(GASS ARCHITECTURE STUDIOS)
Supplier Forensic Analysis · Scanned: 2026/07/29
Open this supplier in the workbench →These findings identify statistical unusualness and named data patterns for review. They do not establish wrongdoing and require source verification.
CIPC screening
ClearCompliance
N/A/100
Awards
1
Total Value
R 68M
Recent Awards
1 awards · Total: R 68 231 742,50
APPOINTMENT OF A MULTIDISCIPLINARY TEAM (LED BY AN ARCHITECTURAL CONSULTANT) TO PROVIDE PROFESSIONAL SERVICES, FOR THE DESIGN AND CONSTRUCTION OF THE SKA SCIENCE OPERATIONS CENTRE (SOC); SKA SCIENCE PROCESSING CENTRE (SPC), SKA SCIENCE REGIONAL CENTRE (SRC) AND SARAO HQ, WHICH FORM PART THE NEW CAPE TOWN HOST INFRASTRUCTURE SYSTEM (CTHIS) FACILITY AT iTHEMBA LABS, CAPE TOWN
National Research Foundation
Ref: NRF/SARAO SHAO/43/2023-24R 68 231 742,50
29 Jul 2024
AI Analysis
Powered by GeminiAI Forensic Analysis
Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo
or upgrade to Pro Subscription
Procurement context
Competitive concentration, procurement-intelligence context, province health, and restricted-supplier status are available to forensic subscribers.
Unlock forensic context →CIPC screening signalsClear
No contributing warning signals in the current evidence.
Unlock Full Analysis
Get access to all forensic flags, evidence details, and AI-generated audit narratives.
View Full Intelligence Report
Get complete award history, director network, and compliance analysis.
View Report →