Issuing Organization
Eskom National Transmission Company of South AfricaLocation
Gauteng
Closing Date
10 Jul 2026
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Megawatt Park, 2 Maxwell Drive - Sunninghill - Sandton - 2157
Organization Type
GOVERNMENT
Published
11 Jun 2026
OCDS Reference
ocds-9t57fa-158809
This tender from ESKOM is for the repair of defective concrete foundations at the ripon traction substation over a six-month period. IT is aimed at contractors specializing in structural concrete repair and civil engineering works. Bidders must comply with eskom's stringent supplier quality management requirements.
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: annex-e (Local content declaration).pdf, annex-d (Imported content declaration).pdf, Drawing 0.54-8725-2-0.pdf and 5 more. You donβt need to refresh β this page will pick up the updated review automatically.
Description
Source: 240-105658000 Supplier Quality Management Specification (3).pdfImportant Dates
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Contact Information
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Submission Guidelines
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Returnable Documents
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Evaluation Criteria
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Formal eligibility is determined by the successful completion and submission of the tender's required returnables, primarily 'Form A' and the documents listed for the applicable Category. A fundamental criterion is the demonstration of a compliant Quality Management System. For high-risk/critical work (as determined by Eskom), a formal capability and capacity assessment may also be a prerequisite for award.
Technical Specifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Methodology
Source: 240-105658000 Supplier Quality Management Specification (3).pdfExperience & Qualifications
Source: 240-105658000 Supplier Quality Management Specification (3).pdfQuality Management
Source: 240-105658000 Supplier Quality Management Specification (3).pdfPricing Schedule
Source: 240-105658000 Supplier Quality Management Specification (3).pdfFinancial Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Compliance Requirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Health & Safety
Source: 240-105658000 Supplier Quality Management Specification (3).pdfContractual Terms
Source: 240-105658000 Supplier Quality Management Specification (3).pdfRequirements
Source: 240-105658000 Supplier Quality Management Specification (3).pdf (unknown)Section
Source: 240-105658000 Supplier Quality Management Specification (3).pdfSubmission Guidelines
Source: annex-e (Local content declaration).pdf (unknown)Returnable Documents: The specific documents required are not detailed in the provided text. You must consult the main tender documents to identify all mandatory forms and submissions.
Compliance Requirements
Source: annex-e (Local content declaration).pdf (unknown)Insufficient searchable text - AI extraction recommended. You must consult the main tender documents for all compliance requirements such as CSD, tax, B-BBEE, CIDB, CIPC, and local content.
Description
Source: MS Teams meeting Link - Ripon Traction SS - E2627NTCSAMWPR.docxScope: Repair of defective concrete foundations at Ripon Traction substation. Duration: 06 months.
Important Dates
Source: MS Teams meeting Link - Ripon Traction SS - E2627NTCSAMWPR.docx (unknown)Clarification meeting: 19 June 2026 at 10:00 SAST via Microsoft Teams.
Submission Guidelines
Source: MS Teams meeting Link - Ripon Traction SS - E2627NTCSAMWPR.docx (unknown)Returnable Documents: Ensure all required returnable documents are completed and submitted as specified.
Evaluation Criteria
Source: MS Teams meeting Link - Ripon Traction SS - E2627NTCSAMWPR.docx (unknown)Not explicitly stated in provided excerpt, but typically requires relevant construction/civil engineering experience, valid company registration, tax compliance, and possibly CIDB grading for construction work in South Africa.
Technical Specifications
Source: MS Teams meeting Link - Ripon Traction SS - E2627NTCSAMWPR.docx (unknown)Scope: Repair of defective concrete foundations at Ripon Traction substation. Duration: 06 months.
Compliance Requirements
Source: MS Teams meeting Link - Ripon Traction SS - E2627NTCSAMWPR.docx (unknown)No specific compliance requirements stated.
Submission Guidelines
Source: annex-d (Imported content declaration).pdf (unknown)Returnable Documents:
Compliance Requirements
Source: annex-d (Imported content declaration).pdf (unknown)Insufficient searchable text - AI extraction recommended
Submission Guidelines
Source: Drawing 0.54-8725-2-0.pdf (unknown)Returnable Documents: The bidder must submit all required returnable documents as specified in the tender documentation.
Description
Source: Ripon Traction Substation Defective ConcreteFoundations C1 1 ECC3 Offer Acceptance .docThe Employer, identified in the Acceptance signature block, has solicited offers to enter into a contract for the procurement of:
Submission Guidelines
Source: Ripon Traction Substation Defective ConcreteFoundations C1 1 ECC3 Offer Acceptance .doc (unknown)Returnable Documents:
Evaluation Criteria
Source: Ripon Traction Substation Defective ConcreteFoundations C1 1 ECC3 Offer Acceptance .doc (unknown)Must have CIDB registration (if applicable); Must accept all Conditions of Tender; Must be authorized to sign binding contract; Must comply with all terms without deviation unless recorded in Schedule of Deviations.
Technical Specifications
Source: Ripon Traction Substation Defective ConcreteFoundations C1 1 ECC3 Offer Acceptance .doc (unknown)The Employer, identified in the Acceptance signature block, has solicited offers to enter into a contract for the procurement of:
Financial Requirements
Source: Ripon Traction Substation Defective ConcreteFoundations C1 1 ECC3 Offer Acceptance .doc (unknown)Pricing format:
Compliance Requirements
Source: Ripon Traction Substation Defective ConcreteFoundations C1 1 ECC3 Offer Acceptance .doc (unknown)No specific requirements found
Description
Source: Ripon Traction Substation Defective Concrete Foundations C1 2b ECC3 Data by Contractor.docDefective concrete foundations at Ripon Traction Substation. Contract period: 06 months. Employer: Eskom National Transmission Company SOC Ltd (NTCSA). This is Part C1.2b of the tender documentation - Contract Data provided by the Contractor under NEC3 ECC.
Submission Guidelines
Source: Ripon Traction Substation Defective Concrete Foundations C1 2b ECC3 Data by Contractor.doc (unknown)Returnable Documents: The document does not contain specific submission guidelines. This appears to be Part C1.2b of a NEC3 Engineering and Construction Contract (ECC3) - the Contract Data section to be completed by the successful contractor, not the tender submission requirements. Bidders should refer to the complete tender pack for submission instructions.
Evaluation Criteria
Source: Ripon Traction Substation Defective Concrete Foundations C1 2b ECC3 Data by Contractor.doc (unknown)Contractors must be familiar with NEC3 ECC (April 2013) and its Guidance Notes; must complete all required contract data fields accurately; must follow specified formatting (electronic form fields or handwritten in ink); must reference example in ECC3 Guidance Notes pages 156-158.
Technical Specifications
Source: Ripon Traction Substation Defective Concrete Foundations C1 2b ECC3 Data by Contractor.doc (unknown)Scope: Repair and remediation of defective concrete foundations at Ripon Traction Substation. Contract Duration: 06 months. The document references NEC3 ECC (April 2013) Engineering and Construction Contract with Shorter Schedule of Cost Components (SSCC). This is contract data for pricing purposes - detailed technical specifications should be in the complete tender documentation.
Financial Requirements
Source: Ripon Traction Substation Defective Concrete Foundations C1 2b ECC3 Data by Contractor.doc (unknown)Pricing Format: Shorter Schedule of Cost Components (SSCC) as per ECC3 (April 2013). The document contains form fields for the tendered total of prices but the actual values are not populated. Bidders must complete the pricing schedule according to SSCC guidelines on page 63 of ECC3 (April 2013).
Compliance Requirements
Source: Ripon Traction Substation Defective Concrete Foundations C1 2b ECC3 Data by Contractor.doc (unknown)No specific compliance requirements found in this document. The document is a contract data template requiring contractor information (name, address, tel, fax), key personnel details (name, job, responsibilities, qualifications, experience), and fee percentages. Bidders should refer to the complete tender documentation for compliance requirements.
Description
Source: BOQ - Ripon SS Civil Works - E2627NTCSAMWPR.xlsxEvaluation Criteria
Source: BOQ - Ripon SS Civil Works - E2627NTCSAMWPR.xlsx (unknown)Contractors must be registered and compliant with South African legislation; demonstrate experience in substation civil works; comply with Occupational Health and Safety Act (No. 85 of 1992) and Eskom standard 32-136; adhere to quality assurance requirements; and have financial capacity to undertake the project. Evidence of independent pricing may be required due to noted pricing similarities between some bidders.
Technical Specifications
Source: BOQ - Ripon SS Civil Works - E2627NTCSAMWPR.xlsx (unknown)Financial Requirements
Source: BOQ - Ripon SS Civil Works - E2627NTCSAMWPR.xlsx (unknown)Compliance Requirements
Source: BOQ - Ripon SS Civil Works - E2627NTCSAMWPR.xlsx (unknown)Description
Source: 240-12248652 Category3- List of Tender Returnables Documents Rev 6_.pdfContact Information
Source: 240-12248652 Category3- List of Tender Returnables Documents Rev 6_.pdf (TENDER)Submission Guidelines
Source: 240-12248652 Category3- List of Tender Returnables Documents Rev 6_.pdf (TENDER)Returnable Documents
Source: 240-12248652 Category3- List of Tender Returnables Documents Rev 6_.pdf (TENDER)Apply (Yes=1)
E.1 Form A is completed and signed. 1
E.2 Add other requirements (if applicable) as per the scope of work and/ or specification 1 10%
Section E Score 2
Evaluation Criteria
Source: 240-12248652 Category3- List of Tender Returnables Documents Rev 6_.pdf (TENDER)Suppliers must have a documented Quality Management System that complies with ISO 9001 (certification is not mandatory but the system must be evidenced). The evaluation criteria are clearly defined with weighted scores: Section A (QMS Requirements) 25%, Section B (QMS in Operation) 25%, Section C (Contract Quality Plan) 20%, Section D (Quality Control Plan) 20%, and Section E (Miscellaneous) 10%. Failure to provide the specified 'tender returnables' will likely result in disqualification.
Technical Specifications
Source: 240-12248652 Category3- List of Tender Returnables Documents Rev 6_.pdf (TENDER)Section
Source: 240-12248652 Category3- List of Tender Returnables Documents Rev 6_.pdfDescription
Source: Waste Management Standard 32-245.pdfThe document is the Eskom Waste Management Standard (32-245). It is an internal policy document outlining Eskom's approach to integrated waste management with a goal of zero waste. It applies throughout Eskom Holdings SOC Limited and its subsidiaries. The standard provides minimum management requirements for waste streams to ensure legal compliance, referencing extensive environmental legislation. It is not a tender document and contains no description of the scope for repairing defective concrete foundations.
Evaluation Criteria
Source: Waste Management Standard 32-245.pdf (unknown)While the standard does not list explicit bidder eligibility criteria, it implies that eligible contractors must: 1) Demonstrate a thorough understanding of and ability to implement this Waste Management Standard and all referenced legislation. 2) Possess or partner with waste management service providers who have the necessary registrations with authorities (e.g., for waste storage facilities over threshold volumes, transportation). 3) Have trained personnel competent in hazardous waste handling and emergency procedures. 4) Have systems to generate and maintain the required legal documentation (safety data sheets, manifests, disposal certificates).
Technical Specifications
Source: Waste Management Standard 32-245.pdf (unknown)The document is an Eskom Waste Management Standard (32-245), not a tender for defective concrete foundations. It outlines waste management requirements for Eskom operations, not technical specifications for a concrete repair tender. The content includes:
This standard is a generic internal policy document and does not contain any technical specifications related to the repair of defective concrete foundations at Ripon Traction substation.
Compliance Requirements
Source: Waste Management Standard 32-245.pdf (unknown)The document is an Eskom Waste Management Standard (32-245), not a tender-specific compliance document. It contains:
Health & Safety
Source: Waste Management Standard 32-245.pdfThe document is the Eskom Waste Management Standard (32-245). It contains requirements for the safe handling, storage, transportation, and disposal of waste, including hazardous waste, asbestos, and health care risk waste. It references safety legislation and standards. However, this is a generic internal standard and does not contain health and safety specifications for a concrete repair tender.
Environmental
Source: Waste Management Standard 32-245.pdfThe document is the Eskom Waste Management Standard (32-245). Its primary focus is environmental management of waste. It details Eskom's hierarchical approach to waste management, legal compliance with NEMA, NEMWA, and other regulations, and specific requirements for managing various waste streams (e.g., coal combustion products, hazardous waste, asbestos). It includes information on waste minimisation, recycling, reuse, recovery, and disposal. This is an internal policy document, not tender-specific environmental requirements.
Description
Source: Transmission Waste Management Business Plan 240-98818649_.pdfThis is a waste management plan document, not a tender for concrete repairs. Its primary description is:
Important Dates
Source: Transmission Waste Management Business Plan 240-98818649_.pdf (unknown)The document states an effective date of 31 March 2023 for the waste management plan update. This is not a tender closing date.
Contact Information
Source: Transmission Waste Management Business Plan 240-98818649_.pdf (unknown)For queries related to this waste management plan document:
Evaluation Criteria
Source: Transmission Waste Management Business Plan 240-98818649_.pdf (unknown)Not applicable as this is a strategic internal document. For a potential tender related to the Ripon Traction substation, eligibility would be defined in a separate, actual tender document.
Technical Specifications
Source: Transmission Waste Management Business Plan 240-98818649_.pdf (unknown)This is a waste management plan document, not a tender for concrete foundation repairs. The technical content describes the plan's scope and purpose:
Methodology
Source: Transmission Waste Management Business Plan 240-98818649_.pdfThe document describes the methodology used to update the waste management plan:
Quality Management
Source: Transmission Waste Management Business Plan 240-98818649_.pdfThe document lists sites visited during a site assessment for the waste management plan update, including clinics, laboratories, and offices. It references ISO 9001:2015 as a normative standard.
Compliance Requirements
Source: Transmission Waste Management Business Plan 240-98818649_.pdf (unknown)The document lists numerous legislative and standard references that form the compliance framework for the waste management plan. Key references include:
Health & Safety
Source: Transmission Waste Management Business Plan 240-98818649_.pdfThe document lists numerous legislative and standard references relevant to health, safety, and environment, including:
Environmental
Source: Transmission Waste Management Business Plan 240-98818649_.pdfThis is the core content of the waste management plan document. It includes:
Contractual Terms
Source: Transmission Waste Management Business Plan 240-98818649_.pdfThe document describes the operational mandates of various Eskom Transmission business units (Network Service Provider, Systems Operator, Market Operator, International Trader). It states the plan's effective date is upon approval and signing. This is not tender-specific contractual terms.
Requirements
Source: Transmission Waste Management Business Plan 240-98818649_.pdf (unknown)The document lists extensive normative and informative references that form the requirements framework for the waste management plan, including:
Section
Source: Transmission Waste Management Business Plan 240-98818649_.pdf1) ISO 9001:2015 Quality Management Systems
13) National Environmental Management: Air Quality Act, 2004 (Act No. )
Description
Source: C0 ECC3 Contract cover page .docProvision of ripon traction substation defective concrete foundations civil works for 6 months]
Evaluation Criteria
Source: C0 ECC3 Contract cover page .doc (unknown)Contractor must be a registered legal entity (registration number required). Must have capacity to undertake civil works for electrical substation foundations. Specific technical qualifications not detailed in visible content but likely required in full tender documents.
Technical Specifications
Source: C0 ECC3 Contract cover page .doc (unknown)Provision of ripon traction substation defective concrete foundations civil works for 6 months]
Description
Source: OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2.pdf (TENDER)National Transmission Company South Africa SOC Ltd (hereinafter βNTCSAβ) invites you to submit a tender for the Defective concrete foundations at Ripon Traction substation for a period of 06 months.
Important Dates
Source: OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2.pdf (TENDER){"closingDate":"11 June 2026","closingTime":"10h00","briefingSession":"{\"date\":\"25 June 2026\",\"time\":\"10h00\",\"venue\":\"e: 25 June 2026\",\"is_compulsory\":true}"}
Contact Information
Source: OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2.pdf (TENDER){"name":null,"email":null,"phone":null,"department":null,"address":"ions of Tender which may"}
Submission Guidelines
Source: OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2.pdf (TENDER)Returnable Documents: The 5 working days period does not apply to CIDB proof of grading. Refer to the returnable, table the prescribed period for CIDB proof of grading.
Returnable Documents
Source: OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2.pdf (TENDER)1.1 Annexures and Returnable Documents to the Tender The documents listed in this paragraph are either attached to this enquiry or should be submitted by the tenderer. The tenderer must submit the returnable set out hereunder as part of its tender at the stipulated deadline. NOTE THE FOLLOWING: -
Evaluation Criteria
Source: OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2.pdf (TENDER)Tenderers are ineligible if: 1) Nationality is from a sanctioned country, 2) Submit multiple tenders (except for system size limits), 3) JV/consortium agreement lacks joint/several liability clause, 4) Have a conflict of interest, 5) Are restricted by National Treasury or on Tender Defaulters list, 6) Subcontract 100% of scope, 7) Are 'flagged suppliers' (implicated in misconduct per Zondo Report/SIU, or on restricted list), 8) Are not registered with CIDB in required grading (5CE), 9) Fail to attend compulsory site visit.
Technical Specifications
Source: OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2.pdf (TENDER)appointments before and after
submitting tenders. NTCSA employees not involved in this enquiry process are not allowed to
contact those that are involved in this process or share enquiry related information with potential
tenderers.
Where a potential tenderer or a tenderer has any question or query on the contents of the enquiry
or any issue related to
Methodology
Source: OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2.pdf1.2 40
activities from start to end activities = 4, Most
duration does not make
sense = 2, No duration
specified = 0
A2 Construction/method statements 30
2.1 Relevancy of method 100 Relevant, well detailed
statements with a description and all required
of how the main activities will submitted = 5(if any
be constructed irrelevant submitted, to
be ignored), Missing
few important
steps/activities missed
= 4, Mostly irrelevant
submitted and with very
few relevant or basic
submitted =2, Irrelevant
or none provided = 0
A3 List of Subcontractors 10
Pricing Schedule
Source: OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2.pdf3.19 Ranking of tenders Tenderers will be ranked by applying the preferential point scoring for the
80/20 system. NTCSA will add the score from Pricing and Specific Goals
together and rank the suppliers from the highest to the lowest.
3.2 Objective Criteria Objective criteria are applicable.
Financial Requirements
Source: OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2.pdf (TENDER)Payment Terms: Payment Terms Tenderers are requested to bear in mind NTCSA's standard payment
terms as stipulated hereunder when submitting tenders and
concluding contracts with NTCSA:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT,
NTCSA is committed to paying Suppliers within 30 days of receipt of
undisputed invoices.
For contracts valued
Compliance Requirements
Source: OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2.pdf (TENDER)A certified copy of a tax clearance certificate is required from foreign tenderers (with a footprint in South Africa but that are not registered on CSD and have Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, Β© copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 70 File name: 559-235050781 OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2- E2627NTCSAMWPR Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Identifier Invitation to Tender Effective Date July 2024 Review Date July 2027 not provided a SARS pin number) and local tenderers (that have not provided their SARS e- filing PIN number for verification by NTCSA and/or their CSD profile / CSD number). Foreign suppliers with no footprint in South Africa must complete the SBD1 document; however, no proof of tax compliance is required. 1.1.11 Tax Evaluation N/A questionnaire to determine whether a company, close corporation (CC) or Trust is a personal service provider for purposes of PAYE 1.1.12 *SBD 6.1 Annexure I Y β Proof of valid and Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, Β© copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 70 File name: 559-235050781 OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2- E2627NTCSAMWPR Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Identifier Invitation to Tender Effective Date July 2024 Review Date July 2027 current CSD Registration (CSD number/CSD Report) [applicable to all tenderers of local origin and foreign tenderers with local footprint] ADDITIONAL CONTRACTUAL REQUIREMENTS SUPPORTING EVIDENCE 1.1.36 Safety β COIDA - Original certificate of good standing or proof of application issued by the Compensation Fund (COID) or a licensed compensation insurer (South African tenderers only) 1.1.37 Quality β requirements. Refer to SHEQ folder. 1.1.38 Other β safety/quality documents as required per scope of works. Refer to SHEQ folder. 1.1.39 Environmental. β Refer to SHEQ folder. 1.1.40 Due β Diligence/financia l analysis Audited Financial Statements of the tenderer for the previous 18 Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, Β© copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 70 File name: 559-235050781 OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2- E2627NTCSAMWPR Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Identifier Invitation to Tender Effective Date July 2024 Review Date July 2027 months, or to the extent that such statements are not available, for the last year. In the case of a joint venture or special purpose vehicle (SPV) specially formed for this tender, audited financial statements for each participant in the JV / SPV must be submitted. Start-up enterprises formed within the last 12 months are not required to submit audited financial statements, but if successful in this enquiry; will be required to furnish statements for the first year once available. DOCUMENTS REQUIRED UNDER FUNCTIONALITY/TECHINICAL CRITERIA 1.1.41 Functionality/Tec Y β hnical. Refer to document to document - Unique Identifier: RIP24P01-SE- D86. Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, Β© copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 70 File name: 559-235050781 OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2- E2627NTCSAMWPR Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Identifier Invitation to Tender Effective Date July 2024 Review Date July 2027 1.2. Tender Data The Tender Data makes several references to the Standard Conditions of Tender and in those instances, the clause numbers are referenced hereunder. If the Standard Conditions of Tender are not attached to the enquiry, then tenderers are required to download this from www.ntcsa.co.za. The βTender Dataβ as detailed herein shall take precedence over the Standard Conditions of Tender in the event of any ambiguity or inconsistency between the two documents. Clause Number from Standard Tender Data Conditions of Tender 1.1 Parties The Employer is NTCSA SOC Ltd Name: Dineo Maepa Tel: + 27 17 749 5775 E-mail: [email protected] 1st tier Escalations can be directed to: Name: Olga Tshabalala Tel: +27 11 800 5842 E-mail: [email protected] 2nd Tier Escalations can be directed to: Name: Frans Pooe Tel: +27 11 800 5842 E-mail: [email protected] 1.3 Enquiry documents The Invitation to tender number is: E2627NTCSAMWPR See the content list above for the enquiry documents. 1.4 Type of enquiry This enquiry is
An open invitation to tender 1.6 NTCSA's rights to accept or The tender shall be for the whole of the contract. reject any tender 2.1 Eligibility Tenderers (whether a single company or an incorporated or unincorporated joint venture or consortium) must meet the eligibility criteria stated in the Tender Data. The tenderer, or any of its principals, must not be under any restriction to do business with NTCSA or State-Owned Companies. Tenderers are ineligible to submit a tender if
Tenderers have the nationality of a country on any international sanctions list. A tenderer shall be found to have the nationality of a country if the tenderer is a national or is constituted, incorporated, or registered and operates in conformity with the provisions of the laws of that country. This criterion shall also apply to the determination of the Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, Β© copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 70 File name: 559-235050781 OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2- E2627NTCSAMWPR Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Identifier Invitation to Tender Effective Date July 2024 Review Date July 2027 nationality of proposed subcontractors or suppliers for any part of the Contract including related services.
Tenderers submit more than one tender either individually or as a partner in a joint venture (JV) or consortium, except on an E-Tendering system where there is a limit size (The upload size per document is 500 megabytes and total submission is restricted to 4 gigabytes).
Tenders submitted by a joint venture or consortium where the JV/consortium agreement does not explicitly state that the parties of the JV or consortium shall be jointly and severally liable for the execution of the Contract in accordance with the Contract terms.
A Tenderer must not have a conflict of interest. All Tenderers found to have a conflict of interest shall be disqualified. Prima facie evidence that a tenderer has a conflict of interest with one or more parties in this tendering process is: (a) they have a controlling partner or majority shareholder in common; or (b) they have a relationship with each other, directly or through common third parties, that puts them in a position to have access to information about or influence on the tender of another tenderer, or to influence the decisions of the Employer regarding this bidding process;
Tenders signed by non- authorised persons.
Any tenderer that is restricted by National Treasury.
Any tenderer on the Tender Defaulters list.
A tenderer that sub-contracts 100% of the Scope of Work.
Flagged suppliers. Ineligible of the flagged suppliers/tenderers will be due to the following reasons
Those suppliers implicated in serious misconduct by the Zondo Report or the SIU pending the finalisation of supplier disciplinary measures against these suppliers; and
Other suppliers implicated in serious misconduct and a breach of the Eskom Supplier Integrity Pact by a forensic report or other source of credible information, such as the SAPS, the NPA, the SIU or other related source.
List of Restricted Suppliers and Defaulters as per PRECCA as issued by National Treasury The implications of this βflagβ are as follows: o No new contracts or extension of existing contracts may be awarded to the supplier pending finalisation of supplier disciplinary processes against the supplier. Where a As such, the supplierβs bid should be removed from any tender evaluation at the βeligibilityβ or βcomplianceβ assessment stage of the evaluation. Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, Β© copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 70 File name: 559-235050781 OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2- E2627NTCSAMWPR Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Identifier Invitation to Tender Effective Date July 2024 Review Date July 2027 NTCSA will disqualify tenderers that are found not to have met the eligibility criteria. 2.2 -2.5 Tender Closing The deadline for tender submission is: Date: 10 July 2026 Time: 10h00 (SAST) Late Tenders will not be accepted. Tenders are uploaded via NTCSA Tender bulletin site on the Eskom E- tendering page. 2.9 Submitting a tender For Electronic Tender Submissions. The tenderer must upload the tender via NTCSA Tender bulletin site on the Eskom E- tendering page. The documents need to be upload under the folder Technical, Commercial, Financial, and other. All documents need to be submitted in a PDF format (The upload size per document is 500 megabytes and total submission is restricted to 4 gigabytes). The price list may be submitted in PDF and a copy in excel format. No Zip/condense files can be uploaded No hard copy will be accepted If for some reason you resubmit your tender, then the latest version of the tender submitted will only be accepted and all previous submission/s will be null and void. Please ensure that the submission status is indicated as complete. Supplier Help Manual guide and video can be found on Eskom E-Tendering page. 2.12 Tender Validity Period The tender validity period is twelve (12) weeks: NTCSA may extend the validity period for a specified additional period. Should extension of validity be required by NTCSA, tenderers agreeing to the request will not be required or permitted to modify a tender. If a tenderer modifies a tender, such a tender will be disqualified from the evaluation process. 2.15 clarification meeting 1. Clarification Meeting A non-compulsory clarification meeting with representatives of NTCSA will take place as follows: Date: 19 June 2026 Time: 10h00 (SAST) Venue: MS Teams (Virtual) Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, Β© copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 70 File name: 559-235050781 OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2- E2627NTCSAMWPR Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Identifier Invitation to Tender Effective Date July 2024 Review Date July 2027 Meeting Link: https://teams.microsoft.com/meet/395363784914145?p=Z CHnhPS1dPtLrbIgH5 Tenderers can participate in the virtual clarification meeting by clicking on the link above.
Site Visit (Compulsory) Date: 25 June 2026 Time: 10h00 (SAST) Venue: Ripon Traction Substation GPS Coordinates: 33.077531S 25.846946E Note: Failure to attend the compulsory site visit, will result in your tender being disqualified Tenderers to confirm their intention to attend with the NTCSA Representative, stating the name, position and contact details of each proposed attendee. Please note that if the tender stipulates that a clarification meeting is mandatory/compulsory, then tenderers must attend such meeting. Tenderers that do not attend such mandatory/compulsory meeting will be disqualified and will not be evaluated. 2.16 Seeking clarification The tenderer will notify NTCSA of any clarifications required before the closing time for clarification queries, which is 05 working days before the deadline for tender submission. This includes the requests for extension for tender closing date. Any addenda or clarifications to the Invitation to Tender (ITT) will be posted on the e-tender portal and the Tender Bulletin. Tenderers must review these platforms for updates before finalizing their bid submissions. NTCSA will not be responsible for any disadvantages or disqualifications resulting from Tenderers not accessing the latest ITT information. 2.22 Alternative tenders Alternative tenders are not allowed. 2.33 Cataloguing The successful tenderer may be required to provide the cataloguing information per item after contract award, and in that instance, will need will to ensure that all materials delivered to NTCSA are labelled in line with NTCSAβs labelling specifications as may be stipulated. Where cataloguing is a requirement, the Pricing Schedule must also include a line item for cataloguing, which tenderers are required to quote for. NTCSA will pay for the cataloguing. 2.34 Provision of Security for Provision of security for performance is not applicable Performance 3.4 Tender Opening For E-tendering. There will be no public opening of tenders. Tenders will be downloaded electronically. Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, Β© copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 70 File name: 559-235050781 OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2- E2627NTCSAMWPR Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Identifier Invitation to Tender Effective Date July 2024 Review Date July 2027 3.5 Prices to be read out or not Prices will not be read out. 3.9 Basic Compliance Basic compliance with this enquiry requires a tenderer to meet all the following requirements: Basic compliance for this invitation to tender are
Meet the eligibility criteria for a tenderer
Submit a complete tender with commercial, financial and technical information
Submission of the mandatory commercial tender returnables as at stipulated deadlines. For E-Tendering, a tendererβs failure to have submitted/uploaded tender documents will render the tender non-responsive. 3.10 Mandatory tender A tenderer that does not submit mandatory documents or the complete returnables information required in mandatory documents by the deadlines stipulated in the Tender Returnable section will be deemed non-responsive. 3.13 Functionality requirements Functionality requirements are applicable. The following criteria will be applicable for this transaction under functionality criteria: Qualitative Evaluation Criteria Tenderers will be evaluated against a weighted scorecard. Tenderers who do not meet the minimum threshold of 70% will not be evaluated further. Functionality will be evaluated as per the table below: Functionality Minimum Threshold Weighting Criteria for Qualification Technical 100% 70% The detailed technical evaluation criteria is aforementioned below in Table
NB: Tenderers will be expected to score at least 70% to proceed to the next stage, if tenderers score below 70%, they will be considered technically unacceptable. Controlled Disclosure When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, Β© copyright NTCSA SOC Ltd, Reg No 2021/539129/30 of 70 File name: 559-235050781 OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2- E2627NTCSAMWPR Template ID: 240-43921804 (Rev 7) Header and Footer portrait template Document 559-235050781 Rev 3 Identifier Invitation to Tender Effective Date July 2024 Review Date July 2027 Table 1: Substation Civil Works Qualitative Technical Evaluation Criteria Reference to Criteria Technical Criteria Qualitative Technical Criteria Sub Specification / Weighting Score Clarification Description Weighting Tender (%) (%) Returnable A1 Construction Program/Technical 20
B-BBEE Details: Claim Form in
terms of PPPFA
2022 regulations
1.1.13 # Specific Goals β
A tendererβs
failure to submit
proof that it meets
the specific goals
will not result in
its
disqualification.
The tenderer will,
however, be
scored zero for
Controlled Disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests
with the user to ensure it is in line with the authorized version on the system. No part of this document may be
reproduced in any manner or form by third parties without the written consent of NTCSA SOC Ltd, Β© copyright NTCSA
SOC Ltd, Reg No 2021/539129/30
of 70
File name: 559-235050781 OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2- E2627NTCSAMWPR
Template ID: 240-43921804 (Rev 7) Header and Footer portrait template
Document 559-235050781 Rev 3
Identifier
Invitation to Tender
Effective Date July 2024
Review Date July 2027
Specific Goals for
purposes of
PPPFA scoring
and ranking.
1.1.14 Compliance with β
Employment
Equity Act
To the extent that
the tenderer falls
within the
definition of a
βdesignated
Employerβ as
contemplated in
the Employment
Equity Act , the
tenderer is
required to
furnish the
Employer with
proof of
compliance with
the Employment
Equity Act,
including proof of
submission of the
Employment
Equity report to
the Department of
Labour. (South
African tenderers
only)
1.1.15 **SBD 4 β Annexure J Y β
Bidders
Disclosure
1.1.16 Additional Documents required in event of JV:-
1.1.16 Letter of intent to β
.1 form a
JV/consortium or
Valid joint venture
agreement
confirming the
rights and
obligations of
each of the joint
venture partners
Controlled Disclosure
When downloaded from the document management syste
B-BBEE Requirements
Source: OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2.pdf (TENDER)3.18 Evaluation of Specific Goals Specific goals will be scored out of 20 points in accordance with the PPPFA. If a tenderer fails to submit evidence of its points claim for a Specific Goal, it will not be disqualified. However, it will be awarded 0 points for that Specific Goal. 3.19 Ranking of tenders Tenderers will be ranked by applying the preferential point scoring for the 80/20 system. NTCSA will add the score from Pricing and Specific Goals together and rank the suppliers from the highest to the lowest.
Health & Safety
Source: OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2.pdffolder.
1.1.38 Other β
safety/quality
documents as
required per
scope of works.
On-Job Training Civil Technician 1
On-Job Training Safety Officer 1
Environmental
Source: OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2.pdffolder.
1.1.39 Environmental. β
Contractual Terms
Source: OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2.pdfsanctions list. A tenderer shall be found to have the nationality of a
country if the tenderer is a national or is constituted, incorporated, or
registered and operates in conformity with the provisions of the laws of
that country. This criterion shall also apply to the determination of the
following reasons:
a) Those suppliers implicated in serious misconduct by the Zondo Report
or the SIU pending the finalisation of supplier disciplinary measures
against these suppliers; and
b) Other suppliers implicated in serious misconduct and a breach of the
terms as stipulated hereunder when submitting tenders and
concluding contracts with NTCSA:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT,
NTCSA is committed to paying Suppliers within 30 days of receipt of
undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including
VAT, NTCSA is committed to paying suppliers within 60 days of receipt of
undisputed invoices.
2.29-2.30 Contract Skills The conditions of contract will be NEC3 Engineering Construction Contract
Development Goal (CSDG) and (ECC).
when submitting tenders and concluding contracts with NTCSA:
For contracts valued below R50 000 000 (Fifty Million Rand) including VAT, NTCSA is committed
to paying Suppliers within 30 days of receipt of undisputed invoices.
For contracts valued above R50 000 000 (Fifty Million Rand) including VAT, NTCSA is committed
to paying suppliers within 60 days of receipt of undisputed invoices.
Requirements
Source: OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2.pdf (TENDER)Contractual Requirements Mandatory Contractual Requirements that must be included in all tenders is the following:-
Section
Source: OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2.pdf# Returnables required at Tender Closing date and time for evaluation
not be disqualified but will score zero.
Documents required under functionality/techinical criteria
1.1.41 Functionality/Tec Y β
evaluation purposes but will be implemented when payment is
Prices will be scored out of 80 points
3.18 Evaluation of Specific Goals Specific goals will be scored out of 20 points in accordance with the
If a tenderer fails to submit evidence of its points claim for a Specific Goal,
it will not be disqualified. However, it will be awarded 0 points for that
80/20 system. NTCSA will add the score from Pricing and Specific Goals
Contractual Requirements are not evaluation criteria. They will be
assessed after the evaluation and ranking of the tenders. Proof that
1.1.37 Quality β
safety/quality
1.1.11 Tax Evaluation N/A
Preference Points
terms of PPPFA
1.1.13 # Specific Goals β
the specific goals
scored zero for
Specific Goals for
PPPFA scoring
Description
Source: Environmental Requirements for Contractors and or Suppliers.pdfImportant Dates
Source: Environmental Requirements for Contractors and or Suppliers.pdf (unknown)Evaluation Criteria
Source: Environmental Requirements for Contractors and or Suppliers.pdf (unknown)Suppliers must provide valid and authentic environmental documentation for evaluation. They must be conversant with South African environmental legislation and Eskom's specific site requirements. The standard lists exempted suppliers (e.g., municipalities, retailers for consumables), but construction/service contractors like those for foundation repair are not exempt. Eligibility is contingent on meeting the pre-determined environmental criteria for the project's risk level (High, Medium, Low).
Technical Specifications
Source: Environmental Requirements for Contractors and or Suppliers.pdf (unknown)Quality Management
Source: Environmental Requirements for Contractors and or Suppliers.pdfCompliance Requirements
Source: Environmental Requirements for Contractors and or Suppliers.pdf (unknown)Health & Safety
Source: Environmental Requirements for Contractors and or Suppliers.pdfEnvironmental
Source: Environmental Requirements for Contractors and or Suppliers.pdfContractual Terms
Source: Environmental Requirements for Contractors and or Suppliers.pdfDescription
Source: Environmental Requirements Proforma 1.pdfReturnable Documents
Source: Environmental Requirements Proforma 1.pdf (unknown)Evaluation Criteria
Source: Environmental Requirements Proforma 1.pdf (unknown)General
Legal
Technical
Technical Specifications
Source: Environmental Requirements Proforma 1.pdf (unknown)Compliance Requirements
Source: Environmental Requirements Proforma 1.pdf (unknown)Health & Safety
Source: Environmental Requirements Proforma 1.pdfDescription
Source: Drawing RIP24P01-SE-D53-1-0.pdfScope: Refurbishment of cracked concrete foundations at Ripon Traction Substation.
Important Dates
Source: Drawing RIP24P01-SE-D53-1-0.pdf (unknown)Closing time: 1:20. No other dates (like briefing or site visit) are specified.
Submission Guidelines
Source: Drawing RIP24P01-SE-D53-1-0.pdf (unknown)Returnable Documents: Not specified in the document.
Evaluation Criteria
Source: Drawing RIP24P01-SE-D53-1-0.pdf (unknown)General
Technical
Technical Specifications
Source: Drawing RIP24P01-SE-D53-1-0.pdf (unknown)The work involves refurbishing cracked concrete foundations at Ripon Traction Substation.
Compliance Requirements
Source: Drawing RIP24P01-SE-D53-1-0.pdf (unknown)No specific compliance requirements (like CSD, B-BBEE, CIDB) are stated in the document.
Health & Safety
Source: Drawing RIP24P01-SE-D53-1-0.pdfSpecific health and safety requirements are not detailed in the document.
Description
Source: Rippon Traction SS Deflective Foundations C1 2a ECC3 Data by Employer 09 June 2026.docxEvaluation Criteria
Source: Rippon Traction SS Deflective Foundations C1 2a ECC3 Data by Employer 09 June 2026.docx (unknown)Contractor must be willing to work within a live high voltage yard; must have capacity to manage risks including security of materials, Transnet operations, and working in energized environment; must comply with South African law and B-BBEE requirements; joint ventures must declare joint and several liability; contractor cannot cede/delegate/assign rights without Employer consent; must have insurance as per contract requirements.
Technical Specifications
Source: Rippon Traction SS Deflective Foundations C1 2a ECC3 Data by Employer 09 June 2026.docx (unknown)Financial Requirements
Source: Rippon Traction SS Deflective Foundations C1 2a ECC3 Data by Employer 09 June 2026.docx (unknown)Compliance Requirements
Source: Rippon Traction SS Deflective Foundations C1 2a ECC3 Data by Employer 09 June 2026.docx (unknown)Description
Source: Site Visit - Ripon Traction SS - E2627NTCSAMWPR.docxImportant Dates
Source: Site Visit - Ripon Traction SS - E2627NTCSAMWPR.docx (unknown)Evaluation Criteria
Source: Site Visit - Ripon Traction SS - E2627NTCSAMWPR.docx (unknown)Attendance at the compulsory site visit is mandatory. Non-attendance results in automatic disqualification. Tenderers must be able to comply with Eskom safety protocols and provide appropriate personnel identification. The tender appears open to qualified contractors capable of concrete foundation repair and maintenance work at electrical substations.
Technical Specifications
Source: Site Visit - Ripon Traction SS - E2627NTCSAMWPR.docx (unknown)Description
Source: Ripon Traction Substation Defective Foundations C2 ECC3 Pricing Data Option B.docRepair of defective concrete foundations at Ripon Traction substation. Contract duration: 06 months. Contract type: NEC3 Engineering and Construction Contract (ECC3) Option B β a re-measurement contract where payment is based on measured quantities multiplied by rates, plus lump sum items. The Contractor Provides the Works in accordance with the Works Information (not the Bill of Quantities). The Bill of Quantities is only a pricing document.
Important Dates
Source: Ripon Traction Substation Defective Foundations C2 ECC3 Pricing Data Option B.doc (unknown)This document does not contain important dates. Briefing session details, site visit dates, clarification deadlines, and closing date should be found in the invitation to tender or Part 1. The tender closing date is stated in the tender record (2026-07-10 at 10:00).
Contact Information
Source: Ripon Traction Substation Defective Foundations C2 ECC3 Pricing Data Option B.doc (unknown)This document does not contain contact information. SCM officials, technical contacts, and submission addresses should be found in the invitation to tender or cover pages. Bidders must obtain the complete tender pack for contact details.
Submission Guidelines
Source: Ripon Traction Substation Defective Foundations C2 ECC3 Pricing Data Option B.doc (unknown)This document (Part C2: Pricing Data) does not contain submission guidelines. Submission requirements, returnable documents, and submission address should be found in the invitation to tender or Part 1 of the tender documentation. Bidders must obtain the complete tender pack to determine submission requirements.
Evaluation Criteria
Source: Ripon Traction Substation Defective Foundations C2 ECC3 Pricing Data Option B.doc (unknown)No explicit eligibility criteria stated in provided text. Likely standard Eskom/NTCSA prequalification requirements apply (e.g., CIDB grading, tax compliance, B-BBEE). Tenderers must understand NEC3 ECC Option B and re-measurement contracts.
Technical Specifications
Source: Ripon Traction Substation Defective Foundations C2 ECC3 Pricing Data Option B.doc (unknown)This document is Part C2 (Pricing Data) only and does not contain technical specifications or scope of work. The Bill of Quantities is only a pricing document β specifications and work descriptions are contained in the Works Information (separate document). The contract uses NEC3 ECC3 Option B (re-measurement contract). Work categories indicated include: Preliminary and Generals, Gantry Foundations, Fence, and Provisional Sums. Bidders must obtain the Works Information to understand the actual scope of work for defective concrete foundations at Ripon Traction substation.
Financial Requirements
Source: Ripon Traction Substation Defective Foundations C2 ECC3 Pricing Data Option B.doc (unknown)Pricing format: NEC3 ECC3 Option B re-measurement contract. Payment basis: quantities multiplied by rates, plus lump sum items. The Bill of Quantities quantities may not be final β actual payment is based on work assessed and certified by the Project Manager at each assessment date. No general provision for advance payment for materials on Site before incorporation (unless secondary Option X14 is used). Prices must be fully inclusive of all work, risks, liabilities, obligations, overheads, and profit. Compensation events use Defined Cost plus Fee (not Bill of Quantities rates), unless Contractor and Project Manager agree otherwise. Measurement units are metric.
Compliance Requirements
Source: Ripon Traction Substation Defective Foundations C2 ECC3 Pricing Data Option B.doc (unknown)This document does not contain compliance requirements. B-BBEE, tax clearance, CSD registration, CIDB requirements, and other compliance criteria should be found in Part 1 or the invitation to tender. Bidders must obtain the complete tender pack to determine compliance requirements.
Description
Source: Rippon Traction SS Deflective Foundations C3 1 ECC3 Employers Works Information.docThe project involves refurbishing defective concrete foundations, replacing the perimeter fence with a high-security fence, and constructing an erosion protection embankment at Ripon Traction Substation to ensure reliable power supply and Grid Code compliance.
Submission Guidelines
Source: Rippon Traction SS Deflective Foundations C3 1 ECC3 Employers Works Information.doc (unknown)Returnable Documents: No specific submission guidelines or returnables are detailed in the extracted text. Refer to the main tender advertisement for submission instructions.
Evaluation Criteria
Source: Rippon Traction SS Deflective Foundations C3 1 ECC3 Employers Works Information.doc (unknown)1) Valid B-BBEE certificate or sworn affidavit (required for contract award), 2) ISO 9001 certification for contractor and suppliers, 3) Compliance with Occupational Health & Safety Act No. 85 of 1993 and NTCSA's Construction Safety, Health and Environmental Management 32-136, 4) Ability to work in live HV environment with ORHVS-certified personnel, 5) Financial thresholds: Companies with revenue β€R10M may submit sworn affidavit (EME), R50Mβ€ must comply with QSE scorecard, >R50M require valid B-BBEE certificate, 6) Must meet local procurement content targets and designated group spending requirements.
Technical Specifications
Source: Rippon Traction SS Deflective Foundations C3 1 ECC3 Employers Works Information.doc (unknown)Scope of work includes:
Financial Requirements
Source: Rippon Traction SS Deflective Foundations C3 1 ECC3 Employers Works Information.doc (unknown)Payment terms:
Compliance Requirements
Source: Rippon Traction SS Deflective Foundations C3 1 ECC3 Employers Works Information.doc (unknown)B-bbee:
Other:
Description
Source: SDL&I - Ripon Traction Substation Defective Concrete Foundations.pdfReturnable Documents
Source: SDL&I - Ripon Traction Substation Defective Concrete Foundations.pdf (TENDER)NB: The following documents are required to claim preference points,
CIPS Certificate
breakdown
Evaluation Criteria
Source: SDL&I - Ripon Traction Substation Defective Concrete Foundations.pdf (TENDER)Tenderers must have CIDB grading of 5CE or higher; Must meet 100% local content threshold for cement concrete and steel barrier fence; Must submit valid B-BBEE certificate or sworn affidavit as condition for contract award (threshold depends on annual revenue: Sworn affidavit for R10M or less, QSE compliance for R50M or less, full B-BBEE certificate for above R50M); Must comply with designated sector requirements; Tenderers not providing preference documentation will score 0 points for specific goals but will not be disqualified.
Technical Specifications
Source: SDL&I - Ripon Traction Substation Defective Concrete Foundations.pdf (TENDER)Methodology
Source: SDL&I - Ripon Traction Substation Defective Concrete Foundations.pdfPricing Schedule
Source: SDL&I - Ripon Traction Substation Defective Concrete Foundations.pdfFinancial Requirements
Source: SDL&I - Ripon Traction Substation Defective Concrete Foundations.pdf (TENDER)Compliance Requirements
Source: SDL&I - Ripon Traction Substation Defective Concrete Foundations.pdf (TENDER)B-BBEE Requirements
Source: SDL&I - Ripon Traction Substation Defective Concrete Foundations.pdf (TENDER)Health & Safety
Source: SDL&I - Ripon Traction Substation Defective Concrete Foundations.pdfContractual Terms
Source: SDL&I - Ripon Traction Substation Defective Concrete Foundations.pdfRequirements
Source: SDL&I - Ripon Traction Substation Defective Concrete Foundations.pdf (TENDER)Important Dates
Source: Health Safety Specification_559-559476474_Rev 1 _Ripon Traction SS.pdf (unknown){"closingDate":"23 June 2025","briefingSession":"{\"date\":\"03 November 2025\",\"time\":null,\"venue\":\"e, and the outer barrier fence is in a poor state and corroded.\",\"is_compulsory\":false}"}
Evaluation Criteria
Source: Health Safety Specification_559-559476474_Rev 1 _Ripon Traction SS.pdf (unknown)General
Technical
Health And Safety
Financial
Technical Specifications
Source: Health Safety Specification_559-559476474_Rev 1 _Ripon Traction SS.pdf (unknown)The aim of the Health & Safety (H&S) specification is to provide principal contractor/s and suppliers
with:
compliance to legal and Eskomβs/ NTCSA H&S requirements.
contract.
NTCSA strives to exceed the minimum standards prevailing in the construction industry and requires
full commitment from all parties to be pro-active to achieve best H&S business practice.
This H&S Specification is intended for principal contractor and their contractors to develop a H&S
plan that meets the specified requirements.
2. Supporting Clauses
2.1 Scope
This H&S specification sets out the minimum legal and NTCSA requirements for construction work
that is specific to the scope of work, site, and type of project.
2.2 Purpose
To indicate to principal contractor the H&S requirements on the project, upon which their planning
for the management of H&S will be based on and thus produce their H&S plan.
2.3 Applicability
This specification is only applicable to the project as mentioned on the first page, title all principal
contractors, contractors, service providers, suppliers and all the activities and processes carried out
for and on behalf of PD.
This specification shall be implemented from the date of approval.
3. Normative/Informative References
Parties using this specification shall apply the most recent edition of the documents listed below.
3.1 Normative
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
Standards β SANS)
3.2 Informative
[1] ISO 45001:2018, Occupational Health and Safety Management Systems-Requirements
[2] ISO 9001:2015 Quality Management Systems- Requirements
4. Definitions
Authorised person: a competent person who has been given permission in writing to perform
specific duties and responsibilities in terms of the Operating Regulations for High Voltage Systems.
Baseline risk assessment: (32-520) baseline operational risks refer to the H&S risks associated
with all standard processes, as well as routine and non-routine activities in the business.
Critical Lifts: (1) any lift weighing in excess of 20 tons, (2) any lift involving a crane suspended work
platform (man cage), (3) any lift over critical operating and/or process equipment and (4) any lift that
exceeds 85 % of the craneβs load chart (5) any lift that utilises more than one lifting device (Tandem
Lift).(6) Load transfers.(7) night lifting.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
Eskom Requirements: Eskom requirements, which evolve from directives, policies, standards,
procedures, specifications, work instructions, guidelines, or manuals.
Hazard identification: the identification and documenting of existing or expected hazards to the
health and safety of persons, which are normally associated with the type of construction work being
executed or to be executed.
Medical surveillance: a planned programme or periodic examination (which may include clinical
examinations, biological monitoring, or medical tests) of employees by an occupational health
practitioner or, in prescribed cases, by an occupational medicine practitioner.
Method Statement: is a written document detailing work procedures and sequences of operations.
On Site/Site: any workplace where the contractor or his employees perform construction related
work as agreed contractually with the client.
Planned Task Observation: an independent observation made during the planned period in which
the task is being executed.
Pre-Task Risk Assessment: a meeting held prior to the commencement of the dayβs work with
relevant personnel (client representative included) associated with the task at hand.
Risk Assessment: a programme to determine any risk associated with any hazard at a construction
site in order to identify the steps needed to be taken to remove, reduce, or control such hazard.
H&S File: a file or other record in permanent form, containing the information on the H&S
management system during construction including all information relating to construction phase after
the handover to Client.
Safe Work Procedures: a series of specific steps that guide a worker through a task from start to
finish in a chronological order. Safe work procedures are designed to reduce the risk by minimizing
potential exposure.
5. Abbreviations
Abbreviation Explanation
AIA Approved Inspection Authority
COIDA Compensation for Occupational Injuries and Diseases Act
CR Construction Regulations
CHSA Construction Health & Safety Agent
CWP Construction Work Permit
DMR Driven Machinery Regulations
DSTI Daily Safety Task Instruction
EA Environmental Authorization
ECO Environmental Control Officer
FAS Fall Arrest Systems
GSR General Safety Regulations
RHCA Regulations for Hazardous Chemical Agents, 2020
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
Abbreviation Explanation
H&S Health and Safety
HIRA Hazard identification and risk assessment
HV High Voltage
LDV Light Delivery Vehicles
LMI Lifting Machine Inspector
LME Lifting Machine Entity
LTIR Lost Time Incident Rate
NEC New Engineering Contract
NEMA National Environmental Management Act
NTCSA National Transmission Company South Africa
NQF National Qualifications Framework
OHNP Occupational Health Nursing Practitioner
OHS Act Occupational Health and Safety Act No.
OHS Occupational Health and Safety
ORHVS Operating Regulations for High Voltage Systems
PPE Personal Protective Equipment
PTO Planned Task Observations
RSA Republic of South Africa
SANAS South African National Accreditation System
SANS South African National Standards
SACPCMP South African Council for the Project & Construction Management Professions
SAQA South African Qualifications Authority.
SDS Safety Data sheets
SHEQ Safety, Health, Environment Quality
SETA Skills Education Training Authorities
SWP Safe Work Procedure
PD Project Delivery
VFL Visible Felt Leadership
6. Key Eskom PD Project Team
Manages the contract signed with the principal contractor and ensures that H&S specifications are
developed and issued with tender enquiries, and that the principal contractorβs H&S plan is approved
prior to commencement of work. He must ensure that applicable legal and other requirements are
complied with by the principal contractor and (if applicable) their contractors. The project manager,
thus takes the overall accountability of this project as
Is responsible for the overall management of the project design as well as ensuring the management
of the compliance of the completed works to the design during and after construction on site.
Where a construction permit is required, the Agent shall act as the representative of the client on
issues of H&S. The duties of the client shall, as far as is reasonably practical, apply to the Agent.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
The Agent shall approve the principal contractor H&S plan. He/she will be responsible for auditing
and ensuring compliance to legal requirements as per the condition of the CWP.
Maluleke
Provides assurance, advice, and support to the project in the management of the H&S issues on the
project. They will also assist in the development of projectβs H&S Specifications which will be issued
with enquiry documents, and that the principal contractorβs H&S plan is submitted; evaluated and
approved. They will be responsible for auditing and ensuring compliance to legal requirements. The
H&S Senior Advisor shall approve the principal contractor H&S plan in all projects that does not have
a CWP.
7. Roles and Responsibilities
7.1 Visible Commitment
Visible commitment is essential in providing a safe work environment. managers, supervisors, and
employees at all levels must demonstrate their commitment by being proactively involved in the dayto-day operations, in particular H&S aspects of the project / contract.
A minimum of one (1) Visible Felt Leadership engagement (VFL) per month shall be conducted by
the contractorβs senior manager and the project manager shall be submitted to Eskom Project
Manager.
7.2 Designers
The designer of a structure must comply with Construction Regulations 6 and ensure that cognizance
is taken of ergonomic design principles and foreseeable constructability health and safety risks
during construction and life cycle of the structure.
7.3 Principal Contractorβs Accountabilities
a. The principal contractor shall comply with provisions of Construction Regulations 7.
b. Where a principal contractor procures the services of a contractor, the principal
contractor shall first inform the client. Such contractor shall also comply with relevant
sections of this H&S specification.
c. The principal contractor must demonstrate how activities of various contractors will be
coordinated to mitigate the risks.
d. The principal contractor shall ensure that his/her H&S plan is approved by the client
before gaining access to site. The same principle will apply to its contractor, where he/she
shall approve his/her contractors H&S plan.
e. A comprehensive & updated list of all contractors on site, also indicating the type of work
being done.
f. The principal contractor shall coordinate, consolidate, and submit H&S performance and
that of contractors on the last day of each month to the client.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
g. The principal contractor must ensure that their senior management and that of their
contractors conduct VFL, at least once a month.
h. The principal contractor must incorporate the client's induction into their induction and
induct their contractors before site access. The principal contractor shall keep all
induction material including registers.
8. Management and Supervision of Construction Work
a. The principal contractor shall comply with provisions of Construction Regulations 8.
b. The principal contractor shall appoint one (1) full-time competent construction manager
responsible for a single site. In a case where a construction manager is not available, an
alternate construction manager shall be appointed in writing for a specified duration.
c. Having considered the size of the site one or more assistant construction manager shall
be appointed in writing.
d. The principal contractor shall appoint full time officer(s) in writing in accordance with the
provisions of Construction Regulations 8(5).
e. Construction supervisors and their assistance must be appointed in accordance with
Construction Regulations 8(7) & (8) respectively.
f. The appointed construction manager(s) and safety officer(s) shall be registered with
Sacpcmp.
The appointment of a registered or non-registered construction manager shall be
done in accordance with the provisions of the PD SACPCMP Registration Categories
attached on the Appendix A, annexure B.
9. Process for Monitoring
This document is under revision control and is valid for the duration of the works and will be
amended, as and when necessary, as requirements are being amended and therefore it will be
required for the principal contractor and contractorβs H&S plan to be amended accordingly.
Conformance to this document shall be via regular safety inspections and by Monthly Audits.
9.1 Related/Supporting Documents
Annexure A β Eskom SHEQ Policy Statement 32-727
Annexure B β 20230726 SACPCMP Registration Categories
Annexure C β Contractor Manpower Sourcing and Verification
Annexure D β Pre-Task Planning Template
Annexure E β Flash Report template
Annexure F β Portable Toilet Specification
Annexure G β Contractor OHS File Handover Record Template
Annexure H β PD Loading and Offloading
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
Annexure I β Tender Evaluation Criteria
Annexure J β Site Readiness Evaluation Criteria
Annexure K - Health and Safety Requirements Acknowledgement
10. Project Details
10.1 Scope of Work
The scope of work will entail the development of concept designs for the refurbishment of defective
foundations at Ripon Traction substation as per the Ripon Traction Substation Gantry Foundations
Cracks report (dated 08/02/2018). The overall objective is that of a long-term view of enhancing the
reliability and quality of supply at Ripon substation. During site inspections, the current drainage is
inadequate, and the outer barrier fence is in a poor state and corroded.
Location: Ripon Substation-33.077531S 25.846946E
10.2 Program details:
1. Anticipated date for the commencement of work on site: 03 November 2025
2. Project completion date or project duration: 30 June 2027
10.3 The Client Project Organogram:
Senior Manager
Projects
N. April
Programme Intergration
Manager Manager Senior Advisor H&S Safety Risk Manager ConstructionAgent H&S
N.Nel TBC R.Leduma G.Small N/A
Project Manager Project Scheduler H&S Officer
C. Rensburg Q.Tshatshu P. Maluleke
Project coordinator Site Supervisor Cost Engineer Risk Advisor
P. Ndongeni A. Mukhacwa
P Sityebi N/A
Project Officer Quantity Survey
TBC B. Mwelase
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
10.4 Principal Contractor Organogram
The principal contractor shall provide an organisational organogram related to this project, listing all
the levels of responsibility from the Chief Executive down to the supervisors responsible for the
project. The organogram must list the names of appointees and their roles and responsibilities
including the statutory requirements appointees. All organograms shall be updated timeously when
appointments are changed and filed in the project H&S file.
For the duration of the contract, the principal contractor shall ensure that competent persons are
appointed in writing in terms of the requirements of the OHS Act and its Regulations; and
or other statutory and Eskom/ NTCSA requirements and that all their appointees are made aware of
their accountabilities and responsibilities and have been suitably trained in terms of their
appointment.
11. Notification of Construction Work
The principal contractor shall notify in writing in a form similar to annexure 2 the relevant Provincial
Director (Labour Centre) of the Department of Employment and Labour of the intention to carry out
construction work as defined in the Construction Regulations 4, at least 7 days before construction
work is to be carried out. No construction work shall commence without a proof of submission of
such notification to the client.
12. Principal Contractor Appointments and Agreements
12.1 OHS Act Section 37 (2) (Legal) Agreement
a. An OHS section 37(2) agreement shall be signed between the client and the principal
contractor at the time of contract award.
b. The original copy of an OHS section 37(2) agreements shall be retained by the contractor
and a copy retained by the client project manager.
c. A copy of OHS section 37(2) agreement must form part of the respective contractorβs H&S
file.
12.2 CR 5(1)(k) Appointment
a. At contract award the principal contractor shall be appointed in writing by the PD Project
Manager for the construction site. Therefore, site access shall be granted once all the
contractual requirements are met.
b. A copy of OHS section 37(2) agreement must form part of the respective contractorβs H&S
file.
12.3 Designated employer, Sec 16(2) and other competencies appointments
The principal contractor shall ensure that a designated employer is appointed in writing for the for
the duration of the project.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
13. Appointments and Competencies
The principal contractor shall ensure that competent persons are appointed in writing for OHS
statutory and non-statutory functions in line with their organisational structure.
The principal contractor shall ensure that the appointees understand their roles, responsibilities and
accountabilities. Copies of relevant appointments shall be kept on an OHS site safety file.
14. Training and Awareness
The scope of training shall include, but not limited to, the type of work being performed and the
relevant procedures. Where training is provided by the external service providers, the principal
contractor shall ensure that the service providers are accredited by SAQA.
The principal contractor must demonstrate how he/she intends managing training/awareness within
their organisation including method of informing visitors and other persons entering the site about
hazards prevalent onsite.
Persons with foreign qualifications and registrations to convert these to equivalent local registrations
in that level or category (this shall be in accordance with SAQA and SETA requirements). The letter
from SAQA shall form part of the tender and site readiness submissions to PD.
15. OHS Policy
The principal contractor shall develop an OHS Policy authorised by their Chief Executives that states
overall OHS objectives and commitment to improving OHS performance and must be conspicuously
displayed and shared with all stakeholders.
16. Compliance and Non-Compliance
The principal contractor shall comply with relevant legal and other requirements as part of the
contract. Expenses to the principal contractor, which result from such compliance, as well as any
site-specific requirements, will be for the principal contractorsβ account.
Where the principal contractor appoints another contractor(s), the same roles, and responsibilities
in relation to the contractor as the client has in relation to the principal contractor shall apply.
The client reserves the right to stop work and issue a non-conformance report and/ Prohibition
notice(s) whenever H&S violations are observed from the principal contractors and their contractors,
after engaging and making both aware of such. Expenses incurred because of such work stoppage
and standing time shall be for the principal contractorβs account. Any nonconformances/findings/observations found during the audits/inspections on the contractor shall be
raised and discussed with the relevant principal contractor (with whom the contractor is contracted
with).
16.1 Legal and Other Requirements
The principal contractors shall comply with the relevant applicable legislation, specifications, and
standards in accordance with the scope of the project.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
The principal contractor shall compile a legal register listing all applicable legislation and standards
that may have an impact on the scope of work that they are performing on the construction project.
The register shall be updated as and when there are amendments.
17. Hazardous Work by Children (Child Labour)
The Bill of Rights in the Constitution of the Republic of South Africa is clear on the rights of
children, especially when it comes to child labour. Child labour shall not be permitted in any of
NTCSA, PD sites.
18. Hazard Identification and Risk Assessment
The principal contractor shall develop a Risk Assessment in line with Construction Regulation 9 in
alignment to Eskom/NTCSA, 32-520 procedure.
Detailed Risk Assessment must be conducted to ensure that all the applicable scenarios are covered
and documented per site activities including practical controls. High Risk Activities
When the principal contractor and/or his/her contractors are working in an area where a high health
and safety hazard exists, the principal contractor shall:
a) Develop a SWP.
b) Ensure that permanent and adequate supervision is available for the duration of the work
performed.
c) Work within visible earths (Standard Line Construction Method).
d) Ensure the use of safety standbys in areas of high-risk activities, and activities that fall within
the scope of the permit to work system.
e) Provide, erect and maintain the required barricading, lighting, flags, flashing lights, or other
safety control equipment to enable operations to proceed in a safe manner.
f) Maintain defined access ways, which are clear of obstructions, to allow for emergency vehicle
entry.
g) Provide any temporary protective shielding required for protecting nearby operations from
the construction activities, at their own cost.
h) When Crossing roads, railway tracks and other power lines during stringing operations, the
principal contactor shall ensure that:
i). βRugby polesβ are properly erected at all road crossings and that the public is warned,
ii). Flagmen placed at strategic positions to warn traffic/ motorists.
iii). Whenever mobile cranes/ lifting machinery are operated onsite, the booms are retracted
and safe clearances from overhead power lines; communication lines or other overhead
obstructions are observed and maintained as per Electrical Machinery Regulations 19 &
21, Eskom Procedure "Operating Regulations for High Voltage Systems (ORHVS), 240-
114967625" clause 5.03.6.3 (working in the close proximity to live line/conductors).
iv). Supervisors are trained in the Eskom ORHVS.
v). Detailed risk assessment shall be conducted prior the activities and a hierarchy of control
measures shall be considered before resorting to PPE. Where PPE are required, risk-
specific PPE shall be identified and issued to the specific team that will be working in the
close-proximity to live line/conductors.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
i) Height restriction barriers/crossbars must be erected on both sides of the overhead power
lines, communication lines or other overhead obstructions. Establish the permitted safe
clearances in consultation with the owner of the line.
19. Operational Regulations for High Voltage Systems
a. To ensure the safety of workers, visitors and other persons who may be affected, the
operating regulations for high voltage systems shall apply during construction of high voltage
apparatus (construction of transmission/distribution lines) or working in live yard inside a
substation.
b. The principal contractor shall ensure that workers in prohibited areas inside a sub-station are
under supervision of an authorised person, under a work permit. When an authorised person
resigns from a company and is employed by another company, his authorisation shall expire
immediately.
c. The authorised person shall be present throughout the operations.
Reference: ORHVS, 240-114967625 and Power Delivery Operating Assessment,
Authorisation and Training Standard, 240-70413865.
20. Costing for H&S
The principal contractor shall ensure that the submitted tender adequately makes provision for the
cost of H&S.
Site Access
The principal contractor shall not permit any person to enter the construction site where their health
and safety may be at risk. Notices at every entrance prohibiting the entry of unauthorised persons
shall be posted:
a. No one should enter the construction site without being inducted. The principal contractor
shall demonstrate how site access shall be manage on site.
b. Entering or leaving the site shall only take place at official access control points and may only
be done via the official designated walkways.
c. Where construction line is being constructed the principal contractor shall ensure that:
i). Members of the public are not allowed to be in the proximity where the activities are
being executed.
ii). Domestic animals are managed not to be in the proximity where the activities are being
executed.
21. Signage
Symbolic safety signs shall comply with the requirements of SANS 1186.The display of the following
signage is mandatory:
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
a. The principal contractor sign shall be posted at their site offices and shall have the name
and contact details of the: Construction Supervisor; Health and Safety Manager/ Officer; First
Aider; Health and Safety Representative and Evacuation warden, Construction Health and
Safety Agent and Construction Permit (where applicable). Emergency numbers, principal
contractor name (including a logo), construction manager and contact number.
b. The Contractors shall provide signage in accordance with the scope and work area.
c. All safety and warning signs shall be always obeyed.
22. Principal Contractorβs Site Facilities
Site facilities shall be established and maintained by the principal contractor. The facilities include
but are not limited to the following (refer to OHS Act, Construction Regulations 30). See also
Annexure F for portable toilet specifications. The design of the toilet should not expose employees
to splashes of other peopleβs human waste.
23. Public Safety
Principal contractors shall in their H&S plan, factor how they would safeguard members of the public
against their activities during the project.
24. Project and Site Rules
24.1 Life Saving Rules
The Eskom Life Saving rules applies to NTCSA employees, agents, consultants, contractors, and
visitors. Failure to adhere to these rules will be considered a serious transgression which will lead to
serious disciplinary action, which may include dismissal. The client reserves the right to suspend the
contractorβs activities pending the outcome of the disciplinary processes.
These rules are implemented to prevent serious injury or death of any employee, labour broker or
contractor working in any area within Eskom/ NTCSA.
The rules are:
Rule description of rule
Open, isolate, test, earth, bond, and/or insulate before touch
Rule 1
(That is plant, any plant operating above 1000 V)
Hook up at heights
Rule 2 Working at height is defined as any work performed above a stable work surface or where a
person puts himself/herself in a position where he/ exposes himself/herself to a fall from or into.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
Buckle up
Rule 3 No person may drive any vehicle on Eskom business and/or on Eskom premises:
Unless the driver and all passengers are wearing seat belts.
Be sober
Rule 4
No person is allowed to be under the influence of intoxicating liquor or drugs while on duty
Permit to work
Rule 5 Where an authorisation limitation exists, no person shall work without the required permit to
work.
Ensure safe live working
To ensure safe live work: Each live worker shall ensure all live work basic principles are adhered
Rule 6 to, as outlined (for the method being used) in the High Voltage Live Working Standard; Observe
and maintain the minimum approach distance; Only perform live work and perform tasks they
are authorised for and that are documented in the respective Task Manual.
24.2 Smoking
Smoking is only permitted at designated areas in accordance with the requirements of the
smoking policy (32-1126: Eskom Smoking Policy). Add to the appendix A.
24.3 Cellular Phones
A contractor shall develop and implement a risk-based cell phone policy for a particular
construction site. Cellular phones shall not be used in areas where their usage is prohibited.
24.4 Fire Extinguishers
A Principal Contractor shall have a layout plan (site offices, laydown area) where fire-fighting
equipment is located.
24.5 Vehicles and Traffic Rules
a. The principal contractor shall ensure that the driver of the vehicle has a valid driverβs licence.
b. Principal contractor shall ensure that drivers and passengers wear seatbelts while travelling
in a motor vehicle.
c. No passengers shall be permitted to be transported at the back of trucks or light delivery
vehicles (LDV).
d. Passengers shall only be permitted to be transported at the back of such vehicles if fitted with
a specially designed crew cab with appropriate seating and seat belt per passenger, by the
manufacturer and manufacturer appointed fitment centre. The test certificate shall be
submitted for consideration to the client.
e. Where a vehicle licence condition stipulates the number of persons to be transported on the
vehicle, such number shall not be exceeded.
f. The principal contractor shall ensure that the vehicles are inspected daily and maintained
regularly as per the manufactureβs specification.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
24.6 Substance and Drug Abuse Management
a. The principal contractor must develop a substance abuse management procedure to manage
substance abuse on site. The procedure shall be in line with the client substance abuse
management procedure were applicable. Eskom Substance Abuse Procedure 32-37.
b. All testing equipment shall be calibrated as per the manufacturerβs recommendation and the
calibration be available on the safety file.
c. The alcohol testers must be trained and appointed in writing.
25. Pre-Task Risk Assessment
The principal contractor shall conduct a daily pre-task risk assessment with employees involved with
the task, such as DSTI. This assessment will be the basis of daily pre-job briefings or toolbox talks
before work begins, highlighting critical steps from the SWP to ensure safety. Proof of
communication and confirmation of understanding will be recorded and kept at the job site during
execution. The signed pre-task risk assessment form shall be filed in the safety file.
26. Pre-task Planning
Upon receipt of the task for the day, the principal contractor manager or his/her assignee the site
supervisor, shall perform a pre-task planning in accordance with Line Construction; Substation
Works and Telecommunication Projects, 559-1432317009 Rev 1, Pre-Task Planning Template, see,
Annexure D.
27. Safe Work Procedures / Method Statements and Practices
The principal contractor shall compile a project/ site-specific SWP for all the high-risk activities as
identified in the risk assessment and scope of work, which will be submitted to client.
28. Planned Task Observations (PTO)
The construction manager / supervisor shall conduct Planned Task Observations (PTO).
PTOs shall be conducted in such a way that the employee is observed against the actual steps of
the safe work procedure (SWP)/ method statements and marked against compliance with each step.
This will assist in determining employee competence and compliance. Record shall be kept.
The minimum items that must be in the PTO but not limited to:
a. Project name.
b. Title of the SWP, reference number and revision number.
c. Specific activity.
d. Steps.
e. Safety Steps.
f. Critical steps.
g. Follow-up action.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
h. Observation conducted by (full name).
i. Designation (e.g., supervisor).
j. Individual/Team observed names.
k. Date of observation.
l. Signature.
29. Work at Elevated Positions and Roof Work
1. The Principal Contractor shall ensure that all work performed at elevated positions conform to
the requirements of the Construction Regulations, the relevant Unit Standard (US) and 32-418
(Working at Height Procedure).
2. A fall protection plan, which must be based on the tower design supported by the required risk
assessments will be compiled, implemented, reviewed, and communicated to all employees
working at heights.
3. The principal contractor shall review their risk assessment and fall protection plan as required,
at intervals to be determined by the principal contractor, and taking into consideration:
a. Incident trend analysis, or new/revised technology.
b. Changes to scope of work, changes to work methods/procedures/equipment, etc.
4. The Contractors shall stop all persons working in elevated positions during periods of inclement
weather.
5. Safety belts are not allowed to be used in Eskom. An appropriate full body safety harness shall
be worn when working at an elevated position, refer to SANS 50361.
6. Working in elevated positions shall only be carried out under the supervision of a competent
person in accordance with US 229995.
7. Fall arrest/protection plan and equipment shall be implemented where fall prevention is not
possible:
a. Fall protection equipment shall comply with Unit Standards and other recognised
international standards.
b. The Principal Contractor and/or his contractor shall compile a fall protection equipment
inspection, testing and maintenance procedure (Refer to SANS 50365 and manufactures
requirements for safe use and for inspections).
8. Provision must be made to prevent objects and/or material from falling from elevated areas and
the protection of persons working below. A drop zone shall be established with barricading and
necessary signs.
9. An Engineer shall do a design and calculations for all scaffolding where applicable.
29.1 Ladders (Portable)
a) Ladders used on the site shall comply with the OHS Act and Regulations, the relevant
SANS standards, or other recognised international standards.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
b) Damaged ladders shall be clearly marked and quarantined and removed from the project
site.
c) Prior to work being performed, an adequate risk assessment shall be conducted, and
work shall be conducted in accordance with General Safety Regulation 6 and 13A and
Construction Regulation 10 of the OHS Act
29.2 Training and authorization
a) Every employer shall ensure that no person engages in any activity in relation to work at
heights unless they are competent to do so.
b) Only training providers that use competent training instructors and assessors who are
SETA-Accredited and SAQA-registered in terms of the relevant unit standards shall be
used.
c) All persons who work at heights or who are required to do rescue at heights shall receive
three days of Fall Arrest System (FAS) training and two days of rescue training in
accordance with the Unit standards 22998 and 229995.
d) The Contractor must ensure that all persons who work at heights and those who will be
required to do rescue at heights shall receive training according to the relevant unit
standards. As a minimum, individuals who work at height and are not responsible for
performing a rescue must undergo three days of FAS training (Unit Standard 229998)
and rescuers must further undergo two days rescue training in accordance with the Unit
Standard 229995. Rescuers must be appointed in writing for the site/project.
e) Official FAS training shall not have an expiry date on the certificate.
f) Only the training date shall be indicated on the certificate.
g) Official rescue training shall expire every three years from the date of issue.
h) The principal contractor shall ensure that there is a Level 2 First Aider trained for every
team working at height.
30. Occupational Health and Hygiene
The principal contractors and contractors shall identify the occupational stressors which could
include exposure to chemical and biological hazards, noise, dust, vibration, heat, etc., to which any
person may be exposed because of his work activities.
30.1 Occupational Hygiene Management Program
Principal Contractors and contractors shall develop, implement, and maintain an occupational
hygiene management programme to ensure that the occupational hygiene stressors are identified
assessed (monitored) and controlled. The occupational hygiene programme shall include, but not
limited to the following elements:
a. Occupational health risk assessment as a foundation.
b. Occupational hygiene monitoring program. Monitoring shall be performed by a SANAS
accredited AIA.
c. Communication of occupational hygiene results and requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
d. Conduct awareness trainings and keep registers; and
e. Keep Occupational Hygiene surveys reports for a period of 40 years.
Where there are occupational hygiene stressors, principal contractors and contractors shall ensure
that occupation surveys are conducted to assess stressors. These programs may include but not
be limited to:
a. Hearing Conservation Programme.
b. Heat and cold stress Management Program.
The principal contractors and contractors shall report to the Department of Employment and Labour
on occupational hygiene milestones (e.g., crystalline silica). Evidence of reporting and copies of
such reports shall be made available to the client senior advisor H&S / H&S officer.
Copies of all occupational hygiene surveys conducted by the principal contractor and contractor shall
be submitted to PD Management/Occupational Hygiene Practitioners for information and record
keeping.
The principal contractor shall provide and adhere to effective monitoring procedures. These
procedures shall include the planning, carrying out and recording of the results of the measurement
programme. This is to confirm the effectiveness of the implemented control measures and the
results shall be made available to the Contracts Manager/Employerβs Representative on request.
Note: Principal contractors and contractors is responsible to measure and monitor all Occupational
Hygiene stressors as contemplated in the Occupational Health and Safety act 85 0f 1993.
30.2 Medical Surveillance Programme
The Principal Contractor and contractor shall ensure that their employees are registered on a
medical surveillance programme and are in possession of a valid medical fitness for duty certificate
specific to the construction work to be performed. The Fitness for duty certificate shall be in form of
Construction Regulation, Annexure 3, and be relevant to the type of work (risk based) that the
employee will be exposed to.
The principal contractor and contractors shall ensure that employees have undergone pre-entry
medical examination before starting work on site. No employee shall access site without a valid
medical fitness for duty certificate.
The principal contractor and contractors shall ensure that employees undergo a periodic medical
examination as and when a need arise.
The Principal Contractor and contractors shall ensure that employees undergo an exit medical
examination at the end of the project or when the service of the specific employee has been
terminated or has expired.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
30.3 Pre-Existing / Current Medical Condition
30.3.1 Disclosure of pre-existing injuries or medical conditions
A pre-existing condition as defined by the OHS Incident Management Definitions and Classification
Parameters Standard (240-131838225), is a medical condition/medical impairment as a result of an
incident arising out of, and in the course of employment, shall be considered:
a) Non-work-related if the incident arises solely because of a pre-existing medical
condition/medical impairment and if a worker without such a condition/medical impairment
would not have suffered such an incident; or
b) Work-related if the incident arises where the pre-existing condition/medical impairment may
have been a contributing factor.
Pre-existing medical conditions can include health issues such as cancer, diabetes, lupus,
depression, acne, hypertension, asthma, arthritis, ulcerative [Allergies] colitis etc or just about any
other health condition such as previous medical operational condition in any part of the body.
An injury are any old injuries that existed prior to the work injury that may or may not have fully
healed. Some workplace environments could aggravate pre-existing conditions even if they would
not necessarily have caused a new condition in an otherwise healthy individual. Examples may
include amongst others, traumatic injury worsening back pain, joint pain (condition), sore neck, knee
injuries etc.
30.3.2 A prospective employer / Supplier expectations/ duties
A prospective employer / supplier shall:
a) request a prospective worker to disclose all pre-existing injuries or medical conditions existing
during the period of the employment process that could reasonably be expected to be
aggravated by performing their employment related duties.
b) request disclosure in writing and this request must be accompanied by details of the nature
of the duties that are subject to the employment.
c) advise prospective workers that if they knowingly supply false or misleading information, they
will not be entitled to compensation or damages under the Compensation for Occupational
Injuries and Diseases Act, Act for any event that aggravates the non-disclosed
pre-existing injury or condition.
d) ensure that pre-existing or current condition is part of:
i). Individual employment contract. Because the contract defines the terms and
conditions of employment
ii). Included in the employment induction.
iii). Person Job Specification shall be developed to have a portion where the individual
when visiting the occupational medical practitioner, it has been completed by the
employer, employee and the medical practitioner can complete the document.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
iv). The employee shall reveal any pre-existing or current medical condition to the
Occupational Medical Practitioner prior the assessment.
v). Part of toolbox talk at least monthly, and awareness conducted more often, and
vi). Records shall be kept.
30.3.3 A prospective contractor employee duty
A prospective employee must, where requested in writing by a prospective employer, disclose all
pre-existing injuries or medical conditions of which they are aware of, that could reasonably be
expected to be aggravated by performing the employment related duties. If the prospective
employee is engaged before making the disclosure (or being requested to make the disclosure),
his or her entitlement to compensation is unaffected.
However, if the prospective employee does not disclose pre-existing medical condition or injury,
this may have an impact on the future management of incidents in particular the work relatedness
or not of an incident which may be attributed or not to pre-existing conditions.
30.3.4 Key considerations for employers
Employers considering implementing changes to their employment conditions and processes in
relation to these amendments shall note:
a) it is the prospective employer's duty to request disclosure of pre-existing injuries or medical
conditions from prospective workers during the pre-employment, periodic and post
screening process, and such information shall be kept confidential.
b) when providing details of the nature of the duties that are subject to the employment, it is
important that this information is accurate and provides specific details of the nature of the
duties. The prospective employee must receive information that will enable them to make
an informed decision about whether their pre-existing injury or condition might be
aggravated by the duties.
c) if the Workers' Compensation Commissioner has previously provided a copy of the
employee's claims history summary the employer shall not:
i). disclose to anyone else the contents of or information contained in the
summary.
ii). give access to the document to anyone else.
iii). use the contents of or the information contained in the summary for any
purpose other than for the purposes of the employment process (penalties
apply).
d) changes to employment conditions and processes should be made in consultation with the
employer's human resources or advisor and employee representative. Employers who may
have queries concerning equal employment condition and processes should seek
independent advice.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
e) employers shall keep accurate records relating to this disclosure as this information will be
requested where applicable during the claim determination process.
f) The employer shall follow their own disciplinary procedure and share the outcome with the
client.
Note:
I. The employer shall ensure that the employees are not exposed or expected to execute
an activity that will exacerbate the pre-existing or current medical condition. Risk
assessment shall be conducted to determine the area where the individual shall be
expected to execute the duties.
II. The pre-existing or current medical condition shall be applicable to new or current
employees within a specific employer.
III. The employer shall manage all the pre-existing or current medical condition (this
include referrals medical conditions) as per legal requirements as all information shall
be kept private and confidential all the time.
30.4 Emergency Care
A list of emergency numbers (local emergency numbers and Eskom ER24(084 124/010 205 3400)
numbers)) shall be posted where it is visible in the officeβs places such as information H&S board,
eating area etc. The principal contractor and contractor(s) shall ensure that all employees are familiar
with the emergency numbers. Where the principal contractor or/and contractor(s) has established
their own contract with a specific service provider, those numbers must be part of the induction and
be used in conjunction with local or Eskom numbers. The principal contractor must make clear to
the employees that in any event one of the numbers must be used or the combination to ensure that
the life of the individual is preserved.
30.5 Employee Assistance Programs (EAP)
The contractor will engage the local clinics on HIV/AIDS Awareness programme. This will include
voluntary counselling and testing (VCT) of individuals, with chronic illnesses such as diabetes;
hypertension; HIV/AIDS awareness training. Ensure access to ongoing support for affected
individuals. The Contractor shall communicate the programme to all personnel.
30.6 Rehabilitation
The principal contractor and contractor(s) shall ensure rehabilitation of employees injured where
rehabilitation is required.
The treating Doctor/Hospital will recommend and refer. The principal contractor must comply with
recommendations, communicate with employee and provide transport according to the planned
appointment.
The process shall continue until the rehabilitation of an employee is declared fit by the
Doctor/Hospital.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
30.7 Compensation of Occupational Injuries and Diseases Act (COIDA)
The principal contractor and contractor(s) shall submit a valid letter of good standing with the
compensation fund or a licensed compensation insurer relevant for the construction sector.
31. Emergency Preparedness and Response
a) The principal contractor shall provide a site-specific emergency preparedness and
response plan of which it shall include the specific activities being executed for site and
offices and submit this plan to the client for review.
b) The Emergency Preparedness Plans must be relevant to the scope of works and to the
prevailing surrounding environmental risks.
c) The principal contractor shall ensure that all the employees are fully conversant with this
plan.
d) The Principal Contractor shall plan, conduct emergency drills at specific intervals and
identify areas for improvement. The report shall be written and action plan where
applicable be developed and all the records shall be made available for inspection/audit
by the client and/or authorities.
e) When preparing worksite Emergency Preparedness Plans, cognisance must be made
as to the locality of the site and the response time for the emergency services. Where
sites are remote, contractor management shall ensure that enough employees are
trained in the various disciplines to be able to afford prompt response attention.
32. Fire Safety
Contractors shall develop a fire safety procedure for the office/ campsite, which must meet the
requirements of the local authority fire department and Section 9 of the Environmental Regulations
for Workplaces.
33. Site plans
The principal contractor must develop a comprehensive site layout plan with the following as a
Compliance Requirements
Source: Health Safety Specification_559-559476474_Rev 1 _Ripon Traction SS.pdf (unknown)A site plan must indicate evacuation routes and emergency assembly point locations.
Zones for particular activities.
Cranes (including radii and capacities).
Site offices.
Welfare facilities.
Off-loading, temporary storage and storage areas (laydown areas).
Sub-contractor facilities were applicable.
Car parking including reverse parking.
Access (must consider people with disability), entrances, security and access controls, temporary roads, and separate pedestrian routes. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30 Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01. HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474 Revision: 1 Page: of 38
Site hoardings and existing boundaries.
Temporary services (including electrical power, lighting, water distribution, drainage, information and communications technology, site security systems, and so on)
Fire hazard The Contractor shall develop emergency protocols for dealing with fires, which may include a Fire Management Plan in accordance with the National Veld and Forest Fire Act (No ) and ensure that all staff is trained / informed in fire prevention. No area shall be denuded of vegetation to create firebreaks. Open fires are not allowed on site. The Contractor Environmental Officer shall ensure that in areas with a high fire danger rating, staff is informed of this. Smoking shall be restricted to designated areas or shall not be allowed, particularly in areas that have a high fire danger rating. Contractor shall ensure that adequate Fire Fighting equipment is available on site, particularly near hot work and/or where it is specifically identified as a requirement by either the landowner or during the risk assessment.
Environmental factors to H&S The principal contractor shall monitor dust and noise caused by mobile equipment, generators and other equipment during construction. Factors such as wind can often affect the intensity to which these impacts are experienced. To ensure that noise does not constitute a disturbance during construction activities. Dust suppression measures shall be in place to reduce the dust caused by the movement of heavy vehicles and other contractor activities in order not obscure visibility.
Signing off the contract No project shall be signed off before the client has assessed the activities completed in relation to health & safety outstanding issues.
Forums for Governance and Communication Governance and communication structures shall be established on site where project H&S matters shall be discussed. The agenda, minutes and attendance registers of H&S meetings shall be available. Statutory H&S Committees in terms of Section 19 and 20 and General Administrative Regulations 5 of the OHS Act and Eskom requirements shall be established. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30 Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01. HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474 Revision: 1 Page: of 38
Construction Vehicles and Mobile Plant Construction vehicles and equipment shall comply with the relevant legal and other requirements like Construction Regulations 23, the National Road Traffic Act, the Mine Health and Safety Act, National Environmental Act and Eskom Vehicle Safety Specification Procedure 240-62946386. The following requirements are applicable during operation of construction vehicles: A principal contractor shall ensure that construction vehicles and mobile plant are operated by persons with appropriate training, certified competent and in possession of proof of competency, and authorised in writing to operate those construction vehicles and mobile plant
Designated drivers shall be in possession of an appropriate valid driverβs licence for the class of vehicle operated. The driverβs license shall be kept by the person so authorised who shall produce such card on request.
All construction vehicle operators, flagman/banksman/signalman/pointsman shall wear visible PPE at identified high-risk construction sites and shall be visible to the operators during the day or night.
Heavy construction vehicle parking sites, driveways, or any site shall be designed in such a way that no reversing is required. Where reversing is unavoidable, it shall only be done in the presence of a flagman or a banksman.
The contractor shall develop a vehicle and pedestrian management plan.
Relevant traffic signs shall be displayed.
Reverse beepers shall be fitted on construction vehicles.
Drivers of construction vehicles and mobile plant shall have medical certificates of fitness to operate those construction vehicle and mobile plant, issued by an occupational health practitioner in the form of Annexure 3 of the Construction Regulations.
The speed limit within the bounds of the construction site shall be clearly stipulated and communicated to everyone and be part of the induction.
Drivers / operators shall not text or talk on cell phones or two-way radios while driving.
The Principal Contractor/ contractor shall ensure that employees do not: i). Ride on back of light delivery vehicles, cranes or other mobile plant equipment. ii). Leave vehicles unattended with the engine running. iii). When unattended, vehicles shall be locked, chock blocks fitted and keys removed;
Vehicle shall be searched on the premises or when entering or leaving the premises.
The Principal Contractor/ contractor shall be responsible for the safety and security of his vehicles (including private vehicles) on the premises.
The Principal Contractor/ contractor shall maintain his vehicles in roadworthy condition with valid licenses. These vehicles shall be subject to inspection by the Client representative. Un- roadworthy vehicles shall not be allowed to site. CONTROLLED DISCLOSURE When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No 2021/539129/30 Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01. HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474 Revision: 1 Page: of 38
Construction vehicles shall be operated in accordance with the license requirements. Where a vehicle licence stipulates the number of persons to be transported on the vehicle, such number shall not be exceeded.
B-BBEE Minimum Level: 2
Health & Safety
Source: Health Safety Specification_559-559476474_Rev 1 _Ripon Traction SS.pdfDate:23 June 2025 Date: 27 June 2025 Date: Date: 16 July 2025
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
Template ID: 559-751375159 Document template (for procedures, manuals, standards, instructions, etc.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
17. Hazardous Work by Children (Child Labour) ...................................................................... 15
18. Hazard Identification and Risk Assessment ....................................................................... 15
19. Operational Regulations for High Voltage Systems ........................................................... 16
20. Costing for H&S .................................................................................................................... 16
21. Site Access ........................................................................................................................... 16
22. Signage ................................................................................................................................. 16
23. Principal Contractorβs Site Facilities ................................................................................... 17
24. Public Safety ......................................................................................................................... 17
25. Project and Site Rules .......................................................................................................... 17
25.1 Life Saving Rules ......................................................................................................... 17
25.2 Smoking ........................................................................................................................ 18
25.3 Cellular Phones ............................................................................................................ 18
25.4 Fire Extinguishers ........................................................................................................ 18
25.5 Vehicles and Traffic Rules ........................................................................................... 18
25.6 Substance and Drug Abuse Management .................................................................. 19
26. Pre-Task Risk Assessment .................................................................................................. 19
27. Pre-task Planning ................................................................................................................. 19
28. Safe Work Procedures / Method Statements and Practices .............................................. 19
29. Planned Task Observations (PTO) ...................................................................................... 19
30. Work at Elevated Positions and Roof Work ........................................................................ 20
30.1 Ladders (Portable) ........................................................................................................ 20
30.2 Training and authorization ........................................................................................... 21
31. Occupational Health and Hygiene ....................................................................................... 21
31.1 Occupational Hygiene Management Program ............................................................ 21
31.2 Medical Surveillance Programme ................................................................................ 22
31.3 Pre-Existing / Current Medical Condition ................................................................... 23
31.3.1 Disclosure of pre-existing injuries or medical conditions .............................. 23
31.3.2 A prospective employer / Supplier expectations/ duties ................................ 23
31.3.3 A prospective contractor employee duty ......................................................... 24
31.3.4 Key considerations for employers ................................................................... 24
31.4 Emergency Care ........................................................................................................... 25
31.5 Employee Assistance Programs (EAP) ....................................................................... 25
31.6 Rehabilitation................................................................................................................ 25
31.7 Compensation of Occupational Injuries and Diseases Act (COIDA) ........................ 26
32. Emergency Preparedness and Response ........................................................................... 26
33. Fire Safety ............................................................................................................................. 26
34. Site plans .............................................................................................................................. 26
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
35. Fire hazard ............................................................................................................................ 27
36. Environmental factors to H&S ............................................................................................. 27
37. Signing off the contract ....................................................................................................... 27
38. Forums for Governance and Communication .................................................................... 27
39. Construction Vehicles and Mobile Plant ............................................................................. 28
40. Housekeeping ....................................................................................................................... 29
41. Hazardous Materials/Chemicals Management .................................................................... 29
42. Flammable and Combustible Liquids ................................................................................. 29
43. Compressed Gas Cylinders ................................................................................................. 30
44. Personal Protective Equipment (PPE)................................................................................. 30
45. Issue, Replacement and Control of PPE ............................................................................. 30
46. Machinery, Tools and Equipment ........................................................................................ 30
47. Hand Tools and Pneumatic Tools ....................................................................................... 31
48. Pressure Equipment ............................................................................................................. 31
49. Lifting Machines and Lifting Tackle (DMR 18, CR 19 and SANS Codes) .......................... 31
50. Electrical Installations and Machinery on Construction sites ........................................... 33
51. Permit to Work ...................................................................................................................... 33
52. Excavations, Trenches and Floor Openings....................................................................... 33
53. Working near Public Roads ................................................................................................. 34
54. Work Stoppage ..................................................................................................................... 34
55. Audits/Inspection ................................................................................................................. 34
56. Non-Conformance and Compliance .................................................................................... 35
57. Compliance and Approval of Contractor Health &Safety (H&S) Plan ............................... 35
58. Contractor Performance Evaluation .................................................................................... 35
59. Investigation of Fatalities / Injuries / Diseases / Near Misses (Principal Contractor
and Contractors) ................................................................................................................... 36
60. Behavioural Safety Observations and Inspections ............................................................ 36
61. Monthly Statistical and Non-Statistical Reports ................................................................. 36
62. Contractors Health &Safety (H&S) Plan .............................................................................. 36
63. H&S File................................................................................................................................. 36
64. Hours of Work ....................................................................................................................... 37
65. Employeesβ right of refusal to work in an unsafe situation ............................................... 37
66. Contract Sign Off .................................................................................................................. 37
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
67. Omissions of this H&S Specification .................................................................................. 37
Appendix A β Eskom Document Hierarchy.................................................................................... 38
This specification is National Transmission Company South Africa (NTCSA), Project Delivery (PD)
minimum Health and Safety (H&S) requirements, should not be construed as all-encompassing or
static in terms of this or other amendments made during the project. The principal contractor must
develop a H&S plan responding to these requirements, as well as other applicable legal and other
requirements.
documents and comply with relevant legislative requirements as well as recognised code of practice
such as:
and national code of practices (South African National Standards β SANS)
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
1. Introduction
The aim of the Health & Safety (H&S) specification is to provide principal contractor/s and suppliers
with:
compliance to legal and Eskomβs/ NTCSA H&S requirements.
contract.
3.1 Normative
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
Standards β SANS)
3.2 Informative
[1] ISO 45001:2018, Occupational Health and Safety Management Systems-Requirements
[2] ISO 9001:2015 Quality Management Systems- Requirements
Authorised person: a competent person who has been given permission in writing to perform
specific duties and responsibilities in terms of the Operating Regulations for High Voltage Systems.
Baseline risk assessment: (32-520) baseline operational risks refer to the H&S risks associated
with all standard processes, as well as routine and non-routine activities in the business.
Critical Lifts: (1) any lift weighing in excess of 20 tons, (2) any lift involving a crane suspended work
platform (man cage), (3) any lift over critical operating and/or process equipment and (4) any lift that
exceeds 85 % of the craneβs load chart (5) any lift that utilises more than one lifting device (Tandem
Lift).(6) Load transfers.(7) night lifting.
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
Eskom Requirements: Eskom requirements, which evolve from directives, policies, standards,
procedures, specifications, work instructions, guidelines, or manuals.
Hazard identification: the identification and documenting of existing or expected hazards to the
health and safety of persons, which are normally associated with the type of construction work being
executed or to be executed.
Medical surveillance: a planned programme or periodic examination (which may include clinical
examinations, biological monitoring, or medical tests) of employees by an occupational health
practitioner or, in prescribed cases, by an occupational medicine practitioner.
Method Statement: is a written document detailing work procedures and sequences of operations.
On Site/Site: any workplace where the contractor or his employees perform construction related
work as agreed contractually with the client.
Planned Task Observation: an independent observation made during the planned period in which
the task is being executed.
Pre-Task Risk Assessment: a meeting held prior to the commencement of the dayβs work with
relevant personnel (client representative included) associated with the task at hand.
Risk Assessment: a programme to determine any risk associated with any hazard at a construction
site in order to identify the steps needed to be taken to remove, reduce, or control such hazard.
H&S File: a file or other record in permanent form, containing the information on the H&S
management system during construction including all information relating to construction phase after
the handover to Client.
Safe Work Procedures: a series of specific steps that guide a worker through a task from start to
finish in a chronological order. Safe work procedures are designed to reduce the risk by minimizing
potential exposure.
RHCA Regulations for Hazardous Chemical Agents, 2020
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
and ensuring compliance to legal requirements as per the condition of the CWP.
7.2 Designers
The designer of a structure must comply with Construction Regulations 6 and ensure that cognizance
is taken of ergonomic design principles and foreseeable constructability health and safety risks
during construction and life cycle of the structure.
7.3 Principal Contractorβs Accountabilities
a. The principal contractor shall comply with provisions of Construction Regulations 7.
b. Where a principal contractor procures the services of a contractor, the principal
contractor shall first inform the client. Such contractor shall also comply with relevant
sections of this H&S specification.
c. The principal contractor must demonstrate how activities of various contractors will be
coordinated to mitigate the risks.
d. The principal contractor shall ensure that his/her H&S plan is approved by the client
before gaining access to site. The same principle will apply to its contractor, where he/she
shall approve his/her contractors H&S plan.
e. A comprehensive & updated list of all contractors on site, also indicating the type of work
being done.
f. The principal contractor shall coordinate, consolidate, and submit H&S performance and
that of contractors on the last day of each month to the client.
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
g. The principal contractor must ensure that their senior management and that of their
contractors conduct VFL, at least once a month.
h. The principal contractor must incorporate the client's induction into their induction and
induct their contractors before site access. The principal contractor shall keep all
induction material including registers.
a. The principal contractor shall comply with provisions of Construction Regulations 8.
b. The principal contractor shall appoint one (1) full-time competent construction manager
responsible for a single site. In a case where a construction manager is not available, an
alternate construction manager shall be appointed in writing for a specified duration.
c. Having considered the size of the site one or more assistant construction manager shall
be appointed in writing.
d. The principal contractor shall appoint full time officer(s) in writing in accordance with the
provisions of Construction Regulations 8(5).
e. Construction supervisors and their assistance must be appointed in accordance with
Construction Regulations 8(7) & (8) respectively.
f. The appointed construction manager(s) and safety officer(s) shall be registered with
done in accordance with the provisions of the PD SACPCMP Registration Categories
attached on the Appendix A, annexure B.
9.1 Related/Supporting Documents
Annexure A β Eskom SHEQ Policy Statement 32-727
Annexure B β 20230726 SACPCMP Registration Categories
Annexure C β Contractor Manpower Sourcing and Verification
Annexure D β Pre-Task Planning Template
Annexure E β Flash Report template
Annexure F β Portable Toilet Specification
Annexure G β Contractor OHS File Handover Record Template
Annexure H β PD Loading and Offloading
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
Annexure I β Tender Evaluation Criteria
Annexure J β Site Readiness Evaluation Criteria
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
10.4 Principal Contractor Organogram
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
accountabilities. Copies of relevant appointments shall be kept on an OHS site safety file.
their organisation including method of informing visitors and other persons entering the site about
hazards prevalent onsite.
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
17. Hazardous Work by Children (Child Labour)
The principal contractor shall develop a Risk Assessment in line with Construction Regulation 9 in
alignment to Eskom/NTCSA, 32-520 procedure.
and safety hazard exists, the principal contractor shall:
a) Develop a SWP.
b) Ensure that permanent and adequate supervision is available for the duration of the work
performed.
c) Work within visible earths (Standard Line Construction Method).
d) Ensure the use of safety standbys in areas of high-risk activities, and activities that fall within
the scope of the permit to work system.
e) Provide, erect and maintain the required barricading, lighting, flags, flashing lights, or other
safety control equipment to enable operations to proceed in a safe manner.
f) Maintain defined access ways, which are clear of obstructions, to allow for emergency vehicle
entry.
g) Provide any temporary protective shielding required for protecting nearby operations from
the construction activities, at their own cost.
h) When Crossing roads, railway tracks and other power lines during stringing operations, the
principal contactor shall ensure that:
i). βRugby polesβ are properly erected at all road crossings and that the public is warned,
ii). Flagmen placed at strategic positions to warn traffic/ motorists.
iii). Whenever mobile cranes/ lifting machinery are operated onsite, the booms are retracted
and safe clearances from overhead power lines; communication lines or other overhead
obstructions are observed and maintained as per Electrical Machinery Regulations 19 &
21, Eskom Procedure "Operating Regulations for High Voltage Systems (ORHVS), 240-
114967625" clause 5.03.6.3 (working in the close proximity to live line/conductors).
iv). Supervisors are trained in the Eskom ORHVS.
v). Detailed risk assessment shall be conducted prior the activities and a hierarchy of control
measures shall be considered before resorting to PPE. Where PPE are required, risk-
specific PPE shall be identified and issued to the specific team that will be working in the
close-proximity to live line/conductors.
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
i) Height restriction barriers/crossbars must be erected on both sides of the overhead power
lines, communication lines or other overhead obstructions. Establish the permitted safe
clearances in consultation with the owner of the line.
a. To ensure the safety of workers, visitors and other persons who may be affected, the
operating regulations for high voltage systems shall apply during construction of high voltage
apparatus (construction of transmission/distribution lines) or working in live yard inside a
substation.
b. The principal contractor shall ensure that workers in prohibited areas inside a sub-station are
under supervision of an authorised person, under a work permit. When an authorised person
resigns from a company and is employed by another company, his authorisation shall expire
immediately.
c. The authorised person shall be present throughout the operations.
Reference: ORHVS, 240-114967625 and Power Delivery Operating Assessment,
Authorisation and Training Standard, 240-70413865.
and safety may be at risk. Notices at every entrance prohibiting the entry of unauthorised persons
shall be posted:
a. No one should enter the construction site without being inducted. The principal contractor
shall demonstrate how site access shall be manage on site.
b. Entering or leaving the site shall only take place at official access control points and may only
be done via the official designated walkways.
c. Where construction line is being constructed the principal contractor shall ensure that:
i). Members of the public are not allowed to be in the proximity where the activities are
being executed.
ii). Domestic animals are managed not to be in the proximity where the activities are being
executed.
Symbolic safety signs shall comply with the requirements of SANS 1186.The display of the following
signage is mandatory:
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
a. The principal contractor sign shall be posted at their site offices and shall have the name
and contact details of the: Construction Supervisor; Health and Safety Manager/ Officer; First
Aider; Health and Safety Representative and Evacuation warden, Construction Health and
Safety Agent and Construction Permit (where applicable). Emergency numbers, principal
contractor name (including a logo), construction manager and contact number.
b. The Contractors shall provide signage in accordance with the scope and work area.
c. All safety and warning signs shall be always obeyed.
22. Principal Contractorβs Site Facilities
to splashes of other peopleβs human waste.
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
smoking policy (32-1126: Eskom Smoking Policy). Add to the appendix A.
24.3 Cellular Phones
construction site. Cellular phones shall not be used in areas where their usage is prohibited.
24.4 Fire Extinguishers
A Principal Contractor shall have a layout plan (site offices, laydown area) where fire-fighting
equipment is located.
24.5 Vehicles and Traffic Rules
a. The principal contractor shall ensure that the driver of the vehicle has a valid driverβs licence.
b. Principal contractor shall ensure that drivers and passengers wear seatbelts while travelling
in a motor vehicle.
c. No passengers shall be permitted to be transported at the back of trucks or light delivery
vehicles (LDV).
d. Passengers shall only be permitted to be transported at the back of such vehicles if fitted with
a specially designed crew cab with appropriate seating and seat belt per passenger, by the
manufacturer and manufacturer appointed fitment centre. The test certificate shall be
submitted for consideration to the client.
e. Where a vehicle licence condition stipulates the number of persons to be transported on the
vehicle, such number shall not be exceeded.
f. The principal contractor shall ensure that the vehicles are inspected daily and maintained
regularly as per the manufactureβs specification.
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
24.6 Substance and Drug Abuse Management
a. The principal contractor must develop a substance abuse management procedure to manage
substance abuse on site. The procedure shall be in line with the client substance abuse
management procedure were applicable. Eskom Substance Abuse Procedure 32-37.
b. All testing equipment shall be calibrated as per the manufacturerβs recommendation and the
calibration be available on the safety file.
c. The alcohol testers must be trained and appointed in writing.
the task, such as DSTI. This assessment will be the basis of daily pre-job briefings or toolbox talks
before work begins, highlighting critical steps from the SWP to ensure safety. Proof of
communication and confirmation of understanding will be recorded and kept at the job site during
execution. The signed pre-task risk assessment form shall be filed in the safety file.
identified in the risk assessment and scope of work, which will be submitted to client.
28. Planned Task Observations (PTO)
The construction manager / supervisor shall conduct Planned Task Observations (PTO).
a. Project name.
b. Title of the SWP, reference number and revision number.
c. Specific activity.
d. Steps.
e. Safety Steps.
f. Critical steps.
g. Follow-up action.
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
h. Observation conducted by (full name).
i. Designation (e.g., supervisor).
j. Individual/Team observed names.
k. Date of observation.
l. Signature.
the protection of persons working below. A drop zone shall be established with barricading and
necessary signs.
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
b) Damaged ladders shall be clearly marked and quarantined and removed from the project
site.
c) Prior to work being performed, an adequate risk assessment shall be conducted, and
work shall be conducted in accordance with General Safety Regulation 6 and 13A and
Construction Regulation 10 of the OHS Act
29.2 Training and authorization
a) Every employer shall ensure that no person engages in any activity in relation to work at
heights unless they are competent to do so.
b) Only training providers that use competent training instructors and assessors who are
include exposure to chemical and biological hazards, noise, dust, vibration, heat, etc., to which any
person may be exposed because of his work activities.
30.1 Occupational Hygiene Management Program
hygiene management programme to ensure that the occupational hygiene stressors are identified
assessed (monitored) and controlled. The occupational hygiene programme shall include, but not
limited to the following elements:
a. Occupational health risk assessment as a foundation.
b. Occupational hygiene monitoring program. Monitoring shall be performed by a SANAS
accredited AIA.
c. Communication of occupational hygiene results and requirements.
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
d. Conduct awareness trainings and keep registers; and
e. Keep Occupational Hygiene surveys reports for a period of 40 years.
procedures shall include the planning, carrying out and recording of the results of the measurement
programme. This is to confirm the effectiveness of the implemented control measures and the
results shall be made available to the Contracts Manager/Employerβs Representative on request.
Note: Principal contractors and contractors is responsible to measure and monitor all Occupational
Hygiene stressors as contemplated in the Occupational Health and Safety act 85 0f 1993.
30.2 Medical Surveillance Programme
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
30.3 Pre-Existing / Current Medical Condition
30.3.1 Disclosure of pre-existing injuries or medical conditions
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
iv). The employee shall reveal any pre-existing or current medical condition to the
employees within a specific employer.
III. The employer shall manage all the pre-existing or current medical condition (this
include referrals medical conditions) as per legal requirements as all information shall
be kept private and confidential all the time.
30.4 Emergency Care
A list of emergency numbers (local emergency numbers and Eskom ER24(084 124/010 205 3400)
numbers)) shall be posted where it is visible in the officeβs places such as information H&S board,
eating area etc. The principal contractor and contractor(s) shall ensure that all employees are familiar
with the emergency numbers. Where the principal contractor or/and contractor(s) has established
their own contract with a specific service provider, those numbers must be part of the induction and
be used in conjunction with local or Eskom numbers. The principal contractor must make clear to
the employees that in any event one of the numbers must be used or the combination to ensure that
the life of the individual is preserved.
30.5 Employee Assistance Programs (EAP)
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
30.7 Compensation of Occupational Injuries and Diseases Act (COIDA)
The principal contractor and contractor(s) shall submit a valid letter of good standing with the
compensation fund or a licensed compensation insurer relevant for the construction sector.
minimum:
a. A site plan must indicate evacuation routes and emergency assembly point locations.
b. Zones for particular activities.
c. Cranes (including radii and capacities).
d. Site offices.
e. Welfare facilities.
f. Off-loading, temporary storage and storage areas (laydown areas).
g. Sub-contractor facilities were applicable.
h. Car parking including reverse parking.
i. Access (must consider people with disability), entrances, security and access controls,
temporary roads, and separate pedestrian routes.
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
j. Site hoardings and existing boundaries.
k. Signage.
l. Temporary services (including electrical power, lighting, water distribution, drainage,
information and communications technology, site security systems, and so on)
hot work and/or where it is specifically identified as a requirement by either the landowner or during
the risk assessment.
health & safety outstanding issues.
shall be discussed. The agenda, minutes and attendance registers of H&S meetings shall be
available.
Statutory H&S Committees in terms of Section 19 and 20 and General Administrative Regulations 5
of the OHS Act and Eskom requirements shall be established.
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
like Construction Regulations 23, the National Road Traffic Act, the Mine Health and Safety Act,
National Environmental Act and Eskom Vehicle Safety Specification Procedure 240-62946386.
persons with appropriate training, certified competent and in possession of proof of competency, and
authorised in writing to operate those construction vehicles and mobile plant:
a. Designated drivers shall be in possession of an appropriate valid driverβs licence for the class
of vehicle operated. The driverβs license shall be kept by the person so authorised who shall
produce such card on request.
b. All construction vehicle operators, flagman/banksman/signalman/pointsman shall wear
visible PPE at identified high-risk construction sites and shall be visible to the operators
during the day or night.
c. Heavy construction vehicle parking sites, driveways, or any site shall be designed in such a
way that no reversing is required. Where reversing is unavoidable, it shall only be done in
the presence of a flagman or a banksman.
d. The contractor shall develop a vehicle and pedestrian management plan.
e. Relevant traffic signs shall be displayed.
f. Reverse beepers shall be fitted on construction vehicles.
g. Drivers of construction vehicles and mobile plant shall have medical certificates of fitness to
operate those construction vehicle and mobile plant, issued by an occupational health
practitioner in the form of Annexure 3 of the Construction Regulations.
h. The speed limit within the bounds of the construction site shall be clearly stipulated and
communicated to everyone and be part of the induction.
i. Drivers / operators shall not text or talk on cell phones or two-way radios while driving.
j. The Principal Contractor/ contractor shall ensure that employees do not:
i). Ride on back of light delivery vehicles, cranes or other mobile plant equipment.
ii). Leave vehicles unattended with the engine running.
iii). When unattended, vehicles shall be locked, chock blocks fitted and keys removed;
k. Vehicle shall be searched on the premises or when entering or leaving the premises.
l. The Principal Contractor/ contractor shall be responsible for the safety and security of his
vehicles (including private vehicles) on the premises.
m. The Principal Contractor/ contractor shall maintain his vehicles in roadworthy condition with
valid licenses. These vehicles shall be subject to inspection by the Client representative. Un-
roadworthy vehicles shall not be allowed to site.
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
n. Construction vehicles shall be operated in accordance with the license requirements. Where
a vehicle licence stipulates the number of persons to be transported on the vehicle, such
number shall not be exceeded.
o. Where the Principal Contractor/ contractor do not own the equipment, the Principal
supply the client with:
a. Safety Data sheets (SDS) in accordance with the requirements of the OHS Act
b. Proposed arrangements for safe storage.
c. Proposed methods for handling/usage.
d. Hazard communication / training plan.
user to ensure it is in line with the authorized version on the system. No part of this document may be reproduced in any
manner or form by third parties without the written consent of National Transmission Company South Africa SOC Ltd Reg No
2021/539129/30
Ripon Traction Substation Defective Concrete Foundations_ C. TXF0091 rev 01.
HEALTH AND SAFETY (H&S) SPECIFICATION Unique Identifier: 559-559476474
Revision: 1
Page: of 38
General Safety Regulation 9 of the OHS Act and SABS 10019:2011 and 10263-2:2015.
43. Personal Protective Equipment (PPE)
In terms of Section 8 of the OHS Act, the duty of the employer is to take steps to eliminate or mitigate
(hierarchy of control measures) any hazard or potential hazard to the safety or health of employees
before resorting to PPE.
Principal contractor shall use the relevant national/international recognised (technique/model)
always approved risk-based PPE, as a minimum:
a. Head protection hard hat (with 3-point chin straps).
b. Steel toe capped safety boots.
c. Eye protection. Where mandatory wearing of impact Safety Spectacles with side shields.
d. Long sleeved and long pants protective clothing (with high visibility stripe) applicable mainly
to site-based employees.
e. High visibility vests: (long sleeve vests, unless the arms are covered β the bib can be worn)
applicable mainly to site office-based personnel and visitors.
f. Refer to General Safety Regulation 2 of the OHS Act.
a. The principal contractor shall provide a detailed procedure with a matrix on the issuing,
maintenance, replacement, and disposal of PPE for all his employees on site.
b. The principal contractor shall keep an updated register of all PPE issued.
a. Machines driven by means of belts, gear wheels, chains and couplings shall be adequately
guarded such that persons cannot gain inadvertent access to the moving parts.
b. Machine guards, inside of guards and moving or rotating parts shall be painted as per
statutory requirements.
c. A competent person shall inspect machine guards as per statutory requirements and by users
prior to use. These inspections and proof of corrective action taken must be recorded and
kept on site.
d. Machinery, tools and equipment shall be regularly inspected, as required by legislation and
risk assessments, registers of tools shall be kept on the safety file. The equipment shall be
numbered or tagged so that it can be properly monitored and inspected.
e. Machinery, tools and equipment shall have the necessary approved test or calibration
documentation, where applicable, prior to being brought onto the premises.
Environmental
Source: Health Safety Specification_559-559476474_Rev 1 _Ripon Traction SS.pdfrequirements of the local authority fire department and Section 9 of the Environmental Regulations
for Workplaces.
waste materials, scrap and rubbish is essential.
Description
Source: Environmental Incident Management Procedure.pdfDocument mismatch: The uploaded document is Eskom's Environmental Incident Management Procedure (Document Identifier: 240-133087117, Revision 3, effective 1 April 2022). This document does not contain the tender specifications for 'Defective concrete foundations at Ripon Traction substation'. The document describes internal environmental incident management processes, classification criteria, investigation requirements, and corrective action procedures for Eskom operations. No tender-specific scope of work, deliverables, or technical requirements are present.
Evaluation Criteria
Source: Environmental Incident Management Procedure.pdf (unknown)General
Environmental
Technical
Legal
Description
Source: Drawing RIP24P01-SE-D14.pdfSecurity fence layout at Ripon substation. Work involves removing existing fence, installing interlocking paving blocks for embankment erosion control, and installing a 6m sliding gate with 2.4m high security mesh fencing including anti-tunneling panels. Drawing reference: RIP24P01-SE-D14, revision concept, not for construction.
Evaluation Criteria
Source: Drawing RIP24P01-SE-D14.pdf (unknown)No explicit eligibility criteria are stated in the provided document excerpt. Applicants should refer to the full tender documentation for formal requirements, but likely need relevant civil and security installation experience, compliance with Eskom standards, and valid contractor registration.
Technical Specifications
Source: Drawing RIP24P01-SE-D14.pdf (unknown)The provided document is a single engineering drawing (RIP24P01-SE-D14) showing a security fence layout at Ripon Traction substation. Technical specifications include:
Note: This drawing must be read in conjunction with specification 240-76368574 and drawings 0.54-8725 sheets 1 and 2. The tender title references defective concrete foundations, but the provided document focuses on perimeter security β this may be one component of a larger scope.
Compliance Requirements
Source: Drawing RIP24P01-SE-D14.pdf (unknown)No specific compliance requirements stated in the provided document. References to Eskom Holdings SOC Limited specifications (Reg No. 2002/015527/30) indicate compliance with Eskom's technical standards is required.
Health & Safety
Source: Drawing RIP24P01-SE-D14.pdfNo specific health and safety requirements stated in the drawing. Standard Eskom OHS requirements for substation work likely apply but are not detailed in this document.
Section
Source: Drawing RIP24P01-SE-D14.pdf (unknown)REFER TO 0.54-390 SHT 52A. ALLOW FOR A 2 m WIDTH
Submission Guidelines
Source: Drawing 0.54-390-52A-0.pdf (unknown)Returnable Documents: The document mentions 'Returnable Documents' but provides no details. You must check the full tender document for a list of required forms and submissions.
Compliance Requirements
Source: Drawing 0.54-390-52A-0.pdf (unknown)The document indicates a compliance section exists but the text could not be extracted. You must check the full tender document for requirements on CSD, tax, B-BBEE, CIDB, CIPC, professional registrations, or local content.
Submission Guidelines
Source: Annex-c_Local content Declaration-Summary Schedule.pdf (unknown)Returnable Documents: Required documents must be submitted as part of the bid. Failure to submit all required returnables may lead to disqualification.
Compliance Requirements
Source: Annex-c_Local content Declaration-Summary Schedule.pdf (unknown)Insufficient searchable text - AI extraction recommended. The document mentions a need for a Local Content Declaration-Summary Schedule, indicating local content requirements are relevant. Bidders should be prepared to submit compliance documents related to local content, B-BBEE, and standard SCM regulations.
Description
Source: Quality 240-68099512 Form A Rev .9_Category 3 Ripon Traction SS foundations Project.pdfContact Information
Source: Quality 240-68099512 Form A Rev .9_Category 3 Ripon Traction SS foundations Project.pdf (unknown)Submission Guidelines
Source: Quality 240-68099512 Form A Rev .9_Category 3 Ripon Traction SS foundations Project.pdf (unknown)Evaluation Criteria
Source: Quality 240-68099512 Form A Rev .9_Category 3 Ripon Traction SS foundations Project.pdf (unknown)Must meet Category 3 quality requirements per clause 3.5.-105658000. Must have ISO 9001 certified quality management system covering all clauses (4-10) and principles (1-7). Must accept Eskom's rights of access, information, preservation, and audit conditions. Must complete tenderer's quality representative section with signature.
Technical Specifications
Source: Quality 240-68099512 Form A Rev .9_Category 3 Ripon Traction SS foundations Project.pdf (unknown)Methodology
Source: Quality 240-68099512 Form A Rev .9_Category 3 Ripon Traction SS foundations Project.pdfQuality Management
Source: Quality 240-68099512 Form A Rev .9_Category 3 Ripon Traction SS foundations Project.pdfCompliance Requirements
Source: Quality 240-68099512 Form A Rev .9_Category 3 Ripon Traction SS foundations Project.pdf (unknown)Section
Source: Quality 240-68099512 Form A Rev .9_Category 3 Ripon Traction SS foundations Project.pdfSubmission Guidelines
Source: Eskom's (SHEQ) Policy poster (32-727) 27 March 2024 - REV 8.pdf (unknown)Returnable Documents:
Compliance Requirements
Source: Eskom's (SHEQ) Policy poster (32-727) 27 March 2024 - REV 8.pdf (unknown)Insufficient searchable text - AI extraction recommended.
Description
Source: 240-130287942 Evaluation and approval page (002).docxScope: Defective concrete foundations at Ripon Traction substation.
Contract Duration: 06 months.
Submission Guidelines
Source: 240-130287942 Evaluation and approval page (002).docx (unknown)Returnable Documents: The submission must include all required returnable documents as specified in the tender document.
Evaluation Criteria
Source: 240-130287942 Evaluation and approval page (002).docx (unknown)The contractor must achieve a minimum SHE compliance score. Score 'A' allows immediate work; Score 'B' allows only site planning/mobilization until deviations are fixed; Score 'C' prohibits site access until full compliance is achieved. The contractor must be registered for Compensation of Workers and provide a Letter of Good Standing. Registration/accreditation (e.g., SACPCMP) is required where applicable.
Submission Guidelines
Source: Addendum 1 - TPD Contractor Evaluation Tool Rev 16.xls (unknown)Returnable Documents: Ensure all required returnable documents are included with your submission.
Evaluation Criteria
Source: Addendum 1 - TPD Contractor Evaluation Tool Rev 16.xls (unknown)Cannot determine - no eligibility criteria visible. The appraisal form suggests contractors would be evaluated on performance across multiple categories including safety, quality, schedule adherence, and financial soundness.
Description
Source: 240-68099512 Form A Rev .9_Category 3 Ripon.pdfContact Information
Source: 240-68099512 Form A Rev .9_Category 3 Ripon.pdf (unknown)Evaluation Criteria
Source: 240-68099512 Form A Rev .9_Category 3 Ripon.pdf (unknown)Tenderers must qualify under Category 3 of Eskom's quality requirements (clause 3.5.-105658000). They must have a Quality Management System aligned with ISO 9001 principles, including customer focus, leadership, engagement of people, process approach, improvement, evidence-based decision making, and relationship management. The tenderer's quality representative must be designated and the form signed.
Technical Specifications
Source: 240-68099512 Form A Rev .9_Category 3 Ripon.pdf (unknown)Section
Source: 240-68099512 Form A Rev .9_Category 3 Ripon.pdfDescription
Source: RIP24P01-SE-E82.pdfContact Information
Source: RIP24P01-SE-E82.pdf (unknown)Evaluation Criteria
Source: RIP24P01-SE-E82.pdf (unknown)Not explicitly stated in provided document. Typically requires compliance with Eskom contractor requirements, relevant engineering certifications, and adherence to Occupational Health and Safety Act. Bidders should demonstrate experience in substation civil works and electrical safety protocols.
Technical Specifications
Source: RIP24P01-SE-E82.pdf (unknown)Compliance Requirements
Source: RIP24P01-SE-E82.pdf (unknown)Health & Safety
Source: RIP24P01-SE-E82.pdfRequirements
Source: RIP24P01-SE-E82.pdf (unknown)Section
Source: RIP24P01-SE-E82.pdfDescription
Source: Transmission Evironmental Management Tender Returnable Evaluation Form.xlsScope: Defective concrete foundations at Ripon Traction substation for a period of 06 months. The project requires comprehensive environmental management documentation and compliance.
Submission Guidelines
Source: Transmission Evironmental Management Tender Returnable Evaluation Form.xls (unknown)Returnable Documents: The bidder must submit the required environmental documentation as specified in the enquiry. This includes objective evidence of documented information such as an Environmental Management Programme (EMPr), Method Statements, Waste Management Plan, and other deliverables listed in the evaluation sections.
Evaluation Criteria
Source: Transmission Evironmental Management Tender Returnable Evaluation Form.xls (unknown)Must achieve minimum 80% weighted average score across all evaluation sections; Must provide documented EMS (certified or conforming); Must have qualified environmental personnel (National Diploma/Degree in Environmental Sciences or equivalent for high-risk projects, or trained representative for low-risk); Must demonstrate compliance with National Environmental Management: Waste Act (Act No. 59 of 2008) and Eskom's Transmission Industry Waste Management Plan; Must complete and sign Environmental Requirements Proforma 240-110600836.
Technical Specifications
Source: Transmission Evironmental Management Tender Returnable Evaluation Form.xls (unknown)Scope: Defective concrete foundations at Ripon Traction substation. The contractor must provide environmental management documentation including: Environmental Management System (EMS) manual or document, Environmental Policy, Project environmental objectives, Environmental Management Programme (EMPr) or Method Statements covering site establishment, water management, vegetation management, hazardous substance handling, noise control, dust control, rehabilitation, wildlife interaction, incident reporting, and compliance obligations. Waste Management Plan covering waste segregation, handling, disposal, and reporting. Aspect and Impact Register specific to the project. Employer-defined additional requirements including an Environmental Bill of Quantity.
Compliance Requirements
Source: Transmission Evironmental Management Tender Returnable Evaluation Form.xls (unknown)The contractor must provide objective evidence of documented environmental management information. This includes proof of a qualified environmental representative: a person with a National Diploma or degree in Environmental Sciences/Management, Nature Conservation, or relevant Natural Sciences, responsible for monitoring environmental planning and activities. For low-risk projects, an environmental representative with two weeks of environmental training is sufficient.
Submission Guidelines
Source: Drawing 0.54-8725-1-2.pdf (unknown)Returnable Documents: Specific returnable documents are required but not listed in the available text. Check the full tender document for the list.
Compliance Requirements
Source: Drawing 0.54-8725-1-2.pdf (unknown)Insufficient searchable text - AI extraction recommended. The document indicates compliance requirements exist but details are not available.
Description
Source: Ripon Traction Substation Defective Concrete Foundations C4 ECC3 Site Information.docEvaluation Criteria
Source: Ripon Traction Substation Defective Concrete Foundations C4 ECC3 Site Information.doc (unknown)While specific eligibility criteria are not detailed in the provided 'Site Information' section, it is implied that applicants must be capable of working on a site with live electrical equipment and must adhere to NTCSA rules and regulations. The contractor must also be responsible for managing site-specific risks related to hidden services.
Technical Specifications
Source: Ripon Traction Substation Defective Concrete Foundations C4 ECC3 Site Information.doc (unknown)Description
Source: NTCSA Supplier Declaration of Interest (2).docxSubmission Guidelines
Source: NTCSA Supplier Declaration of Interest (2).docx (unknown)Evaluation Criteria
Source: NTCSA Supplier Declaration of Interest (2).docx (unknown)Suppliers are not explicitly disqualified based on the content of this declaration alone. However, providing false information in this sworn declaration can lead to NTCSA taking action against the supplier or the signatory personally. The form is a tool for NTCSA to manage conflicts of interest; failure to submit it or the discovery of undeclared conflicts may impact the evaluation or lead to disqualification.
Technical Specifications
Source: NTCSA Supplier Declaration of Interest (2).docx (unknown)Compliance Requirements
Source: NTCSA Supplier Declaration of Interest (2).docx (unknown)Important Dates
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Contact Information
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Evaluation Criteria
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Suppliers must accept Eskom's General Conditions of Purchase unless expressly disagreed in writing. Suppliers must be capable of performing the works/services as described and comply with South African law and jurisdiction. Financial stability is required, as Eskom may terminate if the supplier's financial circumstances prejudice performance.
Technical Specifications
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Quality Management
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfFinancial Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Compliance Requirements
Source: Eskom General Conditions of Purchase - 31 May 2024.pdf (unknown)Contractual Terms
Source: Eskom General Conditions of Purchase - 31 May 2024.pdfA compulsory site visit meeting will be held on: - date: 25 june 2026 - time: 10h00 (sast) - venue: ripon traction substation - GPS coordinates: 33.077531S 25.846946E Note: failure to attend the compulsory site visit, will result in your tender being disqualified.
Request for Bid(Open-Tender)
Megawatt Park, 2 Maxwell Drive - Sunninghill - Sandton - 2157
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: Professional Engineering Technologist (Pr.Tech Eng), CESA Membership
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve architectural, building design, or professional built-environment services.
Act 44 of 2000
Relevant where architectural work or professional building-design services may be required.
Relevant because this tender appears to involve architectural, building design, or professional built-environment services.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve architectural, building design, or professional built-environment services.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Waste Management Standard 32-245.pdf
This document is Eskom's Waste Management Standard (32-245, Revision 5), not the specific tender document for 'Defective concrete foundations at Ripon Traction substation'. The provided content is a comprehensive internal governance document outlining Eskom's mandatory procedures for managing all waste streams (general and hazardous) across its operations. It establishes a framework for waste minimization, handling, storage, transportation, and disposal in compliance with South African legislation.
Drawing 0.54-390-52A-0.pdf
Drawing 0.54-7470-2-5.pdf
Ripon Traction Substation Defective Concrete Foundations C4 ECC3 Site Information.doc
This tender is for the repair of defective concrete foundations at the Ripon Traction substation, located in the Eastern Cape, South Africa. The contract duration is for 6 months. Eskom National Transmission Company (NTCSA) is the procuring entity, and the site is shared with Transnet. All NTCSA rules and regulations must be adhered to.
Annex-c_Local content Declaration-Summary Schedule.pdf
Eskom's (SHEQ) Policy poster (32-727) 27 March 2024 - REV 8.pdf
annex-e (Local content declaration).pdf
Drawing 0.54-8725-1-2.pdf
240-105658000 Supplier Quality Management Specification (3).pdf
This document is Eskom's Supplier Quality Management Specification (QM 58), which defines the mandatory quality management system (QMS) requirements for all suppliers. It is a generic quality specification that will form part of the tender for 'Defective concrete foundations at Ripon Traction substation'. The core requirement is for suppliers to have a QMS based on ISO 9001, with specific documentation required pre-contract award depending on the assigned 'Category' (1-4).
RIP24P01-SE-E82.pdf
Tender for rehabilitation of defective concrete foundations, embankment erosion, and security fencing upgrade at Ripon Traction Substation over 6 months. Scope includes epoxy/cementitious crack injection, foundation modification, embankment rehabilitation, and new perimeter fence installation.
BOQ - Ripon SS Civil Works - E2627NTCSAMWPR.xlsx
Tender for refurbishment of defective concrete foundations at Ripon Traction Substation in Gauteng, including demolition, earthworks, concrete reconstruction, fencing, and electrical earthing works over a 6-month period.
Quality 240-68099512 Form A Rev .9_Category 3 Ripon Traction SS foundations Project.pdf
Eskom National Transmission Company invites tenders for repair of defective concrete foundations at Ripon Traction substation in Gauteng over a 6-month period. The tender requires compliance with Eskom's quality management specification 240-105658000 and ISO 9001 standards.
annex-d (Imported content declaration).pdf
MS Teams meeting Link - Ripon Traction SS - E2627NTCSAMWPR.docx
Eskom National Transmission Company of South Africa (Gauteng) invites tenders for repair and maintenance of defective concrete foundations at Ripon Traction substation for a 6-month period. A virtual clarification meeting is scheduled for 19 June 2026.
Transmission Evironmental Management Tender Returnable Evaluation Form.xls
This is an environmental management tender returnable document from Eskom for the 'Defective concrete foundations at Ripon Traction substation' project. The document outlines a comprehensive environmental compliance evaluation framework across five sections (A-E) that contractors must complete to demonstrate environmental management capabilities. The evaluation uses a scoring system with an 80% threshold for consideration.
Ripon Traction Substation Defective ConcreteFoundations C1 1 ECC3 Offer Acceptance .doc
Tender for repair of defective concrete foundations at Ripon Traction Substation for Eskom National Transmission Company of South Africa. The contract duration is 6 months, with closing date July 10, 2026. The document includes Form of Offer & Acceptance (ECC3) requiring tenderers to commit to all contract obligations.
240-130287942 Evaluation and approval page (002).docx
This tender document is a Safety, Health, and Environment (SHE) compliance assessment form for a 6-month project to repair defective concrete foundations at the Ripon Traction substation for Eskom in Gauteng. The document outlines a scoring system (A, B, C) for contractor SHE plans/files, determining site access and work commencement based on compliance with the Occupational Health and Safety Act and Eskom specifications.
240-68099512 Form A Rev .9_Category 3 Ripon.pdf
Eskom National Transmission Company invites tenders for the repair of defective concrete foundations at Ripon Traction Substation in Gauteng, with a contract duration of 6 months. The tender emphasizes strict quality management, requiring compliance with Eskom's Specification 240-105658000 and ISO 9001 standards.
Addendum 1 - TPD Contractor Evaluation Tool Rev 16.xls
This is not a tender document for 'Defective concrete foundations at Ripon Traction substation'. The provided content is corrupted binary data from a Microsoft Word/Excel file containing Eskom's internal 'Supplier Evaluation Tool' or contractor performance appraisal form. The actual tender details are missing or unreadable.
Drawing 0.54-8725-2-0.pdf
NTCSA Supplier Declaration of Interest (2).docx
This is a declaration of interest form for a tender titled 'Defective concrete foundations at Ripon Traction substation for a period of 06 months' issued by Eskom National Transmission Company of South Africa (NTCSA). The form requires the supplier to declare any potential conflicts of interest with NTCSA employees or directors to ensure procurement integrity.
Ripon Traction Substation Defective Concrete Foundations C1 2b ECC3 Data by Contractor.doc
Tender for repair of defective concrete foundations at Ripon Traction substation in Gauteng under NEC3 Engineering and Construction Contract (April 2013) framework, requiring contractor to complete contract data and submit priced bid.
Eskom General Conditions of Purchase - 31 May 2024.pdf
Eskom seeks a supplier to address defective concrete foundations at Ripon Traction substation in Gauteng over a 6-month period. The contract is governed by Eskom's General Conditions of Purchase, which establish the legal and procedural framework for the agreement, covering payment, delivery, warranties, and termination.
Drawing RIP24P01-SE-D14.pdf
Tender for the replacement of defective concrete foundations and installation of security fencing at Ripon Traction substation over a 6-month period. Key tasks include installing interlocking paving blocks for embankment erosion control, removing and replacing an existing fence with a 2.4m high security fence, and installing a 6m sliding gate.
OT_Invitation to Tender - Ripon SS Civil Works - E2627NTCSAMWPR_v2.pdf
The National Transmission Company South Africa (NTCSA) invites tenders for civil works to repair defective concrete foundations at Ripon Traction Substation over a 6-month period. The tender is for a contract valued under R50 million, requiring CIDB 5CE grading, and uses the NEC3 Engineering Construction Contract. Evaluation follows an 80/20 scoring system (80% price, 20% B-BBEE specific goals) after a mandatory technical functionality assessment.
240-12248652 Category3- List of Tender Returnables Documents Rev 6_.pdf
Eskom National Transmission seeks a contractor to repair defective concrete foundations at Ripon Traction Substation in Gauteng over a 6-month period. The tender heavily emphasizes quality management, requiring a detailed Quality Management System (QMS) and specific quality plans. A dedicated Quality Officer is mandatory for the project duration.
Transmission Waste Management Business Plan 240-98818649_.pdf
This document is not a tender document but Eskom Transmission's Industry Waste Management Plan Update (2023-2028). It outlines the company's framework for managing waste across its operations, focusing on compliance, minimization, and best practices. The tender information provided (Ripon Traction substation foundations) appears to be separate and not addressed in the uploaded document content.
C0 ECC3 Contract cover page .doc
This is a tender document from Eskom's National Transmission Company of South Africa for civil works to repair defective concrete foundations at the Ripon Traction Substation in Gauteng. The contract will use the NEC3 Engineering & Construction Contract format and has a 6-month duration. The document appears to be a template or cover page with structural sections defined but detailed content not fully visible in the provided text.
Environmental Requirements for Contractors and or Suppliers.pdf
This is a standard environmental requirements document from Eskom Transmission, not the specific tender document for the 'Defective concrete foundations at Ripon Traction substation' project. It outlines the mandatory environmental management framework that all contractors and suppliers must comply with when working for Eskom Transmission. The tender for the concrete foundations will be governed by these overarching requirements.
Drawing RIP24P01-SE-D53-1-0.pdf
Tender for the repair of defective concrete foundations at Ripon Traction substation in Gauteng, South Africa, over a 6-month period. The project involves refurbishing cracked foundations, including concrete casting, reinforcement, and surface treatment.
Environmental Requirements Proforma 1.pdf
The tender is for the repair of defective concrete foundations at Ripon Traction substation in Gauteng, South Africa, over a 6-month period. The document provided is a Contractor Environmental Requirements Proforma outlining environmental compliance obligations for the project.
Rippon Traction SS Deflective Foundations C1 2a ECC3 Data by Employer 09 June 2026.docx
Tender for repair of defective concrete foundations, perimeter fencing, and soil erosion mitigation at Ripon Traction Substation in Eastern Cape, South Africa, using NEC3 ECC3 contract (Option B) with a completion date of 28 February 2027.
Site Visit - Ripon Traction SS - E2627NTCSAMWPR.docx
Eskom National Transmission Company South Africa seeks contractors for repair and maintenance of defective concrete foundations at Ripon Traction substation over a 6-month period. This is a specialized infrastructure maintenance tender requiring physical site assessment before bid submission.
Rippon Traction SS Deflective Foundations C3 1 ECC3 Employers Works Information.doc
Tender for the repair of defective concrete foundations, replacement of perimeter fencing, and construction of erosion protection embankment at Ripon Traction Substation in Gauteng. The project aims to prevent equipment collapse and ensure reliable power supply. The contract duration is 6 months, with a closing date of July 10, 2026.
Ripon Traction Substation Defective Foundations C2 ECC3 Pricing Data Option B.doc
This tender document outlines a re-measurement contract (NEC3 ECC Option B) for repairing defective concrete foundations at Ripon Traction Substation in Gauteng for Eskom NTCSA over a 6-month period. The contract uses a bill of quantities with rates and lump sums for pricing, and payment is based on measured work completed without defects.
SDL&I - Ripon Traction Substation Defective Concrete Foundations.pdf
Eskom NTCSA tender for repair of defective concrete foundations at Ripon Traction Substation in Gauteng over a 6-month period. The tender uses an 80/20 preference point system with up to 20 points for B-BBEE status. This is a designated sector requiring 100% local content for cement concrete and steel barrier fence components. CIDB grading requirement is 5CE or higher. Tenderers must submit SDL&I commitments including B-BBEE improvement plans, local procurement proposals, job creation/retention plans, and skills development proposals (Civil Technician and Safety Officer). A 2.5% retention applies on all invoices for SDL&I non-compliance.
Health Safety Specification_559-559476474_Rev 1 _Ripon Traction SS.pdf
The tender is for the refurbishment of defective concrete foundations at Ripon Traction Substation in Gauteng, South Africa, over a 6-month period. The project is managed by Eskom National Transmission Company of South Africa (NTCSA) and requires strict adherence to Health and Safety (H&S) specifications, legal compliance, and Eskom/NTCSA standards. The scope includes addressing structural defects, inadequate drainage, and a corroded outer barrier fence to enhance reliability and quality of supply at the substation. The project is expected to commence on 03 November 2025 and must be completed by 30 June 2027.
Environmental Incident Management Procedure.pdf
The tender is for the repair of defective concrete foundations at Ripon Traction substation in Gauteng, South Africa, over a 6-month period. The project is managed by Eskom National Transmission Company and requires adherence to Eskomβs Environmental Incident Management Procedure, which outlines strict protocols for identifying, reporting, classifying, and investigating environmental incidents. The tender closes on July 10, 2026.
To download these documents and access AI-powered analysis, visit the main tender page.
Date & Time
Friday, 10 July 2026 - 10:00
Venue
https://teams.microsoft.com/meet/395363784914145?p=ZCHnhPS1dPtLrbIgH5
11 Jun
2026
Tender Published
Tender was published
10 Jul
2026
Closing Date
Tender closing date
Contact Person
Dineo Maepa
Phone
011-629-5024
[email protected]
Website
www.eskom.co.za/Pages/Landing.aspx
Address
Lake Street, Germiston, Johanessburg, 1401, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
38
Last checked
11 Jun 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Eskom is South Africa's primary electricity supplier, managing generation, transmission, and distribution.
Contact
011-629-5024[email protected]www.eskom.co.za/Pages/Landing.aspxLake Street, Germiston, Johanessburg, 1401, South Africa
Key Personnel
Median Estimate
RΒ 920Β 000
Range
Based on CESA reports. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Architectural and engineering activities; technical testing and analysis. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
A professional guide for consulting engineers on bidding for government infrastructure projects. Understanding percentage-based fees, discounting ECSA guidelines, and managing professional indemnity risk.
Cybersecurity tenders in Gauteng have tripled in volume since 2024, driven by the Provincial Governmentβs Digital Security Modernisation Programme and the mandatory cyber-incident reporting regulations that came into force in January 2026. If you supply protective monitoring, penetration testing, or SOC-as-a-Service, your next opportunity is already on the radarβbut only if your PSIRA, CSD and BBBEE paperwork is watertight. A single lapsed guard certificate or outdated ISO 27001 accreditation will see your bid rejected before technical evaluation begins.
The rapidly evolving cybersecurity landscape in South Africa has made it imperative for security contractors in Gauteng to stay abreast of the latest technical requirements and certification standards. As the country continues to navigate the complexities of digital transformation, the regulatory environment has become increasingly stringent, with a strong emphasis on compliance and risk management. In this context, understanding the technical requirements and certification standards for cybersecurity tenders is crucial for security suppliers looking to navigate the procurement landscape successfully in 2026.
As a Construction contractor in Gauteng, 2026 is shaping up to be a year of renewed focus on regulatory compliance and transformation. The Construction Industry Development Board (CIDB) grading system remains a critical component of procurement processes, ensuring that contractors are assessed for their financial, technical, and experiential capabilities. Understanding the CIDB Grade 5 requirements is essential for contractors looking to secure tenders and grow their businesses.
π‘ Want more tendering tips and strategies?
Explore Our Blog