Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISKCompliance
N/A/100
Awards
2
Total Value
R 49M
Recent Awards
2 awards · Total: R 49 009 951
An enquiry process in order to supplement the existing pre-approved panel of two (02) contractors with an additional four (4) contractors, for the construction
of HV Lines performed within the Sub Transmission portfolio, in the KwaZulu Natal (KZN), and Free State (FS) Operating Units (Central East Cluster), on an “as and when” required basis, for a period of forty-eight (48) months for construction and one (1) year for project completion.
ESKOM
Ref: E1053DXKZNR 40 320 986
10 Dec 2025
THE PROVISION OF VEGETATION MANAGEMENT AND BUSH CLEARING SERVICES IN THE TRANSMISSION NORTH EAST GRID FOR A PERIOD OF FIVE (05) YEARS ON AN AS AND WHEN REQUIRED BASIS
ESKOM
Ref: MWP2461TXR 8 688 965
02 Jun 2025
AI Analysis
Powered by GeminiAI Forensic Analysis
Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo
or upgrade to Pro Subscription
Risk Assessment
Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISKBased on 0 forensic flags detected
Unlock Full Analysis
Get access to all forensic flags, evidence details, and AI-generated audit narratives.
View Full Intelligence Report
Get complete award history, director network, and compliance analysis.
View Report →