Risk Score
0RISK SCORE
LOW RISKCompliance
N/A/100
Awards
9
Total Value
R 21M
Recent Awards
9 awards · Total: R 21 133 545
The Establishment of an Enabling Agreement with a maximum Panel of 30 Contractors for the Provision of Supervision, Labour, Equipment, Material (except the “Big Five” material: Meters, Poles/Cross Arms, Transformers, Cable & Conductor), Transport (as it will be required and authorised) for Electrification of Low Value New Household and Infills Connections (Below R3 000 000,00 per project) for a period of two (2) years and a further six (6) months for the close out of projects, for the Distribution Division in the KwaZulu-Natal Operating Unit, Central East Cluster on an as and when required.
ESKOM
Ref: KZN157R 1
13 Oct 2025
An enabling agreement to establish a panel of 60 Contractors to execute Minor works Project on an “As and When required basis, for a period of 36 months in the KZN Operating Unit, Central East Cluster.
ESKOM
Ref: KZN103R 2 496 413
01 Apr 2025
ESTABLISHMENT OF AN ENABLING AGREEMENT FOR CLASS 3&4 WOOD POLE REPLACEMENT UNDER DEAD WORK CONDITIONS FOR 11-33 KV AT FSOU, BLOEMFONTEIN ZONE AND BETHLEHEM ZONE, CENTRALEAST CLUSTER ON AN AS AND WHEN REQUIRED BASIS. ESKOM WILL ENTER INTO A 5 PANEL CONTRACT.
ESKOM
Ref: KZN108R 3 428 571
25 Mar 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
ESKOM
Ref: KZN132R 1
16 Jan 2025
The provision of MV and LV Electrification infrastructure and connections (households and infills) within the LimLanga Cluster – Limpopo over a period of 48 months.
ESKOM
Ref: LPOO125NKR 5 514 773
06 Sept 2024
The appointment of a panel of 70 contractors for the provision of Live Work Services (maintenance and repairs) on the MV networks (up to and including 33kV) and associated projects in the Limpopo Operating Unit on an “as and when required” basis for a period of 60 months (5 Years).
ESKOM
R 5 714 286
The provision of emergency distribution line repairs and maintenance –6.6Kv – 33kV under dead work condition on an as when required basis for a period of 36 months in the Free State Operating Unit with contractors who are B-BBEE level 1-
ESKOM
R 3 979 500
Addition of contractors on an existing panel contract for the provision of Electrification Households connections and infills in Mpumalanga on an as and when required basis
ESKOM
R 0
4 More Awards
View complete award history with full tender details.
Pro access from R199/mo
or upgrade to Pro Subscription
Risk Assessment
0RISK SCORE
LOW RISKBased on 0 forensic flags detected
Unlock Full Analysis
Get access to all forensic flags, evidence details, and AI-generated audit narratives.
View Full Intelligence Report
Get complete award history, director network, and compliance analysis.
View Report →