Skip to main content
ToolsForensic Analysiswelcony investments

welcony investments

Supplier Forensic Analysis · Scanned: 2026/05/23

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
10
Total Value
R 3,4M

Recent Awards

10 awards · Total: R 3 446 072

Showing 5 of 10
TMT-DBE-21/22-SAFE3-ECCL75
Unknown Department
Ref: 1156
R 0
N/A
The Establishment of an Enabling Agreement with a maximum Panel of 30 Contractors for the Provision of Supervision, Labour, Equipment, Material (except the “Big Five” material: Meters, Poles/Cross Arms, Transformers, Cable & Conductor), Transport (as it will be required and authorised) for Electrification of Low Value New Household and Infills Connections (Below R3 000 000,00 per project) for a period of two (2) years and a further six (6) months for the close out of projects, for the Distribution Division in the KwaZulu-Natal Operating Unit, Central East Cluster on an as and when required.
ESKOM
Ref: KZN157
R 1
13 Oct 2025
An enabling agreement to establish contracts , with eleven (11) service providers ( One (1) service provider per area), for the Provision of LPU Meter Reading Services, SPU Check Reading, Disconnections, Reconnections and Meter Change Outs for the various areas in Kwa-Zulu Natal (Kokstad Sector, Margate Sector, PMB Sector, Ladysmith Sector, Newcastle Sector, Pongola Sector, Empangeni Sector, Stanger Sector) and Free State Operating Units (Central Free State, Northern Free State, Eastern Free State), Central East Cluster (on an as when required basis) for a period of thirty-six (36) months
ESKOM
Ref: KZN148
R 1
17 Apr 2025
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.
ESKOM
Ref: KZN132
R 1
16 Jan 2025
The appointment of the panel of eleven (11) service providers based on the standardized rates, for the provision of Meter Reading Services within Limlanga Cluster – Limpopo on “as and when” required basis for a period of 60 months
ESKOM
Ref: LP00163AR
R 350
07 Nov 2024

5 More Awards

View complete award history with full tender details.
Paid access from R499/mo

or upgrade to Pro Subscription

AI Analysis

Powered by Gemini

AI Forensic Analysis

Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo

or upgrade to Pro Subscription

Risk Assessment

Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →