Risk Score
Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
9
Total Value
R 21M

Recent Awards

9 awards · Total: R 21 133 544,86

Showing 5 of 9
The Establishment of an Enabling Agreement with a maximum Panel of 30 Contractors for the Provision of Supervision, Labour, Equipment, Material (except the “Big Five” material: Meters, Poles/Cross Arms, Transformers, Cable & Conductor), Transport (as it will be required and authorised) for Electrification of Low Value New Household and Infills Connections (Below R3 000 000,00 per project) for a period of two (2) years and a further six (6) months for the close out of projects, for the Distribution Division in the KwaZulu-Natal Operating Unit, Central East Cluster on an as and when required.
Eskom
Ref: KZN157
R 1,00
13 Oct 2025
An enabling agreement to establish a panel of 60 Contractors to execute Minor works Project on an “As and When required basis, for a period of 36 months in the KZN Operating Unit, Central East Cluster.
Eskom
Ref: KZN103
R 2 496 412,97
01 Apr 2025
ESTABLISHMENT OF AN ENABLING AGREEMENT FOR CLASS 3&4 WOOD POLE REPLACEMENT UNDER DEAD WORK CONDITIONS FOR 11-33 KV AT FSOU, BLOEMFONTEIN ZONE AND BETHLEHEM ZONE, CENTRALEAST CLUSTER ON AN AS AND WHEN REQUIRED BASIS. ESKOM WILL ENTER INTO A 5 PANEL CONTRACT.
Eskom
Ref: KZN108
R 3 428 571,42
25 Mar 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
Eskom
Ref: KZN132
R 1,00
16 Jan 2025
The provision of MV and LV Electrification infrastructure and connections (households and infills) within the LimLanga Cluster – Limpopo over a period of 48 months.
Eskom
Ref: LPOO125NK
R 5 514 772,76
06 Sept 2024

4 More Awards

View complete award history with full tender details.
Paid access from R499/mo

or upgrade to Pro Subscription

AI Analysis

Powered by Gemini

AI Forensic Analysis

Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo

or upgrade to Pro Subscription

Risk Assessment

Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →