Dust handling plant refurbishment for unit 3, 4 and 5 at kendal power station for the period of 12 months.
Tender source analysis
What the tender required and what the award supports
Source material and existing AI analysis appear first. Supplier conclusions remain qualified by the evidence Tenders-SA holds.
Summary
ESKOM requires the refurbishment of the dust handling plant serving units 3, 4 and 5 at kendal power station in mpumalanga, over a contract period of 12 months. NO compulsory briefing session is indicated, and the tender closes on 19 november 2026. Category, industry and tender type were not specified in the source data, so contractors in mechanical/plant refurbishment should review the full tender documents for qualifying criteria.
Award analysis coverage
0 of 0 source documents fully reviewed. Unstated details are identified only after complete source review.
technical scope
4 sourced criteria
financial capacity
Source analysis requires completion or review
pricing
Source analysis requires completion or review
compliance returnables
Source analysis requires completion or review
evaluation
Source analysis requires completion or review
experience
Source analysis requires completion or review
personnel
Source analysis requires completion or review
equipment capacity
Source analysis requires completion or review
delivery contract
1 sourced criteria
equity registrations
Source analysis requires completion or review
What the buyer was looking for
1Inferred operational need
Refurbishment of the dust handling plant for Units 3, 4 and 5 at Kendal Power Station
Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Source: AI key requirements Β· requirements
Known supplier evidence
Tenders-SA records other appointments with overlapping scope terms for KEPCO KPS SOUTH AFRICA.
Qualified inference
Supported inference
An award confirms appointment. It does not prove why a supplier was selected, that every qualification remains current, or that delivery was completed successfully.
The recorded history supports exposure to related scope, but does not establish the bid evidence submitted or current delivery capacity.
Related historical records suggest exposure; they do not prove bid contents, current capacity, or delivery.
2Inferred operational need
Project located in Mpumalanga
Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Source: AI key requirements Β· requirements
Known supplier evidence
Tenders-SA records other appointments with overlapping scope terms for KEPCO KPS SOUTH AFRICA.
Qualified inference
Supported inference
The recorded history supports exposure to related scope, but does not establish the bid evidence submitted or current delivery capacity.
Related historical records suggest exposure; they do not prove bid contents, current capacity, or delivery.
3Mandatory requirement
No compulsory briefing session indicated
Why it matters: The source identifies this as a mandatory or eligibility condition for a compliant bid.
No source document identifier is stored for this item.
Source: AI key requirements Β· requirements
Known supplier evidence
The linked award records KEPCO KPS SOUTH AFRICA as appointed for this tender. Recorded contract value: 1 ZAR.
Qualified inference
Inference only
The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
4Inferred operational need
Closing date: 19 November 2026
Why it matters: This is a qualified operational interpretation of the stored scope, not a stated mandatory or scored criterion.
Inferred from stored analysis; verify against the source document. No source document identifier is stored for this item.
Source: AI key requirements Β· requirements
Known supplier evidence
The linked award records KEPCO KPS SOUTH AFRICA as appointed for this tender. Recorded contract value: 1 ZAR.
Qualified inference
Inference only
The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
5Delivery obligation
Contract period of 12 months
Threshold: 12 months
Why it matters: The source says this applies after appointment and concerns contract delivery.
No source document identifier is stored for this item.
Source: AI key requirements Β· requirements
Known supplier evidence
The linked award records KEPCO KPS SOUTH AFRICA as appointed for this tender. Recorded contract value: 1 ZAR.
Qualified inference
Inference only
The successful bid likely addressed this expectation, but the submitted evidence and evaluation reason are unavailable.
The linked award confirms appointment only, not the submitted qualification or reason for selection.
APPOINTMENT OF A TRAVEL MANAGEMENT COMPANY TO RENDER TRAVEL MANAGEMENT SERVICES TO THE IUCMA FOR A PERIOD OF THIRTY-SIX (36) MONTHS.IUCMA/001/TRAVEL/2025