Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
0RISK SCORE
LOW RISKCompliance
N/A/100
Awards
5
Total Value
R 89M
Recent Awards
5 awards · Total: R 88 530 209
Install and test the underground optic fibre from Harvard Substation to Eskom Centre control room in Bloemfontein (approximately -13km).
ESKOM
Ref: MWP2743NTCSAR 19 288 180
01 Jul 2025
2549GS – APPOINTMENT OF VARIOUS CONTRACTORS FOR THE SUPPLY, DESIGN, INSTALLATION AND COMMISSIONING OF SECONDARY PLANT INFRASTRUCTURE NETWORK (PANELS)
City Power – Johannesburg
Ref: 2549GSR 1
03 Mar 2025
INSTALLATION AND MAINTENANCE OF FIBRE NETWORK INFRASTRUCTURE AND OUTSIDE PLANT (OSP) FACILITIES
City of Cape Town
Ref: 228S/2023/24R 69 242 027
17 Feb 2025
Appointment of a panel of Installers or Installation Companies for the installation of domestic Digital Terrestrial Television (DTT) STB’s, Direct to Home (DTH) STBs and Integrated Digital Television Receive System in South Africa (in all nine provinces) for a period of 1 year.
Sentech Limited
Ref: SENT/001/2022-23R 0
21 Jul 2022
WC1018TP(R)
Unknown Department
Ref: 52945R 0
01 Jan 1900
Risk Assessment
0RISK SCORE
LOW RISKBased on 0 forensic flags detected
Unlock Full Analysis
Get access to all forensic flags, evidence details, and AI-generated audit narratives.
View Full Intelligence Report
Get complete award history, director network, and compliance analysis.
View Report →