Risk Score
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
5
Total Value
R 2,5M

Recent Awards

5 awards · Total: R 2 496 515

Showing 5 of 5
The establishment of an enabling agreement for a panel of 30 Contractors to cater for the provision of electrical works performed within the breakdown portfolio on an “As and When required basis, for a period of thirty – six (36) months in the KZN Operating Unit, Central East Cluster.
ESKOM
Ref: KZN142
R 100
06 Nov 2025
The Establishment of an Enabling Agreement with a maximum Panel of 30 Contractors for the Provision of Supervision, Labour, Equipment, Material (except the “Big Five” material: Meters, Poles/Cross Arms, Transformers, Cable & Conductor), Transport (as it will be required and authorised) for Electrification of Low Value New Household and Infills Connections (Below R3 000 000,00 per project) for a period of two (2) years and a further six (6) months for the close out of projects, for the Distribution Division in the KwaZulu-Natal Operating Unit, Central East Cluster on an as and when required.
ESKOM
Ref: KZN157
R 1
13 Oct 2025
An enabling agreement to establish a panel of 60 Contractors to execute Minor works Project on an “As and When required basis, for a period of 36 months in the KZN Operating Unit, Central East Cluster.
ESKOM
Ref: KZN103
R 2 496 413
01 Apr 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
ESKOM
Ref: KZN132
R 1
16 Jan 2025
The Establishment of an Enabling Agreement with a maximum Panel of 30 Contractors for the Provision of Supervision, Labour, Equipment, Material (except the “Big Five” material), Transport (as it will be required and authorised) for Electrification of New Household Connections (above R3 000 000,00 per project) for Distribution Division in the KZN Operating Unit, Central East Cluster on an as and when required basis with BBBEE Level 1 and 2 companies.
ESKOM
Ref: KZN021
R 0
07 Dec 2022

AI Analysis

Powered by Gemini

AI Forensic Analysis

Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo

or upgrade to Pro Subscription

Risk Assessment

0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →