Skip to main content
ToolsForensic Analysispower line africa sa

power line africa sa

Supplier Forensic Analysis · Scanned: 2026/04/06

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
1
Total Value
R 877M

Recent Awards

1 awards · Total: R 877 489 300

Showing 5 of 1
The Construction of the Ferrum-Upington 400kV Line from Ferrum Substation to Upington Substation.
ESKOM
Ref: MWP2407TX
R 877 489 300
01 Oct 2025

Risk Assessment

0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →