Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
14-16 Kgwebo Street, Mabe Business Park - Waterfall East - Rustenburg - 0299
Organization Type
GOVERNMENT
Published
30 Jun 2026
OCDS Reference
ocds-9t57fa-160647
This tender, issued by ESKOM holdings soc ltd, seeks a service provider to conduct roof inspection, repair, and reinstatement of the vryburg main building, including electrical, ceiling, floor finishes, and asbestos confirmation, with provision of certificates of compliance (coc) for insurance purposes. The project is governed by nec3 engineering & construction contract (option b: priced contract with bills of quantities) and requires strict compliance with health, safety, and environmental regulations.
Date & Time
Friday, 24 July 2026 - 10:00
Venue
17 Market Street, Vryburg, Northwest Province Coordinates: -26.95731939228146, 24.71976509325358
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
14-16 Kgwebo Street, Mabe Business Park - Waterfall East - Rustenburg - 0299
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Description
Source: Quality requirements.zipTitle: Supplier Quality Management: Document Identifier: 240-105658000
Alternative Reference QM 58
Number:
Area of Applicability: Eskom Holdings SOC Ltd
Functional Area: Quality Management
Revision: 3
Total Pages: 28
Next Review Date: October 2024
Disclosure Controlled Disclosure
Classification:
Compiled by Supported by Functional Authorized by
Responsibility
SA Sambo P Dondashe L Meyer K Pather
Chief Advisor Middle Manager Acting Senior General Manager
Quality Quality Manager Quality Risk and
Management Management Management Sustainability
Date: 15/10/2021 Date: 15/10/2021 Date: 15/10/2021 Date: 17 October 2021
EDC TN Formatted 15.10.2021
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Content
. Introduction ............................................................................................................................... 3
2. Supporting Clauses .................................................................................................................. 3
2.1 Scope ............................................................................................................................... 3
2.1.1 Purpose ................................................................................................................. 3
2.1.2 Applicability ........................................................................................................... 3
2.1.3 Effective date ......................................................................................................... 3
2.2 Normative/Informative References ................................................................................... 3
2.2.1 Normative .............................................................................................................. 3
2.2.2 Informative............................................................................................................. 3
2.3 Definitions ........................................................................................................................ 4
2.4 Abbreviations ................................................................................................................... 5
2.5 Roles and Responsibilities ............................................................................................... 6
2.6 Process for Monitoring ...................................................................................................... 6
2.7 Related/Supporting Documents ........................................................................................ 6
3. Pre-Contract Award: Quality Requirements .............................................................................. 7
3.1 Supplier and Sub-Supplier Quality Management System Requirements .......................... 7
3.2 Quality Plan ...................................................................................................................... 8
3.3 Contract Quality Plan........................................................................................................ 8
3.4 Quality Control Plan ....................................................................................................... 10
3.5 Pre-Contract Award: Quality Requirement ...................................................................... 13
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment ........................... 16
3.7 Post-Contract Award ...................................................................................................... 17
3.7.1 Contract Execution .............................................................................................. 17
3.7.2 Supplier Quality Performance Monitoring Phase ................................................. 18
3.7.3 Supplier Quality Audit .......................................................................................... 18
3.8 Standard Conditions ....................................................................................................... 19
3.8.1 Rights of Access .................................................................................................. 19
3.8.2 Eskom Rights to Information ................................................................................ 20
3.8.3 Preservation ........................................................................................................ 21
3.8.4 Quality Audits Related Conditions ....................................................................... 25
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by
Eskom ................................................................................................................. 25
3.8.6 Special Processes ............................................................................................... 26
4. Acceptance ............................................................................................................................. 27
5. Revisions ................................................................................................................................ 27
6. Development Team ................................................................................................................ 27
7. Acknowledgements ................................................................................................................ 28
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
vendor registration, management, monitoring, assessment and auditing of suppliers. Eskomβs
position is to partner with suppliers who fully demonstrate commitment to the development,
implementation, and maintenance of a quality management system (QMS) that conforms to the
requirements of ISO 9001 standard. The priority is to encourage suppliers to continually improve
their QMS and enhance service delivery by implementing and conforming to the standard.
2. Supporting Clauses
2.1 Scope
2.1.1 Purpose
The purpose of this specification is to outline the requirements according to which suppliers shall
ο· develop,
ο· implement,
ο· maintain, and
ο· continually improve
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
2.1.2 Applicability
This specification shall apply throughout Eskom Holdings Limited divisions, its subsidiaries,
suppliers, and sub-suppliers and shall form part of all Eskom requests for information (RFI)/ requests
for quotation (RFQ)/ requests for proposal (RFP), including contracts for the procurement of products
and services.
2.1.3 Effective date
Date of authorisation of the specification
2.2 Normative/Informative References
Parties using this document shall apply the most recent edition of the documents listed in the
following paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems β Requirements
[2] ISO 10005 Quality Management Systems β Guidelines for Quality Plans.
2.2.2 Informative
[3] ISO 9000 Quality Management Systems β Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems β Guidelines for Quality Management in Projects
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
[6] ISO 9004 Quality Management β Quality of an Organisation β Guidance to Achieve Sustained
Success
[7] 32-1033: Eskomβs Procurement and Supply Chain Management Policy
[8] 32-1034: Eskomβs Procurement and Supply Chain Management Procedure
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
[12] IAEA Safety Standard GS-R-3.1 Application of the Management System for Facilities and
Activities
[13] SANS 10845-1 Construction Procurement Part1: Processes, Methods and Procedures
2.3 Definitions
The vocabulary of ISO 9000 and the following definitions apply in the application of this specification.
2.3.1 Component: a constituent part of the product or sub-assembly of the product. The product
may comprise multiple individual components
2.3.2 Contract Quality Plan: a document of the supplierβs process for delivering the level of quality
required by the contract. It is a framework for the contractorβs process for delivering quality.
Purpose of a CQP is to outline how the results defined in the specifications will be achieved.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
manufacturing shall not proceed without the attendance of, and written authorisation of, an
Eskom representative or Eskom inspection agency, whichever is applicable.
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
concerned with the implementation of a specific QCP/ ITP. These can be in the form of
inspection, hold points, surveillances, witnesses, reviews and verifications.
2.3.5 Inspection Agency: an organisation or person appointed by Eskom for the purpose of
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
services.
2.3.6 Level 1 Plant Items: equipment, whose failure has an effect on personnel safety and/ or
health, causes an environmental incident, cause a huge production loss or major equipment
damage. Equipment that are safety/ redundancy/ protective device or covered by statutory
regulations requirements.
2.3.7 Level 2 Plant Items: equipment, whose failure impacts plant availability and/or reliability,
causes significant costs or secondary damage.
2.3.8 Level 3 Plant Items: equipment that does not impact on personnel safety and/ or health,
environmental, cost, availability and/ or reliability of plant.
2.3.9 Nonconformity: a deficiency in material, composition, characteristic, or performance that
renders the quality of an item, component, or product unacceptable or indeterminate. The
term also covers a deficiency in, or deviation from/non-adherence to, the quality management
system requirements, prescribed production processes, and/or related documentation such
as procedures and instructions.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
2.3.10 Quality Plan: specification of the actions, responsibilities and associated resources to be
applied to a specific object.
2.3.11 Quality Control Plan: a document specifying the activities to be inspected throughout the
execution of the project, inclusive of test methods, procedures, and acceptance criteria (This
term is equivalent to QIP and ITP).
2.3.12 Requirement: the need or expectation that is stated, generally implied, or obligatory.
Requirements are generally specified in the purchase order and/or contract documentation,
but may not be limited to these.
2.3.13 Primary Plant (Power Plant): primary plant include High Voltage equipment situated inside
the control room (breakers, bus-bars, CTβs, VTβs and transformers).
2.3.14 Secondary Plant (Control Plant): secondary plant includes all equipment used to control
and protect the HV equipment on the primary plant side. (Protection, metering, AC/DC and
tele-control).
2.3.15 Special Process: is any production or service process which generates products or services
which cannot be measured, monitored, or verified prior to delivery and use.
2.3.16 Supplier: is a current or potential supplier, vendor, contractor, consultant, or service provider.
A supplier may be a natural or legal person and includes any employee acting within the
course and scope of his/her employment or any agent or manager acting for, or on behalf of,
or in the interests of, the person registered as supplier on the Eskom supplier database.
2.3.17 Sub-supplier: an organisation that provides a product/service to the supplier and/or that
enters into a subcontract and assumes some of the obligations of the supplier or prime
contractor.
2.3.18 Witness Point: a predetermined stage in the quality control plan where and inspection
activity will take place. Work may proceed, provided Eskom or its inspection agency has been
formally notified and confirmed that inspection is waived.
2.4 Abbreviations
Abbreviation Explanation
AIA Approved Inspection Authority
CA Corrective Action
CQP Contract Quality Plan
FIDIC Federation Internationale Des Ingenieurs- Conseils
FMECA Failure Mode, Effects and Criticality Analysis
HAZOP Hazard and Operability Study
ISO International Organisation for Standardisation
ITP Inspection and Test Plan
NC Nonconformity
NDT Non Destructive Testing
PMI Positive Material Identification
QCP Quality Control Plan
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
Abbreviation Explanation
QMS Quality Management System
PQP Project Quality Plan
RFI Request for Information
RFQ Request for Quotation
RFP Request for Proposal
SHEQ Safety, Health, Environment, and Quality
SETA Skills Education Training Authorities
WPS Welding procedure specifications
WQR Welderβs Qualification Record
2.5 Roles and Responsibilities
Eskom Quality representative/ professional will select applicable requirements for existing and
potential Eskom suppliers using Form A (Tender and Contract Quality Requirements for Supplier
Quality Management: Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001
Standard).
The existing and/ or potential suppliers must complete, sign and return Form A with the other
returnable as listed in the List of Tender Returnable document (240-12248652). Other roles and
responsibilities for this standard are defined within the text of this specification.
2.6 Process for Monitoring
The application of this specification throughout Eskom shall be audited as per the management
system audit schedule.
2.7 Related/Supporting Documents
The documents superseded by this specification: all divisional and business unit supplier quality
requirements standards and/or specifications.
Forms and templates:
[1] 240-68099512 Tender and Contract Quality Requirements for Supplier Quality Management
Specification 240-105658000/ QM 58 and Quality Requirements for ISO 9001 Standard (Form
A)
[2] 240-109253698 Template for a Typical Contract Quality Plan
[3] 240-109253302 Quality Control Plan/Inspection and Test Plan
[4] 240-126469599 Method Statement Template.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3. Pre-Contract Award: Quality Requirements
The quality assessment criteria and Form A of this specification will be selected and completed by
an Eskom Quality representative/ professional who will identify the applicable supplier quality
requirements to be met.
Form A of this specification must also be completed and signed by the supplier responding to an
Eskom invitation to tender, in order to acknowledge and accept Eskom Supplier Quality requirements
as per this specification and ISO 9001 Standard or any additional quality requirements specific to
the scope of work.
3.1 Supplier and Sub-Supplier Quality Management System Requirements
3.1.1 The supplier and sub-supplier shall develop, implement, maintain and improve a formal QMS
that conforms to the latest ISO 9001 standard or any applicable standard of QMS (latest
applicable revision) and in accordance with the requirements of this specification.
3.1.2 Such a formal system shall consist of the appropriate documented information required by
ISO 9001 and may include a quality manual, quality plans, work procedures, work
instructions, method statements, work flow documentation, etc., as the case may be. This
requirement constitutes the most basic QMS requirements.
3.1.3 Unless specifically excluded from the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), such a QMS shall carry a valid ISO 9001
certificate from an accredited certification body, as indicated in the applicable Eskom
invitation (this requirement applies equally to both the supplier and any/ all manufacturing
third-party organisations mentioned above).
3.1.4 Unless specifically excluded in the quality list of tender returnable, as per the categories of
quality requirements (Category 1, 2, 3, or 4), the supplier shall have a fully developed,
documented, implemented, reviewed and maintained QMS that complies with the
requirements of ISO 9001 standard or any applicable standard of QMS. In the event that the
main supplier invariably requires the assistance of a sub-supplier in order to realise its own
supply obligations. The aforementioned requirement applies equally in all cases where any
such sub-supplierβs scope of responsibility includes the provision of any of the following
activities, namely, design and development, manufacturing, maintenance, testing, storage,
delivery, installation, commissioning, and project management, or in the cases the supplier
name changes, mergers, acquisitions and/ or cessions. Eskom Quality department must
ensure that the changed entity can still fulfil the requirements as set out in the contract
documentation.
3.1.5 Eskom reserves the right to request and perform necessary assessments at sub-supplier
facilities.
3.1.6 The main supplier shall be responsible for defining and managing the specific quality
assurance and control elements applicable to the respective sub-supplierβs scope of
work/supply and ensure that its sub-supplier(s) quality programmes support Eskom
requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.1.7 The supplier shall inform Eskom of any proposed changes to the QMS or staff that will affect
the quality system prior to implementation of these changes.
3.1.8 The main supplier shall develop and implement a performance management programme for
their sub-supplier. The programme shall include, but not limited to:
ο· Verification of the QMS
ο· Audits and surveillances
ο· Regular assessment of the CQPs and reviews of QCPs.
ο· NC and Defect Management
ο· Inspection and test plans
ο· Risk management
3.2 Quality Plan
The information in this section constitutes the minimum requirements for a quality plan.
3.2.1 Where specified in the Evaluation Criteria and/ or quality list of tender returnables , as per the
categories of quality requirements (Category 1, 2, 3, or 4); all individual products, services
and processes shall have a documented, implemented, reviewed and maintained contract
quality plan and/or quality control plan (inspection and test plan).
3.2.2 Where specified in the evaluation criteria and/ or quality list of tender returnables. All
production and/ or service provision shall be carried out in accordance with a documented
and agreed contract quality plan (CQP) and/ or quality control plan (QCP)/ inspection and test
plan (ITP).
3.2.3 The supplier shall plan for the required quality-related activities and interfaces within the
supplierβs quality system in order to demonstrate its ability towards both controlling and
meeting specified Eskom requirements.
Note 1: Contract Quality Plan should address the quality assurance elements related to the scope
of work and/ or technical specification.
Note 2: Quality Control Plan (QCP)/ Inspection and Test Plan (ITP) should address the quality
control elements related to the scope of work and/ or technical specification.
3.3 Contract Quality Plan
The main supplier shall require sub-suppliers to submit project quality plans (PQPs)/ contract quality
plans (CQPs) and associated documentation in accordance with the requirements of project QMS
processes applicable to the sub-supplierβs scope of work.
The supplier shall, where applicable, based on scope of work criticality, ensure that procurement
documents clearly and unambiguously require sub-supplier submission of a sub-supplier CQP for
supplier and Eskom review.
The main supplier shall ensure that sub-supplier CQPs are developed and implemented in
accordance with the ISO 10005 Quality Management System Guidelines for Quality Plans. In
addition to the elements specified in ISO 10005, the supplierβs and/ or sub-suppliersβ CQPs shall
include the following (as applicable):
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.3.1 The management of records, including material tests, positive material identification (PMI)
testing, material certification, etc.
3.3.2 The provision for free and uninhibited access by the supplier and/or personnel at the time of
inspection.
3.3.3 The proposals for submission of final documentation, the final manufacturing data book, prior
to shipment.
3.3.4 The special processes related to welding: management of the welderβs qualification record
(WQR), welding procedure specifications (WPS), and procedures qualification records (PQR)
that will be used in the performance of work for supplier review and acceptance prior to
commencing manufacture. Welders shall be qualified to the specified Codes of Construction
for the applicable procedures. The requirements for qualification shall be specified by the
supplier, and welder records shall be maintained by sub-suppliers performing the work.
3.3.5 The special installation procedures and other required fabrication or manufacturing
procedures (that is, those required for post-weld heat treatment, tube rolling, coatings, etc.)
that will be used in the performance of work shall require supplier review and acceptance
prior to commencing manufacture. The personnel carrying out special processes (for
example, NDE, welding, coating, heat treatment, etc.) where the results cannot be fully
verified by subsequent inspection and test shall be suitably qualified and, where applicable,
registered with statutory bodies as legally required, that is, as radiographic workers to conduct
radiography. The requirements for the qualification shall be specified, and personnel records
shall be maintained in accordance with the Project Quality Personnel Qualification
Specification and, where applicable, legal requirements.
3.3.6 The personnel required to perform special processes shall be certified competent through a
certificate of competency in accordance with the companyβs internal training management
and competency control procedures or an external certification body (for example, NDT)
through an accredited service provider as per Skills Education Training Authorities (SETA)
requirements.
3.3.7 All personnel who perform activities that affect quality shall have their training needs identified
and documented. The required training shall be implemented in accordance with the
companyβs training management and competency control procedures. All the training
certificates shall meet the SETA requirements in terms of having the unit standard completed
and the accreditation number of the service providers.
3.3.8 Instructions and requirements for equipment and materials storage, preservation, and
maintenance, including identification of materials required for preservation and maintenance,
are to be provided sufficiently prior to receipt (prior to shipment or earlier) to ensure that
appropriate resources are available at the time of delivery.
3.3.9 Specific quality monitoring and verification activities are to be undertaken on the supplierβs
sub-suppliers by Eskom or it agent.
3.3.10 The CQP information need to include, but not limited to:
ο· Spells out the aspects of the QMS to be applied within a specific Eskom project, and the
methods to be utilised to ensure quality.
ο· Outline the resources, the communication channels, applicable documents and records to be
generated.
ο· Management Authority and Responsibility from both supplier and client need to outline in the
Cqp.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
ο· List of documents and records that will be used and submitted during the execution of the
project.
ο· Communications channels should include contact person and contact details
ο· Monitoring & measurement procedures for activities need to be indicated.
3.3.11 The main supplier and sub-supplier CQPs shall comply with the Eskom Quality Requirements
Specifications and shall be submitted prior to the initial scope of work kick-off or initial pre-
fabrication meeting and prior to commencement of manufacturing, whichever is earlier.
3.3.12 The Eskom template for CQP provided shall be used as guideline, where the supplier does
not have a CQP template.
3.4 Quality Control Plan
The supplier shall develop and implement processes and procedures that efficiently and effectively
monitor, verify and document the quality of the scope of work for deliverables.
The main supplier shall ensure that sub-supplier QCPs/ ITPs are prepared at a level of detail
sufficient to address all quality-control-related activities in a chronological order, from contract review
through materials verification, manufacturing, fabrication, assembly, final testing, commissioning,
hand-over documentation, and certification. In addition, the supplier shall ensure compliance with
the following requirements:
3.4.1 All stages of manufacturing, fabrication, assembly and installation shall be controlled by a
supplierβs QCP/ ITP that clearly and unambiguously identifies the quality verifications to be
performed and special attention to controls related to critical products and services.
3.4.2 QCP/ ITP shall be reviewed and accepted by Eskom, its inspection authority or agency, and
they shall allow for the insertion of Eskom specific requirements, including hold and witness
points prior to the commencement of work.
3.4.3 Subsequent changes to the Eskom accepted QCP/ ITP shall require Eskom, its inspection
authority or agencyβs agreement prior to the commencement of work involving an activity
affected by such changes.
3.4.4 The ITPs should cover materials certification, fabrication works, in-process inspections, final
acceptance tests, packaging and pre- shipment/ transportation, shipping/ transportation
inspections where contracted, preservation, site acceptance tests, construction and erection
works, and pre-commissioning and commissioning tests.
3.4.5 All sub-supplier QCP/ ITP activity shall be performed using an Eskom-accepted supplier
Qcp/ itp.
3.4.6 All applicable codes, standards, and relevant acceptance criteria documents are available at
the work location, and Eskom representatives on site shall have on-going access to this
information. Workplace documentation shall be available in English and in any workforce-
appropriate language.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.7 Where activities subject to inspection and test procedures are to be undertaken by a sub-
supplier, the QCP/ ITP shall make reference to this fact and shall include descriptive details
of the sub-supplierβs involvement. A separate QCP/ ITP shall be required for each sub-
supplier scope of work.
3.4.8 The supplier shall be ultimately accountable and responsible for the development and proper
implementation of all sub-supplier QCPs/ ITPs, including those reviewed or developed by
sub-suppliers.
3.4.9 Eskom reserves the right to select intervention points on QCPs/ ITPs for Eskom oversight of
selected functions and to perform surveillance or audits of the work.
3.4.10 Once signed, the ITPs and QCPs become addendums to the main contract. These ITPs can
be reviewed at Eskomβs discretion based on its assessment of the supplierβs performance or
other risks.
3.4.11 A QCP/ ITP shall contain the following information:
ο· Eskom contract number and title
ο· The supplierβs order number
ο· Identification of the area of works/contract
ο· Description of the work, with components, item number, and activity date
ο· QCP/ITP unique number
ο· A list of the sequence of operations, including inspection and tests
ο· The identification of the specification, drawing number, or procedure for each operation,
with reference to the relevant criticality risk rating
ο· The acceptance criteria, with reference to the technical specification, in-house, national, or
international standard, with the relevant clause number for each operation
ο· The inspection and test activities that the supplier has nominated for its intervention points
ο· Provision for the inclusion of intervention points nominated by Eskom and/or its authority/
agency
ο· Provision for intervention point acceptance by date and signature for all parties having
intervention in the plan
ο· Inspection and test records to be generated by the supplier for each operation and an
indication of records to be provided to Eskom (as applicable)
3.4.12 The main supplier shall require sub-suppliers to submit QCPs/ ITPs and associated
documentation applicable to the sub-supplier scope of work. Any changes made to the QCP
after submission must be resubmitted to Eskom for further review. The supplier shall ensure
that all sub-supplier QCPs/ ITPs are in compliance with the Eskom Quality Requirements
Specifications, including, but not limited to, the following requirements:
ο· Clear and unambiguous description of the equipment and location(s) at which each activity
will take place, including facility location(s)
ο· Identification of quality verification activity and stage
ο· The details of reference documents, procedures, or method statements to be utilised in
performance of the activity, including specific reference to actual sections and pages of
procedures, standards, instructions, specifications, etc.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
ο· Definition of acceptance criteria
ο· Listing of certifying or verifying documents generated to provide evidence of compliance
with specified requirements; documents are to be provided using the proper Eskom
document numbering requirements
ο· Identification of main supplier and sub-supplier (where applicable) third-party/approved
inspection authority (AIA) and Eskom inspection activities defined in terms of witness, hold,
document review, and verification monitoring points and provision for sign-off of each of the
above-mentioned parties for each intervention point
ο· Qualification requirements for quality control inspectors, including any third-party/AIA
inspectors
ο· Listing of all proposed test procedures
ο· Acceptance criteria for each inspection or test in alignment with specified tolerances
ο· A section for signed acceptance of the QC/ITP by the supplier, sub-supplier (where
applicable), and Eskom prior to commencement of work
ο· Inspection or testing intervention points, including, but not limited to, factory acceptance test
and package acceptance test, witness, and hold points
3.4.13 A quality kick-off meeting will be held at the start of the contract and, if required, at the start
of each subsequent phase.
ο· The supplier shall arrange coordination meetings with Eskom prior to placement of orders
for items or equipment to ensure that all technical and commercial requirements are clear
and understood. Fourteen daysβ advance notice of meetings shall be given to Eskom.
ο· Supplier inspection personnel, including inspection agency personnel, shall be competent
and qualified to perform inspection and testing assignments. Mobilisation of all such
personnel shall be in compliance with the Project Quality Personnel Qualification
Specification.
3.4.14 Where QCP/ ITP is applicable, the supplier shall ensure that sub-suppliers are provided with
comprehensive, clearly written, and unambiguous inspection and testing protocols, including
processes, procedures, and methods that shall include, but not be limited to, the following:
ο· Requirements for inspection checklists and inspection assignments, with lists of items to be
inspected
ο· An inspection and testing report format, report content, schedule for report processing and
distribution, and report retention requirements
ο· Inspection and test report results response tracking (log) and resolution of nonconformity in
inspection and test processes, procedures, or methods and nonconformity identified in
inspection and test results
ο· Associated Failure Mode, Effects and Criticality Analysis (FMECA) reports relating to the
equipment and sub-systems (if applicable)
ο· Hazard and Operability Study (HAZOP) report, as applicable
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.4.15 The supplier shall establish processes and procedures for formal assessment of sub-supplier
inspection and testing programmes. These shall include review of sub-supplier inspection
reports and other quality control documentation. Additional formal assessment of
manufacturing, fabrication, and assembly facility operations shall be conducted by the
supplier to ensure continuing suitability, adequacy, and effectiveness of the sub-supplierβs
inspection and testing programmes. Assessment frequency shall be established in
consideration of the sub-supplier scope of work, criticality of scope of work deliverables, and
performance information. The assessment scope and schedule shall be developed in
consultation with Eskom.
3.4.16 Supplier processes and procedures for verification of supplier and sub-supplier purchased
product compliance with specifications shall obtain document return/review status prior to
implementation.
3.4.17 The objective is to finalise any outstanding procedural or other issues before proceeding to
deliver the works.
3.4.18 Eskom, in consultation with the supplier, develops an agenda for the meeting, and Eskom will
keep minutes of these meetings.
3.4.19 Mandatory pre-inspection meetings will be convened by Eskom or its inspection agency or
AIA to be attended by the supplierβs and sub-supplierβs representatives, including their quality
representatives who will be involved in the works, and records are to be kept.
3.4.20 Eskom reserves the right to appoint resident quality inspectors who can be based at the
supplierβs or sub-supplierβs premises and on site where the work is being performed. The
supplier is expected to provide workspace at no cost to Eskom for the inspector, as required.
3.4.21 Eskom may appoint any organisation it prefers to perform quality assurance and quality
control activities, either in the capacity as an AIA or inspection agency, on the works
contracted to the supplier, and the supplier or its sub-suppliers may not object, prevent,
hinder, undermine, circumvent, question, discredit, or in any way make it impossible for such
organisation to carry out its work on behalf of Eskom.
3.4.22 The Eskom template for QCP/ ITP provided shall be used as guideline, where the supplier
does not have a QCP/ ITP template.
3.5 Pre-Contract Award: Quality Requirement
3.5.1 Main Supplier and Sub-supplier Categories
Eskom supplier quality requirements for all existing and potential suppliers and sub-suppliers are
classified into four categories (category 1, 2, 3 and 4). Suppliers must prepare and submit quality
documentation as per the tender selected category (indicated in Form A) using the list of tender
returnables document.
NOTE: Only one (1) category must be applicable per procurement process e.g. [Eskom requests for
information (RFI)/ requests for quotation (RFQ)/ requests for proposal (RFP), including contracts for
the procurement of products and services].
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The following are the minimum returnable documentation for Categories 1 to 4:
3.5.2 Category 1: Quality Requirements
ο· The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
ο· The supplier shall submit a valid copy of ISO 9001 or any applicable certificate of a QMS (the
latest applicable revision). The QMS should drive the supplierβs business management
processes to ensure that all of Eskomβs requirements are fully met on a consistent basis.
ο· The supplier shall submit the latest copy of the management system internal and external
audit reports. The audit reports must include, if applicable, nonconformity identified, and the
resulting remedial actions (correction and/ or corrective action reports).
ο· The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
ο· Where applicable; the supplier shall submit a draft, or an example of an inspection and test
plan (ITP) or quality control plan (QCP) on similar and/ or previous work done.
ο· The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
ο· The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
ο· The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
documents (240-12248652).
3.5.3 Category 2: Quality Requirements
ο· The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
ο· The supplier shall submit objective evidence of a developed, implemented and maintained QMS
that complies with ISO 9001 or any applicable standard of quality management system (the latest
applicable revision). The following documents (approved/ signed copies) shall be submitted:
ο§ Quality Management System manual or a documented information that have defines and
describes the QMS and its scope
ο§ Quality Policy, aligned with the supplierβs strategic direction (documented information)
ο§ Quality Objectives (documented information)
ο§ Control of documented information (both maintain and retain documented information )
ο§ Internal audit procedure (documented information)
ο§ Control of nonconforming outputs (documented information)
ο§ Nonconformity and Corrective action procedure (documented information)
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
The QMS should drive all the supplierβs business management processes to ensure that all of
Eskomβs requirements are fully met on a consistent basis.
ο· The supplier shall submit the latest copy of the management system internal audit reports. The
audit reports must include, if applicable, nonconformity identified, and the resulting remedial
actions (correction and/ or corrective action reports).
ο· The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
ο· Where applicable; the supplier shall submit an example of inspection and test plan (ITP) or
quality control plan (QCP) on similar or previous work done.
ο· The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
ο· The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
ο· The supplier shall submit documented information retained (records) of management review
meetings that include agenda, meeting minutes, attendance registers, reports, presentations,
etc.
Note: specific requirements per tender will be selected using the List of Tender Returnable
document (240-12248652).
3.5.4 Category 3: Quality Requirements
ο· The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
ο· The supplier shall submit objective evidence of a developed QMS that complies with ISO 9001
(or the latest applicable revision). The following documented information (approved/ signed
copies) shall be submitted:
o Quality management system manual or a (documented information) that have
defines and describes the QMS and its scope
o Quality Policy, aligned with the supplierβs strategic direction (documented
information)
o Quality Objectives (documented information)
o Control of documented information (both maintain and retain documented
information )
o Internal audit procedure (documented information)
o Control of nonconforming outputs (documented information)
o Nonconformity and Corrective action procedure (documented information)
The QMS should drive all the supplierβs business management processes to ensure that all of
Eskomβs requirements are fully met on a consistent basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
ο· The supplier shall submit a draft contract quality plan that is specific to the scope of work as
described in the tender documents. The plan must address the minimum requirements as per
Iso 10005.
ο· Where applicable; the supplier shall submit an example inspection and test plan (ITP) or
quality control plan (QCP).
ο· The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
ο· The supplier shall submit a copy of documented information for roles, responsibilities and
authorities in relation to the QMS. Examples of relevant documented information are;
organization charts, job descriptions, work instructions, duty statements, manuals, procedures.
NB: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.5.5 Category 4: Quality Requirements
ο· The supplier shall complete and sign Form A (Enquiry/Contract/Quality Requirements for
Supplier Quality Management Specification 240-105658000/ QM 58 and ISO 9001).
ο· The supplier shall submit a quality method statement based on ISO 9001 and specific to the
scope of work.
ο· The quality method statement should address all the supplierβs business management
processes to ensure that all of Eskomβs requirements are fully met on a consistent basis.
ο· The supplier shall submit a signed/ approved quality policy (aligned with the supplierβs strategic
direction). (documented information)
ο· The supplier shall submit a copy of quality objectives. (documented information)
ο· The supplier shall submit documented information for Control of Externally Provided Processes,
Products and Services.
ο· The supplier shall submit a copy of the documented information for roles, responsibilities and
authorities, specific to the project/ scope of work/ technical requirements. Examples of relevant
documented information are; organization charts, job descriptions, work instructions, duty
statements, manuals, procedures.
Note: specific requirements per tender will be selected using the List of Tender Returnables
document (240-12248652).
3.6 Main Supplier and Sub-supplier Capability and Capacity Assessment
Supplier capability and capacity assessments shall be performed prior to contract award on potential
suppliers participating in Eskom Holdings procurement process to:
ο· provide products and services with high risk to operational sustainability
ο· work on critical plant and equipment
ο· supply of critical plant items or components
ο· provide special processes
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
All sub-suppliers used by the main supplier/ contractor, performing work on Eskom critical plant
equipment, supplying commodities and providing specialised services shall be subjected to the
capability and capacity assessment.
Critical plant includes the following:
ο· Generation Level 1 & 2 plant
ο· Transmission and Distribution Power Plant & Control Plant
ο· Mega Projects
All potential quality risks identified will be included in the assessment report provided for the tender
evaluation.
Note: Form A (Enquiry/ Contract/ Quality Requirements for Supplier Quality Management:
Specification 240-105658000/ QM 58 and ISO 9001) will be used to select and indicate whether
capability and capacity assessment will be conducted.
3.7 Post-Contract Award
3.7.1 Contract Execution
The supplier shall submit the following documents within 30 days or as per stated timeline after the
contract date, prior to the commencement of work, for acceptance by Eskom:
ο· The supplier shall complete a QCP before contract award. This shall be reviewed and
signed off by Eskom within 30 days or as per stated timeline after contract award.
ο· The supplier shall complete a quality control plan and ITP(s) for review and acceptance by
Eskom prior to the commencement of any work, inclusive of subcontracted work, within 30
days or as per stated timeline after contract award.
ο· The sub-supplier QCP/ ITP shall be submitted for review and comment by the supplier and
by Eskom within 30 days or as per stated timeline after the award of the tender. All supplier
and Eskom comments shall be resolved prior to commencing work.
ο· The equipment lists and an indication of pressurised components and systems.
Note: These plans are to be compiled in line with Eskomβs requirements and will have to be
discussed with, and approved by, Eskom prior to any work commencing.
ο· Correspondence shall be directed to the project manager, and periodic quality review
meetings shall be convened by Eskom with the supplier.
ο· The mandatory quality review meetings are to be convened by the nominated project quality
manager or his/her representative for the contract.
ο· Monthly quality performance and management reports are to be prepared by the supplier
during contract execution. The content of these reports shall be agreed by Eskom when
submitted to Eskom on a monthly basis.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.2 Supplier Quality Performance Monitoring Phase
During the contract execution phase, suppliers shall be monitored by Eskom for performance on
quality-related aspects.
The outcomes of such monitoring will enable Eskom to take any appropriate actions pertaining to
the supplier.
The monitoring shall be carried out periodically by Eskom or at predetermined intervals during the
execution of a contract using agreed key performance indicators. The monitored key performance
areas include the following:
ο· CQP and QCP /ITP
ο· Delivery
ο· Design
ο· Cost
ο· Management system
Subsequent key performance indicators associated with these areas will include the following:
ο· Nonconformity monitoring
ο· Audit and assessment evaluation scoring
ο· Management system compliance and accreditation
ο· Achievement of delivery targets as per contractual agreements
ο· Process improvements
ο· Correction and corrective action response and closure
3.7.3 Supplier Quality Audit
3.7.3.1 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.2 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers
3.7.3.3 Quality audits and related quality performance reviews are intended to provide an objective
evaluation of compliance with performance expectations defined in this specification, in the
supplier contract quality plan (CQP), and in any other project scope of work specification.
3.7.3.4 Quality audits and related quality performance reviews include, but are not limited to, any
quality or other project functional area audits, assessments, verification of compliance
reviews, surveillance, inspections, or other interim or final assessments of scope of work
deliverables provided by the supplier or sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.7.3.5 Quality audits and related quality performance reviews shall be carried out by trained,
accredited, and experienced personnel in accordance with procedures documented in the
Cqp.
3.7.3.6 The supplier shall submit, for Eskom review, documented processes for conducting project
scope of work quality audits and related quality performance reviews. Supplier quality audits
and related quality performance review processes shall be designed to address evaluation
of progress towards completion of project functional area deliverables as well as final
deliverable quality.
3.7.3.7 The supplier shall provide a schedule of anticipated quality audits covering all functional
areas and related quality performance reviews at the time of first post-contract award CQP
submission.
3.8 Standard Conditions
3.8.1 Rights of Access
Eskom:
3.8.1.1 shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts;
3.8.1.2 reserves the right to review, inspect, and audit any or all parts of the supplierβs QMS, as well
as any documentation, materials, or equipment associated with the work, at any time or
project work location; and
3.8.1.3 reserves the right to carry out assessments and audits on all new suppliers and sub-
suppliers.
The supplier:
3.8.1.4 shall support Eskomβs effort to monitor, verify, and/or witness any activities associated with
the work at any time;
3.8.1.5 shall cooperate with Eskom requests for documentation, records, and inspection and
witnessing. Eskom participation in audits, appraisals, assessment of plans, and verification
shall be conducted at no extra cost to Eskom;
3.8.1.6 shall ensure that a sub-supplier provides access to Eskom to all work procedures, records,
and supporting documentation through provision of access to view and photocopy, as
required, to support verification of scope of work requirements. Access shall include the
ability to photograph Eskom equipment, systems, system components, materials, etc.;
3.8.1.7 shall provide access to all quality-related information pertaining to activities performed by
itself or sub-suppliers, where Eskom might not have participated in the witnessing of their
quality assurance or control (this refers to inspections, audits, etc. performed by the supplier
on its own sub-suppliers);
3.8.1.8 shall allow Eskom to assess, audit, approve, or reject any sub-suppliers employed by
Eskomβs suppliers to assist with the product and/or service delivery to Eskom; and
3.8.1.9 shall ensure that the above requirements flow down to sub-suppliers.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.2 Eskom Rights to Information
3.8.2.1 To expect that the works will be conducted in accordance with the contract between the
parties.
3.8.2.2 To have access to the supplierβs information as determined by applicable legislation.
3.8.2.3 Eskom reserves the right to oversee the supplierβs audit programmes by participating in
selected audits as an observer and by assessing the supplier during key work stages.
Eskom will coordinate with the supplier to develop an oversight schedule aligned with the
supplierβs audit schedule.
3.8.2.4 To obtain access to any audit reports of audits performed by the supplier reflected in the
audit programme.
3.8.2.5 To conduct independent quality audits during all phases of the contract, and the supplier
shall provide all resources to support these activities.
3.8.2.6 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplierβs and sub-suppliersβ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.2.7 To participate in, and/or lead, investigations related to incidents involving its products.
3.8.2.8 To require from suppliers to be responsible for the cost of re-inspections.
3.8.2.9 To withhold payment from suppliers as a result of outstanding nonconformities, irrespective
of the agreed payment schedule and in accordance with the conditions of contract.
3.8.2.10 Shall be granted electronic and hard-copy access to all quality plans, procedures,
documentation, and other quality records relating to the work, including, but not limited to,
data extracts.
3.8.2.11 Reserves the right to review, inspect, and audit any or all parts of the supplierβs QMS, as
well as any documentation, materials, or equipment associated with the work, at any time or
project work location.
3.8.2.12 Shall carry out assessments and audits on all new suppliers and sub-suppliers.
3.8.2.13 Reserves the right to appoint resident quality inspectors who can be based at the supplierβs
or sub-supplierβs premises and on site where the work is being performed.
3.8.2.14 Reserves the right to select intervention points within all developed supplier QCPs/ ITPs
for Eskom oversight of selected functions and to perform surveillance or audits of the work.
3.8.2.15 Shall be given access at all reasonable times before, during, and after manufacture and
before delivery, construction, erection, and commissioning to measure, test, and inspect the
products and workmanship, as necessary, at the supplierβs premises and at Eskom sites.
3.8.2.16 Reserves the right to suspend any pending deliveries by the issuing of a cease delivery
order at any time and for any portion of the work that is not being performed in accordance
with the specified/agreed requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3 Preservation
The supplier shall develop and implement a comprehensive preservation programme consisting of
plans, processes, procedures and actions undertaken for the purpose of planning for and
maintenance of material deliverables quality. The supplier preservation programme scope includes,
but is not limited to, the following:
3.8.3.1 Engagement of personnel suitably qualified for oversight of, and (as required) direct
implementation of, preservation programme requirements.
3.8.3.2 Development and implementation of preservation programme training appropriate to work
need.
3.8.3.3 Eskom may make use of its appointed service provider tasked to provide a full suite of
services encompassing an online monitoring system and asset tracking during, but not
limited to the following stages: inspections, testing, shipping, transportation, storage, and
commissioning. The supplier is to enable full access during all of these stages in order to
allow the installation of the devices on Eskom-identified products and equipment, which
include the sub-supplierβs testing facilities, processing plant, and any other processes
deemed important towards effective and efficient quality control.
3.8.3.4 Eskom seeks cooperation between the supplierβs designers and those of Eskomβs service
provider in ensuring seamless installation of the device and other associated installations.
Moreover, there is also a need to integrate data flows and systems between Eskom and the
supplier. Further details are included in the Eskom specifications and works information.
3.8.3.5 Review and tracking of compliance with Eskom and supplier engineering specification of
preservation requirements.
3.8.3.6 Review and tracking of compliance with sub-supplier provided preservation requirements
and recommendations.
3.8.3.7 Evaluation of prospective temporary and longer-term material storage sites for consistency
with preservation programme expectations.
3.8.3.8 Preservation work plan development and plan execution performance evaluation of all
parties engaged for provision of material transportation, handling, or storage services.
3.8.3.9 Oversight of material quality preservation plan preparation and plan execution performance
at all work locations.
3.8.3.10 Development of a preservation programme records management process, in compliance
with Eskom information management requirements, which comprehensively addresses
generation, maintenance, and ready access by Eskom to all preservation programme
records.
3.8.3.11 The supplier shall deploy a clearly defined documented programme providing for
identification of all physical asset pre-operation preservation of quality requirements. In this
reference, the term βphysical assetsβ should be understood to include bulk materials,
including consumable items, equipment systems, system components, and any other
procured or supplied materials or equipment transferred to project control, but not deployed
for operational purposes.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.12 Where the project responsibility for equipment and materials management has been
formally delegated, the supplierβs preservation programme shall ensure clear and
unambiguous communication of pre-operation preservation of goods quality requirements
to sub-suppliers.
3.8.3.13 The supplierβs preservation programme shall clearly and unambiguously document
processes and procedures for efficient and effective monitoring of compliance with
programme requirements.
3.8.3.14 Compliance monitoring shall commence with ensuring comprehensive consideration of
preservation requirements in the engineering instruction and subsequent inclusion of said
instruction in procurement documentation and shall be applicable until such time as
equipment or materials have been incorporated in an operating or operational system or
structure.
3.8.3.15 Compliance evaluation frequency shall anticipate transfer of tactical-level responsibility for
management of preservation responsibilities between project functional areas, for example,
procurement to logistics, logistics to fabrication, fabrication to logistics, logistics to
construction, etc., and shall, in similar fashion, anticipate transfer of support for tactical-level
responsibility between various subcontracted service providers.
3.8.3.16 Supplier engineering shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project procurement, logistics, construction management,
quality, security, and other project functional areas, as required, for efficient and effective
implementation of preservation requirements. This shall take the form of a preservation
programme applicable to all systems, system components, equipment, materials, customer-
supplied materials, and other goods procured or managed under the scope of work.
3.8.3.17 The supplierβs preservation management programme shall clearly and unambiguously
address temporary, long-term, and in-transit preservation requirements, including, but not
limited to:
ο· requirements for protection against, or insulation from, atmospheric conditions,
sunlight, temperature, soil, dust, humidity, salt spray, corrosive atmospheres, or
other physical environment conditions;
ο· detailed procedures for application, use, monitoring, and maintenance of coatings,
coverings, fasteners, lines, and other components for internal and external weather
proofing;
ο· requirements for electrical grounding or isolation;
ο· requirements for internal or external environment creation, for example, inert gas
charging, heating, cooling, etc., inclusive of gas storage, electric power supply, etc.;
ο· detailed procedures for initial set-up, charging, activation, and maintenance of
internal atmosphere generation, regeneration, monitoring, and relieving systems, for
example, inert gas management systems;
ο· requirements for protection against, or insulation from, vibration or long-period
cyclical motion in transit, for example, wave-generated movement during sea
transport;
ο· internal and external structural integrity protection, for example, internal and external
bracing, padding, framing, chocking, etc.;
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
ο· support structure requirements, for example, stools, pads, or other devices,
substrates, or support required to ensure in-storage and in-transit stability of
systems, system components, equipment, and material, or other discrete units or
items;
ο· provision for physical separation and/or barriers to prevent airborne or direct
transmittal of contaminants between work areas or between work areas and storage
areas, for example, prevention of carbon steel grinding or cutting debris impact on
stainless steel elements, airborne drift of blast aggregate into vessels or machinery,
etc.;
ο· provision for, and final disposition of, temporary and longer-term storage or transit
required supports and related binding devices, for example, stools, stands, sea
fasteners, platforms, chocks, spacers, cabling, etc.;
ο· provision of requirements for temporary work platforms or other support structures
required to ensure provision of preservation services, for example, provision of a
self-elevating work platform for periodic access to elevated fittings, gauges, man-
ways, etc.;
ο· requirements for protection against, or insulation from, contact with other objects, for
example, padding or other protection for external tubing, fittings, or other impact-
sensitive structures or components;
ο· clear physical delineation of temporary and longer-term storage areas supplemented
by hard and soft barriers, as required, to maintain a protective perimeter;
ο· documented agreements with storage facility and transportation provider
management regarding security management, including, but not limited to, facility
access and egress control and control of access to project goods and materials
within facility boundaries or aboard vehicles or vessels; and
ο· detailed procedures for inspection and testing to verify performance of preservation
procedures and to provide for timely notice and corrective action to maintain
preservation status.
3.8.3.18 The supplierβs preservation management programme scope shall encompass
management of preservation requirements, from initial transfer of ownership or management
responsibility to project scope of responsibility, through any period of temporary or longer-
term storage and through any period of transit, including transit for final delivery at point of
active use or installation.
3.8.3.19 The supplierβs preservation management programme shall clearly and unambiguously
address processes and procedures to ensure that storage and control of materials are
accomplished in accordance with manufacturer recommendations, specifications, and
project-specific requirements.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.3.20 The supplierβs preservation management programme shall incorporate special precautions
to address preservation and control of valves, electrical motors and components,
mechanical and rotating equipment, piping and fittings, instrumentation, flange faces,
gaskets, coatings, insulation, and other materials. Special precautions include, but are not
limited to, supplier-specified maintenance procedures related to engines, electric motors,
pumps, compressors, etc., such as periodic shaft rotation, engine turnover, lubrication, etc.
3.8.3.21 The supplier shall ensure that clear and unambiguous requirements for preservation of the
system, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented in purchase orders, work authorisations, and other
communications between the supplier and sub-suppliers.
3.8.3.22 Where sub-supplier expertise is utilised in determination of the preservation protocol,
supplier procurement processes shall ensure clear and unambiguous documentation of sub-
supplier input into preservation management programme requirements.
3.8.3.23 Supplier procurement shall ensure that preservation requirements for scope of work
systems, system components, equipment, materials, and other procured goods are clearly
and unambiguously documented and that preservation requirements are efficiently and
effectively communicated to project logistics, construction management, quality, security,
and other project functional areas, as required, for efficient and effective implementation of
preservation requirements.
3.8.3.24 The supplier shall ensure comprehensive, clear, and unambiguous designation of sub-
supplier responsibility for execution of all preservation management programme elements,
including, but not limited to, all systems, processes, procedures, methods, ready access to
records, and provision of equipment, tools, or services essential to efficient and effective
execution of the preservation management programme.
3.8.3.25 The supplier shall ensure that preservation management programme responsibilities are
clearly and unambiguously defined within the project team and efficiently and effectively
implemented at all project scope of work locations. Inclusion of supplier and sub-supplier
scope of work in the development and implementation of a preservation management
programme shall be considered essential to efficient and effective preservation
management programme execution.
3.8.3.26 The supplier shall ensure clear and unambiguous designation of project team responsibility
for oversight and management of preservation management programme elements during
every stage of project development.
3.8.3.27 The supplier shall ensure that Eskom has free and unrestricted access to all preservation
records for inspection and audit.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.4 Quality Audits Related Conditions
3.8.4.1 The supplier shall maintain an accurate quality audit and related quality performance review
schedule and shall incorporate the current schedule as an attachment to the supplier CQP.
3.8.4.2 The supplierβs quality audit and related quality performance review schedule development
process shall be designed to incorporate consideration of information generated by
previously conducted audits and reviews, by input from project risk management evaluations
(risk register), or from Eskom or sub-supplier subject matter expertise.
3.8.4.3 Eskom reserves the right to oversee supplier audit programmes by participating in selected
audits as an observer and by assessing the supplier during key work stages. Eskom will
coordinate with the supplier to develop an oversight schedule aligned with the supplierβs
audit schedule.
3.8.4.4 Eskom will have the right to obtain access to any audit reports of audits performed by the
supplier reflected in the audit programme.
3.8.4.5 Eskom reserves the right to conduct independent quality audits, scheduled and
unscheduled, during all phases of the contract. The supplier shall provide all resources to
support these activities.
3.8.4.6 Eskom shall be given access at all reasonable times before, during, and after manufacture
and before delivery, construction, erection, and commissioning to measure, test, and inspect
the products and workmanship, as necessary, at the supplierβs premises and at Eskom sites.
3.8.4.7 The supplier shall obtain access for Eskom to measure, test, witness tests, and inspect
products that are being manufactured by any sub-supplier. This includes surveillances.
3.8.4.8 The assessments and audits shall be carried out on all new suppliers and their sub-
suppliers.
3.8.4.9 Eskom shall have the right to participate in, or request that, a technical investigation be
launched and conducted at the supplierβs and sub-suppliersβ premises or other sites when
risk to Eskom products or service deliverables is identified.
3.8.4.10 Qualification requirements for supplier and sub-supplier personnel engaged in conducting
quality audits and related quality performance reviews shall be defined in the supplier CQP
and shall be in compliance with the Project Quality Personnel Qualification Specification.
3.8.5 Management of Nonconformities and Nonconforming Outputs Identified by Eskom
3.8.5.1 Nonconformity reports raised by Eskom and issued against the supplier shall be investigated
by the supplier as a matter of urgency in order to determine the root cause, corrective action
measures, as required, with implementation time frames.
3.8.5.2 A formal response shall be prepared in respect of the defined criteria and submitted to
Eskom for its review, evaluation, and acceptance, within a maximum of 14 calendar days
from the date of issue of the nonconformity and should be aligned with the site
requirements/procedure.
3.8.5.3 Eskom may, at its discretion, request a response sooner and, in any case, before the
supplier proceeding with any pending/further intervention or corrective action, as may be
required by Eskom.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.5.4 Should Eskom or its inspection authority/agency identify any nonconforming products during
the conduct of its audits/surveillances/inspections, the supplier shall be deemed to be in
breach of contract and shall be held liable for any repair, rework, and/or associated
replacement costs. The supplier may, in such instances, also be held liable for the full costs
associated with the conducting of follow-up audits/surveillances/inspections.
3.8.5.5 The nature, magnitude, and/or frequency of nonconformity and inspection defect/rejection
reports raised by Eskom or its appointed inspection authority/agency shall form the basis of
any action to rescind/withdraw the supplierβs qualification status.
3.8.5.6 Nonconforming outputs identified by Eskom shall be documented via a NC Report and
issued to the suppliers via the contract communication protocol. The suppliers shall
investigate the matter and respond in writing to Eskom of disposition within the stated
contractual conditions.
Note: The dates for the disposition should align to contractual conditions.
3.8.5.7 Eskom shall identify repeat deficiencies as systematic failures of the supplierβs QMS and
shall notify the supplier of the trends. Eskom can initiate an internal audit to highlight the
system failures. The supplier with raise a Corrective Action Report and undertake Root
Cause Analysis. In such cases, QMS rectification and/ or update measures shall be taken
immediately.
3.8.5.8 Should the Supplier fail to respond and rectify nonconforming products within stipulated
contractual conditions. The Project Manager should apply contractual remedies in
accordance with Fidic/ NEC contract.
3.8.5.9 Repeated Nonconformities; if there are any identified repeat nonconformities from the same
supplier within a period of 6 months or less. This must then be escalated to the management
review committees of the BU/ OU/ Cluster/ or Divisions for adjudication. If not resolved, then
the matter must be escalated to the supplier review committee for recommendation.
3.8.6 Special Processes
The following requirements shall be applicable as well as additional requirements as specified in the
scope of work for the provision of the following special process services:
3.8.6.1 The supplier shall ensure that all processes which require that procedures be pre-qualified
or work methods and operators tested and qualified are controlled and all steps followed
before the work can commence.
3.8.6.2 This typically covers such activities as welding, non-destructive testing, special fabrication
techniques, coating, painting, etc.
3.8.6.3 All special processes (procedures and processes) shall be submitted for review and
acceptance by Eskom, accredited or certified agency. No work shall commence until these
are accepted.
3.8.6.4 Where applicable, a relevant Management System for the special process shall be certified
or approved by an accredited body and proof of certification shall be submitted to Eskom for
review. An example for this will be the Welding Management System based on ISO 3834.
3.8.6.5 Where samples are required for acceptance, these shall be submitted to Eskom for review
and acceptance.
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
3.8.6.6 The supplier shall ensure that all operators are suitably qualified for these processes in
accordance with the procedures, processes and/ or applicable standards/ codes.
3.8.6.7 The records of qualification of procedures, processes and operators shall be maintained by
the supplier in accordance with the applicable procedure or code and these made available
to Eskom at all times.
4. Acceptance
This document has been seen and accepted by:
Name Designation
Kerseri Pather General Manager: Risk and Sustainability
Lenock Meyer Acting Senior Manager: Quality Management
Pamela Dondashe Middle Manager: Quality Assurance
Mandla Mkhwanazi Middle Manager: SHEQ Procurement and Supply Chain Management
Suzette Manthe Senior Advisor: Quality Performance and Planning
Lorna Ndlela Middle Manager: Eskom Document and Records Management
5. Revisions
Date Rev. Compiler Remarks
October 2021 3 SA Sambo Specification was due for revision and in addition, to
align the requirements with the latest Eskom business
processes and systems.
October 2018 2 SA Sambo Specification reviewed to be aligned with the
requirements of ISO 9001:2015
March 2016 1 SA Sambo Specification was due for revision and also to
repackage the requirements and tender returnable
documents into four categories.
December 2011 0 A Hunter New document
6. Development Team
The following people were involved in the development of this document:
ο· Andrew Else
ο· Bongi Tshabalala
ο· Feziwe Mogamisi
ο· Lesego Garegae
ο· Patrick Thwane
ο· Xolani Zuma
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Supplier Quality Management: Specification Unique Identifier: 240-105658000
Revision: 3
Page:
7. Acknowledgements
Eskom Operational Quality Forum Members
Controlled disclosure
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the
user to ensure it is in line with the authorized version on the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd,
Reg No 2002/015527/30.
Quality Control Plan Approvals Name Signature Intervention Point Legend (KEY)
Contractor /Supplier Hold Point AP - Document Requires T1 β 100% Testing A1 β 100% Inspection
Approval T2- Sample Testing A2- Sample Inspection
Subcontractor (where applicable) Witness Point W1 β 100% witness W2 - Sample witness
Eskom Document IN - Document Requires for R1- 100% Document Review R2- Sample Document
Review information only Review
Approved Inspection Authority (AIA) Surveillance (S)
(Where applicable) Verification (V)
Activities Intervention Point Category Inspection and Test Method Supplier Inspection Eskom Inspection Records
No Description / Requirement Date Supplier Eskom S=Statutory Method Controlling Acceptance AIA/NOBO Internal/TPI AIA/NOBO Internal/TPI
/ N= Non- document Criteria
statutory
Notes: INSPECTION AND TEST METHOD (e.g. Visual, Microscopy, NDT, Liquid/ Dye Penetrant, Magnetic Particle, EDDY, etc.); ACCEPTANCE CRITERIA ( e.g. Functionality requirement,
Performance Measures, Regulatory Compliance, Chemical test , etc.)
Abbreviations: NOBO (Notification Body); TPI (Third Party Inspection)
Public
When downloaded from the document management system, this document is uncontrolled and the responsibility rests with the user to ensure it is in line with the authorised version on
the system.
No part of this document may be reproduced without the expressed consent of the copyright holder, Eskom Holdings SOC Ltd, Reg No 2002/015527/30.
B.2 Documented information for Control of Externally Provided Processes, Products and Services - Must include criteria for evaluation, selection,
(type in the information required) Document/ Dept./
Procedure Discipline
Outline the scope of work as detailed in the Works Information of the NEC Note the Relevant
Indicate with an
105658000 (x) as applicable
Specification or (-) if not
Applicable
Pre-contract award quality requirements x
(*Select Only Applicable Category). NB: Not more than one category must be selected. Also indicate
whether site assessment is applicable.
Category 1 (refer to clause 3.5.-105658000) -
Category 2 (refer to clause 3.5.-105658000) -
Category 3 (refer to clause 3.5.-105658000) -
Category 4 (refer to clause 3.5.-105658000) X
Main Supplier and Sub-supplier Capability and Capacity Assessment (refer to clause 3.-105658000) -
3 post-contract award(eskom)
Evaluation Criteria
Source: Quality requirements.zip (unknown)General
Quality Specific
Technical
Section
Source: Quality requirements.zipSupplier Quality Management: Specification Unique Identifier: 240-105658000
The intention of this specification is to specify and describe the minimum quality requirements for all
existing and potential Eskom suppliers and define the quality criteria for the selection, evaluation,
implementation, and maintenance of a quality management system (QMS) that conforms to the
a quality management system (QMS) based on ISO 9001, which should form the basis for conformity
to Eskom quality requirements and continually adhere to them throughout the duration of a contract
[1] ISO 9001 Quality Management Systems β Requirements
[2] ISO 10005 Quality Management Systems β Guidelines for Quality Plans.
[3] ISO 9000 Quality Management Systems β Fundamentals and Vocabulary
[4] 32-727: Safety, Health, Environment, and Quality (SHEQ) Policy
[5] ISO 10006 Quality Management Systems β Guidelines for Quality Management in Projects
[6] ISO 9004 Quality Management β Quality of an Organisation β Guidance to Achieve Sustained
[9] PPPFA: Preferential Procurement Policy Framework Act, 2000 (Act No. )
[10] CIDB 1004: Best Practice Guideline A4: Evaluating Quality in Tender Submissions
[11] 240-12248652 Supplier Quality Management: List of Tender Returnables
2.3.2 Contract Quality Plan: a document of the supplierβs process for delivering the level of quality
required by the contract. It is a framework for the contractorβs process for delivering quality.
2.3.3 Hold Point: a predetermined stage in the quality control plan (QCP) beyond which work/
2.3.4 Intervention Points: those control points indicated by the various controlling bodies
inspection, hold points, surveillances, witnesses, reviews and verifications.
performing quality assurance/ quality control, monitoring, inspection and/ or expediting
Title: Supplier Quality Management: Document Identifier: 240-105658000
Functional Area: Quality Management
Quality Quality Manager Quality Risk and
Description
Source: Environmental Requirements for Roof Replacement Vryburg.pdfappointment letter (outlining
roles and responsibilities)
4 Communication Procedure/ Strategy (including
communication plan)
5 Environmental Incidents Register (including
incident reporting template/form)
6 Environmental Aspects and Impacts Register
(specific to project
Evaluation Criteria
Source: Environmental Requirements for Roof Replacement Vryburg.pdf (unknown)Documentation
All required environmental documents must be submitted and meet minimum requirements to score points.
Compliance
Applicants must demonstrate compliance with environmental legislation and best practices.
Experience
While not explicitly stated, implied need for experience in roof repair/reinstatement and environmental management.
Legal Standing
Applicants must be legally registered entities capable of fulfilling the contract.
Technical Capacity
Ability to meet technical specifications for roof repair and environmental management.
Health & Safety
Source: Environmental Requirements for Roof Replacement Vryburg.pdfaddress Targeted Objectives (aligned with point 6
above)
8 Environmental Emergency Plan (including
emergency contact details, environmental events
and emergency drill form)
Environmental
Source: Environmental Requirements for Roof Replacement Vryburg.pdfscore
ion Apply 1 CommentsRef. KPIs Track Submiss or 0
1 Signed Environmental Policy (including
commitment to pollution prevention, continual
improvement and compliance to environmental
legislations)
2 Signed Company organogram β with the inclusion
of an Environmental Responsible Person
3 Valid Environmental appointment letter (outlining
roles and responsibilities)
4 Communication Procedure/ Strategy (including
communication plan)
5 Environmental Incidents Register (including
incident reporting template/form)
Action (including Non-conformanceβs form/
template)
11 Environmental Management Plan (with method
statements for the below mentioned elements)
11.1 Conservation of existing vegetation (Trees
ground cover and related pristine environment)
11.1 Environmental Human Resources
11.2 Environmental Training
11.3 Incidents Management and Reporting
11.4 Construction Management
11.5 Compliance Obligation (legal and other
requirements related to scope of work)
11.6 Rehabilitation work of affected area/
environment
12.1 Procedure/ method statement for handling of
waste (not limited to storage, handling,
transportation and disposal of accumulated
building related waste)
12.2 Register for possible waste to be generated on
site
12.3 Waste Separation
12.4 Waste Minimisation
12.5 Records of Waste quantities to be disposed
(template)
12.6 Compliance Obligation (Legal requirements)
14 Training Schedule and training Matrix (Indicating
resources trained dates and scheduled dates for
planned environmental trainings)
Section
Source: Environmental Requirements for Roof Replacement Vryburg.pdf9 Evaluation of Compliance, Monitoring and
Part b score
Description
Source: OHS requirements.zipProject involves roof inspection, repair, and reinstatement of Vryburg Main Building. Eskom requires contractors to develop a SHE plan that meets minimum legislative and Eskom requirements. The SHE specification outlines roles and responsibilities for principal contractors, appointed contractors, construction managers, supervisors, employees, and health and safety officers. Key responsibilities include: ensuring legislative compliance; maintaining SHE files; providing Letters of Good Standing; appointing competent staff; conducting risk assessments; providing induction and task-specific training; issuing PPE; managing substance abuse; reporting incidents; and establishing health and safety committees.
Submission Guidelines
Source: OHS requirements.zip (unknown)Returnable documents include: signed acknowledgement of Eskom's OHS legal and other requirements form; Health and Safety Plan addressing project risks with procedures for fall protection, incident management, emergency management, fatigue management, and substance abuse; detailed costing for OHS broken down by scope, not lump sum; Baseline OHS Risk Assessment with methodology; valid Letter of Good Standing (COIDA); OHS policy signed by CEO; medical fitness certificates for at least 4 climbers; OHS competency certificates and legal appointment letters for roles including Construction Manager (SACPCMP registered), Construction Health and Safety Officer (SACPCMP registered), Construction Supervisor, Fall Protection Planner, Ladder Inspector, Scaffolder Inspector, Hazardous Chemical Controller, Incident Investigator, Risk Assessor, SHE Representative, First Aider level 2, and Fall Arrest Training.
Evaluation Criteria
Source: OHS requirements.zip (unknown)Mandatory
Preferred
Disqualifiers
Technical Specifications
Source: OHS requirements.zip (unknown)Scope: Roof inspection, repair, and reinstatement of Vryburg Main Building. Deliverables include: assessment of entire roof assembly for SANS compliance; replacement of southern end roof system with SANS approved solution; detailed assessment of undamaged roof; roof certificate; compliance with SANS10400-XA; replacement of impacted services and provision of CoC; documentation for occupancy certificate. Contractor must design architectural, structural, and electrical components. Architectural design includes roof layout, material selection, retention of existing tiles, full roof painting, gutter replacement, asbestos assessment, ceiling works, internal painting, new carpet tiles, and site protection. Structural design includes assessment and replacement of damaged trusses. Electrical scope includes illumination survey, upgrade to LED fittings, cable testing, replacement of failed cables, conduit installation, earthing, and CoC. Fire detection requires manual call point and signage. Contractor must develop a SHE plan meeting Eskom's minimum requirements and all applicable legislation.
Compliance Requirements
Source: OHS requirements.zip (unknown)B-BBEE minimum level 2 required. OHS compliance includes: valid Letter of Good Standing (COIDA); OHS policy signed by CEO; medical fitness certificates for climbers; OHS competency certificates and legal appointments for specified roles; Construction Manager and Construction Health and Safety Officer must be SACPCMP registered. Contractor must comply with Occupational Health and Safety Act and regulations, Construction Regulations, and other referenced legislation.
Section
Source: OHS requirements.zipOHS tender evaluation template (Annexure C 1) used for high-risk projects. Evaluation checks for submission and compliance of key OHS returnables including: signed acknowledgement form; Health and Safety Plan; detailed OHS costing; Baseline Risk Assessment; Letter of Good Standing; OHS policy; medical fitness certificates; and competency certificates for specified roles. Each item is marked Yes/No/Not Applicable, leading to a final recommendation.
Description
Source: Invitation to Tender (ITT) for Vryburg Project.pdfProject scope: Appointment of a service provider for the Vryburg Roof Repair and Reinstatement Project. Work includes roof inspection, repair, and reinstatement of the Vryburg Main Building. The project requires a mandatory site clarification meeting to assess structural conditions, water damage, safety risks, and access points. Contract terms: NEC3 β Engineering and Construction Contract. Tender validity: 120 days from closing date.
Important Dates
Source: Invitation to Tender (ITT) for Vryburg Project.pdf (RFP)Closing date and time: 24 July 2026 at 10h00. Compulsory Site Clarification Meeting: 09 July 2026 at 11h00, Venue: 17 Market Street, Vryburg, Northwest Province (Coordinates: -26.95731939228146, 24.71976509325358). Clarification queries deadline: 5 working days before tender closing (19 July 2026). Tender validity period: 120 days from closing date.
Contact Information
Source: Invitation to Tender (ITT) for Vryburg Project.pdf (RFP)Eskom Representative: Nosihle Makhamba, Tel: 014 523 7157, Email: [email protected]. Fraud/Corruption Hotline: 0800 11 2722, Email: [email protected]. Submission portal: https://etendering.eskom.co.za/login
Submission Guidelines
Source: Invitation to Tender (ITT) for Vryburg Project.pdf (RFP)Submit tenders electronically via Eskom E-tendering portal (https://etendering.eskom.co.za/login) by the closing date and time. Ensure submission status is marked as 'complete'. Only PDF format is accepted. Maximum upload size per document: 500 MB; total submission: 4 GB. No hard copies or zipped files allowed. Late submissions will not be accepted. Resubmissions will override previous versions. Mandatory returnables at closing: Authorisation Form (Annexure A), Acknowledgement Form (Annexure B), Tendererβs Particulars (Annexure C), Integrity Declaration Form (Annexure D), SBD 6.2 Declaration Certificate for Local Production and Content (Annexures G1-G4 if applicable), SBD 1 (Annexure H), SBD 6.1 Preference Points Claim Form (Annexure I), SBD 4 β Bidders Disclosure (Annexure J), E-tendering Help Manual acknowledgement form, Tax Evaluation Questionnaire (if applicable), and Pricing Schedule/BOQ. Failure to submit mandatory returnables by the deadline will result in disqualification. For joint ventures, submit a valid JV agreement, single designated bank account confirmation, and separate written confirmation of single business entity operation.
Evaluation Criteria
Source: Invitation to Tender (ITT) for Vryburg Project.pdf (RFP)General
CIDB
B-BBEE
Financial
Technical Specifications
Source: Invitation to Tender (ITT) for Vryburg Project.pdf (RFP)Scope: Roof inspection, repair, and reinstatement of Vryburg Main Building. Mandatory site visit required to verify structural conditions, water damage, safety risks, and access points. Technical evaluation is mandatory; refer to the Technical Folder for detailed specifications. Functionality criteria apply with a 70% threshold. Tenderers must submit technical documentation as per the attached Technical Evaluation Strategy. Additional requirements: Proof of Registration as Electrical Contractor (ECSA/SACPCMP) for the Principal Contractor or JV/Sub-contractor. For civil works, provide ECSA certificate for the responsible Professional Engineer/Technologist or a registered Architectural Professional (SACAP).
Pricing Schedule
Source: Invitation to Tender (ITT) for Vryburg Project.pdfPricing Schedule/BOQ must be completed and submitted in PDF format only. Upload size per document: 500 MB; total submission: 4 GB. Pricing must be inclusive of VAT, exclude contingencies, and account for arithmetical corrections. Unconditional discounts are considered for evaluation; conditional discounts are applied at payment. Prices are scored out of 80 points. Net Present Value comparisons may be used. If cataloguing is required, include a line item in the Pricing Schedule for cataloguing costs (Eskom will pay for cataloguing).
Financial Requirements
Source: Invitation to Tender (ITT) for Vryburg Project.pdf (RFP)Pricing Schedule/BOQ must be completed and submitted in PDF format. Prices must be inclusive of VAT, exclude contingencies, and account for arithmetical corrections. Unconditional discounts are considered for evaluation; conditional discounts are applied at payment. Payment terms: Within 30 days for contracts β€ R50M (VAT inclusive); within 60 days for contracts > R50M (VAT inclusive). Cataloguing may be required post-award; include a line item for cataloguing in the Pricing Schedule if applicable. Financial viability: Submit latest approved annual financial statements (no drafts) including directorβs report, auditorβs report, statement of financial position, comprehensive income, changes in equity, cash flows, and notes. For unincorporated JVs/SPVs, each partner must submit financial statements. Public Interest Score (for non-audited SA entities) and ITA34C copies for current and previous years are required.
Compliance Requirements
Source: Invitation to Tender (ITT) for Vryburg Project.pdf (RFP)Mandatory: CSD registration (CSD number/report). CIDB grading: Minimum 5GB for main contractor/JV/sub-contractor. Joint ventures must have all members registered with CIDB; lead partner must have a grading equal to or one level below the required designation. Combined CIDB grading must meet or exceed the required level. Proof of CIDB grading must be submitted at tender closing or within 21 working days post-closing. Safety: COIDA certificate of good standing or proof of application. Quality: Compliance with documents in the Quality Folder. Environmental: Compliance with documents in the Environmental Folder. Employment Equity: Proof of compliance (for designated employers) including submission of EE report to the Department of Labour. Tax Clearance: Certified copy required for foreign tenderers (with SA footprint) and local tenderers (without SARS e-filing PIN). Foreign suppliers with no SA footprint must complete SBD1 but need not provide tax compliance proof. Additional: SHEQ requirements, SDL&I requirements, and any other stipulated conditions. Integrity Declaration Form (Annexure D) and Supplier Integrity Pact must be downloaded and signed.
Health & Safety
Source: Invitation to Tender (ITT) for Vryburg Project.pdfMandatory PPE for site visits: Safety shoes, hard hats, etc. One representative per company allowed at the compulsory site clarification meeting (roll call will verify attendance). Safety requirements: COIDA certificate of good standing or proof of application from the Compensation Fund or licensed insurer (South African tenderers only). Additional SHEQ requirements as per the Safety Folder. Site meeting objectives: Verify structural roof conditions, extent of water damage, identify safety risks (roof access, fall protection), clarify scope, and coordinate activities. Non-attendance at the mandatory site meeting results in disqualification.
Contractual Terms
Source: Invitation to Tender (ITT) for Vryburg Project.pdfContract terms: NEC3 β Engineering and Construction Contract. Tender validity period: 120 days from closing date. Payment terms: 30 days for contracts β€ R50M (VAT inclusive); 60 days for contracts > R50M (VAT inclusive). Cataloguing may be required post-award; successful tenderer must label materials per Eskom specifications. Alternative tenders are not allowed. Contractual requirements (non-evaluation criteria) include: Proof of CSD registration, SHEQ requirements, financial viability (financial statements), SDL&I requirements, and any other stipulated conditions. Failure to meet contractual requirements may result in non-responsiveness. Eskom reserves the right to negotiate with preferred bidders if prices are not market-related. Subcontracting with subsidiary companies is discouraged and must be declared.
Returnable Documents
Source: SDL&I requirement.zip (TENDER)Evaluation Criteria
Source: SDL&I requirement.zip (TENDER)B-BBEE
Tenderers must have a valid B-BBEE status (Level 1β8 or Non-Compliant Contributor). Higher levels score more points.
Local Content
100% local content for roofing materials is mandatory (Designated Sector).
Legal
Tenderer must be a registered entity in South Africa (CIPC documentation required).
Documentation
Failure to submit required documents (e.g., B-BBEE certificate, shareholding proof) results in 0 points for specific goals but not disqualification.
SDL&I
Commitment to SDL&I objectives is contractual but not a scoring criterion.
Technical Specifications
Source: SDL&I requirement.zip (TENDER)Financial Requirements
Source: SDL&I requirement.zip (TENDER)Compliance Requirements
Source: SDL&I requirement.zip (TENDER)B-BBEE Requirements
Source: SDL&I requirement.zip (TENDER)Contractual Terms
Source: SDL&I requirement.zipRequirements
Source: SDL&I requirement.zip (TENDER)Section
Source: SDL&I requirement.zipDescription
Source: Technical requirements.zipOn the 4th of August an inspection of the Vryburg roof was conducted for the local roof collapse,
based on the findings the following scope was developed to replacement the roof and impacted
ceiling services, address concerns regarding excessive vibrations which were identified in
previous inspection and address minor refurbishments.
2. Supporting clauses
2.1 Scope
This document covers the minimum technical specification for the scope of the works. This
document is to be inserted into the relevant NEC Works Information.
2.1.1 Purpose
The purpose of this document is to outline the minimum technical specifications for the works.
This document provides the Engineering input to be included in a Contract document based on
the NEC conditions of contract.
2.1.2 Applicability
This document applies to the Vryburg Roof Replacement and building refurbishment Project.
2.2 Normative/informative references
Parties using this document apply the most recent edition of the documents listed in the following
paragraphs.
2.2.1 Normative
[1] ISO 9001 Quality Management Systems.
[2] Construction Regulations, 2014
[3] 32-727 - Eskom Safety, Health, Environment and Quality (SHEQ) Policy
[4] Occupational Health and Safety Act No. ,
[5] SANS 9001, Quality systems
[6] SANS 10400, The Application of the National Building Regulations
2.2.2 Informative
[7] 240-53113685, Design Review Procedure
2.2.3 Disclosure Classification
Controlled disclosure: controlled disclosure to external parties (either enforced by law, or
discretionary).
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Vryburg Roof Replacement and building Unique Identifier: 363-ERE-CEEC-D00035-7
refurbishment Project Technical Specification Revision: 1
Page:
2.2.4 Definitions
Definition Description
2.3 Abbreviations
Abbreviation Description
ECM Engineering Change Management
ECSA Engineering Council of South Africa
ERE Eskom Real Estate
est. Estimate
LDC Leadership Development Centre
MDR Multi-disciplinary Review
NEC New Engineering Contract
OEM Original Equipment Manufacturer
RAC Registered Asbestos Contractor
SABS South African Bureau of Standards
SANS South African National Standards
VMS Video Management System
2.4 Roles and responsibilities
Roles and responsibilities shall be as per The Employerβs design review procedure 240-
53113685.
Contracts Manager:
The contracts manager is responsible to incorporate this Technical Specification into a contract
based on the NEC conditions of contract.
Architectural Practitioner:
The Architectural Practitioners are responsible to review the completed contract to ensure that
this Technical Specification has been incorporated correctly.
Project Manager:
The project manager is responsible for facilitating and ensuring continuous coordination and
management of the requirements during the design development, execution phase and closing
out of the project.
Facilities Manager:
The facilities manager is responsible for ensuring continuous sustainable performance of
facilities. During construction phase he/she ensures that there are smooth interactions with
tenants and stakeholders where required.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Vryburg Roof Replacement and building Unique Identifier: 363-ERE-CEEC-D00035-7
refurbishment Project Technical Specification Revision: 1
Page:
Contractor:
The contractor's responsibility is to build the project according to the contract documentation
within the required cost and time budgets and the specified standards.
The Contractor will play the role of the design authority ensuring the following:
βͺ The design satisfies the design requirements.
βͺ All relevant Eskom design standards, procedures and guidelines have been adhered to.
βͺ The design is suitable and correct calculations, philosophy, functionality, etc. have been
applied.
βͺ The design is integrated by identifying all interfaces with other packages/plant
systems/assets and ensuring that these interfaces are catered for.
Eskom Engineering
Eskom Engineering will play the role of architect engineer and ensure that:
βͺ The design satisfies the stakeholder requirements (i.e., validation of design deliverables
against stakeholder requirements);
βͺ The design is integrated by identifying all interfaces with other packages/plant systems/
assets and ensuring that these interfaces are catered for;
βͺ Foreseen technical risks are identified and addressed/challenged with the Design
Authority
βͺ General technical oversight is provided over the design.
2.5 Process for monitoring
The design aspects will be monitored by conducting end of phase design reviews as described
in the Eskom design review procedure [7]
2.6 Related/supporting documents
None.
3. Engineering and the contractorβsdesign
3.1 Description of the works
3.1.1 Executive overview
This project entails the following.
ensure compliance with SANS
well as any defect to a SANS approved roofing system with future PV support
and smoke detectors for the entire building to ensure COC is issued.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Vryburg Roof Replacement and building Unique Identifier: 363-ERE-CEEC-D00035-7
refurbishment Project Technical Specification Revision: 1
Page:
from the road adjacent to the building
occupancy certificate for the building
3.1.2 Employerβs objectives and purpose of the works
The works are required to ensure the building is safe for occupancy.
3.1.3 Interpretation and terminology
The following abbreviations are used in this Works Information:
Abbreviation Meaning given to the abbreviation
AFC Approved for construction
OBL Outside battery limits
3.1.4 Existing System
The building is a rigid brick structure with wooden trusses and a central atrium.
3.2 Management and start up.
3.2.1 Documentation control
All documents supplied by the Contractor are subject to Eskomβs acceptance. The language of
all documentation is English.
The Contractor includes the Employerβs drawing number in the drawing title block. This
requirement only applies to design drawings developed by the Contractor and Subcontractors.
Drawing numbers are assigned by the Employer as drawings are developed.
All review documentation is submitted with transmittals. Any review information submitted
without transmittals are considered rejected automatically.
The Contractor complies a Master Document List (MDL) which contains a list of all documents
issued for review, document number, document title, transmittal number, date of submission,
overall document review status. The MDL is a live document, the contractor issues an updated
MDL within the progress report to the Project Manager
3.3 Engineeringandthecontractorβsdesign
3.3.1 Employerβs design
The works entails the replacement of the roof and building refurbishment. Which entails the
following, including the additional scope within the contractorβs design (Section 3.3.2):
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Vryburg Roof Replacement and building Unique Identifier: 363-ERE-CEEC-D00035-7
refurbishment Project Technical Specification Revision: 1
Page:
associated infrastructure, to ensure compliance with SANS
roofing system with future PV support and Assessment of the entire Roof System to
ensure compliance with SANS
o Removal of the damaged portion of the roof and replaced with a SANS approved
roof solution
o Provide a detailed assessment of the undamaged roof
o Provide a roof certificated for the entire roof
o Ensuring that roof assembly complies with SANS10400-XA
o Replacement of ceiling for the southern
appropriate CoC
3.3.2 Parts of the workswhich the Contractoris to design
3.3.2.1 Architectural Scope
The architectural scope is an extension of the overview as per Employerβs Design. The
Contractor shall conduct and appointing a competent person to assess damages and provide
repair methodology together with the necessary documentation to apply to the respective Local
Authority for approval before any work commences.
components, fasteners, roofing, underlay, sisalation, insulation and bracing, suspension
kits, ceilings and its cornices, a lighting layout together with the building management
sensors and cable management trays and their fixing.
efficiency that will meet the requirements to reach SANSXA for roof assembly as well as
efficient lighting components and additional spare parts like drivers to be made available
and no end of life/model/series components to be provided for. The material selection,
drawings, specifications shall be accompanied by samples of said designed for material
for approval.
supporting data sheets. The material selection to have confidence in SANS and its
occupancy class and design. The overall design and final design solution to consider all
materials and ensure that no adverse reactions are possible and to be the same
information as the submitted documentation used to seek approval from the Local
Authority.
building.
*
leaks, repair underlay and battens where required.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Vryburg Roof Replacement and building Unique Identifier: 363-ERE-CEEC-D00035-7
refurbishment Project Technical Specification Revision: 1
Page:
and ensure proper fall and discharge to existing stormwater systems
Inspection and assessment to be performed and submitted to the Project Manager.
o Retain existing grid on the unaffected area.
o Replace only damaged or stained tiles.
o For the affected area remove the existing grid and install the new grid and
ceiling tiles.
o All internal walls excluding office walls.
o Roof, gutters, and fascias (if roof is retained).
o Internal handrails and balustrades.
tiles throughout
surface conduits are seen, routes ought to be detailed and accounted for
adequate roof covering to be provided for and to ensure no further damage due to
ingress during construction occurs
care during construction to be followed to minimize cleaning that could cause adverse
effects on existing property but as well as neighbouring property, sidewalk and public
roads.
that arises and any supporting evidence for before and after comparisons aiding in hold
accountable persons for any damage.
to be raised and approved before the next step.
the project quality and final hand over
3.3.2.2 Structural Scope
The Contractor assesses the roof trusses and replaces all damaged trusses at the southern end
of the building.
The Contractor ensures all works are approved by a Professional Engineer/Technologist.
3.3.2.3 Electrical Scope
The Contractor shall conduct, appointing a competent person, a post illumination survey
according to SANS 10114 part 1 and 2 - Interior lighting - Artificial lighting of interiors and
Emergency lighting. The minimum Illuminance levels measured in each respective area shall
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Vryburg Roof Replacement and building Unique Identifier: 363-ERE-CEEC-D00035-7
refurbishment Project Technical Specification Revision: 1
Page:
be presented in a tabulated format for the Eskom Vryburg Main Building (17 Market Street)
property.
The Contractor to perform this survey as per the mentioned stipulated standards, compile a
comprehensive illumination survey formal report as part of work execution and submit it to the
Employer.
Upgrade and replace:
o All light fittings throughout the entire building.
Include:
o Energy-efficient LED fittings.
o Testing and commissioning.
ο― Tests
To assess the structural collapse impact on the electrical infrastructure, the contractor
shall carryout insulation resistance and continuity tests on all buildingβs associated
power cables.
Conductor resistance/continuity test shall be performed and the result measured is to be
compared against resistance value stipulated in the cable datasheet and it shall be
ensured that the measured resistance value is well within the tolerance values provided.
Tests shall be in accordance with SANS 10142-1, 97, 1507, 1574, 1339, 10198-13 and
other relevant standards.
The insulation resistance of each core to sheath or conduit and between cores of all
cables shall be measured and recorded after the cable has been confirmed dead. Core
to sheath or conduit implies phase to earth and core to core connotes phase to phase.
For each cable termination, the person performing the testing activity shall ensure
printing out their full name, indicate the test date and time, signing and records the
readings in the appropriate place provided. A pass criterion shall be as per SANS 5526
and Table 9 of SANS 1507-3 (2020). All these standards shall be adhered to.
Table z: Insulation Resistance test phase to earth
DC Test Voltage Check Test Voltage Phase-Earth (Ξ©) Cable location
500V
1000V
_______V
Comments:
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Vryburg Roof Replacement and building Unique Identifier: 363-ERE-CEEC-D00035-7
refurbishment Project Technical Specification Revision: 1
Page:
Table a: showing Voltage Test results β Phase to neutral
Phase to neutral (V) Phase to earth β B (V) Neutral β earth (V)
Activity performed by
Name :_____________________________ _______________________________
Signature and date :
____________________________ _______________________________
The Contractor replaces the failed cables and replaces them using size specified below,
moreover, the contractor shall submit test results to the Employer. The intention is to reuse
current electrical components such as cabling, switches etc should it be found compliant.
ο― Sizes
The Contractor ascertains the cabling in the property complies to the following requirements:
The minimum size of copper wire for the lighting circuits shall be 2.5 mm2.
The minimum size of copper wire for the socket outlet circuits shall be 4.0 mm2.
Sizes of conductors not specified must be determined in accordance with the SANS 10142-1.
Cables for voltage drop compliance shall be prioritised. The maximum voltage drop of 5% shall
be used from the distribution board to the further luminaires on the circuit.
The Contractor assesses sizes on all circuits and submits a report to the Employer prior
proceeding to the next step of complying the property.
It is noteworthy that functional cabling shall be reused whereas damaged shall be replaced with
the corresponding specification above.
The Contractor shall install conduits, and saddles to contain the above ceiling power cables.
Where required, power trunking shall also be used.
Install conduits for floating cabling, conduits shall comply with SANS 950.
The power trunking shall comply with SANS 61084-1.
Conduit in roof spaces shall be installed parallel or at right angles to the roof members and shall
be secured at intervals not exceeding 1,5m by means of saddles screwed to the roof timbers.
All conduits shall be manufactured of mild steel with a minimum thickness of 1,2mm for plain-
end conduit and 1,6mm in respect of screwed conduit and galvanised. All conduit and
accessories used shall be galvanised to SANS 121.
Should power trunking, saddles and conduits be found non-compliant, the Contractor shall
replace them as per the requirements set out in this specification and report latter.
The Contractor shall ensure that the electrical system is properly earthed, and conductive
metallic parts bonded to SANS 10142-1.
Upon completion of the Works, full verification testing shall be carried out on the installation(s)
and the Employerβs representatives shall be invited to witness at the testing phase. At least 12
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Vryburg Roof Replacement and building Unique Identifier: 363-ERE-CEEC-D00035-7
refurbishment Project Technical Specification Revision: 1
Page:
types, according to the installation rules, of tests shall be performed and recorded on the
recording sheets.
A certificate of compliance shall then be tendered to the Employerβs representative prior or
during commissioning for review and submitted for acceptance as part of the handover
packages at the completion of the Works.
3.3.2.4 Fire Detection Scope
Based on the buildingβs size, it is classified as G1 on a building standard SANS 10200-T, which
means it is an office building. Therefore, fire detection systems are not required. Only an
evacuation signal, such as a manual call point located on the exit doors, is needed for
emergencies. The manual call point can be installed with a buzzer to alert the occupants when
there is an emergency.
3.3.2.5 Fire Escape Doors & Building Signage (Prohibition, Warning, Mandatory, and
Emergency/Safe Condition)
Fire Exit Door - Supply and install:
o Single fire exit door with Automatic hydraulic door closer.
o Install in accordance with SANS 1253 (Class , manufacturer specifications.
o single door, complete with all associated components, fittings, and finishes. The door must
be of commercial-grade quality. The Contractor must get preapproval of the door of the
employer before supply and installation.
Signage
o Remove and replace all old signage.
o Install new signage where required.
o Renovate the two existing external notice boards.
3.3.3 Procedure for submission and acceptance of Contractorβs design
All Documents are submitted to the Project Manager for review prior to implementation. All
review documentation is submitted with transmittals. Any review information submitted without
transmittals are considered rejected automatically.
At the end of each contracted design phase (e.g., Concept, Basic, detailed design phase), the
Contractor provides an integrated design report which is reviewed at a Multi-Disciplinary Design
Review (MDR) which will allow the project to move into the next design phase or allow for design
freeze.
Construction may not begin prior to design freeze.
3.3.4 As-built drawings, operating manuals and maintenance schedules
None are available
3.4 Construction
The Contractor is required to:
a) Submit a comprehensive method statement of the entire works to the Project Manager for
acceptance prior to the start of the works
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Vryburg Roof Replacement and building Unique Identifier: 363-ERE-CEEC-D00035-7
refurbishment Project Technical Specification Revision: 1
Page:
b) Submit a project specific safety file to the Employer for comments / acceptance.
c) Prepare earthworks for craneage access and working rigging areas if required.
d) Manage his activities on Site to ensure that no interference takes place between his work
and that of others.
e) Complete "Contract Activities Daily Reports".
f) Liaise with the Project Manager regarding utilities and telephone facilities required for his
Site establishment.
g) Liaise with the Project Manager regarding the location of waste disposal sites and rubbish
dumps,
h) Maintain and promotes labour harmony on the Site and in the working environment.
i) Immediately report any potential labour disharmony to the Project Manager.
j) Not recruit or employ any personnel from the Employer and Others, without prior
acceptance of the Project Manager.
k) The Contractor submits a fully detailed Quality Control Plan (QCP) for acceptance within
one week of the Contract Date.
l) The Contractor submits a schedule of unpriced orders to be placed and this is updated
regularly.
m) The Contractor is responsible for defining the level of QA/QC (intervention Points) or
inspection to be imposed on his Subcontractors and suppliers of material in the Quality
Control Plans (QCPs). This level is based on the criticality of plant and materials, and is
submitted to the Employer for acceptance.
n) Product data sheets and product samples are submitted for review and acceptance by the
Project Manager after contract award and prior to the commencement of work.
o) All quality control documentation is submitted to the Project Manager within 7 days of
Contract Date.
3.4.1 Completion, testing, commissioning and correction of Defects
3.4.1.1 Work to be done by the Completion Date
3.4.1.2 Commissioning
As referred to in Section 3.3.2.3, upon completion of the Works, full verification testing shall be
carried out on the installation(s) and the Employerβs representatives shall be invited to witness
at the testing phase. At least 12 types, according to the installation rules, of tests shall be
performed and recorded on the recording sheets.
A certificate of compliance shall then be tendered to the Employerβs representative prior or
during commissioning for review and submitted for acceptance as part of the handover
packages at the completion of the Works.
Provide all required Certificates of Compliance (COCs), including but not limited to:
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Vryburg Roof Replacement and building Unique Identifier: 363-ERE-CEEC-D00035-7
refurbishment Project Technical Specification Revision: 1
Page:
3.5 Plantand materials standards and workmanship
3.5.1 Building works
Works are in accordance with the current SANS regulations
3.5.2 Civil engineering and structural works
Works are in accordance with the current SANS regulations
3.5.3 Handover Requirements
Apart from any statutory data packages required, the Contractor also compiles a data package
of the relevant drawings, test certificates etc. which he submits to the Project Manager for
acceptance. These include, but are not limited to:
of the works.
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Vryburg Roof Replacement and building Unique Identifier: 363-ERE-CEEC-D00035-7
refurbishment Project Technical Specification Revision: 1
Page:
drawings are submitted in PDF and native CAD formats (.DGN)
works have been constructed in accordance with the design.
The contents are presented in a hard cover file or files.
The data packages are prepared daily for all completed work.
Two hard copies and one soft copy of the Data Book are handed to the Employer for
acceptance.
Data Books are submitted for review and acceptance before completion of the works to the
Employer.
3.5.4 Other [as required]
3.6 List of drawings
3.6.1 Documentation issued by the Employer
This is the list of documents issued by the Employer at or before the Contract Date and which
apply to this contract.
Note: Some documents may contain both Works Information and Site Information.
Document number Revision Title
4. Specifications for the works
4.1 Applicable national standards
The Contractor is required to adhere to the latest editions of, and the normative references
within, the following SANS standards, codes of practice, regulations & standards:
Number Title
SANS 10400 Suite National Building Regulations
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Vryburg Roof Replacement and building Unique Identifier: 363-ERE-CEEC-D00035-7
refurbishment Project Technical Specification Revision: 1
Page:
4.2 Additional requirements and prerequisites
N/a
5. Authorisation
This document has been seen and accepted by:
Name & Surname Designation Signature
Emmanuel Koananane Client Representative
Mdu Vilakazi Engineer β Electrical
Nompilo Miya Engineer β C&I
6. Revisions
Date Rev. Compiler Remarks
October 2025 1 BW Thomas Final
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
On the 4th of August an inspection of the Vryburg roof was conducted for the local roof collapse, based on
the findings a scope was developed to replacement the roof and impacted ceiling services, address
concerns regarding excessive vibrations which were identified in previous inspection and address minor
refurbishments.
This document contains the Tender Technical Criteria for the appointment of the Contractor to conduct the
works.
2. Supporting clauses
2.1 Scope
This document provides the tender technical evaluation strategy for the required works of the Vryburg Roof
Repair Project.
2.1.1 Purpose
The purpose of this tender technical evaluation strategy is to define the Mandatory Evaluation Criteria,
Qualitative Evaluation Criteria and TET member responsibilities for tender technical evaluation. The
technical evaluation strategy serves as basis for the tender technical evaluation process.
2.1.2 Applicability
This document is applicable to the Vryburg Roof Repair Project
2.2 Normative/informative references
Parties using this document shall apply the most recent edition of the documents listed in the following
paragraphs.
2.2.1 Normative
[1] 240-48929482: Tender Technical Evaluation Procedure
2.2.2 Informative
[2] 363-ERE-CEEC-D00035-7 Vryburg Roof Repair and refurbishment Project Technical Specification
Rev 1
2.3 Definitions
Definition Description
Refers to the corporation appointed to perform the engineering,
Contractor/Tenderer
procurement, and construction works required for the project.
Employer Refers to Eskom Holdings State Owned Company
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy Vryburg Roof Repair Unique Identifier: 363-ERE-CDDD-D00185-65
Project Revision: 1
Page:
Definition Description
Refers to the Eskom Engineering team who will perform the reviews and
Eskom Plant
provide technical assistance for the work performed by the appointed
Engineering
Contractor.
The document/s forming part of the contract in which the methods of
executing the various items of work to be done is described, as well as the
Specification nature and quality of the materials to be supplied and it includes technical
schedules and drawings attached thereto as well as all samples and
patterns
The Client The end user will be Eskom who will be represented by Eskom Properties
throughout the duration of the Project.
2.3.1 Classification
Controlled Disclosure: Controlled Disclosure to external parties (either enforced by law, or discretionary).
2.4 Abbreviations
Abbreviation Description
BoQ Bill of Quantity
CoC Certificate of Compliance
DoL Department of Labour
ECSA Engineering Council of South Africa
EDWL Engineering Design Work Lead
LDE Lead Discipline Engineer
TET Technical Evaluation Team
RFP Request For Proposal
2.5 Roles and responsibilities
N/A as per 240-48929482: Tender Technical Evaluation Procedure
2.6 Process for monitoring
N/a
2.7 Related/supporting documents
N/a
Controlled disclosure
When downloaded from the EDMS, this document is uncontrolled and the responsibility rests with the user to ensure it is in line
with the authorised version on the system.
Tender Technical Evaluation Strategy Vryburg Roof Repair Unique Identifier: 363-ERE-CDDD-D00185-65
Project Revision: 1
Page:
3. Tender technical evaluation strategy
3.1 Technical evaluation threshold
Mandatory Technical Evaluation Criteria (gatekeepers) are βmust meetβ criteria. These criteria shall not be
weighted, or point scored but shall be assessed on a Yes/No basis as to whether the criteria are met. An
assessment of βNoβ against any criterion shall technically disqualify the tenderer and shall not be further
evaluated against Qualitative Criteria.
Qualitative Technical Evaluation Criteria are weighted evaluation criteria used to identify the highest
technically ranked tenderer after determining that all the Mandatory Evaluation Criteria have been met.
The Qualitative Evaluation Criteria are weighted to reflect the relevant importance of each criterion. The
minimum weighted final score (threshold) required for a tender to be considered from a technical
perspective is 70%.
The following scoring method will be used:
Score percentage (%) description
Compliant
5 100
Unit Qty RATE Amount
The tenderer is advised that the bills of quantities must be read in conjunction with the
technical specification, NEC Scope of works and layout drawing
Vryburg-eskom
1 preliminary and generals
1.1 Fixed P&G including Establishment Sum 1 R125 059.61 R 125 059.61
1.2 Time related P&G Sum 1 R583 611.53 R 583 611.53
1.3 SHEQ requirements Sum 1 R83 373.08 R 83 373.08
1.4 De-Establishment Sum 1 R41 686.54 R 41 686.54
Carried to final summary R 833 730.75
2 management and professional fees
Provision For all management and professional fees associated with the successful planning,
coordination, and execution of the project. This shall include, but not be limited to, costs for
2.1 project management, supervision, and the engagement of professional services such as Sum 1 R1 466 269.25 R 1 466 269.25
engineering, architectural, quantity surveying, and any other specialist consultants required.
Carried to final summary R 1 466 269.25
3 inspections and designs
3.1 Inspection Report
Roof and Ceiling
Roof and ceiling condition inspection of all roof sections and ceiling types, including detailed
3.1.1 assessment, identification of defects and water damage
Important Dates
Source: Technical requirements.zip (unknown)Inspection conducted on 4th of August. Quality Control Plan (QCP) due within one week of the Contract Date. All quality control documentation due within 7 days of Contract Date.
Contact Information
Source: Technical requirements.zip (unknown)Emmanuel Koananane (Client Representative), Mdu Vilakazi (Engineer β Electrical), Nompilo Miya (Engineer β C&I).
Submission Guidelines
Source: Technical requirements.zip (unknown)Contractors must submit a comprehensive method statement of the entire works to the Project Manager for acceptance prior to the start of works. A project-specific safety file must be submitted to the Employer for comments/acceptance. Design documents must be submitted to the Project Manager for review prior to implementation, with transmittals; documents without transmittals are automatically rejected. Integrated design reports are reviewed at a Multi-Disciplinary Design Review (MDR) before moving to the next phase or design freeze. A fully detailed Quality Control Plan (QCP) must be submitted for acceptance within one week of the Contract Date.
Evaluation Criteria
Source: Technical requirements.zip (unknown)Mandatory
Qualitative
Disqualifiers
Technical Specifications
Source: Technical requirements.zip (unknown)Scope includes replacement of the roof and impacted ceiling services, addressing excessive vibrations, and minor refurbishments. Fire detection is not required (classified as G1 office building), but an evacuation signal (manual call point with buzzer) is required. Fire exit doors must include automatic hydraulic door closers and comply with SANS 1253. All works must adhere to SANS 10400 National Building Regulations. As-built drawings must be submitted in PDF and native CAD formats (.DGN).
Compliance Requirements
Source: Technical requirements.zip (unknown)Works must comply with SANS regulations and SANS 10400. Compliance requires the provision of Certificates of Compliance (COCs) for Electrical, Structural (where applicable), Asbestos clearance (if required), and Plumbing (if impacted). Quality systems must align with ISO 9001 and Eskom SHEQ Policy. Contractors must maintain labour harmony on site.
Section
Source: Technical requirements.zipβͺ The design is suitable and correct calculations, philosophy, functionality, etc. have been
[1] ISO 9001 Quality Management Systems.
[3] 32-727 - Eskom Safety, Health, Environment and Quality (SHEQ) Policy
[5] SANS 9001, Quality systems
Description
Source: Financial requirements.zipScope: Roof inspection, repair and reinstatement of Vryburg Main Building.
Note: Finance will not review financials with errors and does not adjust statements.
Public Interest Score (PIS) and report requirements:
Submission Guidelines
Source: Financial requirements.zip (unknown)Returnable Documents:
Note: Finance will not review financials with errors and does not adjust statements. Communication with suppliers only occurs via minuted clarification meetings set with the buyer.
Returnable Documents
Source: Financial requirements.zip (unknown)Required returnable documents:
Evaluation Criteria
Source: Financial requirements.zip (unknown)Financial Compliance
Applicants must submit valid, error-free financial statements as per the Companies Act and PIS requirements.
Documentation
All required financial documents (audit reports, financial statements, tax assessments, etc.) must be provided.
Contract Transparency
Applicants must disclose all existing contracts with Eskom, including financial details.
PISCompliance
Applicants must meet the PIS score requirements for their company type (owner-managed or not) and financial compilation method (internal/external).
Technical Specifications
Source: Financial requirements.zip (unknown)Scope: Roof inspection, repair and reinstatement of Vryburg Main Building.
Note: Finance will not review financials with errors. We do not adjust financial statements.
Public Interest Score (PIS) and report requirements clarification:
Financial Requirements
Source: Financial requirements.zip (unknown)Financial statement analysis requirements:
Note: Finance will not review financials with errors, does not adjust statements, and communicates only via minuted buyer-led clarification meetings. PIS verification based on AFS. Report turnaround: 7 days after all documents received.
Requirements
Source: Financial requirements.zip (unknown)Financial report requirements based on Public Interest Score (PIS):
Description
Source: NEC 3.pdfContact Information
Source: NEC 3.pdf (unknown)Submission Guidelines
Source: NEC 3.pdf (unknown)Returnable Documents
Source: NEC 3.pdf (unknown)The Contractor is (Name): Address Tel No. Fax No.
Evaluation Criteria
Source: NEC 3.pdf (unknown)General
B-BBEE
Technical
Financial
Ethical
Technical Specifications
Source: NEC 3.pdf (unknown)Experience & Qualifications
Source: NEC 3.pdfQuality Management
Source: NEC 3.pdfPricing Schedule
Source: NEC 3.pdfFinancial Requirements
Source: NEC 3.pdf (unknown)Compliance Requirements
Source: NEC 3.pdf (unknown)B-BBEE Requirements
Source: NEC 3.pdf (unknown)Health & Safety
Source: NEC 3.pdfEnvironmental
Source: NEC 3.pdfContractual Terms
Source: NEC 3.pdfSection
Source: NEC 3.pdf (unknown)The Employer is (Name): Eskom Holdings SOC Ltd (reg no: 2002/015527/30), a state-owned company incorporated in terms of the company laws of the Republic of South Africa Address Registered office at Megawatt Park, Maxwell Drive, Sandton, Johannesburg Represented By: Zwelakhe Mbolekwa 014 523 7071 [email protected]
30 Jun
2026
Tender Published
Tender was published
24 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
OHS requirements.zip
Eskom is seeking a service provider for the Vryburg Roof Repair and Reinstatement Project, which involves roof inspection, repair, and reinstatement of the Vryburg Main Building. The tender emphasizes strict Occupational Health and Safety (OHS) compliance, including detailed risk assessments, safety plans, statutory appointments, and adherence to Eskomβs SHE (Safety, Health, and Environment) specifications. The project is classified as high-risk construction work, requiring comprehensive documentation and certifications.
Invitation to Tender (ITT) for Vryburg Project.pdf
Eskom Holdings SOC Ltd invites tenders for the Vryburg Roof Repair and Reinstatement Project, which includes roof inspection, repair, and reinstatement of the Vryburg Main Building. The tender is open, with a closing date of 24 July 2026 at 10:00 UTC. A compulsory site clarification meeting is scheduled for 09 July 2026 at 11:00 AM in Vryburg, North West Province. Submissions must be made electronically via Eskomβs e-tendering portal in PDF format, with a maximum upload size of 500 MB per document and a total submission limit of 4 GB. The tender validity period is 120 days from the closing date.
Quality requirements.zip
Eskom is seeking a service provider for the Vryburg Roof Repair and Reinstatement Project, which includes roof inspection, repair, and reinstatement of the Vryburg Main Building in the North West Province. The tender emphasizes strict adherence to Eskom's Supplier Quality Management Specification (240-105658000), requiring compliance with ISO 9001 standards, documented Quality Management Systems (QMS), and submission of quality plans, inspection/test plans, and method statements. The project falls under Category 4 quality requirements, which mandates a quality method statement, policy, objectives, and control of externally provided processes.
Technical requirements.zip
Eskom is seeking a service provider for the Vryburg Roof Repair and Reinstatement Project, which involves roof inspection, repair, and reinstatement of the Vryburg Main Building. The project includes roof replacement, structural repairs, electrical upgrades, ceiling works, and compliance with SANS standards. The tender closes on July 24, 2026, and requires adherence to strict technical, safety, and regulatory standards.
Financial requirements.zip
ESKOM is seeking a service provider for the Vryburg Roof Repair and Reinstatement Project, which includes roof inspection, repair, and reinstatement of the Vryburg Main Building. The tender requires strict financial documentation and compliance with the Companies Act and Public Interest Score (PIS) regulations.
NEC 3.pdf
ESKOM is seeking a service provider for the Vryburg Roof Repair and Reinstatement Project, which includes roof inspection, repair, and reinstatement of the Vryburg Main Building. The scope covers floor finishes, electrical work, ceiling work, asbestos confirmation, roof assessment, and provision of Certificates of Compliance (COC) for electrical and roofing for insurance purposes. The contract is governed by the NEC3 Engineering & Construction Contract (ECC3) with Option B (Priced Contract with Bills of Quantities).
Environmental Requirements for Roof Replacement Vryburg.pdf
ESKOM is seeking a service provider for the Vryburg Roof Repair and Reinstatement Project, which includes roof inspection, repair, and reinstatement of the Vryburg Main Building. The tender emphasizes strict environmental compliance, requiring comprehensive documentation and plans to ensure adherence to environmental legislation and best practices.
SDL&I requirement.zip
Eskom is seeking a service provider for the Vryburg Roof Repair and Reinstatement Project, which involves roof inspection, repair, and reinstatement of the Vryburg Main Building on an 'as and when required' basis. The contract duration is 6 months, with a focus on B-BBEE compliance, local content, and socio-economic development (SDL&I) objectives. The tender closes on July 24, 2026.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomContact Person
Nosihle Makhamba
Phone
013-296-3476
[email protected]
Address
14-16 Kgwebo Street, Mabe Business Park - Waterfall East - Rustenburg - 0299
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
8
Last checked
30 Jun 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Eskom is South Africa's primary electricity supplier, managing generation, transmission, and distribution.
Median Estimate
RΒ 794Β 249
Range
Based on 21 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Construction. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
Everything South African construction contractors need to know about how procurement officers verify cidb grades: what gauteng contractors must ensure is correct β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb grading system explained: what every gauteng contractor must know in 2026 β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb vs nhbrc: understanding dual registration requirements for residential projects in gauteng β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Everything South African construction contractors need to know about cidb grading system explained: what every gauteng contractor must know in 2026 β april 2026 update β covering CIDB grading certificate, NHBRC registration (residential), step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
π‘ Want more tendering tips and strategies?
Explore Our Blog