Skip to main content
ToolsForensic Analysisbenver civils and plant hire

benver civils and plant hire

Supplier Forensic Analysis · Scanned: 2026/06/06

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
18
Total Value
R 76M

Recent Awards

18 awards · Total: R 75 848 503,58

Showing 5 of 18
T/ING/010/2021
Unknown Department
Ref: 6316
R 0,00
N/A
UPGRADING OF GREENHAVEN PHASE 3 SEWER PIPELINES AND BULK SEWERAGE PIPELINE
Mossel Bay Municipality
Ref: TDR52/2025/2026:
R 15 098 293,65
05 Dec 2025
INSTALLATION AND CONSTRUCTION OF BULK WATER PIPELINE AND PUMPSTATION, SWELLENDAM(RAILTON)
Swellendam Municipality
Ref: SMT07-25-26
R 8 050 750,29
03 Nov 2025
UPGRADING OF RAILTON GRAVEL ROADS AND STORMWATER PHASE 3 (PORTION 2)
Swellendam Municipality
Ref: SMT49/24/25
R 13 635 395,00
25 Aug 2025
THE PROVISION OF BASIC INFRASTRUCTURE FOR MOSS LIGHT INDUSTRIAL AREA
Mossel Bay Municipality
Ref: TDR62/2024/2025
R 6 656 894,26
03 Apr 2025

13 More Awards

View complete award history with full tender details.
Paid access from R499/mo

or upgrade to Pro Subscription

AI Analysis

Powered by Gemini

AI Forensic Analysis

Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo

or upgrade to Pro Subscription

Risk Assessment

Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →