Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
0RISK SCORE
LOW RISKCompliance
N/A/100
Awards
19
Total Value
R 65M
Recent Awards
19 awards · Total: R 65 346 553
The prequalification of a panel of thirteen (13) contractors for the construction and dismantling of MV and HV distribution substations, traction stations, switching stations and bays for voltages ranging from 1.1kV up to and including 132kV within Limlanga Cluster- Limpopo, on an “as and when” required basis over a period of 60 months
ESKOM
Ref: LP00146MMR 0
22 Sept 2025
ESTABLISHMENT OF A PRE-APPROVED LIST OF SERVICE PROVIDERS (PANEL) FOR THE CONSTRUCTION OF INFRASTRUCTURE IN THE FORM OF CIVIL ENGINEERING WORKS AND GENERAL BUILDING WORKS (CONSTRUCTION) FOR A PERIOD OF THIRTY-SIX (36) MONTHS
Gauteng - Gauteng Department of Human Settlements
Ref: HLA 4/2/4-2023/10R 1
17 Jun 2025
8/2/2/430 (2025-2028)BID TO APPOINT A PANEL OF SERVICE PROVIDERS TO
INSTALL, REPLACE AND COMMISSION PRE-PAID ELECTRICITY METERS FOR MIDVAAL LOCAL MUNICIPALITY ON AN AS AND WHEN REQUIRED BASIS FROM THE DATE OF APPOINTMENT TO 30 JUNE 2028
Midvaal Local Municipality
Ref: 8/2/2/430 (2025-2028)R 14 950 000
12 Jun 2025
BID 8/2/2/440 (6CE/5CEPE OR HIGHER) TO APPOINT A PANEL FOR THE INSTALLATION AND REPLACEMENT OF BULK AND DOMESTIC WATER METERS AND RELATED EQUIPMENTS (SPECIALS) FOR MIDVAAL LOCAL MUNICIPALITY ON AN AS AND WHEN REQUIRED BASIS FOR A PERIOD OF 36 MONTHS.
Midvaal Local Municipality
Ref: 8/2/2/440 (6CE5CEPE) OR HIGHERR 10 810 000
06 Jun 2025
EXPRESSION OF INTEREST FRAMEWORK AGREEMENTS FOR GENERAL BUILDING WORKS FOR VARIOUS INFRASTRUCTURE PROJECTS THROUGHOUT SOUTH AFRICA
Coega Development Cooperation
Ref: CDC/290/24R 0
26 May 2025
The replacement of the storm water pipe and parking in the New Germany office complex, Kwa-Zulu Natal Operating Unit, Central East Cluster
ESKOM
R 9 627 639
BREAKDOWN, MAINTENANCE & REPAIR FUNCTIONS
ON SUB-TRANSMISSION LINES – (44-132KV) UNDER DEAD WORK CONDITION FOR A PERIOD OF 36 MONTHS IN THE FREE STATE OPERATING UNIT ON AN
AS AND WHEN REQUIRED BASIS
ESKOM
R 3 482 999
An enabling agreement to establish a panel of 60 Contractors to execute Minor works Project on an “As and When required basis, for a period of 36 months in the KZN Operating Unit, Central East Cluster.
ESKOM
R 2 496 413
14 More Awards
View complete award history with full tender details.
Pro access from R199/mo
or upgrade to Pro Subscription
Risk Assessment
0RISK SCORE
LOW RISKBased on 0 forensic flags detected
Unlock Full Analysis
Get access to all forensic flags, evidence details, and AI-generated audit narratives.
View Full Intelligence Report
Get complete award history, director network, and compliance analysis.
View Report →