Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
0RISK SCORE
LOW RISKCompliance
N/A/100
Awards
2
Total Value
R 1,8B
Recent Awards
2 awards · Total: R 1 778 886 770
THE REHABILITATION, REFURBISHMENT AND HERITAGE RESTORATION OF THE JC HALL, MSP HALL AND HOUSE 85 BUILDINGS AT THE ROBBEN ISLAND MUSEUM
Robben Island Museum
Ref: RIM08-IFM-2025/26R 14 468 944
08 Oct 2025
REFURBISHMENT OF BUILDING, MECHANICAL AND ELECTRICAL INFRASTRUCTURE AT THE DIMBAZA WASTEWATER TREATMENT WORKS –PHASE 1
REQUIRED GRADING 6 GB OR HIGHER
The Evaluation Criteria is as follows:
MANDATORY REQUIREMENT
STAGE 1: LOCAL CONTENT
STAGE 2: FUNCTIONALITY
STAGE 3: PREFERENTIAL PROCUREMENT POINTS
Eastern Cape - Eastern Cape Development Corporation
Ref: ECDC/INFRA/14/072023R 1 764 417 826
12 Dec 2023
Risk Assessment
0RISK SCORE
LOW RISKBased on 0 forensic flags detected
Unlock Full Analysis
Get access to all forensic flags, evidence details, and AI-generated audit narratives.
View Full Intelligence Report
Get complete award history, director network, and compliance analysis.
View Report →