Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Proposal
Delivery Location
1 JONES RD - KEMPTON PARK - JOHANNESBURG - 0186
Organization Type
GOVERNMENT
Published
28 May 2026
OCDS Reference
ocds-9t57fa-157367
This RFP seeks to establish a panel of service providers to deliver mechanical engineering maintenance services across acsa’s nine south african airports for a period of five years. The scope covers maintenance, repairs, and testing of critical airport systems such as HVAC, baggage handling, fire systems, and fuel hydrants, with separate bids required for each sub-category and airport.
Categories
Request for Proposal
1 JONES RD - KEMPTON PARK - JOHANNESBURG - 0186
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Description
Source: AUTOMATIC SLIDING DOORS PRICING SCHEDULE.pdf28 May
2026
Tender Published
Tender was published
27 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - PEOPLE MOVERS.pdf
RFP for a 5-year panel of mechanical engineering maintenance service providers for ACSA airports, focusing on People Mover systems (lifts, escalators, moving walkways). Evaluation heavily weights (70%) qualified key personnel with specific trade certifications and registrations.
FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - GROUND POWER UNITS.pdf
The Airports Company of South Africa (ACSA) is requesting proposals for a 5-year panel of service providers to deliver mechanical engineering maintenance across its airports. The tender evaluates bidders on company experience (20 points), guarantees/warranties (10 points), and key personnel qualifications (70 points).
RFP - MECHANICAL ENGINEERING - COR8195 2026 RFP.pdf
The Airports Company South Africa (ACSA) is inviting proposals for a panel of service providers to deliver mechanical engineering maintenance across its airports for a 5-year period. The tender (COR8195/2026/RFP) covers 17 sub-categories of mechanical systems (e.g., HVAC, baggage handling, fire systems) across 9 airports. Bidders must submit separate proposals for each discipline/airport combination, with evaluations based on functionality, price, and B-BBEE compliance. The contract will operate on a rotational basis, with work allocated as needed.
BAGGAGE HANDLING SYSTEM PRICING SCHEDULE.pdf
ACSA seeks to establish a panel of service providers for mechanical engineering maintenance across South African airports for a 5-year contract period. The tender covers baggage handling systems maintenance and requires qualified personnel including engineers, site managers, technicians, artisans, and controls technicians with specific SAQA-accredited qualifications. Third-party procurement will be managed through a mark-up system, and contractors must manage spares using ACSA's inventory management system.
FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - ROLLER SHUTTER DOORS.pdf
RFP for a 5-year panel of service providers to deliver mechanical engineering maintenance for ACSA airports, with emphasis on roller shutter door maintenance capabilities.
FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - BIN COMPACTORS AND ROAD BLOCKERS.pdf
RFP for establishing a panel of service providers to deliver mechanical engineering maintenance services across ACSA airports for a 5-year period. Evaluation heavily emphasizes company experience, guarantees/warranties, and the qualifications/experience of key personnel.
FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - LUGGAGE TROLLEYS AND TROLLEY PUSHERS.pdf
The Airports Company of South Africa (ACSA) is requesting proposals (RFP) for a panel of service providers to deliver mechanical engineering maintenance across its airports for a 5-year period. The tender evaluates bidders based on company experience (20 points), guarantees/warranties (10 points), and key personnel qualifications/experience (70 points).
SEWARAGE - POTABLE & STORM WATER PUMPS PRICING SCHEDULE.pdf
ACSA seeks a panel of service providers for 5-year mechanical engineering maintenance of sewerage, potable, and stormwater pumps at its airports. The tender includes labor rate pricing, third-party procurement mark-ups, and spares management under ACSA's manual inventory system.
FIRE WATER PUMPS PRICING SCHEDULE.pdf
ACSA seeks a panel of service providers for 5-year mechanical engineering maintenance at airports, focusing on fire water pump systems. The tender involves labor rates for qualified personnel, third-party procurement mark-ups on spares, and contractor-managed inventory under ACSA's manual system.
DRAFT NEC3 - TSC .pdf
Airports Company South Africa SOC Limited seeks to establish a panel of service providers for mechanical engineering maintenance across ACSA airports for a 5-year period. The contract uses NEC3 Term Service Contract (TSC) framework with Option A (Priced contract with price list), and includes provisions for price adjustment for inflation, changes in law, and detailed liability limitations. The contract is governed by South African law with English as the contract language.
WASTE WATER TREATMENT PLANT PRICING SCHEDULE.pdf
The Airports Company of South Africa (ACSA) is requesting proposals for a 5-year contract to establish a panel of service providers for mechanical engineering maintenance across its airports. The tender includes roles for chemical engineers, site supervisors, process controllers, millwrights, and assistants, with specified qualifications and hourly rates. The contract also covers third-party procurement of spares with a mark-up structure, inventory management, and compliance with ACSA’s manual inventory system.
FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - BAGGAGE HANDLING.pdf
The Airports Company of South Africa (ACSA) is requesting proposals for a panel of service providers to deliver mechanical engineering maintenance across its airports for a 5-year period. The tender evaluates bidders based on company experience (20 points), guarantees/warranties (10 points), and key personnel qualifications/experience (70 points).
BIN COMPACTORS & ROAD BLOCKERS PRICING SCHEDULE.pdf
ACSA is seeking proposals to establish a panel of service providers for mechanical engineering maintenance across South African airports over a 5-year period. The tender covers equipment maintenance including bin compactors and road blockers, with specific requirements for qualified personnel (site supervisors, technicians, and assistant mechanics), third-party procurement mark-up structures, and comprehensive spares inventory management using ACSA's manual inventory system.
FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - AIRCRAFT DOCKING SYSTEM.pdf
Airports Company of South Africa (ACSA) is seeking proposals from service providers to form a panel for mechanical engineering maintenance services at ACSA airports for a 5-year period. The tender evaluation is heavily weighted towards key personnel qualifications (70 points), with additional points for company experience (20 points) and guarantees/warranties (10 points).
FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE SPRINKLER SYSTEM HOSE REELS & FIRE HYDRANTS.pdf
Airports Company of South Africa (ACSA) is seeking proposals to establish a panel of service providers for mechanical engineering maintenance at ACSA airports nationwide for a 5-year period. The tender evaluation is heavily weighted toward key personnel qualifications (70 points) with additional points for company experience (20 points) and guarantees/warranties (10 points), totaling 100 points.
TURN STILES AND BOOM GATES PRICING SCHEDULE.pdf
The Airports Company of South Africa (ACSA) is requesting proposals for a 5-year contract to establish a panel of service providers for mechanical engineering maintenance across its airports. The scope includes maintenance of turnstiles, boom gates, and other mechanical systems, with a focus on inventory management of spares and third-party procurement mark-ups.
FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - HVAC.pdf
This is a Request for Proposal (RFP) from the Airports Company of South Africa (ACSA) to establish a panel of service providers for mechanical engineering maintenance across its airports for a 5-year period. The evaluation is heavily weighted towards the qualifications and experience of key personnel.
HVAC PRICING SCHEDULE.pdf
ACSA seeks a panel of service providers for 5-year mechanical engineering maintenance across South African airports, focusing on HVAC systems, with detailed staffing, spares management, and third-party procurement requirements.
AIRCRAFT DOCKYING SYSTEM PRICING SCHEDULE.pdf
RFP for a panel of service providers to deliver mechanical engineering maintenance for ACSA airports nationwide for 5 years, focusing on Aircraft Docking Systems. The tender includes requirements for qualified personnel, third-party procurement mark-up structures, and contractor-managed spares inventory.
LUGGAGE TROLLEYS AND PUSHERS PRICING SCHEDULE.pdf
RFP for a 5-year panel of service providers to deliver mechanical engineering maintenance services for ACSA airports. The tender includes maintenance of luggage trolleys and trolley pushers, with specific staffing requirements and a structured approach to spares management and third-party procurement mark-ups.
FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - GAS FIRE HOT WATER GENERATING PLANT.pdf
A 5-year RFP for a panel of service providers to deliver mechanical engineering maintenance services across ACSA airports, with evaluation heavily weighted towards technical personnel qualifications and company experience.
FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE WATER PUMPS.pdf
The Airports Company of South Africa (ACSA) is requesting proposals for a panel of service providers to deliver mechanical engineering maintenance across its airports for a 5-year period. The tender evaluates bidders based on company experience (20 points), guarantees/warranties (10 points), and key personnel qualifications (70 points).
FIRE SPRINKLER SYSTEM PRICING SCHEDULE.pdf
This RFP seeks to establish a panel of service providers for mechanical engineering maintenance of fire protection systems (sprinklers, hose reels, hydrants) at ACSA airports for a 5-year term. The contract involves labor provision with qualified personnel and a cost-plus-mark-up model for spares and third-party work, managed via ACSA's manual inventory system.
FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - SEWERAGE POTABLE & STORM WATER PUMPS.pdf
Airports Company of South Africa (ACSA) requests proposals for a panel of service providers to provide mechanical engineering maintenance services at ACSA airports for a 5-year period. The tender evaluates bidders based on company experience (20 points), guarantees and warranties (10 points), and key personnel qualifications (70 points).
PEOPLE MOVERS PRICING SCHEDULE.pdf
Airports Company of South Africa (ACSA) is seeking proposals to establish a panel of service providers for mechanical engineering maintenance across ACSA airports for a 5-year period. The tender covers lift/elevator maintenance, mechanical systems, and related engineering services with specific personnel qualification requirements and a cost-plus mark-up pricing structure for third-party procurement and spares.
GAS FIRE HOT WATER GENERATION PLANT PRICING SCHEDULE.pdf
Airports Company of South Africa (ACSA) is seeking proposals from service providers to form a panel for providing mechanical engineering maintenance at ACSA airports for a 5-year period. The scope includes maintenance of gas fire hot water generating plants and related mechanical systems, with requirements for qualified personnel including site supervisors, technicians, and gas practitioners. The tender includes a third-party procurement mark-up structure for spares and services, with spares management to be handled by the contractor using ACSA's inventory management system.
FIRE EXTINGUISHERS PRICING SCHEDULE.pdf
Airports Company of South Africa (ACSA) is seeking proposals to establish a panel of service providers for mechanical engineering maintenance services across ACSA airports for a 5-year period. The tender covers fire extinguisher services, third-party procurement with mark-up structures, and spares inventory management. Personnel must hold specific SAQCC Fire and N2/N5 mechanical/electrical qualifications.
FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FUEL SYSTEMS.pdf
The Airports Company of South Africa (ACSA) is requesting proposals for a panel of service providers to deliver mechanical engineering maintenance across its airports for a 5-year period. The tender evaluates bidders based on company experience (20 points), guarantees/warranties (10 points), and key personnel qualifications/experience (70 points).
GROUND POWER UNITS PRICING SCHEDULE.pdf
The Airports Company of South Africa (ACSA) is requesting proposals for a 5-year contract to establish a panel of service providers for mechanical engineering maintenance across its airports. The scope includes maintenance of Ground Power Units (GPUs) and other mechanical systems, with a focus on electrical and millwright trade-certified personnel, inventory management of spares, and cost structures including mark-ups on third-party procurement.
FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - WASTE WATER TREATMENT PLANTS.pdf
A 5-year panel appointment for mechanical engineering maintenance services at ACSA airports, focusing on wastewater treatment plant expertise.
FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - TURNSTILES AND BOOM GATES.pdf
A 5-year panel appointment for mechanical engineering maintenance services across ACSA airports, evaluated on company experience, guarantees/warranties, and key personnel qualifications.
AUTOMATIC SLIDING DOORS PRICING SCHEDULE.pdf
This is a Request for Proposal (RFP) from the Airports Company of South Africa (ACSA) to establish a panel of service providers for mechanical engineering maintenance across its airports for a five-year period. The tender specifically details requirements for maintaining automatic sliding doors and outlines a structured pricing model for labor, third-party procurement (spares), and associated mark-ups.
FIRE SYSTEMS PRICING SCHEDULE.pdf
Airports Company of South Africa (ACSA) seeks to establish a panel of service providers for mechanical engineering maintenance across its airports for a 5-year period. The tender focuses on fuel systems maintenance and outlines a cost structure for labor, third-party procurement, and spares management.
GAS FIRE HOT WATER GENERATING PLANT PRICING SCHEDULE.pdf
The Airports Company of South Africa (ACSA) is requesting proposals for a 5-year contract to establish a panel of service providers for mechanical engineering maintenance across its airports. The scope includes maintenance of gas fire, hot water generating plants, and related systems, with a focus on inventory management of spares and third-party procurement.
FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - AUTOMATIC SLIDING DOORS.pdf
The Airports Company of South Africa (ACSA) is requesting proposals for a 5-year panel of service providers to deliver mechanical engineering maintenance across its airports. The tender evaluates bidders on company experience (20 points), guarantees/warranties (10 points), and key personnel qualifications/experience (70 points).
ROLLER SHUTTER DOORS PRICING SCHEDULE.pdf
Airports Company of South Africa (ACSA) seeks to establish a panel of service providers for mechanical engineering maintenance at ACSA airports for a 5-year period. The tender covers roller shutter doors maintenance with specific staffing requirements including Site Supervisors, Technicians, and Assistant Mechanical personnel. The contract includes third-party procurement with a mark-up structure and spares inventory management using ACSA's manual inventory system.
FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE EXTINGUISHERS.pdf
Airports Company of South Africa (ACSA) is seeking proposals to establish a panel of service providers for mechanical engineering maintenance services at ACSA airports for a 5-year period. The tender evaluation is heavily weighted towards key personnel qualifications (70 points) with additional points for company experience (20 points) and guarantees/warranties (10 points).
To download these documents and access AI-powered analysis, visit the main tender page.
ACSA owns and manages South Africa's principal commercial airports.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Submission Guidelines
Source: AUTOMATIC SLIDING DOORS PRICING SCHEDULE.pdf (unknown)Returnable documents must be submitted as part of the bid. Ensure all required forms are completed and included.
Evaluation Criteria
Source: AUTOMATIC SLIDING DOORS PRICING SCHEDULE.pdf (unknown)Key personnel must hold specific qualifications: Site Supervisors require an SAQA-accredited trade test (Fitter/Millwright) and an OHS Training certificate; Technicians require an SAQA-accredited trade test for Millwright; Assistant Mechanical personnel require an N2 qualification. The contractor must be willing and able to comply with ACSA's manual inventory management system for spares.
Technical Specifications
Source: AUTOMATIC SLIDING DOORS PRICING SCHEDULE.pdf (unknown)Methodology
Source: AUTOMATIC SLIDING DOORS PRICING SCHEDULE.pdf (unknown)Pricing Schedule
Source: AUTOMATIC SLIDING DOORS PRICING SCHEDULE.pdf (unknown)Financial Requirements
Source: AUTOMATIC SLIDING DOORS PRICING SCHEDULE.pdf (unknown)Compliance Requirements
Source: AUTOMATIC SLIDING DOORS PRICING SCHEDULE.pdf (unknown)Health & Safety
Source: AUTOMATIC SLIDING DOORS PRICING SCHEDULE.pdfContractual Terms
Source: AUTOMATIC SLIDING DOORS PRICING SCHEDULE.pdfEvaluation Criteria
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - BAGGAGE HANDLING.pdf (unknown)Mandatory
Preferred
Technical Specifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - BAGGAGE HANDLING.pdf (unknown)The tender specifies key personnel requirements for mechanical engineering maintenance of airport baggage handling systems:
Experience & Qualifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - BAGGAGE HANDLING.pdfThe tender outlines detailed experience and qualification requirements for key personnel and company history:
Quality Management
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - BAGGAGE HANDLING.pdfThe document specifies personnel qualifications and experience requirements relevant to quality of service delivery:
Compliance Requirements
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - BAGGAGE HANDLING.pdf (unknown)The document outlines experience and personnel requirements that form part of compliance:
Contractual Terms
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - BAGGAGE HANDLING.pdfThe document references evaluation criteria for company experience and guarantees, but does not specify contractual terms, duration, termination, or penalties.
Evaluation Criteria
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - HVAC.pdf (unknown)Bidders must demonstrate a minimum of 4-5 similar projects to score points for experience, and project values should ideally exceed R6,000,001. Guarantees/warranties must be for 24 months or more for full points. Each key personnel role has strict, non-negotiable qualification and experience thresholds (minimum 3 years for most roles), with no partial points awarded.
Technical Specifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - HVAC.pdf (unknown)Experience & Qualifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - HVAC.pdfCompliance Requirements
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - HVAC.pdf (unknown)Contractual Terms
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - HVAC.pdfSection
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - HVAC.pdf (unknown)Evaluation Criteria
Source: LUGGAGE TROLLEYS AND PUSHERS PRICING SCHEDULE.pdf (unknown)Service providers must demonstrate qualified personnel with SAQA-accredited trade tests (Fitter/Millwright/Mechanic) and relevant OHS training. Ability to manage inventory per ACSA procedures and provide spares pricing. Compliance with third-party procurement mark-up terms.
Technical Specifications
Source: LUGGAGE TROLLEYS AND PUSHERS PRICING SCHEDULE.pdf (unknown)Pricing Schedule
Source: LUGGAGE TROLLEYS AND PUSHERS PRICING SCHEDULE.pdf (unknown)Financial Requirements
Source: LUGGAGE TROLLEYS AND PUSHERS PRICING SCHEDULE.pdf (unknown)Health & Safety
Source: LUGGAGE TROLLEYS AND PUSHERS PRICING SCHEDULE.pdfRequirements
Source: LUGGAGE TROLLEYS AND PUSHERS PRICING SCHEDULE.pdf (unknown)Description
Source: GROUND POWER UNITS PRICING SCHEDULE.pdfEvaluation Criteria
Source: GROUND POWER UNITS PRICING SCHEDULE.pdf (unknown)Qualifications
Experience
Implied need for experience in mechanical engineering maintenance, particularly in airport environments or similar high-compliance sectors.
Compliance
Legal
Applicants must be registered service providers capable of entering a 5-year contract with ACSA.
Technical Specifications
Source: GROUND POWER UNITS PRICING SCHEDULE.pdf (unknown)Experience & Qualifications
Source: GROUND POWER UNITS PRICING SCHEDULE.pdf (unknown)Financial Requirements
Source: GROUND POWER UNITS PRICING SCHEDULE.pdf (unknown)Compliance Requirements
Source: GROUND POWER UNITS PRICING SCHEDULE.pdf (unknown)Health & Safety
Source: GROUND POWER UNITS PRICING SCHEDULE.pdfContractual Terms
Source: GROUND POWER UNITS PRICING SCHEDULE.pdfEvaluation Criteria
Source: HVAC PRICING SCHEDULE.pdf (unknown)Service providers must demonstrate compliance with SAQA-accredited qualifications for all roles (e.g., B-Tech/BSC for Engineer, trade tests for artisans, SAQCC registration for refrigeration practitioners); ability to manage inventory per ACSA procedures; and financial capacity to handle spares budgeting up to R400,000.
Technical Specifications
Source: HVAC PRICING SCHEDULE.pdf (unknown)Pricing Schedule
Source: HVAC PRICING SCHEDULE.pdf (unknown)Financial Requirements
Source: HVAC PRICING SCHEDULE.pdf (unknown)Contractual Terms
Source: HVAC PRICING SCHEDULE.pdfEvaluation Criteria
Source: GAS FIRE HOT WATER GENERATION PLANT PRICING SCHEDULE.pdf (unknown)Must have SAQA Accredited trade test qualifications for Fitter/Millwrights for site supervisors. Must have SAQA Accredited trade test for Millwright for technicians. Must have SAQCC Gas (Natural Gas) registration for gas practitioners. Must be capable of managing inventory using ACSA's inventory management procedures. Must have capacity to handle third-party procurement and mark-up billing structure. Must comply with ACSA's inventory procedures and reporting requirements.
Technical Specifications
Source: GAS FIRE HOT WATER GENERATION PLANT PRICING SCHEDULE.pdf (unknown)Pricing Schedule
Source: GAS FIRE HOT WATER GENERATION PLANT PRICING SCHEDULE.pdf (unknown)Financial Requirements
Source: GAS FIRE HOT WATER GENERATION PLANT PRICING SCHEDULE.pdf (unknown)Health & Safety
Source: GAS FIRE HOT WATER GENERATION PLANT PRICING SCHEDULE.pdfContractual Terms
Source: GAS FIRE HOT WATER GENERATION PLANT PRICING SCHEDULE.pdfDescription
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - GAS FIRE HOT WATER GENERATING PLANT.pdfThe scope involves maintenance of industrial gas systems. Key personnel requirements include:
Submission Guidelines
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - GAS FIRE HOT WATER GENERATING PLANT.pdf (unknown)Returnable Documents: Required documents are not fully specified in the extracted text. Refer to the main tender document for complete submission instructions.
Evaluation Criteria
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - GAS FIRE HOT WATER GENERATING PLANT.pdf (unknown)Minimum eligibility includes: Proven experience with at least 4 similar projects (for partial points) and project values exceeding R200,001 (for partial points); Key personnel must hold SAQA-accredited trade tests, specific certifications (OHS, SAQCC Gas registration), and exact years of experience in industrial gas systems maintenance; Company must provide warranties of at least 12 months (for partial points).
Technical Specifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - GAS FIRE HOT WATER GENERATING PLANT.pdf (unknown)The work involves maintenance of industrial gas systems, specifically Gas Fire Hot Water Generating Plants.
Key Personnel Requirements:
Experience & Qualifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - GAS FIRE HOT WATER GENERATING PLANT.pdfBidder and key personnel experience is critically evaluated.
Quality Management
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - GAS FIRE HOT WATER GENERATING PLANT.pdfQuality is ensured through qualified and experienced key personnel:
Compliance Requirements
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - GAS FIRE HOT WATER GENERATING PLANT.pdf (unknown)Key personnel must meet specific qualification and registration requirements:
Contractual Terms
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - GAS FIRE HOT WATER GENERATING PLANT.pdfThe bidder must commit to providing guarantees and warranties. This commitment must be submitted as a formal letter on company letterhead, signed by the CEO/MD or a delegated signatory (with proof of delegation). The offered warranty period will be scored.
Section
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - GAS FIRE HOT WATER GENERATING PLANT.pdf (unknown)Functional evaluation criteria includes:
Description
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - AUTOMATIC SLIDING DOORS.pdfScope includes maintenance of industrial shutter doors. Key personnel requirements:
Evaluation Criteria
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - AUTOMATIC SLIDING DOORS.pdf (unknown)Must demonstrate proven experience in mechanical engineering maintenance for airports or similar large-scale infrastructure.
Must provide valid SAQA-accredited certifications for all key personnel.
Must submit reference letters for past projects (Appendix F) and project lists (Appendix E).
Guarantees/warranties must meet minimum 24-month duration and be formally documented.
Compliance with OHS (Occupational Health and Safety) standards is mandatory for supervisory roles.
Technical Specifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - AUTOMATIC SLIDING DOORS.pdf (unknown)Key personnel technical requirements:
Experience & Qualifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - AUTOMATIC SLIDING DOORS.pdfKey Personnel (70 points):
Quality Management
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - AUTOMATIC SLIDING DOORS.pdfPersonnel qualifications for quality assurance:
Compliance Requirements
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - AUTOMATIC SLIDING DOORS.pdf (unknown)Key compliance requirements:
Contractual Terms
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - AUTOMATIC SLIDING DOORS.pdfGuarantee and Warranties (10 points):
Section
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - AUTOMATIC SLIDING DOORS.pdf (unknown)Functional evaluation criteria:
Description
Source: FIRE EXTINGUISHERS PRICING SCHEDULE.pdfSubmission Guidelines
Source: FIRE EXTINGUISHERS PRICING SCHEDULE.pdf (unknown)Returnable Documents: Required forms must be completed and submitted as part of the bid.
Evaluation Criteria
Source: FIRE EXTINGUISHERS PRICING SCHEDULE.pdf (unknown)Personnel must hold required qualifications (SAQCC Fire for supervisors/technicians, N2/N5 for mechanical/electrical work). Technical competency in fire systems and mechanical engineering maintenance required. Ability to manage inventory systems and third-party procurement processes.
Technical Specifications
Source: FIRE EXTINGUISHERS PRICING SCHEDULE.pdf (unknown)Pricing Schedule
Source: FIRE EXTINGUISHERS PRICING SCHEDULE.pdf (unknown)Financial Requirements
Source: FIRE EXTINGUISHERS PRICING SCHEDULE.pdf (unknown)Compliance Requirements
Source: FIRE EXTINGUISHERS PRICING SCHEDULE.pdf (unknown)Health & Safety
Source: FIRE EXTINGUISHERS PRICING SCHEDULE.pdfContractual Terms
Source: FIRE EXTINGUISHERS PRICING SCHEDULE.pdfDescription
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - TURNSTILES AND BOOM GATES.pdfThe work involves maintenance of mechanical systems. Key requirements include:
Evaluation Criteria
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - TURNSTILES AND BOOM GATES.pdf (unknown)Minimum 4 similar projects for experience points; project values above R200,001 for scoring; guarantee/warranty period of at least 12 months; key personnel must meet all specified SAQA qualifications, years of experience, and affiliation requirements exactly.
Technical Specifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - TURNSTILES AND BOOM GATES.pdf (unknown)The scope involves mechanical engineering maintenance for turnstiles and boom gates. Key personnel requirements:
Experience & Qualifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - TURNSTILES AND BOOM GATES.pdfFor turnstiles and boom gates, key personnel requirements are:
Points are awarded per resource meeting all qualifications, experience, and affiliation requirements; no part points.
Quality Management
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - TURNSTILES AND BOOM GATES.pdfQuality is ensured through qualified key personnel:
Compliance Requirements
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - TURNSTILES AND BOOM GATES.pdf (unknown)Key compliance requirements include:
Contractual Terms
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - TURNSTILES AND BOOM GATES.pdfThe tender requires demonstration of company experience and guarantees:
Section
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - TURNSTILES AND BOOM GATES.pdf (unknown)Evaluation criteria with maximum points:
Description
Source: FIRE SPRINKLER SYSTEM PRICING SCHEDULE.pdfSubmission Guidelines
Source: FIRE SPRINKLER SYSTEM PRICING SCHEDULE.pdf (unknown)Evaluation Criteria
Source: FIRE SPRINKLER SYSTEM PRICING SCHEDULE.pdf (unknown)Personnel must hold specific certifications: SAQA-accredited trade tests for fitters/millwrights, ECSA registration for fire systems practitioners, and N2 qualification for assistants. Compliance with ACSA's inventory procedures is mandatory.
Technical Specifications
Source: FIRE SPRINKLER SYSTEM PRICING SCHEDULE.pdf (unknown)Pricing Schedule
Source: FIRE SPRINKLER SYSTEM PRICING SCHEDULE.pdf (unknown)Financial Requirements
Source: FIRE SPRINKLER SYSTEM PRICING SCHEDULE.pdf (unknown)Compliance Requirements
Source: FIRE SPRINKLER SYSTEM PRICING SCHEDULE.pdf (unknown)Health & Safety
Source: FIRE SPRINKLER SYSTEM PRICING SCHEDULE.pdfContractual Terms
Source: FIRE SPRINKLER SYSTEM PRICING SCHEDULE.pdfDescription
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - AIRCRAFT DOCKING SYSTEM.pdfEvaluation Criteria
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - AIRCRAFT DOCKING SYSTEM.pdf (unknown)Bidders must have: Completed Appendix E (project list) and Appendix F (reference letters) for company experience claims; Official letterhead commitment for guarantees/warranties signed by CEO/MD or delegated signatory with proof of delegation; Personnel meeting all specified qualifications, experience, and affiliation requirements for Aircraft Docking System work. Bidders with fewer than 4 similar projects or project values below R200,000 will score 0 points on those criteria.
Technical Specifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - AIRCRAFT DOCKING SYSTEM.pdf (unknown)Experience & Qualifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - AIRCRAFT DOCKING SYSTEM.pdfCompliance Requirements
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - AIRCRAFT DOCKING SYSTEM.pdf (unknown)Contractual Terms
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - AIRCRAFT DOCKING SYSTEM.pdfSection
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - AIRCRAFT DOCKING SYSTEM.pdf (unknown)Submission Guidelines
Source: PEOPLE MOVERS PRICING SCHEDULE.pdf (unknown)Returnable documents must be submitted.
Evaluation Criteria
Source: PEOPLE MOVERS PRICING SCHEDULE.pdf (unknown)Lift Inspector must be registered with ECSA and Department of Labour. Site Manager must be ECSA registered lift inspector OR have completed Apprenticeship in Lift Mechanic plus electrical/mechanical trade test and N6 plus Occupational Health and Safety Training Certificate. Lift Technicians require completed apprenticeship in Lift Mechanic plus Electrical/Mechanical Trade test or N5. Artisans need trade tests in Mechanical/Millwright or Electrical. Controls Technicians require National Diploma in Instrumentation. Technical Assistants require N2 in Engineering.
Technical Specifications
Source: PEOPLE MOVERS PRICING SCHEDULE.pdf (unknown)Pricing Schedule
Source: PEOPLE MOVERS PRICING SCHEDULE.pdf (unknown)Financial Requirements
Source: PEOPLE MOVERS PRICING SCHEDULE.pdf (unknown)Compliance Requirements
Source: PEOPLE MOVERS PRICING SCHEDULE.pdf (unknown)Health & Safety
Source: PEOPLE MOVERS PRICING SCHEDULE.pdfContractual Terms
Source: PEOPLE MOVERS PRICING SCHEDULE.pdfEvaluation Criteria
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - PEOPLE MOVERS.pdf (unknown)Minimum 4 similar projects for full experience points; project values above R6 million preferred. Guarantees/warranties of 24+ months score highest. Key personnel must hold specific certifications (ECSA registration, trade tests, diplomas) with minimum 3 years' experience each.
Technical Specifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - PEOPLE MOVERS.pdf (unknown)The following key personnel are required with specific qualifications and experience:
Experience & Qualifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - PEOPLE MOVERS.pdfKey personnel qualifications and experience are critical:
Compliance Requirements
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - PEOPLE MOVERS.pdf (unknown)Bidders must demonstrate:
Health & Safety
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - PEOPLE MOVERS.pdfFor the Site Manager role, any Occupational Health and Safety training certificate is required as part of the qualifications.
Contractual Terms
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - PEOPLE MOVERS.pdfThe tender includes requirements for:
Description
Source: WASTE WATER TREATMENT PLANT PRICING SCHEDULE.pdfServices budget purposes include a placeholder amount (Z) for budgeting. The contractor must maintain an up-to-date inventory file containing purchase orders, requests, work orders, delivery notes, stock count records, etc.
Evaluation Criteria
Source: WASTE WATER TREATMENT PLANT PRICING SCHEDULE.pdf (unknown)Qualifications
Compliance
Technical
Technical Specifications
Source: WASTE WATER TREATMENT PLANT PRICING SCHEDULE.pdf (unknown)The tender requires staffing with specific qualifications:
Contractor must manage spares using ACSA’s manual inventory management system, including:
Storage space for spares will be allocated by ACSA and may be shared based on availability.
Pricing Schedule
Source: WASTE WATER TREATMENT PLANT PRICING SCHEDULE.pdf (unknown)Pricing for third-party procurement includes mark-up on spares:
Financial Requirements
Source: WASTE WATER TREATMENT PLANT PRICING SCHEDULE.pdf (unknown)Pricing for third-party procurement includes mark-up on spares:
Description
Source: GAS FIRE HOT WATER GENERATING PLANT PRICING SCHEDULE.pdfServices budget purposes include maintaining an up-to-date inventory file (purchase orders, work orders, delivery notes, stock count records).
Evaluation Criteria
Source: GAS FIRE HOT WATER GENERATING PLANT PRICING SCHEDULE.pdf (unknown)Qualifications
Compliance
Technical Specifications
Source: GAS FIRE HOT WATER GENERATING PLANT PRICING SCHEDULE.pdf (unknown)Scope includes mechanical engineering maintenance for ACSA airports.
Key personnel qualifications:
Quality Management
Source: GAS FIRE HOT WATER GENERATING PLANT PRICING SCHEDULE.pdfKey personnel qualifications required:
Pricing Schedule
Source: GAS FIRE HOT WATER GENERATING PLANT PRICING SCHEDULE.pdf (unknown)Pricing schedule for third-party procurement (spares):
Financial Requirements
Source: GAS FIRE HOT WATER GENERATING PLANT PRICING SCHEDULE.pdf (unknown)Pricing format:
Mark-up structure for budgeting purposes (note: total mark-up amounts in the table are not guaranteed):
Compliance Requirements
Source: GAS FIRE HOT WATER GENERATING PLANT PRICING SCHEDULE.pdf (unknown)No specific compliance requirements (like CSD, tax, B-BBEE) are stated in the extracted text.
Health & Safety
Source: GAS FIRE HOT WATER GENERATING PLANT PRICING SCHEDULE.pdfHealth and safety requirements related to inventory management:
Contractual Terms
Source: GAS FIRE HOT WATER GENERATING PLANT PRICING SCHEDULE.pdfContractual terms for pricing:
Evaluation Criteria
Source: BIN COMPACTORS & ROAD BLOCKERS PRICING SCHEDULE.pdf (unknown)Must have SAQA accredited trade test certifications for mechanical engineering trades (Fitter, Millwright, or Mechanic). OHS Training certification required for site supervisors. N2 qualification minimum for assistant mechanics. Must demonstrate capability to manage inventory using ACSA's manual inventory management system including stock counts, inventory cards, spares movement management, and secure storeroom operations.
Technical Specifications
Source: BIN COMPACTORS & ROAD BLOCKERS PRICING SCHEDULE.pdf (unknown)Quality Management
Source: BIN COMPACTORS & ROAD BLOCKERS PRICING SCHEDULE.pdfPricing Schedule
Source: BIN COMPACTORS & ROAD BLOCKERS PRICING SCHEDULE.pdf (unknown)Financial Requirements
Source: BIN COMPACTORS & ROAD BLOCKERS PRICING SCHEDULE.pdf (unknown)Health & Safety
Source: BIN COMPACTORS & ROAD BLOCKERS PRICING SCHEDULE.pdfContractual Terms
Source: BIN COMPACTORS & ROAD BLOCKERS PRICING SCHEDULE.pdfDescription
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE WATER PUMPS.pdfThe work involves maintenance of water-based firefighting systems. Personnel must have a SAQA Accredited trade test and 3 years experience in maintenance.
Evaluation Criteria
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE WATER PUMPS.pdf (unknown)Mandatory
Technical
Technical Specifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE WATER PUMPS.pdf (unknown)The scope includes maintenance of water-based firefighting systems. Key personnel requirements:
Experience & Qualifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE WATER PUMPS.pdfKey Personnel (70 points): Points awarded for each resource meeting all requirements. No part points. Requirements per role:
Quality Management
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE WATER PUMPS.pdfQuality is ensured through qualified personnel:
Compliance Requirements
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE WATER PUMPS.pdf (unknown)Key compliance requirements include:
Contractual Terms
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE WATER PUMPS.pdfFor Guarantee and Warranties (10 points): Submit a signed commitment letter on company letterhead. Points awarded:
Section
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE WATER PUMPS.pdf (unknown)Evaluation criteria include:
Evaluation Criteria
Source: TURN STILES AND BOOM GATES PRICING SCHEDULE.pdf (unknown)General
Technical
Quality Management
Source: TURN STILES AND BOOM GATES PRICING SCHEDULE.pdfPricing Schedule
Source: TURN STILES AND BOOM GATES PRICING SCHEDULE.pdf (unknown)Financial Requirements
Source: TURN STILES AND BOOM GATES PRICING SCHEDULE.pdf (unknown)Health & Safety
Source: TURN STILES AND BOOM GATES PRICING SCHEDULE.pdfContractual Terms
Source: TURN STILES AND BOOM GATES PRICING SCHEDULE.pdfDescription
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE SPRINKLER SYSTEM HOSE REELS & FIRE HYDRANTS.pdfThe work involves maintenance of pumps and fire sprinklers. Personnel require:
Evaluation Criteria
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE SPRINKLER SYSTEM HOSE REELS & FIRE HYDRANTS.pdf (unknown)Bidders must have: completed 4+ projects of similar nature in mechanical engineering maintenance; managed contracts valued at R200,000+; obtained SAQA accredited trade test certifications for supervisors and artisans; ECSA registration for fire systems practitioners; professional affiliations (SANS 30, ASIB, ECSA) where specified; capability to provide 24+ month guarantees; and proper authorization from CEO or delegated signatory for warranty commitments.
Technical Specifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE SPRINKLER SYSTEM HOSE REELS & FIRE HYDRANTS.pdf (unknown)The scope involves mechanical engineering maintenance for fire sprinkler systems, hose reels, and fire hydrants.
Key personnel requirements:
Experience & Qualifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE SPRINKLER SYSTEM HOSE REELS & FIRE HYDRANTS.pdfKey Personnel (70 points):
Quality Management
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE SPRINKLER SYSTEM HOSE REELS & FIRE HYDRANTS.pdfKey personnel must meet specific qualifications and experience:
Compliance Requirements
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE SPRINKLER SYSTEM HOSE REELS & FIRE HYDRANTS.pdf (unknown)Bidders must provide evidence for evaluation criteria:
Contractual Terms
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE SPRINKLER SYSTEM HOSE REELS & FIRE HYDRANTS.pdfGuarantee and Warranties (10 points):
Section
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE SPRINKLER SYSTEM HOSE REELS & FIRE HYDRANTS.pdf (unknown)Scoring criteria:
Evaluation Criteria
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - WASTE WATER TREATMENT PLANTS.pdf (unknown)Company must demonstrate: 1) Experience: Minimum 4 similar projects for partial points (10 max), with project values ideally over R6 million for full points; 2) Guarantees/Warranties: Minimum 24 months for full points; 3) Key Personnel: Must meet exact qualification (e.g., B-Tech, trade tests), experience (years in specific roles), and affiliation (e.g., ECSA registration) requirements—no partial points awarded.
Technical Specifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - WASTE WATER TREATMENT PLANTS.pdf (unknown)Experience & Qualifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - WASTE WATER TREATMENT PLANTS.pdfQuality Management
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - WASTE WATER TREATMENT PLANTS.pdfCompliance Requirements
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - WASTE WATER TREATMENT PLANTS.pdf (unknown)Section
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - WASTE WATER TREATMENT PLANTS.pdf (unknown)Description
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - SEWERAGE POTABLE & STORM WATER PUMPS.pdfScope: Maintenance of pumps and valves.
Key personnel:
Evaluation Criteria
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - SEWERAGE POTABLE & STORM WATER PUMPS.pdf (unknown)Bidders must have completed similar mechanical engineering maintenance projects. Minimum requirements include at least 4 projects for 5 points or more than 5 projects for maximum points on experience. Contract values of R200,001 to R6,000,000 earn 5 points, while contracts over R6,000,001 earn 10 points. Warranty commitment of at least 12 months is required for any points. Key personnel must have SAQA accredited qualifications and relevant experience in pumps, valves, and mechanical systems.
Technical Specifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - SEWERAGE POTABLE & STORM WATER PUMPS.pdf (unknown)Scope: Mechanical engineering maintenance for sewerage, potable, and storm water pumps.
Key personnel requirements:
Experience & Qualifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - SEWERAGE POTABLE & STORM WATER PUMPS.pdfKey Personnel (70 points): Points awarded for each resource meeting qualifications, experience, and affiliation requirements (no part points).
Quality Management
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - SEWERAGE POTABLE & STORM WATER PUMPS.pdfKey personnel qualifications for quality assurance:
Compliance Requirements
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - SEWERAGE POTABLE & STORM WATER PUMPS.pdf (unknown)Key personnel qualifications and experience must be met for evaluation points.
Company experience must be proven with a list of projects (Appendix E) and reference letters (Appendix F).
Guarantee and warranty commitment must be submitted on company letterhead signed by CEO/MD or delegated signatory (proof of delegation required).
Section
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - SEWERAGE POTABLE & STORM WATER PUMPS.pdf (unknown)Company Experience (20 points):
Evaluation Criteria
Source: FIRE WATER PUMPS PRICING SCHEDULE.pdf (unknown)ECSA registration as water-based fire systems practitioner; SAQA-accredited trade test (Fitter/Millwright); proposed personnel must meet qualification requirements.
Technical Specifications
Source: FIRE WATER PUMPS PRICING SCHEDULE.pdf (unknown)Quality Management
Source: FIRE WATER PUMPS PRICING SCHEDULE.pdfPricing Schedule
Source: FIRE WATER PUMPS PRICING SCHEDULE.pdf (unknown)Financial Requirements
Source: FIRE WATER PUMPS PRICING SCHEDULE.pdf (unknown)Compliance Requirements
Source: FIRE WATER PUMPS PRICING SCHEDULE.pdf (unknown)Health & Safety
Source: FIRE WATER PUMPS PRICING SCHEDULE.pdfContractual Terms
Source: FIRE WATER PUMPS PRICING SCHEDULE.pdfEvaluation Criteria
Source: ROLLER SHUTTER DOORS PRICING SCHEDULE.pdf (unknown)Personnel must hold SAQA Accredited trade test qualifications (Fitter/Millwrights for Supervisors, Millwright for Technicians). OHS Training certification required for Site Supervisors. N2 qualification required for Assistant Mechanical positions. All qualifications must be verifiable and current.
Technical Specifications
Source: ROLLER SHUTTER DOORS PRICING SCHEDULE.pdf (unknown)Pricing Schedule
Source: ROLLER SHUTTER DOORS PRICING SCHEDULE.pdf (unknown)Financial Requirements
Source: ROLLER SHUTTER DOORS PRICING SCHEDULE.pdf (unknown)Health & Safety
Source: ROLLER SHUTTER DOORS PRICING SCHEDULE.pdfContractual Terms
Source: ROLLER SHUTTER DOORS PRICING SCHEDULE.pdfEvaluation Criteria
Source: SEWARAGE - POTABLE & STORM WATER PUMPS PRICING SCHEDULE.pdf (unknown)Service providers must have personnel with SAQA-accredited trade tests (Fitter/Millwright) for supervisory/technical roles, and N2 qualification for assistants. Must comply with ACSA inventory procedures and OHS requirements.
Technical Specifications
Source: SEWARAGE - POTABLE & STORM WATER PUMPS PRICING SCHEDULE.pdf (unknown)Pricing Schedule
Source: SEWARAGE - POTABLE & STORM WATER PUMPS PRICING SCHEDULE.pdf (unknown)Financial Requirements
Source: SEWARAGE - POTABLE & STORM WATER PUMPS PRICING SCHEDULE.pdf (unknown)Health & Safety
Source: SEWARAGE - POTABLE & STORM WATER PUMPS PRICING SCHEDULE.pdfContractual Terms
Source: SEWARAGE - POTABLE & STORM WATER PUMPS PRICING SCHEDULE.pdfDescription
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - BIN COMPACTORS AND ROAD BLOCKERS.pdfMaintenance of mechanical systems. Key personnel roles include Site Supervisor/Mechanic and Technician with specified experience and qualifications.
Evaluation Criteria
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - BIN COMPACTORS AND ROAD BLOCKERS.pdf (unknown)Company must demonstrate experience via projects of similar nature (more than 5 projects for max points) and project values (over R6 million for max points). Must commit to a warranty/guarantee period of 24 months or more for max points. Proposed key personnel must hold specific SAQA-accredited qualifications and have exact years of experience in mechanical/hydraulic system maintenance and OHS. No part points are awarded in the Key Personnel section.
Technical Specifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - BIN COMPACTORS AND ROAD BLOCKERS.pdf (unknown)Key personnel technical requirements:
Experience & Qualifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - BIN COMPACTORS AND ROAD BLOCKERS.pdfKey Personnel experience and qualifications:
Quality Management
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - BIN COMPACTORS AND ROAD BLOCKERS.pdfKey personnel qualifications and experience requirements for quality assurance:
Compliance Requirements
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - BIN COMPACTORS AND ROAD BLOCKERS.pdf (unknown)Key compliance requirements:
Contractual Terms
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - BIN COMPACTORS AND ROAD BLOCKERS.pdfCompany Experience and Guarantee/Warranties are part of the evaluation criteria, not contractual terms. Refer to evaluationCriteria section for details.
Section
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - BIN COMPACTORS AND ROAD BLOCKERS.pdf (unknown)Points will be awarded based on the detailed functional evaluation criteria covering Company Experience, Guarantee and Warranties, and Key Personnel.
Description
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - ROLLER SHUTTER DOORS.pdfScope involves maintenance of industrial roller shutter doors. Key personnel include Supervisor with OHS training and experience, and Technician with trade test and experience.
Submission Guidelines
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - ROLLER SHUTTER DOORS.pdf (unknown)Returnable Documents: Provide required documents as specified in the tender. Ensure all submissions are complete to avoid disqualification.
Evaluation Criteria
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - ROLLER SHUTTER DOORS.pdf (unknown)Company must demonstrate: 1) Experience with 4+ similar projects for partial points (10 points for 5+ projects), 2) Project values exceeding R6,000,001 for full points in value category, 3) Minimum 24-month guarantee/warranty period for full points, 4) Key personnel with SAQA-accredited trade tests, specific experience durations, and required affiliations as per scoring matrix.
Technical Specifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - ROLLER SHUTTER DOORS.pdf (unknown)Scope includes maintenance of industrial roller shutter doors.
Key personnel requirements:
Experience & Qualifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - ROLLER SHUTTER DOORS.pdfKey personnel experience and qualifications are evaluated:
Quality Management
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - ROLLER SHUTTER DOORS.pdfPersonnel qualifications ensure quality:
Compliance Requirements
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - ROLLER SHUTTER DOORS.pdf (unknown)Key personnel qualifications and experience are evaluated as part of functional criteria.
Contractual Terms
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - ROLLER SHUTTER DOORS.pdfCompany experience and guarantee/warranty requirements form part of the evaluation.
Section
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - ROLLER SHUTTER DOORS.pdf (unknown)Points are awarded based on meeting specified criteria; no part points are awarded.
Evaluation Criteria
Source: AIRCRAFT DOCKYING SYSTEM PRICING SCHEDULE.pdf (unknown)Must hold relevant trade certifications: Instrumentation and Control/Electrical/Millwright Trade Test for supervisors/technicians; N2 qualification for assistants. OHS training certificate required for site supervisor. Must comply with ACSA's manual inventory management procedures for spares.
Technical Specifications
Source: AIRCRAFT DOCKYING SYSTEM PRICING SCHEDULE.pdf (unknown)Pricing Schedule
Source: AIRCRAFT DOCKYING SYSTEM PRICING SCHEDULE.pdf (unknown)Financial Requirements
Source: AIRCRAFT DOCKYING SYSTEM PRICING SCHEDULE.pdf (unknown)Health & Safety
Source: AIRCRAFT DOCKYING SYSTEM PRICING SCHEDULE.pdfContractual Terms
Source: AIRCRAFT DOCKYING SYSTEM PRICING SCHEDULE.pdfEvaluation Criteria
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE EXTINGUISHERS.pdf (unknown)Bidders must have: Proven experience in similar mechanical engineering projects with supporting reference letters; Project values meeting minimum thresholds; Qualified key personnel meeting all specified qualifications, experience, and registration requirements (SAQCC Fire, CIDB SF registration); Written guarantee/warranty commitment on company letterhead signed by authorized signatory; All personnel requirements must be fully met - no partial points awarded
Technical Specifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE EXTINGUISHERS.pdf (unknown)Key personnel technical requirements:
Experience & Qualifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE EXTINGUISHERS.pdfKey personnel experience and qualifications:
Quality Management
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE EXTINGUISHERS.pdfQuality and compliance requirements for key personnel:
Compliance Requirements
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE EXTINGUISHERS.pdf (unknown)Key compliance requirements:
Contractual Terms
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE EXTINGUISHERS.pdfGuarantee and warranty terms:
Section
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FIRE EXTINGUISHERS.pdf (unknown)Evaluation criteria details:
Evaluation Criteria
Source: FIRE SYSTEMS PRICING SCHEDULE.pdf (unknown)Personnel must meet minimum qualifications: Engineer (B-Tech/BSc Mechanical/Electrical/Electronic), Site Supervisor (SAQA Trade Test in Millwright/Fitting and OHS certificate), Technicians (SAQA Trade Test in Millwright/Fitting), Assistant Mechanical (N2), Controls Technician (N5 in Electrical/Control & Instrumentation).
Technical Specifications
Source: FIRE SYSTEMS PRICING SCHEDULE.pdf (unknown)Pricing Schedule
Source: FIRE SYSTEMS PRICING SCHEDULE.pdf (unknown)Financial Requirements
Source: FIRE SYSTEMS PRICING SCHEDULE.pdf (unknown)Health & Safety
Source: FIRE SYSTEMS PRICING SCHEDULE.pdfContractual Terms
Source: FIRE SYSTEMS PRICING SCHEDULE.pdfDescription
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - LUGGAGE TROLLEYS AND TROLLEY PUSHERS.pdfThe work involves maintenance of mechanical systems. Key roles include Mechanic (requiring 2 years' OHS experience, any OHS training certificate, and 2 years' supervisory experience) and Technician (requiring SAQA-accredited trade test and 2 years' maintenance experience).
Evaluation Criteria
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - LUGGAGE TROLLEYS AND TROLLEY PUSHERS.pdf (unknown)Proven track record in mechanical engineering maintenance (preferably in airports or similar large-scale facilities).
Ability to provide reference letters and project lists (Appendices E & F).
Compliance with SAQA-accredited qualifications for key roles.
Submission of signed guarantees/warranties (24+ months).
All key personnel must meet non-negotiable qualification/experience thresholds (no partial credit).
Technical Specifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - LUGGAGE TROLLEYS AND TROLLEY PUSHERS.pdf (unknown)The scope involves maintenance of mechanical systems for luggage trolleys and trolley pushers. Key personnel requirements:
Experience & Qualifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - LUGGAGE TROLLEYS AND TROLLEY PUSHERS.pdfFor guarantees and warranties, submit a letter on official company letterhead signed by the CEO/Managing Director or delegated signatory (proof of delegation required). Scoring based on warranty period: less than 12 months (0 points), 12 to less than 24 months (5 points), 24 months or more (10 points).
Quality Management
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - LUGGAGE TROLLEYS AND TROLLEY PUSHERS.pdfPersonnel qualifications and experience are specified:
Compliance Requirements
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - LUGGAGE TROLLEYS AND TROLLEY PUSHERS.pdf (unknown)Bidders must demonstrate:
Contractual Terms
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - LUGGAGE TROLLEYS AND TROLLEY PUSHERS.pdfThe tender evaluates company experience and guarantees:
Section
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - LUGGAGE TROLLEYS AND TROLLEY PUSHERS.pdf (unknown)Points are awarded for each key personnel resource that fully meets the Qualifications, Experience, and Affiliation requirements. No partial points are given.
Description
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FUEL SYSTEMS.pdfThe work involves maintenance of liquid petroleum facilities at airports. Specific roles include Millwright/Fitting technicians and supervisors.
Evaluation Criteria
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FUEL SYSTEMS.pdf (unknown)Mandatory
Desirable
Technical Specifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FUEL SYSTEMS.pdf (unknown)The scope involves mechanical engineering maintenance for liquid petroleum facilities at airports.
Key personnel specifications:
Experience & Qualifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FUEL SYSTEMS.pdfKey personnel must meet specific experience and qualification thresholds.
Quality Management
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FUEL SYSTEMS.pdfQuality is ensured through qualified and experienced key personnel.
Compliance Requirements
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FUEL SYSTEMS.pdf (unknown)Bidders must demonstrate compliance through submitted documentation.
Contractual Terms
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FUEL SYSTEMS.pdfBidders must provide evidence of company experience and commit to guarantee and warranty periods.
Section
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - FUEL SYSTEMS.pdf (unknown)Functional evaluation is out of 100 points across three categories.
Description
Source: DRAFT NEC3 - TSC .pdfThe service is described in Part C3 Service Information. The affected property is airport-specific details to be inserted. The contractor's main responsibilities are detailed in Part C3. The contractor must provide a plan within 30 calendar days from contract date.
Contact Information
Source: DRAFT NEC3 - TSC .pdf (unknown)The Service Manager is identified as 'XX' in the contract data. The Employer is Airports Company South Africa SOC Limited, with airport-specific addresses to be inserted. No specific contact details are provided in the extracted text.
Submission Guidelines
Source: DRAFT NEC3 - TSC .pdf (unknown)Returnable Documents: The contractor must submit a fully completed Form of Offer and Acceptance, including a schedule of deviations if any. The offer must be signed by a duly authorised representative. The contractor must provide CVs for key people as part of the tender schedule. All documentation must be submitted before the closing date.
Returnable Documents
Source: DRAFT NEC3 - TSC .pdf (unknown)Returnables include signed Form of Offer and Acceptance with contractor and employer signature blocks, witness details, and schedule of deviations. Contractor must provide company name, address, telephone, fax, and key people CVs with names, jobs, responsibilities, qualifications, and experience.
Evaluation Criteria
Source: DRAFT NEC3 - TSC .pdf (unknown)Contractors must be in good standing with Compensation Fund or Licensed Insurer (COID Act). Public Liability and Professional Indemnity insurance required with specific coverage amounts based on contract value (R5M for contracts below R50M, R10M for contracts above R50M). Deductibles apply for Contract Works and Public Liability claims, varying by Landside vs Airside location and contract value. Contractors must submit BEE Certificate and Tax Clearance Certificate annually. Contractor representatives must be duly authorised under Section 16.2 of OHS Act.
Technical Specifications
Source: DRAFT NEC3 - TSC .pdf (unknown)The service involves mechanical engineering maintenance at ACSA airports. The scope includes providing the service in accordance with Part C3 Service Information, which covers employer requirements, management strategy, health and safety, environmental controls, procurement, and working on the affected property. Key personnel must be identified with CVs appended. Risk register must include items such as existing services, access to site, delays in supply, progress against program, and travelling public/ACSA stakeholders.
Experience & Qualifications
Source: DRAFT NEC3 - TSC .pdfContractor must provide CVs for key people (names, jobs, responsibilities, qualifications, experience) appended to tender schedule. At least four key personnel positions are indicated. Contractor's key people are part of the contract data provided by the contractor.
Pricing Schedule
Source: DRAFT NEC3 - TSC .pdfPricing data is in Part C2, including price assumptions and a price list with item number, description, unit, expected quantity, rate, and price. The total price inclusive of VAT must be stated in words and figures, aligned with the Activity Schedule. The contract is a priced contract with a price list.
Financial Requirements
Source: DRAFT NEC3 - TSC .pdf (unknown)The contract is a priced contract with a price list (refer to Part C2). The total price must be inclusive of VAT and calculated per the Activity Schedule. Payment terms: payments are made within 30 days, with an assessment interval of XX weeks. Currency is South African Rand (ZAR). Interest rate is the prime lending rate of Nedbank.
Compliance Requirements
Source: DRAFT NEC3 - TSC .pdf (unknown)The contractor must annually present a compliant BEE Certificate and a Tax Clearance Certificate. Failure is a material breach leading to possible contract cancellation. The contractor must comply with the Occupational Health and Safety Act and Construction Regulations, including appointing a competent person for baseline risk assessments and ensuring all employees are covered under COID Act. Insurance requirements vary based on contract value and location (landside/airside), with specific deductibles for contract works, public liability, and professional indemnity.
Health & Safety
Source: DRAFT NEC3 - TSC .pdfContractor must comply with Occupational Health and Safety Act and Construction Regulations. Requires a signed OHS agreement under section 37(2) before work commences. Contractor must ensure employees are covered under COID Act, provide insurance (public liability and other covers), perform baseline risk assessment, appoint competent persons, enforce safety discipline, issue PPE, implement safe work procedures, report incidents, control alcohol/substances, and cooperate with client safety inquiries. Non-compliance may lead to contract cancellation.
Environmental
Source: DRAFT NEC3 - TSC .pdfContractor must comply with environmental controls covering fauna and flora, noise, dust, water, and waste management as per Part C3. Specific requirements include control of noise, dust, water, waste, and hook-ups to existing works. Environmental constraints and management are detailed in the service information.
Contractual Terms
Source: DRAFT NEC3 - TSC .pdfContract based on NEC3 Term Service Contract (April 2013) with main Option A (Priced contract with price list), dispute resolution Option W1, and secondary Options X1, X2, X18, and Z clauses. Key terms: law of contract is South African, language is English, period for reply is 7 calendar days, starting date and service period to be specified, payment within 30 days, interest at Nedbank prime rate. Arbitration in Johannesburg under Association of Arbitrators rules. Limitation of liability clauses limit indirect/consequential loss to nil and cap liability to total of prices. Additional Z clauses cover cession, joint liability, ethics, confidentiality, step-in rights, liens, intellectual property, dispute resolution panels, B-BBEE/tax compliance, communication, and delegation under OHS Act.
Section
Source: DRAFT NEC3 - TSC .pdfEvaluation includes health and safety, environmental, and quality assurance requirements as per Part C3.
Evaluation Criteria
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - GROUND POWER UNITS.pdf (unknown)Proven track record in mechanical engineering maintenance (preferably aviation/airport environments)
Ability to provide reference letters (Appendix F) and project lists (Appendix E)
Compliance with SAQA-accredited trade certifications for key roles
Warranty commitments on official letterhead with CEO/MD sign-off
Personnel must meet all listed qualifications/experience (no partial credit)
Technical Specifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - GROUND POWER UNITS.pdf (unknown)Key personnel technical requirements:
Experience & Qualifications
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - GROUND POWER UNITS.pdfExperience and qualifications:
Quality Management
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - GROUND POWER UNITS.pdfPersonnel quality requirements:
Compliance Requirements
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - GROUND POWER UNITS.pdf (unknown)Key compliance requirements:
Contractual Terms
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - GROUND POWER UNITS.pdfContractual requirements:
Section
Source: FUNCTIONAL EVALUATIONS CRITERIA - MECHANICAL - GROUND POWER UNITS.pdf (unknown)Evaluation criteria:
Description
Source: BAGGAGE HANDLING SYSTEM PRICING SCHEDULE.pdfThis document relates to baggage handling system maintenance services at ACSA airports.
Key elements covered:
Note: This is a pricing schedule document; obtain the full RFP for complete scope description
Evaluation Criteria
Source: BAGGAGE HANDLING SYSTEM PRICING SCHEDULE.pdf (unknown)Bidders must have SAQA-accredited qualifications for all proposed personnel. Trade test certificates must be SAQA accredited. Bidders must be capable of managing inventory systems and have capacity to handle third-party procurement. Financial capacity to manage spares budget with mark-up structure. Note: Specific company registration, tax clearance, and experience requirements would need to be confirmed in full tender documentation.
Technical Specifications
Source: BAGGAGE HANDLING SYSTEM PRICING SCHEDULE.pdf (unknown)The document specifies personnel qualifications and inventory management requirements for baggage handling system maintenance.
Personnel qualifications required:
Inventory management responsibilities:
Note: Storage space will be allocated by ACSA and may be shared based on availability
Pricing Schedule
Source: BAGGAGE HANDLING SYSTEM PRICING SCHEDULE.pdf (unknown)Third-party procurement mark-up structure:
Formula: Total mark-up values to be budgeted = (Z x Y) where Z is the spares amount for budget purposes
Cost basis: Net cost (excluding VAT) of parts delivered to site with all discounts deducted
Note: This schedule forms part of the form of offer and acceptance
Financial Requirements
Source: BAGGAGE HANDLING SYSTEM PRICING SCHEDULE.pdf (unknown)Pricing structure for third-party procurement and spares:
Mark-up rates (to be applied to third-party quotations):
Cost principles:
Note: The mark-up amounts in the table are for budgeting purposes and not guaranteed
Compliance Requirements
Source: BAGGAGE HANDLING SYSTEM PRICING SCHEDULE.pdf (unknown)No specific compliance requirements (such as CSD registration, tax clearance, B-BBEE, CIDB, or professional registrations) are detailed in this pricing schedule document.
What the document does require:
Bidder guidance:
Health & Safety
Source: BAGGAGE HANDLING SYSTEM PRICING SCHEDULE.pdfStoreroom safety and security requirements:
Note: Obtain full tender document for complete OHS requirements
Contractual Terms
Source: BAGGAGE HANDLING SYSTEM PRICING SCHEDULE.pdfContract pricing and reimbursement terms:
Description
Source: RFP - MECHANICAL ENGINEERING - COR8195 2026 RFP.pdfEngineering maintenance for acsa airports for a period of 5 years
Important Dates
Source: RFP - MECHANICAL ENGINEERING - COR8195 2026 RFP.pdf (RFP)Issue Date: 27th May 2025. Query/Query Closing Date: 20th July 2026. Bid Closing Date and Time: 27th July 2026 at 12:00 PM (Midday). Briefing sessions are held between June 11, 2026, and July 9, 2026, across various airports (non-compulsory).
Briefing Session
Source: RFP - MECHANICAL ENGINEERING - COR8195 2026 RFP.pdf (RFP)OR Tambo International Airport 11-Jun-26 10:00hrs
Upington International Airport 12-Jun-26 10:00hrs
Cape Town International Airport 18-Jun-26 10:00hrs
Non - Compulsory Briefing
Session Date :
and Time
King Phalo Airport 26-Jun-26 10:00hrs
Bram Fischer International Airport 02-Jul-26 10:00hrs
Kimberly Airport 03-Jul-26 10:00hrs
King Shaka International Airport 09-Jul-26 10:00hrs
Site Inspection Requirements : N/A
Bid Closing Date and Time : 27th of July 2026 at 12H00 PM
Contact Information
Source: RFP - MECHANICAL ENGINEERING - COR8195 2026 RFP.pdf (RFP)Contact Person: Thami Mncube. Telephone: 061 653 0462. Email: [email protected].
Submission Guidelines
Source: RFP - MECHANICAL ENGINEERING - COR8195 2026 RFP.pdf (RFP)Bids must be deposited in the bid box located at O R Tambo International Airport, North Wing Offices, 3rd Floor, Tender office, Tender box B, Kempton Park, Johannesburg. Bidders must indicate the specific Airport and Sub-Category discipline they are bidding for by ticking the provided boxes. Each discipline must be tendered for separately. Bids must be submitted by the closing date and time; late, incomplete, or conditional bids may be rejected. Proof of authority (e.g., company resolution) must be submitted with the bid signature.
Returnable Documents
Source: RFP - MECHANICAL ENGINEERING - COR8195 2026 RFP.pdf (RFP)Bid response documents may be deposited in the bid box situated at (street address)
O R Tambo International Airport
North Wing Offices, 3rd Floor, Tender office, Tender box B
Kempton Park, Johannesburg
Evaluation Criteria
Source: RFP - MECHANICAL ENGINEERING - COR8195 2026 RFP.pdf (RFP)ACSA uses a pre-determined, staged evaluation process focusing on functionality. Bidders are assessed for compliance with set minimum requirements and the submission of all mandatory returnable documents. Failure to meet minimum thresholds or missing mandatory documents will result in disqualification. The process is staged, requiring compliance at one stage before progressing to the next.
Technical Specifications
Source: RFP - MECHANICAL ENGINEERING - COR8195 2026 RFP.pdf (RFP)The RFP is for a panel of service providers to provide mechanical engineering maintenance for ACSA airports for 5 years. Scope includes maintenance, repairs, replacements, and testing of asset classes including: HVAC Systems, Mechanical Gates/Booms/Turnstiles, Ground Power Units, Automated Docking Systems, Passenger Loading Systems, Baggage Conveyor Systems, Fuel Hydrant Systems, Bin Compactors/Road Blockers, Pumps, Lifts/Escalators/Travellators, Sliding Doors, Roller Shutter Doors, Waste Water Treatment Plants, and Fire Systems (Extinguishers, Water Pumps, Sprinklers, Hydrants, Hose Reels).
Methodology
Source: RFP - MECHANICAL ENGINEERING - COR8195 2026 RFP.pdfSection 3: evaluation criteria
3.1 Evaluation Criteria
3.1.1. ACSA will use a pre-determined evaluation criteria when considering received bids. The evaluation criteria
will consider functionality. During the evaluation of received bids ACSA will make an assessment
whether all the bids comply with set minimum requirements and whether all returnable
documents/information have been submitted. Bidders which fail to meet minimum requirements, or
overall minimum thresholds or have not submitted required mandatory documents will be
disqualified from the bid process.
3.1.2 The requirements of any given stage must be complied with prior to progression to the next stage. ACSA
reserves the right to disqualify bidders without requesting any outstanding document/information.
3.2 A staged approach will be used to evaluate bids, and the approach will be as follows:
Stage 1 Stage 2 Stage 3 Stage 4 Stage 5
Quality Management
Source: RFP - MECHANICAL ENGINEERING - COR8195 2026 RFP.pdfand Time
King Phalo Airport 26-Jun-26 10:00hrs
Bram Fischer International Airport 02-Jul-26 10:00hrs
Kimberly Airport 03-Jul-26 10:00hrs
King Shaka International Airport 09-Jul-26 10:00hrs
Site Inspection Requirements : N/A
Bid Closing Date and Time : 27th of July 2026 at 12H00 PM
Tel +27 11 723 1400 Fax +27 11 453 9354
Western Precinct, Aviation Park, O.R. Tambo International Airport, 1 Jones Road, Kempton Park, Gauteng, South Africa,
1632
P O Box 75480, Gardenview, Gauteng, South Africa, 2047
Airports Company South Africa SOC Ltd Reg No 1993/004149/30 VAT no 4930138393 Board of Directors: F Zikalala Mvelase (Interim Chairperson), Dr K Badimo, D
Hlatshwayo, A Khumalo, G Mancotywa, L Mbotya (Chief Financial Officer), M Mpofu (Chief Executive Officer), Y Pillay, S Sambo, N Siyotula, F Sefara (Company Secretary)
COR8195/2025/RFP
includes maintenance, repairs, replacements and testing of the following asset classes, but are
not limited to:
a. HVAC Systems
b. Mechanical Gates, Booms and Turnstiles
c. Ground Power Units
d. Automated Docking System
e. Passenger Loading Systems
f. Baggage Conveyor Systems
g. Fuel Hydrant Systems
h. Bin Compactors and Road Blockers
i. Pumps
j. Lifts, Escalators and Travellators
k. Sliding Doors
l. Roller Shutter Doors
m. Waste Water Treatment Plants / Storage Facilities
n. Fire Systems (Fire Extinguishers, Fire-Water Pumps, Fire Sprinkler Systems, Fire
Hydrants, Fire Hose Reels)
Pricing Schedule
Source: RFP - MECHANICAL ENGINEERING - COR8195 2026 RFP.pdfshareholder and thus regarded as a state-owned company (SOC) in terms of the Public Finance
Management Act (PFMA). The company is legally and financially autonomous and operates under
commercial law.
Financial Requirements
Source: RFP - MECHANICAL ENGINEERING - COR8195 2026 RFP.pdf (RFP)Bidders must provide VAT registration numbers. Professional indemnity and public liability insurance confirmation in line with ACSA requirements will be requested upon allocation of scope of works for pricing after appointment to the panel.
Compliance Requirements
Source: RFP - MECHANICAL ENGINEERING - COR8195 2026 RFP.pdf (RFP)Bidders must be registered and authorized to provide services in South Africa. Requirements include Tax Compliance Status (TCS) system PIN from SARS. Specific CIDB gradings are required for sub-categories (e.g., EP or EB for Aircraft Docking Systems, ME for most mechanical maintenance, ME or CE for Waste Water Treatment Plants). Bidders must complete Supplier Information and Foreign Supplier questionnaires if applicable. Company experience (Appendix E or F) and Key Resources (Appendix G/CVs) must be submitted to receive points.
Health & Safety
Source: RFP - MECHANICAL ENGINEERING - COR8195 2026 RFP.pdfTable 2: SUB-CATEGORY: AS PER THE SCOPE OF WORKS UNDER APPENDICES
Number Services CIDB GRADING ✓
for empowerment.
1.3.8 ACSA retains the right to appoint other professional service providers (PSP) for some projects.
1.3.9 ACSA reserves the right to appoint more than one company wherein an attempt is made to
transfer skills from established companies to companies owned by Historically Disadvantaged
Individuals (HDIs). In case such an appointment is done, performance management will be
monitored based on a skills transfer plan that will be entered into at the beginning of the project.
Tel +27 11 723 1400 Fax +27 11 453 9354
Western Precinct, Aviation Park, O.R. Tambo International Airport, 1 Jones Road, Kempton Park, Gauteng, South Africa,
1632
P O Box 75480, Gardenview, Gauteng, South Africa, 2047
Airports Company South Africa SOC Ltd Reg No 1993/004149/30 VAT no 4930138393 Board of Directors: F Zikalala Mvelase (Interim Chairperson), Dr K Badimo, D
Hlatshwayo, A Khumalo, G Mancotywa, L Mbotya (Chief Financial Officer), M Mpofu (Chief Executive Officer), Y Pillay, S Sambo, N Siyotula, F Sefara (Company Secretary)
COR8195/2025/RFP
NOTE: Company Experience Appendix E or Appendix F must be duly completed and submitted
for each project completed. Failure to submit the forms will result in the bidder not being
allocated points.
NOTE: No letters of appointment, or completion certificates will be accepted as proof of
experience.
NOTE: For Key Resources evaluations, Appendix G and / or CV must be duly completed and
submitted for each resource completed per category.
Tel +27 11 723 1400 Fax +27 11 453 9354
Western Precinct, Aviation Park, O.R. Tambo International Airport, 1 Jones Road, Kempton Park, Gauteng, South Africa,
1632
P O Box 75480, Gardenview, Gauteng, South Africa, 2047
Airports Company South Africa SOC Ltd Reg No 1993/004149/30 VAT no 4930138393 Board of Directors: F Zikalala Mvelase (Interim Chairperson), Dr K Badimo, D
Hlatshwayo, A Khumalo, G Mancotywa, L Mbotya (Chief Financial Officer), M Mpofu (Chief Executive Officer), Y Pillay, S Sambo, N Siyotula, F Sefara (Company Secretary)
COR8195/2025/RFP
to be in orders by SARS) Appendix M
management Appendix N
Tel +27 11 723 1400 Fax +27 11 453 9354
Western Precinct, Aviation Park, O.R. Tambo International Airport, 1 Jones Road, Kempton Park, Gauteng, South Africa,
1632
P O Box 75480, Gardenview, Gauteng, South Africa, 2047
Airports Company South Africa SOC Ltd Reg No 1993/004149/30 VAT no 4930138393 Board of Directors: F Zikalala Mvelase (Interim Chairperson), Dr K Badimo, D
Hlatshwayo, A Khumalo, G Mancotywa, L Mbotya (Chief Financial Officer), M Mpofu (Chief Executive Officer), Y Pillay, S Sambo, N Siyotula, F Sefara (Company Secretary)
COR8195/2025/RFP
Certificate of Authority of Joint Ventures (where
N y
applicable) Appendix B
N
SBD 4 Form Bidder’s Disclosure Appendix P Y N
SBD 6.1 Form Preference Points Claim
I/We the undersigned ____________________________________________________ (Name) herby
certify that the information furnished in this tender document is true and correct. We further certify that
we understand that where it is found that we have made a false declaration or statement in this tender,
Section 8: terms and conditions of RFP
8.1 Conditions of the request for proposal
8.1.1 This RFP is open only to bidders who are registered and duly authorised to provide the Services
in South Africa.
8.1.2 Any bids received after the tender closing date and time 27th of July 2026 at 12:00am (Midday)
shall not be considered by ACSA and therefore be disqualified. These bids shall be retained
unopened and destroyed after the award of the contract to the successful bidder unless a written
request for the return thereof is received from the relevant bidder within thirty (30) days of the
award.
8.1.3 Except where specifically provided for in this RFP, a bidder may make no changes to its bid after
the closing time and date.
8.1.4 ACSA reserves the right to award the contract on the basis of bid submitted by a bidder subject to
ACSA’ s terms and conditions and by submission of its bid the bidder agrees to be legally bound
thereby if its bid is accepted by ACSA.
8.1.5 ACSA or its duly appointed representatives shall be the sole adjudicators of the acceptability and
or feasibility of the bids. The decision shall be final and except as required by law or otherwise, no
reason for the acceptance or rejection of any bid will be furnished.
8.1.6 If the bid has been awarded on the strength of information furnished by a Bidder, which information
is proved to have been incorrect, in addition to any other legal remedy it may have, ACSA may at
any time during the life of the contract:
a) Recover from the relevant bidder all costs, losses or damages incurred by it as a result of the
award; and/or
b) Cancel the award of the bid and/or contract and claim any damages, which it may have suffered
or will suffer as a result of having to make less favourable arrangements.
8.1.7 The Bidder shall be liable to pay for losses sustained and/or additional costs or expenditure
incurred by ACSA as a result of cancellation. ACSA shall furthermore have the right to recover
such losses, damages or additional costs by way of set off against monies due or which may
become due to the Bidder in terms of the said contract.
8.1.8 If ACSA and the successful Bidder fail to enter into or execute a formal written contract within thirty
(30) days of the award (or such later date as may be determined by ACSA as a result of the
bidder’s failure to comply with any representation made in the bidder’s bid, then the award shall
be deemed null and void. ACSA’ s aforesaid rights are without prejudice and in addition to any
Tel +27 11 723 1400 Fax +27 11 453 9354
Western Precinct, Aviation Park, O.R. Tambo International Airport, 1 Jones Road, Kempton Park, Gauteng, South Africa,
1632
P O Box 75480, Gardenview, Gauteng, South Africa, 2047
Airports Company South Africa SOC Ltd Reg No 1993/004149/30 VAT no 4930138393 Board of Directors: F Zikalala Mvelase (Interim Chairperson), Dr K Badimo, D
Hlatshwayo, A Khumalo, G Mancotywa, L Mbotya (Chief Financial Officer), M Mpofu (Chief Executive Officer), Y Pillay, S Sambo, N Siyotula, F Sefara (Company Secretary)
COR8195/2025/RFP
8.1.12 Appendix 1 must be executed in the name of the business actually proposing to perform the
Services if awarded the contract. Appendix 1 must be signed by an authorised representative of
the bidder.
8.1.13 In the case of a joint venture or partnership between The Service Provider, evidence of such a
joint venture must be included in the bid in the form of a Joint Venture Agreement or Memorandum
of Understanding. Each member of the joint venture may complete and sign Appendix 1.
Contractual Terms
Source: RFP - MECHANICAL ENGINEERING - COR8195 2026 RFP.pdfSuccessful tenderers are not guaranteed work; the panel operates on an as-and-when needed basis. ACSA is not obliged to provide work to all panel organizations. Contract terms vary by project, with selection based on qualification, performance, and rotational models. ACSA may request employee secondment to the PSP for skill transfer. Disputes are resolved via a single Arbitrator under the rules of the Arbitration Foundation of Southern Africa (AFSA) in Johannesburg. Arbitration awards are final and binding. ACSA reserves the right to reject incomplete, late, or conditional bids and may withdraw the RFP at any time without liability for bidder losses.
Requirements
Source: RFP - MECHANICAL ENGINEERING - COR8195 2026 RFP.pdf (RFP)Indicate which Airport, and Sub-Category discipline you are submitting your bid for by ticking the box provided. Each discipline should be tendered for separately and will be evaluated accordingly and separate contracts will be entered into.
Section
Source: RFP - MECHANICAL ENGINEERING - COR8195 2026 RFP.pdfPt−Pmin
Ps= 80(1− )
Pmin
Where:
Ps = Points scored for price of tender under consideration
Pt = Price of tender under consideration
Pmin = Price of lowest acceptable tender
Evaluation of Preference
Bidders are requested to submit B-BBEE certificates. In the event of a tie-on points for two or more bidders,
the contract will be awarded to a bidders/s that scored the highest points for specific goals If two or more
entities score the same points for specific goals, the award will be decided by drawing of lots.
Please refer to Pricing Instructions and Schedule attached separately as part of the of this tender
document
Bidders are requested to submit B-BBEE certificates. In the event of a tie-on points for two or more bidders,
the contract will be awarded to a bidders/s that scored the highest points for specific goals If two or more
entities score the same points for specific goals, the award will be decided by drawing lots.
Number of
Specific Goals points
(80/20 system)
B-BBEE Status Level 1 5
B-BBEE Status Level 2 4.5
B-BBEE Status Level 3 4
B-BBEE Status Level 4 3
Tel +27 11 723 1400 Fax +27 11 453 9354
Western Precinct, Aviation Park, O.R. Tambo International Airport, 1 Jones Road, Kempton Park, Gauteng, South Africa,
1632
P O Box 75480, Gardenview, Gauteng, South Africa, 2047
Airports Company South Africa SOC Ltd Reg No 1993/004149/30 VAT no 4930138393 Board of Directors: F Zikalala Mvelase (Interim Chairperson), Dr K Badimo, D
Hlatshwayo, A Khumalo, G Mancotywa, L Mbotya (Chief Financial Officer), M Mpofu (Chief Executive Officer), Y Pillay, S Sambo, N Siyotula, F Sefara (Company Secretary)
COR8195/2025/RFP
Confidential Confidential
ConfidentialConfidential
B-BBEE Status Level 5 2
B-BBEE Status Level 6 0.5
B-BBEE Status Level 7 0.3
B-BBEE Status Level 8 0.1
Black youth majority-owned entities 5
Black women majority-owned entities 5
Company majority owned by people with 5
disabilities
Non- compliant contributor 0
ACSA will award points for the B-BBEE level and only one of the above preference
areas highlighted in red.
Procedure for the usage of the panel
The service providers, once appointed and subject to operational requirements, will be invited to deliver services
on a rotational basis. Such will be in a form of a request for quotations to suppliers listed on the panel. The
number of service providers to be invited for quotations will be at the discretion of ACSA and depended on the
number of suppliers on the panel. Proposals will be evaluated based on the preferential procurement policy of
ACSA. Where this is not practical due to time constrains or the nature of the expertise required, ACSA may do
a direct appointment to a service provider without sourcing quotations. The direct allocations will be determined
based on one or more of the following attributes:
Tel +27 11 723 1400 Fax +27 11 453 9354
Western Precinct, Aviation Park, O.R. Tambo International Airport, 1 Jones Road, Kempton Park, Gauteng, South Africa,
1632
P O Box 75480, Gardenview, Gauteng, South Africa, 2047
Airports Company South Africa SOC Ltd Reg No 1993/004149/30 VAT no 4930138393 Board of Directors: F Zikalala Mvelase (Interim Chairperson), Dr K Badimo, D
Hlatshwayo, A Khumalo, G Mancotywa, L Mbotya (Chief Financial Officer), M Mpofu (Chief Executive Officer), Y Pillay, S Sambo, N Siyotula, F Sefara (Company Secretary)
COR8195/2025/RFP
Confidential Confidential
ConfidentialConfidential
Section 4: returnable documents
4.1 Mandatory Returnable documents
ACSA will disqualify from the bid process any bidder that has failed to submit mandatory returnable
documents and information. Bidders should therefore ensure that all the mandatory returnable documents
and information have been submitted. In order to assist bidders, ACSA has also included a column next
to the required mandatory document and information to enable bidders to keep track of whether they have
submitted or not.
4.2 Other Returnable Documents and information
These types of documents and information are required but are not mandatory or are only mandatory at
specific stages of the process. ACSA may request bidders to submit these documents or information after
the closing date and time or might already have them on the system. Where a document or information is
only mandatory at a specific stage in the process, ACSA may only disqualify a bidder for non-submission
at that stage and after reasonable efforts were made to request the document from the bidder. The
documents are as follows:
Other returnable documents and submitted
Mandatory administrative
INFORMATION [Yes or No]
Certificate of Attendance of Compulsory
Y n
Briefing Section 6
Completed in full and signed Form of offer –
Y n
C1.1.
Completed in full and signed Bidders Disclosure
N y
Form SBD 4.
Tax Pin number (ACSA may not award to a
N y
bidder whose tax affairs have not been declared
to be in orders by SARS) Appendix M
Names and identity numbers of Directors /
N y
Trustees / Members / Shareholders and Senior
management Appendix N
Tel +27 11 723 1400 Fax +27 11 453 9354
Western Precinct, Aviation Park, O.R. Tambo International Airport, 1 Jones Road, Kempton Park, Gauteng, South Africa,
1632
P O Box 75480, Gardenview, Gauteng, South Africa, 2047
Airports Company South Africa SOC Ltd Reg No 1993/004149/30 VAT no 4930138393 Board of Directors: F Zikalala Mvelase (Interim Chairperson), Dr K Badimo, D
Hlatshwayo, A Khumalo, G Mancotywa, L Mbotya (Chief Financial Officer), M Mpofu (Chief Executive Officer), Y Pillay, S Sambo, N Siyotula, F Sefara (Company Secretary)
COR8195/2025/RFP
Confidential Confidential
ConfidentialConfidential
Certificate of Incorporation of the bidding entity
N y
showing ownership split Appendix N
Central Supplier Database Report (CSD)
N y
Appendix O
Declaration of Interest and Politically Exposed
N y
Persons Section 5
N y
Declaration of Forbidden Practices Section 7
N y
Terms and Conditions of RFP Section 8
Bidders must accept the ACSA Terms and
N y
Conditions Section 9
Confidentiality and Non-Disclosure Agreement
N y
Section 10
Certificate of Authority to Sign Tender Appendix
N y
A
Certificate of Authority of Joint Ventures (where
N y
applicable) Appendix B
Record of Addenda to Tender Documents
N y
Appendix C
Proposed Amendments and Qualifications
N y
Appendix D
Schedule of the Tenderer’s Experience
N y
Appendix E
N y
Reference letter from the Client Appendix F
CV and Experience of Key Personnel Appendix
N y
G
Proof of Professional Registration Appendix H N
Y
Tel +27 11 723 1400 Fax +27 11 453 9354
Western Precinct, Aviation Park, O.R. Tambo International Airport, 1 Jones Road, Kempton Park, Gauteng, South Africa,
1632
P O Box 75480, Gardenview, Gauteng, South Africa, 2047
Airports Company South Africa SOC Ltd Reg No 1993/004149/30 VAT no 4930138393 Board of Directors: F Zikalala Mvelase (Interim Chairperson), Dr K Badimo, D
Hlatshwayo, A Khumalo, G Mancotywa, L Mbotya (Chief Financial Officer), M Mpofu (Chief Executive Officer), Y Pillay, S Sambo, N Siyotula, F Sefara (Company Secretary)
COR8195/2025/RFP
Confidential Confidential
ConfidentialConfidential
Transformation Framework and Specification
forms Appendix J Y
N
Proposed Subcontractor Appendix K Y N
Letter of Good Standing with the Workers
Compensation Commissioner Appendix L Y
N
SBD 4 Form Bidder’s Disclosure Appendix P Y N
SBD 6.1 Form Preference Points Claim
Appendix Q Y
N
Y
Additional functional evaluation criteria N
documents
4.3 Validity of submitted information
Bidders must ensure that all conditions, documents and information which has been submitted in
pursuance to this bid remains valid for the duration of the contract period. In the event where a validity
document expires an updated document must be submitted. The duty is on the bidder to provide updated
information to ACSA immediately after such information has changed.
Tel +27 11 723 1400 Fax +27 11 453 9354
Western Precinct, Aviation Park, O.R. Tambo International Airport, 1 Jones Road, Kempton Park, Gauteng, South Africa,
1632
P O Box 75480, Gardenview, Gauteng, South Africa, 2047
Airports Company South Africa SOC Ltd Reg No 1993/004149/30 VAT no 4930138393 Board of Directors: F Zikalala Mvelase (Interim Chairperson), Dr K Badimo, D
Hlatshwayo, A Khumalo, G Mancotywa, L Mbotya (Chief Financial Officer), M Mpofu (Chief Executive Officer), Y Pillay, S Sambo, N Siyotula, F Sefara (Company Secretary)
COR8195/2025/RFP
Confidential Confidential
ConfidentialConfidential
Section 5: declaration form
5.1 Declaration of interest and politically exposed persons
Making a Declaration
Any legal person or persons having a relationship with persons employed by ACSA, including a blood
relationship, may submit a bid in terms of this tender document. In view of possible allegations of unfairness,
should the resulting bid, or part thereof, be awarded to persons connected with or related to ACSA employees,
it is required that the bidder or his/her authorised representative declare his/her position in relation to ACSA
employees or any member of the evaluation or adjudication committee which will consider bids.
ACSA requires all bidders to declare that they have not acted in any manner inconsistent with the law, policy, or
fairness. Furthermore, ACSA requires bidders to declare if they have Politically Exposed Persons (PEP) also
known as Domestic Prominent Influential Persons (DPIP) in their organisation. See below definition of PEP/DPIP.
Politically Exposed Persons or DPIP are individuals who are or have been entrusted with prominent public
functions in the country or a foreign country, for example Heads of State or of government, senior politicians,
senior government, judicial or military officials, senior executives of state-owned corporations, important political
party officials. Business relationships with family members or close associates of PEPs involve reputational risks
similar to those with PEPs themselves. PEP status in the following areas shall be declared:
of government or foreign government (elected or not)’
formed by or for the benefit of any such individual;
children, and spouse's parents or siblings etc
5.1.1 All bidders must complete a declaration of interest form below:
Full name of the bidder or representative of
the bidding entity
Identity Number
Position held in the bidding entity
Registration number of the bidding entity
Tax Reference number of the bidding entity
VAT Registration number of the bidding entity
Tel +27 11 723 1400 Fax +27 11 453 9354
Western Precinct, Aviation Park, O.R. Tambo International Airport, 1 Jones Road, Kempton Park, Gauteng, South Africa,
1632
P O Box 75480, Gardenview, Gauteng, South Africa, 2047
Airports Company South Africa SOC Ltd Reg No 1993/004149/30 VAT no 4930138393 Board of Directors: F Zikalala Mvelase (Interim Chairperson), Dr K Badimo, D
Hlatshwayo, A Khumalo, G Mancotywa, L Mbotya (Chief Financial Officer), M Mpofu (Chief Executive Officer), Y Pillay, S Sambo, N Siyotula, F Sefara (Company Secretary)
COR8195/2025/RFP
Confidential Confidential
ConfidentialConfidential
I/We certify that there is / no PEP/DPIP conflict of interest/ no relationship between the bidding entity or
any of its shareholders / directors / owner / member / partner/ senior management with any ACSA
employee or official.
Where a relationship or PEP/DPIP conflict of interest exists, please provide details of the ACSA
employee or official and the extent of the relationship below:
PEP/DPIP Declaration
DPIP/PEP Declaration for self/family member or close associate:
Nature of Political Exposure Term of the Description of activities relating to
office political exposure
Full Names of Directors / Trustees / Members / Shareholders/ Senior Management of the bidding entity.
Personal Income Tax Reference
Full Name Identity Number
Number
Tel +27 11 723 1400 Fax +27 11 453 9354
Western Precinct, Aviation Park, O.R. Tambo International Airport, 1 Jones Road, Kempton Park, Gauteng, South Africa,
1632
P O Box 75480, Gardenview, Gauteng, South Africa, 2047
Airports Company South Africa SOC Ltd Reg No 1993/004149/30 VAT no 4930138393 Board of Directors: F Zikalala Mvelase (Interim Chairperson), Dr K Badimo, D
Hlatshwayo, A Khumalo, G Mancotywa, L Mbotya (Chief Financial Officer), M Mpofu (Chief Executive Officer), Y Pillay, S Sambo, N Siyotula, F Sefara (Company Secretary)
COR8195/2025/RFP
Confidential Confidential
ConfidentialConfidential
5.1.2.I/We declare that we have not acted in any manner which promotes unfairness, contravenes any law
or is against public morals. We further certify that we will in full compliance of this tender terms and
conditions as well as ACSA policies in the event that we are successful in this tender.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
1 JONES RD - KEMPTON PARK - JOHANNESBURG - 0186
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
37
Last checked
29 Jun 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Median Estimate
R 1 853 033
Range
Based on 22 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Learn how to submit a winning bid with these related articles
How established construction firms use Joint Ventures with EMEs and QSEs to meet B-BBEE preferential procurement targets and access set-aside contracts.
A practical guide for small and medium building contractors on winning government tenders for schools, clinics, housing, and municipal buildings in South Africa.
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct — april 2026 update — covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
How small and medium construction contractors use Joint Ventures to combine CIDB grades, win larger infrastructure projects, and grow beyond their current grading ceiling.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.