room - 18 Seater 38,0 152,0
2 Hearing room Hearing room - 12 Seater 26,0 52,0
4 Hearing room Hearing room - 26 Seater 44,0 176,0
6 Print stations Print station 1,5 9,0
51 Storage Storage cabinet 1,5 76,5
1 Waiting Area Waiting area - 10 sqm 10,0 10,0
1 Archive Archive room 70,0 70,0
3 Pre con room Pre con room - 3 Seater 8,0 24,0
1 Storage room - HR Store room - HR 8,0 8,0
1 Storage room - Finance Store room - Finance 6,0 6,0
1 Storage Store room - Stationery and consumables 6,0 6,0
1 Storage Store room - Cleaning chemicals 4,0 4,0
1 Storage Store room - DPWO 4,0 4,0
1 Storage Store room - Disposal & furniture 8,0 8,0
1 Library Library - Regional 4,0 4,0
Screening check point
3 Security 3,3 9,9
1 Server Server room 12,0 12,0
1 Sick Bay Sick bay 10,0 10,0
2 Hot Desk Hot desk 3,3 6,6
2 Caucus room Quite rooms 6,0 12,0
1 SAT & Post Hearing SAT & Post hearing - 120 sqm 80,0 80,0
1 SAT & Post hearing - 150 sqm
Pre-Hearing Roll Call 75,0 75,0
1 Waiting Area-Precons Waiting area - 10 sqm 10,0 10,0
2 Cleaners Room Waiting area - 10 sqm 3,3 6,6
35 Parking 0,0 0,0
1 Boardroom Boardroom - 22 Seater 44,0 44,0
0 Boardroom Boardroom - 22 Seater 0,0 0,0
1 Training Room Training room 45,0 45,0
2 Disability parking
Total 607,9 1461,6
Total 1616,3
Secondary circulation (10%) 161,6
Subtotal 1777,9
Primary circulation (20%) 355,6
Total gla 2133,5
16 | P a g e
Tenant Installation (TI) scope of work (Cost to be included in Tenant Installation (TI)
including all third-party insurance covers prior to tenant installation (TI) commencement.
The Landlord will be expected to prepare the CCMA tenant Installation (TI) as per the CCMA requirements
outlined below. The Landlord is also expected to prepare two (2) Bill of Quantities (BOQ) pertaining to the TI
requirements as indicated below:
Item base build tenant tenant
(Landlords responsibility) allowance specific items
Signage
Internal
Signage Inter-leading glass doors h) Board Room Aluminum notice
a) Compliance –OHS (fire, toilets, emergency numbering boards in foyers
evacuation plan etc. – Health and Safety i) SAT cubicle
requirements) numbering
b) Lift landing j) Directional
c) Frosted glass signage
d) No smoking Signage (The quantity will
e) Reception Signage depend on space
f) Waiting area Signage planning template,
g) Referral’s Signage floor plate,
building design
and layout)
Visible Building Side view panels in all boardrooms on door Visible Frosted glass
Signage handle side or on the door panels, Height –
1895mm
Width – 595 mm
External
Visible Building Building and Window Signage Shop Front Shop front
signage signage (If
applicable)
Maintenance
Fire Detection a) Supply and installation of fire detection
system for all the areas in terms of the
Occupational Health and Safety (OHS) Act
17 | P a g e
Item base build tenant tenant
(Landlords responsibility) allowance specific items
and Building Regulations.
b) Any fire protection systems (fire hose,
hydrants, sprinkle system, fire extinguishers)
Annual maintenance and service reports
required as per the OEM maintenance
schedule.
c) Annual fire assessment certificate.
Windows External Windows to be cleaned at a minimum of
bi-annually.
Lifts Lifts must be serviced monthly, maintained and
inspected in line with the OEM (Original
Equipment Manufacturer) by lift technician and/ or
registered lift inspector and Comprehensive
Report (annexure B) issued by registered lift
inspector every two years including a monthly
service report will be provided.
Fully Functional Air- Maintenance of air-conditioners will be as per
conditioning manufacturer specification. Filters to be
systems are chemically cleaned or replaced as and when
required in all areas required and that the servicing would be the
responsibility of the Landlord. The air-conditioning
system must be always fully functional and
maintained as per regulatory requirements at the
cost of the landlord.
Security
Access control
Entries & exits on It is the Landlord’s responsibility to provide Landlord to
leased area office and parking area two-way access biometrics provide dual end
with card and finger recognition with a to end solution
maintenance contract funded by the landlord. (card & finger)
Fire escape doors fitted with biometric scanners Biometrics; finger
linked to fire alarm. scanning devices
18 | P a g e
Item base build tenant tenant
(Landlords responsibility) allowance specific items
installed with
Emergency break glass units installed on all fire maintenance
exits. contract for all
It is the Landlord’s responsibility to link the entry and exit
emergency break glass unit with the fire alarm. points of the
leased premises.
Make provision to
separate
private/staff and
public areas.
Landlord to Install Landlord to install and maintain CCTV camera as Installed with Common Area
CCTV cameras on well as monitor common areas. maintenance
common areas: all Common area to be monitored by the Landlord. contract (Including
entrance, exits, Blind spots to be monitored by the Landlord. software,
Parking and Foyers. hardware, and
training).
Landlord to Install Leased area to be
CCTV Cameras on monitored by the
Leased Space Landlord.
CCTV cameras
signage to be
installed.
Gun Safe Landlord to have (gun-handling graded security Quantity to be Compartmental
staff) provided by tenant gun safe (6)
a) The building must be a weapon-free zone, once plans are
and the CCMA will require twenty-four (24) completed.
hour Grace C physical security guarding
services registered in terms of PSIRA
regulations stationed at all entries and exit
points of the building (including parking /
basement) at the cost of the preferred bidder
(to ensure safeguarding of the building). This
will be applicable in a multi/single tenant
building.
19 | P a g e
Item base build tenant tenant
(Landlords responsibility) allowance specific items
b) Warning signage informing visitors of the
need to comply with weapon-free zone and
security checks.
Alarm System Landlord to provide alarm system linked to the
landlord’s armed response at all entry and exit
points.
SAT (Public The Landlords’ responsibility Number of
Screening cubicles = 13
allocation area/ Table-top
Cubicles) Secured 10mm
shatter proof glass
Speaker holes/ for
sound and space
at bottom for
documents
exchange
Three tier drawers
with quality locks.
Shopfront lease Should space be offered on ground floor, all
space windows should be secured with either roller
shutters/ burglar bars/ burglar gate
Electrical Lighting- installations (lights) must support Green
Concept (i.e. use of energy-saving lights/LED
lights, link lights to sensors, etc.)
Red plugs points – To be connected to generator.
Plugs to be used in case of power failure.
White plug points- to be connected to main power,
DB board labelled and lockable. Provide electrical
compliance certificate by a registered electrician.
20 | P a g e
Item base build tenant tenant
(Landlords responsibility) allowance specific items
Plumbing All plumbing installations in kitchens and ablution
facilities must be SABS approved with a one-year
guarantee (all fixtures and fittings).
Engagements with municipality and resolved
issues relating to water pressure, drain blockages
etc.
(a) Toilets installed with integrated toilet
bowls (built in seats in porcelain)
(b) Sanitary facilities are compliant with the
building regulations.
(c) Toilets for people with disabilities.
(d) Provide wash basins
N.B: the Landlord will be responsible for all the
plumbing maintenance, replacement of spare
parts as and when required.
IT Infrastructure a) Cabling (double trunking/skirting a) Fireproof door
b) Racks/cable trays) when required. to the server
c) Smoke detectors. room
d) Server room air conditioner (24000BTU) to be b) Raised floor
maintained by the Landlord as part of the (200mm-
lease. 300mm off
e) Fire extinguisher outside the server room the ground)
(next to the entrance door) c) Anti-static
f) Server room evacuation plan (must be part of tiles or mat in
the building evacuation plan) the server
g) An approved electrical layout and floor plans room
h) Electrical/Generator calibration, distribution d) Server room -
board (DB) installation and all relevant cabling Red plugs for
in the server room to connect the 6kVA 230V all server
UPS units which will be provided by the room
CCMA. The landlord will relocate the UPS to equipment
the New premises in the case of an office and additional
relocation. white plugs
i) All Routing and core drilling for cables for any other
21 | P a g e
Item base build tenant tenant
(Landlords responsibility) allowance specific items
j) Red and White plugs for user workstation and electrical
office devices and equipment equipment
e) Power plugs
for all floor
cabinets
f) Landlord to
provide a start
date for IT
cabling and
the IT cabling
installation
preference
will be guided
by CCMA.
g) 25mm PVC
conduit- into
the server
room.
h) Power
Poles/Pedest
als and
Ethernet wall
plates
i) Agrees to
provide for or
grants
permission for
the
installation of
Microwave
Links (Dish)
on rooftops,
optical Fibre
installations
22 | P a g e
Item base build tenant tenant
(Landlords responsibility) allowance specific items
and Wireless
Links.
j) Biometrics
with finger
or card into
the server
room
k) Brick walled
/Fire rated
drywall server
room (120
minutes) wall
structures (4m
x 4m)
BCP (Business Generator
Continuity Plan) The landlord must maintain the Generator as per
agreed intervals. Landlord to supply diesel as and
when required and in turn invoice tenant on a bill-
back.
N.B: the Landlord to ensure that the generator
capacitates all the red plugs in case of power
failure
Water Tank/s
The landlord must install; maintain the water
tank/s and ensure that there is running water in
the tank/s in case of water disruptions at the
landlord’s cost.
Ambiance and The building must meet these requirements:
tranquility of the
building
CCMA operations.
infrastructure and façade of the building is
maintained and is free from endangered
23 | P a g e
Item base build tenant tenant
(Landlords responsibility) allowance specific items
species i.e. Birds.
is above the 85dB, the bidder must at their
own cost ensure that they comply with the
minimum noise level.
free for inspection.
Parking
Internal Access control Quantity = 35
Physical Security bays (inclusive of
Garage door maintenance. 2 parking bays for
Signage for designated bays. the disabled).
Disability parking If all thirty-five (35)
Traffic lights - for single entry and exit buildings. bays cannot be
Covered/Shaded parking accommodated
on-site, then a
minimum of
twenty (20) on-site
parking bays of
which two (2)
parking bays must
comply with the
disability
requirements and
fifteen (15) may
be off-site not
more that 100m
away.
Occupation Health and Safety (OHS)
OHS a. Roofs and ceilings: Leak free
b. Walls and flooring: Leak free (i.e. no cracks,
no peeling wallpaper, no tripping hazards, no
torn and peeling carpets and no peeling or
worn off paint, no leaks and/or slippery floors).
24 | P a g e
Item base build tenant tenant
(Landlords responsibility) allowance specific items
c. Stairways, Ladders, and handrails: Safe (i.e.
not slippery, loose, unstable, no insufficient
lighting and/or obstructions).
d. Walkways (passages): Clear of all hazards
and Obstruction (i.e. the surface is not
slippery, carpet not peeling and/or there are
no protruding and tripping hazards like nails,
splinters, etc.)
e. Emergency Evacuation floor plans approved
by the fire department & displayed in view of
staff & public in all prominent places and must
be illuminated.
f. Assembly points to be clearly marked.
g. Emergency red arrows illustrating where you
are and the escape route, the alternative
route should also be indicated on the
emergency floor plan.
h. Emergency lights supported by an alternative
power supply.
i. Exit signs at fire escape doors fitted in green
fluorescent (SANS).
j. The building must have fire escape doors as
required by municipal bylaws.
k. Doors to accommodate people with
disabilities.
l. The building must comply with fire
regulations.
m. Lifts – inside & outside signage stating not to
be used in case of fire.
n. Lifts must be disability compliant (i.e. size
adequate for a wheelchair to turn; the height
of control panel within reach of wheelchair-
bound person to operate; and have voice
commands to indicate the floors for the
25 | P a g e
Item base build tenant tenant
(Landlords responsibility) allowance specific items
visually challenged and be brail compliant.
The Landlord must ensure that the lift/s must
be connected to the generator in case of
power failure.
o. Fire hose reels and extinguishers clearly
marked and in full view with operation
instructions & emergency numbers.
p. All distribution boxes (DB) installed with locks
and clearly labeled.
q. Smoke detectors/ linked to fire alarm
(monitored by the landlord).
r. Automatic Sprinkler System/ Fire Division at
500m2 and must be monitored, maintained
and replaced as when required.
s. All OHS signs SANS approved and at
prominent places.
t. Natural light after alterations is completed
must be 400 LUX. The average-maintained
lighting level in a (Dependent on building and
windows with natural light coming in):
u. Noise level assessment/ monitoring, should
not be above 85dB, please refer to
Environmental Regulations.
v. Hearing rooms, training room and offices to
be soundproof.
w. Ventilation - ensure that the building is
sufficiently ventilated either by natural or
mechanical means. Please refer to
Environmental Regulations.
x. Fire drills to be conducted by the landlord in a
multi-tenant building once every six (6)
26 | P a g e
Item base build tenant tenant
(Landlords responsibility) allowance specific items
months.
y. The building must be disability friendly and
compliant (including entrance, ramps, rails,
lifts, toilets and parking, etc.).
z. Chemical storerooms must comply with light,
control of temperature and fire extinguisher
outside the door. Fluorescent tubes that are
low in ultraviolet light, should be used
wherever, possible in storage areas.
Ultraviolet light can be easily, measured with
a light meter, and levels should not exceed,
75NW/lumen. Prohibition sign must be
placed outside, the door.
aa. Archiving room must comply, with light,
windows, control of temperature and fire
extinguisher outside the door. Fluorescent tubes
that are low in ultraviolet, light should be used,
wherever possible in storage areas. Ultraviolet
light can be easily, measured with a light, meter,
and levels should, not exceed 75NW/lumen.
bb. Pest control- Landlord to fumigate the building
quarterly at its cost and provide written proof
thereof.
cc. The Landlord is responsible for providing
Cleaners to ensure that common areas is always
clean and presentable.
Compliance documents
Documents to be a) Electrical Compliance Certificate issued Landlord to submit
presented on by a qualified electrical contractor or qualified timelines not
occupation. electrician registered by the department of exceeding 12
27 | P a g e
Item base build tenant tenant
(Landlords responsibility) allowance specific items
employment and labour. months from
b) Fire Assessment Certificate issued by signing of the SLA
the local municipality’s Emergency for the submission
Management Services (EMS) of all the required
c) Occupancy Certificate issued by the local documents/
municipality as stipulated by the National certificates.
Building Regulations and Building Standards Written
Act. permission to
d) Pest control certificate as stipulated by occupy from the
the National Building Regulations and local municipality
Building Standards Act. to be provided
e) Copy of emergency escape routes - per whilst awaiting the
area or floor Occupancy
f) Lift Compliance Certificate issued by an Certificate
accredited Engineer (National
g) Lift Maintenance Contract Building
h) Air Conditioner Maintenance Contract Regulations/Sect
i) Maintenance contract for dual Biometrics ion 14 (4) (a) (iii)
finger and card scanning devices installed
(Common and leased area)
j) CCTV maintenance contract (common
and leased area)
k) Building Insurance Policy
l) Maintenance contract for Generator.
m) Security Guard/s Contract and PSIRA
compliance.
n) 24-hour Armed Response Contract
o) Maintenance contract for Alarm System.
p) Provide monthly proof of utilities payment
from connected third parties (municipal,
agent, etc.).
28 | P a g e
Tenant Installation Project Manager scope of work
CIDB‐registered; and Registered at an appropriate CIDB grading for the scope and value of work.
29 | P a g e
Section 3: evaluation criteria
30 | P a g e
5.1 All the documentation submitted in response to this RFP must be in English.
5.2 The bidder is responsible for all the costs that it shall incur related to the preparation and submission
of the bid document.
5.3 Bids submitted by bidders which are, or comprised of companies must be signed by a person or persons
duly authorised thereto by a resolution of the applicable Board of Directors, a copy of which Resolution,
duly certified, must be submitted with the bid.
5.4 The bidder should check the numbers of the pages of its bid to satisfy itself that none of their
documents are missing or duplicated. No liability will be accepted by CCMA in regard to anything
arising from the fact that pages/documents of a bid are missing or duplicated.
5.5 A valid Tax Clearance Certificate with the tax compliance status PIN must be included in the bid
response to verify bidders’ tax compliance status.
5.6 All bidders must be registered on the Central Supplier Database (CSD) prior to submitting bids and
include in their bid a copy of their Master Registration Number (Supplier Number) in order for CCMA to
verify the bidder’s tax status on CSD and other Governing compliances.
5 | P a g e
(For purposes of this specification, the term ‘Landlord shall refer to the Service Provider/ Bidder)
organization that was established by the Labour Relations Act of 1995 (LRA) to deliver dispute
prevention and resolution services to the people of South Africa. The core mandate of the CCMA, as one
of the organizations charged with implementing the LRA, is derived from the purpose of the LRA which,
amongst others, is to advance economic development, social justice, labour peace and the
democratization of the workplace.
12 | P a g e
∗ The landlord must ensure that any security services provided at the leased premises, whether
rendered directly by the landlord or through a third-party security service provider appointed by
the landlord comply with all applicable legislative and regulatory requirements throughout the
contract period. This includes ensuring that the security service provider and all deployed
security personnel are registered with the Private Security Industry Regulatory Authority
(PSIRA); are registered with and in good standing with the Compensation Fund (COIDA);
maintain valid public liability insurance; hold valid ICASA and firearm licenses where applicable;
have proof of registration with, or a Letter of Good Standing from the Security Sector Provident
Fund; possess a valid Letter of Good Standing with Affinity Health where required in terms of
the National Bargaining Council for the Private Security Sector Main Collective Agreement; and
provide proof of registration with and compliance with the National Bargaining Council for the
(“Heritage building” is a building possessing architectural, aesthetic, historic or cultural values which is declared as
heritage building by the Planning Authority/Heritage conservation committee or any other Competent Authority in
whose jurisdiction such building is situated).
b) Not sharing with any labour related organizations (including but not limited i.e., legal
14 | P a g e
firm/attorneys/lawyers/advocates doing labour disputes, union or federation, labour brokers, employer organisations;
intermediary institutions such as Insurance brokers) upon occupation and for the duration of the lease period.
c) The CCMA may share with a Bargaining council.
d) For convenience purposes, the floors to be leased must be consecutive for the CCMA occupation if the building is a
multi-tenant building. i.e., no other occupants in between the CCMA consecutive floors.
e) CCMA may share with medical facilities but limited to small doctors’ practices such as general practitioners and
specialists. This excludes hospitals, pathological laboratory, clinics and mortuaries.
0 Admin Manager Open plan (1,8m desk) N 0,0 0,0
0 Administration Assistant Open plan (1,8m desk) N 0,0 0,0
1 Administration Clerk Open plan (1,8m desk) N 3,3 3,3
2 Archiving Administrator Open plan (1,8m desk) N 3,3 6,6
1 RSC Associate Open plan (1,8m desk) N 3,3 3,3
1 HR Regional Assistant Single closed office N 4,0 4,0
0 Mail Clerk Open plan (1,8m desk) N 0,0 0,0
1 Messenger Driver Open plan (1,8m desk) N 3,3 3,3
0 Personal Assistant Open plan (1,8m desk) N 0,0 0,0
1 Teamleader: Admin Single closed office N 10,0 10,0
1 Receptionist Reception N 13,0 13,0
0 Registry/Administration Open plan (1,8m desk) N 0,0 0,0
Dispute Resolution
22 Case Manager Officer Open plan (1,8m desk) N 3,3 72,6
Commissioner Single closed office N 0,0 0,0
0 Interpreter Single closed office N 10,0 0,0
1 Regional Senior Commissioner Single closed office N 10,0 10,0
Senior CMO Single closed office N 6,0 12,0
1 Senior Commissioner Single closed office N 10,0 10,0
1 Dispute Management Administrator Open plan (1,8m desk) N 3,3 3,3
36 staff 86,1 154,7
Total 607,9 1461,6
Total 1616,3
Secondary circulation (10%) 161,6
Subtotal 1777,9
Primary circulation (20%) 355,6
Total gla 2133,5
16 | P a g e
Tenant Installation (TI) scope of work (Cost to be included in Tenant Installation (TI)
including all third-party insurance covers prior to tenant installation (TI) commencement.
The Landlord will be expected to prepare the CCMA tenant Installation (TI) as per the CCMA requirements
outlined below. The Landlord is also expected to prepare two (2) Bill of Quantities (BOQ) pertaining to the TI
requirements as indicated below:
facilities must be SABS approved with a one-year
guarantee (all fixtures and fittings).
e) Copy of emergency escape routes - per whilst awaiting the
area or floor Occupancy
f) Lift Compliance Certificate issued by an Certificate
accredited Engineer (National
g) Lift Maintenance Contract Building
h) Air Conditioner Maintenance Contract Regulations/Sect
i) Maintenance contract for dual Biometrics ion 14 (4) (a) (iii)
finger and card scanning devices installed
(Common and leased area)
j) CCTV maintenance contract (common
and leased area)
k) Building Insurance Policy
l) Maintenance contract for Generator.
m) Security Guard/s Contract and PSIRA
compliance.
n) 24-hour Armed Response Contract
o) Maintenance contract for Alarm System.
p) Provide monthly proof of utilities payment
from connected third parties (municipal,
agent, etc.).
28 | P a g e
Section
Source: BID DOCUMENT- PROVISIONING OF OFFICE AND SPACE ON A LEASE AGREEMENT FOR THE CCMA TSHWANE OFFICE FOR A PRIOD OF FIVE (5) YEARS.pdfand ensure effective delivery of service, quality and value-add to CCMA’s business.
8.4 The CCMA reserves the right to verify the validity of any submitted documents during the evaluation
that cannot be verified by the CCMA will not be considered for evaluation purposes, and no points will
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
345 Pretorius St, Pretoria Central, Pretoria, 0002, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
05 Aug 2026
AI status
Not enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
011-377-6916[email protected]www.ccma.org.za345 Pretorius St, Pretoria Central, Pretoria, 0002, South Africa
Key Personnel
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Rental and leasing activities. Unlock full pricing strategies, bid frequency, and historical win rates.