Skip to main content
ToolsForensic Analysisicon construction

icon construction

Supplier Forensic Analysis · Scanned: 2026/04/06

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
8
Total Value
R 267M

Recent Awards

8 awards · Total: R 267 173 345

Showing 5 of 8
T/ING/020/2021
Unknown Department
Ref: 9985
R 0
N/A
ZNB00188/00000/00/HOD/INF/20/T
Unknown Department
Ref: 10036
R 0
N/A
Completion of the Augmentation of James Kleynhans Water Treatment works: Phase 3
Amatola Water Board
Ref: AW2024/25/21
R 223 363 000
03 Dec 2025
TENDER FOR MIDDLE-DRIFT BULK AUGMENTATION: CIVIL, BUILDING, MECHANICAL & ELECTRICAL WORKS FOR 10ML/DAY EXPANSION, AND EXISTING WORKS REFURBISHMENT TO THE MIDDLE-DRIFT WATER TREATMENT WORKS (NB: PLEASE NOTE THAT THE TENDER DOCUMENTS WILL ONLY BE AVAILABLE ON THE SITE BRIEFING DAY, 10 APRIL 2025 @12H00)
King Cetshwayo Municipality
Ref: KCDM.RBIG.01.2025
R 43 810 344
31 Jul 2025
APPOINTMENT OF A PANEL OF CONTRACTORS (8CE – 9CE) FOR THE INSTALLATION OF ENGINEERING SERVICES FOR THE FREE STATE DEPARTMENT OF HUMAN SETTLEMENTS TO BE APPOINTED ON “AS AND WHEN REQUIRED” BASIS FOR A PERIOD OF 36 MONTHS FROM THE DATE OF APPOINTMENT.
Free State - Human Settlement
Ref: HS-B02/2024-2027
R 1
09 May 2025
MAPHUMULO BULK WATER SUPPLY SCHEME - PHASE 3
Umgeni Water
R 0
T/ING/020/2021
Unknown Department
R 0
ZNB00188/00000/00/HOD/INF/20/T
Unknown Department
R 0

3 More Awards

View complete award history with full tender details.
Pro access from R199/mo

or upgrade to Pro Subscription

Risk Assessment

0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →