Skip to main content
ToolsForensic Analysissemilson group

semilson group

Supplier Forensic Analysis · Scanned: 2026/07/07

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
3
Total Value
R 39M

Recent Awards

3 awards · Total: R 39 060 668,95

Showing 5 of 3
Part A: Duvha Transmission Power System Control and Monitoring (TPSCM) Data Centre Building. Building, Infrastructure, Fencing and Security together with the Non-Lethal Energized Perimeter Detection System (NLEPDS). Part B: Design, Supply, Install, Test and Commission the Backup Power System for the TPSCM Duvha SOC Building Part C: Design, Manufacture, Supply, develop user documentation, perform testing at Works, Deliver, Install, and Commission the Integrated Physical Security System and Associated Equipment at the Duvha TPSCM Facility
Eskom
Ref: MWP2672NTCSA
R 29 941 722,06
29 May 2025
APPOINTMENT OF A TURNKEY CONTRACTOR FOR THE RENOVATIONS AND REFURBISHMENT OF BUILDING 76 WITHIN THE NAVAL BASE DURBAN IN THE KWAZULU NATAL PROVINCE
Development Bank of Southern Africa (DBSA)
Ref: RFP202/2024
R 9 118 946,89
09 Apr 2025
STRUCTURAL CONCRETE REMEDIAL WORKS
SA Bureau of Standards
Ref: RFP 20670
R 0,00
01 Jan 1900

AI Analysis

Powered by Gemini

AI Forensic Analysis

Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo

or upgrade to Pro Subscription

Risk Assessment

Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →