Skip to main content
ToolsForensic Analysistsalanang construction management

tsalanang construction management

Supplier Forensic Analysis · Scanned: 2026/05/23

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
1
Total Value
R 3,5M

Recent Awards

1 awards · Total: R 3 515 380

Showing 5 of 1
APPOINTMENT OF A 4GB or 4CE or HIGHER CONTRACTOR FOR THE REFURBISHMENT OF PLATFORM AND SITE WORKS AT KENTEMADE STATION FOR A PERIOD OF 12 MONTHS FROM DATE OF SITE HANDOVER IN THE WESTERN CAPE REGION
Passenger Rail Agency of South Africa
Ref: WCR/CRES/03/08/2023
R 3 515 380
22 Feb 2024

AI Analysis

Powered by Gemini

AI Forensic Analysis

Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo

or upgrade to Pro Subscription

Risk Assessment

Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →