Skip to main content
ToolsForensic Analysisabedcon projects

abedcon projects

Supplier Forensic Analysis · Scanned: 2026/05/25

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
4
Total Value
R 15M

Recent Awards

4 awards · Total: R 14 852 748

Showing 5 of 4
APPOINTMENT OF A PANEL OF TERM CONTRACTORS FOR THE UPGRADE, REFURBISHMENT, MAINTENANCE, REPAIRS AND IMPLEMENTATION OF MUNICIPAL WATER AND SANITATION INFRUSTRUCTURE FOR ALL MUNICIPALITIES WITHIN MPUMALANGA PROVINCE AS AND WHEN REQUIRED FOR A PERIOD OF THREE (03) YEARS
Mpumalanga - Cooperative Governance and Traditional Affairs
Ref: CGT/102/24/MP
R 1
29 Nov 2024
FOR THE SUPPLY AND INSTALL OF: CCTV SURVEILLANCE SYSTEM AT MILLSITE KRUGERSDORP FOR A PERIOD OF ONE MONTH.
Transnet SOC Ltd
Ref: CRAC-KGG-43399/TFR/2023/10/0005/47376/RFQ
R 1 426 700
06 Mar 2024
Supply and Install High mast lights in various wards of Chief Albert Luthuli Municipality
Chief Albert Luthuli Municipality
Ref: ALMT12/2023
R 4 043 971
31 Jan 2024
Supply and Delivery of Electrical Materials for 36 months as and when required
Chief Albert Luthuli Municipality
Ref: ALMT04/2023
R 9 382 076
31 Jan 2024

AI Analysis

Powered by Gemini

AI Forensic Analysis

Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo

or upgrade to Pro Subscription

Risk Assessment

Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →