Skip to main content
ToolsForensic Analysisnedlan construction

nedlan construction

Supplier Forensic Analysis · Scanned: 2026/06/24

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
4
Total Value
R 77M

Recent Awards

4 awards · Total: R 77 177 666,00

Showing 5 of 4
CONSTRUCTION OF MTHWANE SECONDARY SCHOOL IN HARRY GWALA DISTRICT, KWAZULU-NATAL - 7 GB OR HIGHER
Coega Development Cooperation
Ref: CDC/179/23
R 77 177 666,00
11 Mar 2024
Beehive Building Roof Replacement Project in the New Germany Office Complex,KZN Operating Unit, Central East Cluster.
Eskom
Ref: KZN067
R 0,00
08 Aug 2023
MDLOTI RIVER DEVELOPMENT: HAZELMERE DAM RAISING CONSTRUCTION OF 16 HOUSES OF 100M2 AND 2 OF 40M2 AREA. CONTRACT PERIOD 10 MONTHS. ONLY BIDDERS WITH CIDB GRADING 7GB OR HIGHER ARE ELIGIBLE TO BID
Water and Sanitation
Ref: DWS25-0223 WTE
R 0,00
02 Aug 2023
To establish a contract for the civil works, upgrade at Klipspruit substation in the Newcastle area of the KZN Operating Unit with companies with B-BBEE level 1-4 status level of contributor.
Eskom
Ref: KZN006
R 0,00
01 Jan 1900

AI Analysis

Powered by Gemini

AI Forensic Analysis

Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo

or upgrade to Pro Subscription

Risk Assessment

Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →