Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Duvha - Emalahleni - eMalahleni - 1034
Organization Type
GOVERNMENT
Published
05 Nov 2026
OCDS Reference
ocds-9t57fa-177013
ESKOM requires the replacement of boiler sheeting and cladding on unit 3 at duvha power station over a six-month period. Bidders must submit a set of quality management deliverables that are evaluated under category 3, covering iso 9001-aligned qms documentation, evidence of qms operation, a draft contract quality plan, a quality control plan or inspection and test plan, and a signed form a. The most consequential consideration is that the bid is judged on the completeness and relevance of these quality documents, with the draft contract quality plan and the quality control plan carrying the greatest weight.
Quality evaluation only: bids are assessed on Category 3 quality returnables (Sections A to E); no price, B-BBEE, CSD, tax or CIDB criteria are stated in this document.
Section A (35% weight): submit a QMS manual or scope document or quality method statement, top-management-approved quality policy and objectives, records list, and documented information for control of documented information, nonconforming outputs, nonconformity and corrective action, and internal audit.
Section B (35% weight): provide documented information defining roles, responsibilities and authorities, and for control of externally provided processes, products and services.
Section C (20% weight): submit a draft contract quality plan specific to the scope of work in line with ISO 10005; this plan carries important QA deliverables.
Section D (20% weight): submit a quality control plan, checklist or inspection and test plan (ITP) for the scope of works (ISO 10005) and an example ITP or QCP from similar or previous work.
Section E (10% weight): complete and sign Form A; additional user-defined requirements apply only if listed for the scope.
ISO 9001 certification is not mandatory, but bidders must show a documented QMS that complies with ISO 9001.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Browse categories with current opportunities in this area.
Compare tender activity across provinces.
Explore organisations currently publishing tenders.
Tools and research to help you assess opportunities.
Check the registered grade against the tender conditions, or estimate a possible grade. Check CIDB registration · Estimate a CIDB grade.
Date & Time
Monday, 30 November 2026 - 10:00
Venue
https://teams.microsoft.com/meet/3878606918641006?p=kKbrU72lz2Ml7b5ZL6
Categories
Request for Bid(Open-Tender)
Duvha - Emalahleni - eMalahleni - 1034
AI Document Analysis Stages
Description
05 Nov
2026
Tender Published
Tender was published
30 Nov
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
SDLI Strategy Unit 3 Boiler Sheeting and Cladding Replacement at Duvha for a period of six months.pdf
The department requires the replacement of boiler sheeting and cladding for Unit 3 at Duvha Power Station for a six‑month period.
382-170400 Duvha Power Station Unit 3 Boiler House Sheeting and Cladding Replacement Technical Specification rev 1 signed.pdf
Replacement of missing, damaged and removed sheeting, side cladding and flashings on the Unit 3 boiler house at Duvha Power Station, including rope access, temporary works and corrosion protection, over a six-month period. The work is for Eskom's Duvha Power Station in Mpumalanga.
382-170399 Tender Technical Evaluation Strategy U3 boiler sheeting replacement rev_2.0.pdf
The tender calls for the replacement of Unit 3 boiler sheeting and cladding at Duvha Power Station for a six‑month period. Bidders must provide rope‑access installation services, remove damaged materials, and install new steel cladding and sheeting, supported by detailed technical documentation and qualified personnel.
Environmental Requirements for Duvha Power Station Unit 3 Boiler House Sheeting and Cladding Replacement.pdf
Replacement of boiler sheeting and cladding on Unit 3 at Duvha Power Station for a period of six months. Eskom requires the contractor to comply with station environmental and waste management procedures and to submit an emergency response plan before work begins.
ITT -U3 Boiler Sheeting Cladding Replacement.pdf
Replacement of Unit 3 boiler sheeting and cladding at Duvha Power Station over a 06 (six) month period, including repair of damaged and rusted cladding and sheeting support structures and site de-establishment, for Eskom Holdings SOC Ltd in Mpumalanga.
240-68099512 FORM CATERGORY 3.docx
Replacement of boiler sheeting and cladding for Unit 3 at Duvha Power Station for a period of six months is required by ESKOM.
SHEQ TENDER REQUEIREMENTS FOR SUPPLY OF BOILER HOUSE CLADDING REPLACEMENT.pdf
Replacement of sheeting and cladding for Unit 3 boiler at Duvha Power Station for a period of six months. The procurement is by ESKOM in Mpumalanga province.
240-109253698 CQP Template 2021.docx
Unit 3 boiler sheeting and cladding replacement for a period of six months at Duvha Power Station in Mpumalanga.
240-105658000 - QM 58 Supplier Quality Management.pdf
Eskom requires a contractor for Unit 3 boiler sheeting and cladding replacement at Duvha Power Station over six months. The contractor must comply with Eskom's Supplier Quality Management specification (QM 58), which mandates a quality management system aligned with ISO 9001, category-specific quality documentation, contract quality plans, inspection and test plans, and allows Eskom audit and access rights.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx
Replacement of Unit 3 boiler sheeting and cladding at Duvha Power Station over a 06 (six) month period. The work is executed under a quality control plan with defined inspection and test intervention points.
NEC ECSC3 for Unit 3 Boiler Sheeting and Cladding Replacement for a period of 06 (Six) Months at Duvha Power Station.pdf
Replacement of Unit 3 boiler house sheeting and cladding at Duvha Power Station over a six-month period, including dismantling damaged cladding, supplying and installing sheeting and cladding, repairing support structures, and providing as-built drawings. The work is contracted under the NEC3 Engineering and Construction Short Contract (ECSC3) with Eskom Holdings SOC Ltd as Employer.
240-12248652 Category3- List of Tender Returnables Documents Rev 5.xlsx
Replacement of boiler sheeting and cladding on Unit 3 over a six-month period at Duvha Power Station in Mpumalanga. Bidders submit a Category 3 quality returnable pack covering quality management system evidence, a draft contract quality plan and quality control plans.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomWin Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Background
Scope
Technical Specifications
Source: 382-170400 Duvha Power Station Unit 3 Boiler House Sheeting and Cladding Replacement Technical Specification rev 1 signed.pdf (unknown)Scope of works
Materials
Fasteners
Installation and testing
Drawings
Methodology
Source: 382-170400 Duvha Power Station Unit 3 Boiler House Sheeting and Cladding Replacement Technical Specification rev 1 signed.pdfTemporary works design
Method statements and installation
Quality Management
Source: 382-170400 Duvha Power Station Unit 3 Boiler House Sheeting and Cladding Replacement Technical Specification rev 1 signed.pdfQuality Control Plan
Standards and testing
Records
Health & Safety
Source: 382-170400 Duvha Power Station Unit 3 Boiler House Sheeting and Cladding Replacement Technical Specification rev 1 signed.pdfSafety file and induction
Working at height
Permits and weather
Personal protection and site control
Liability and supplies
Legislation
Environmental
Source: 382-170400 Duvha Power Station Unit 3 Boiler House Sheeting and Cladding Replacement Technical Specification rev 1 signed.pdfWaste disposal
Contractual Terms
Source: 382-170400 Duvha Power Station Unit 3 Boiler House Sheeting and Cladding Replacement Technical Specification rev 1 signed.pdfContractor liability
Temporary works
Quality and handover
Submission Guidelines
Source: SDLI Strategy Unit 3 Boiler Sheeting and Cladding Replacement at Duvha for a period of six months.pdf (TENDER)Returnable forms — complete, sign and submit with the bid:
Mandatory returnables where applicable:
Specific goals (B-BBEE): maximum 10 points under 90/10 or 20 points under 80/20.
B-BBEE points:
Award: contract awarded to the tenderer scoring the highest total points (price plus specific goals), rounded to two decimal places.
B-BBEE evidence: tenderers failing to submit preference point documentation are not disqualified but score 0 points for specific goals.
Objective criteria: designated sector — steel cladding (steel products and components for construction) requires 100% local production and content; SBD 6.2 and Annex C are mandatory returnables where applicable.
Objective criteria consequence: failure to meet objective criteria may lead to the second-ranked tenderer being recommended for award.
SDL&I commitments: do not form part of scoring but become contractual obligations if awarded.","importantDates": null,"contactInformation": "Buyer: Silungile Sibiya
Department: Duvha Power Station","technicalSpecifications": "Scope: Unit 3 boiler sheeting and cladding replacement at Duvha Power Station.
Duration: 6 (six) months.
Business unit: Duvha Power Station, Mpumalanga.
Designated component: steel cladding (steel products and components for construction).
Local content requirement: 100% for steel cladding.","financialRequirements": "SDL&I penalty: 1.5% of the invoice amount for failure to meet SDL&I obligations.
SDL&I penalty: 1.5% of the contract value for failure to meet SDL&I obligations.
Performance security / retention: Eskom retains 1.5% of every invoice (excluding VAT) as security for fulfilment of all SDL&I obligations.
Release of retention: upon receipt of SDL&I progress reports, fulfilment of all SDL&I obligations, and submission of an approved compliance report by the SDL&I Department.
Pricing format: tender response must be separated into components as per the Price Schedule; local procurement content equals total spending minus the imported component.","complianceRequirements": "B-BBEE evidence to claim preference points:
B-BBEE certificate rules by annual total revenue:
Valid B-BBEE certificate or sworn affidavit is a condition for contract award.
Local content: steel cladding designated component requires 100% local production and content.
CIPC: proof of ownership or shareholding preferably supported by CIPC documentation.","overallConfidence": 0.72,"shouldSave": true,"sectionScores": {"submissionGuidelines": 0.4,"evaluationCriteria": 0.85,"importantDates": 0.0,"contactInformation": 0.2,"technicalSpecifications": 0.65,"financialRequirements": 0.65,"complianceRequirements": 0.75},"extendedSections": [{"sectionType": "description", "content": "Scope: Unit 3 boiler sheeting and cladding replacement at Duvha Power Station.
Duration: 6 (six) months.
Business unit: Duvha Power Station.
Mandatory returnable where applicable: SBD 6.2 Declaration Form and Annex C (Local Content Declaration-Summary Schedule)."}, {"sectionType": "evaluation_criteria", "content": "Specific goals: a maximum of 10 points under the 90/10 system or 20 points under the 80/20 system may be awarded for the B-BBEE specific goal.
Points scored for the specific goal are added to the price points and the total is rounded to two decimal places.
The contract is awarded to the tenderer scoring the highest points.
B-BBEE points:
Tenderers failing to submit preference point documentation are not disqualified but score 0 points for specific goals.
Required evidence: valid B-BBEE certificate or sworn affidavit/CIPC affidavit; proof of ownership or shareholding with breakdown; certified ID copies of shareholders; proof of disability where applicable; consolidated certificate for a trust, consortium or joint venture."}, {"sectionType": "health_safety", "content": "Sworn affidavit validity requirements:
Local procurement content: total spending minus the imported component."}]}{
Important Dates
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)30 November 2026 at 08:00
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx (unknown)Replacement of boiler sheeting and cladding at Unit 3, Duvha Power Station for 6 months
Submission Guidelines
Source: ITT -U3 Boiler Sheeting Cladding Replacement.pdf (TENDER)Submission method: electronic upload only via the Eskom E-tendering site; no hard copies accepted.
File format: all documents in PDF; price list in PDF.
File limits: 500 MB per document; total submission restricted to 4 GB.
No zip or condensed files may be uploaded.
Upload folders: Technical, Commercial, Financial and other.
Resubmission: the latest version submitted is accepted and all previous submissions are null and void.
Submission status must show as complete.
Closing: 30 November 2026 at 10h00; late tenders will not be accepted.
Mandatory returnable forms:
Disqualification risks: omitted or unsigned mandatory returnables; late submission; multiple submissions; unauthorised signatory; conflict of interest; National Treasury restriction; listing on the Tender Defaulters List; 100 percent subcontracting of the scope; sanctioned nationality of the bidder or its subcontractors or suppliers.},"evaluationCriteria": "Technical or functional minimum qualifying score: 70 percent; tenderers below the threshold are disqualified.
Price and specific goals are combined and tenderers are ranked from highest to lowest total points.
Preferential Procurement Regulations 2022 apply.
Point system: 80/20 for estimated value up to and including R50 million excluding VAT; 90/10 above R50 million excluding VAT.
Price scored out of 80 or 90 points; specific goals scored out of 20 or 10 points.
B-BBEE points under the 90/10 system: Level 1 equals 20; Level 2 equals 18; Level 3 equals 14; Level 4 equals 12; Level 5 equals 8; Level 6 equals 6; Level 7 equals 4; Level 8 equals 2; non-compliant equals 0.
B-BBEE evidence: valid certificate from a SANAS-accredited verification agency, sworn affidavit or CIPS affidavit; CIPC shareholding proof with breakdown; certified ID copies of shareholders; disability proof where applicable; consolidated certificate for trusts, consortia and joint ventures.
No preference-point documentation: not disqualified, but zero points for specific goals.
Price rules: inclusive of VAT; arithmetical errors corrected; contingencies excluded; unconditional discounts considered; conditional discounts not considered for evaluation.
Objective criteria: not applicable. Reverse e-auction: not applicable.","importantDates": "Issue date: 05 November 2026.
Clarification meeting, non-compulsory: 16 November 2026 at 13:00, held on Microsoft Teams.
Meeting ID: 387 860 691 864 100 6; passcode: Z5rr6Jn7.
Dial-in: +27 21 834 0825; phone conference ID: 516 544 797#.
Clarification queries: in writing to the Eskom Representative, at least ten working days before the closing deadline.
Closing: 30 November 2026 at 10h00.
Tender validity: 84 days from the closing date and time.","contactInformation": "Eskom Representative for tender and technical queries:
Procurement Manager:
Submission channel: Eskom E-tendering site, electronic upload only
Fraud and corruption reporting: 0800 11 2722 or [email protected]","technicalSpecifications": "Procurement: Unit 3 boiler sheeting and cladding replacement for a period of six months at Duvha Power Station.
Scope of work: replacement of sheeting and cladding materials; site de-establishment; repair of damaged and rusted cladding and sheeting support structures.
Contract form: NEC3 Engineering and Construction Short Contract, April 2013, with additional conditions Z1 to Z11.
Rope access technicians: valid rope access certificates at levels 1, 2 and 3; CVs with a minimum of five years of relevant experience and verifiable references; certified copies of IDs and rope access certificates, with certification within six months; demonstrated experience in roof sheeting installation.
Cataloguing: may be required after award; materials must be labelled per Eskom specifications; the Pricing Schedule must include a cataloguing line item, which Eskom pays for.","financialRequirements": "Prices: inclusive of Value Added Tax.
Payment terms: contracts below R50 million including VAT - payment within 30 days of receipt of undisputed invoices; contracts above R50 million including VAT - payment within 60 days.
Financial statements: audited financial statements for the previous 18 months, or the last year where unavailable; for a joint venture or special purpose vehicle, statements for each participant; start-ups under 12 months are exempt but must furnish first-year statements if successful.
Security for performance: not applicable.
SDL&I retention: 2 percent of every invoice excluding VAT retained as security for SDL&I obligations; released on progress reports, fulfilment and an approved compliance report.
SDL&I penalty: 2 percent of the invoice amount or 2 percent of the contract value for failure to meet SDL&I obligations.
Subcontracting: minimum 5 percent of contract value to an EME or QSE that is 51 percent owned by black people living in rural, underdeveloped areas or townships.
Local procurement content target: 100 percent.","complianceRequirements": "Mandatory: CSD registration number on the Central Supplier Database.
CIDB: Grade 4GB or higher valid proof for the main contractor, joint venture and/or subcontractor, at closing or within 21 working days if agreed.
Tax: tax compliance status via the CSD.
B-BBEE: annual revenue up to R10 million (EME) - sworn affidavit; annual revenue up to R50 million (QSE) - applicable certificate or affidavit unless at least 51 percent black-owned; annual revenue above R50 million - valid B-BBEE certificate.
CIPC: company registration and shareholding documents required to claim preference points.
OHS: Annexure B acknowledgement of Eskom's OHS legal and other requirements; Health and Safety Plan; detailed OHS costing, not a lump sum; Baseline OHS Risk Assessment with methodology; valid Letter of Good Standing under COIDA or equivalent; OHS policy signed by the CEO complying with OHS Act Section 7; OHS competency evidence including SACPCMP registration, national diploma in safety management and HIRA certificate.
Environmental: environmental policy compliant with ISO 14001:2015; compliance with Duvha Waste Management Procedure ENVP0005; Emergency Response Plan before commencement.
Quality: ISO 9001-aligned documented quality management system; draft Contract Quality Plan; quality control plan, checklist or ITP.
Standard forms: SBD 1 Invitation to Bid; SBD 4 Declaration of Interest; SBD 6.1 Preference Points Claim; SBD 6.2 Local Production and Content Declaration.","overallConfidence": 0.92,"shouldSave": true,"sectionScores": {"submissionGuidelines": 0.9,"evaluationCriteria": 0.9,"importantDates": 0.95,"contactInformation": 0.85,"technicalSpecifications": 0.85,"financialRequirements": 0.9,"complianceRequirements": 0.9},"extendedSections": [{"sectionType": "description", "content": "Scope: Unit 3 boiler sheeting and cladding replacement for a period of six months at Duvha Power Station.
Work includes replacement of sheeting and cladding materials, site de-establishment, and repair of damaged and rusted cladding and sheeting support structures.
Contract: NEC3 Engineering and Construction Short Contract, April 2013, with additional conditions Z1 to Z11.
Duration: six months."}, {"sectionType": "evaluation_criteria", "content": "Technical or functional minimum qualifying score: 70 percent; below threshold leads to disqualification.
Price and specific goals combined; tenderers ranked highest to lowest.
80/20 point system for estimated value up to and including R50 million excluding VAT; 90/10 above R50 million.
Price out of 80 or 90 points; specific goals out of 20 or 10 points.
B-BBEE points under the 90/10 system: Level 1 equals 20; Level 2 equals 18; Level 3 equals 14; Level 4 equals 12; Level 5 equals 8; Level 6 equals 6; Level 7 equals 4; Level 8 equals 2; non-compliant equals 0.
Preference evidence: SANAS-accredited B-BBEE certificate, sworn affidavit or CIPS affidavit; CIPC shareholding proof; certified ID copies; disability proof where applicable; consolidated certificate for joint ventures, consortia or trusts.
No preference evidence: not disqualified, but zero points for specific goals.
Objective criteria: not applicable. Reverse e-auction: not applicable."}, {"sectionType": "contractual_terms", "content": "Contract form: NEC3 Engineering and Construction Short Contract, April 2013, with additional conditions Z1 to Z11.
Tender validity: 84 days from the closing date and time.
Security for performance: not applicable.
Alternative tenders: not allowed.
Payment terms: 30 days from undisputed invoice for contracts below R50 million including VAT; 60 days for contracts above R50 million including VAT.
SDL&I retention: 2 percent of every invoice excluding VAT retained as security for SDL&I obligations.
SDL&I penalty: 2 percent of the invoice amount or 2 percent of the contract value for failure to meet SDL&I obligations.
Subcontracting: minimum 5 percent of contract value to a designated EME or QSE that is 51 percent black-owned and located in a rural, township or underdeveloped area.
Cataloguing: may be required after award; Eskom pays for cataloguing; a cataloguing line item must be included in the Pricing Schedule."}, {"sectionType": "quality_management", "content": "Quality management system: objective evidence of a documented QMS that complies with ISO 9001 but is not necessarily certified.
Section A: QMS manual or scope document; quality policy approved by top management; quality objectives approved by top management; control of documented information under ISO 9001:2015 clause 7.5; control of nonconforming outputs under clause 8.7; nonconformity and corrective action under clause 10.2; internal audit under clause 9.2. Section A score: 7.
Section B: organisation chart and responsibility matrix including the quality function under clause 5.3; control of externally provided processes, products and services under clause 8.4. Section B score: 2.
Section C: draft Contract Quality Plan specific to the scope under ISO 10005. Section C score: 1.
Section D: quality control plan, checklist or ITP per the scope of works; example ITP or QCP on similar previous work. Section D score: 1.
Section E: Form A completed and signed. Section E score: 1."}, {"sectionType": "health_safety", "content": "OHS returnable 1: Annexure B acknowledgement of Eskom's OHS legal and other requirements, signed and submitted.
OHS returnable 2: Health and Safety Plan addressing project OHS risks - replacement of sheeting and cladding, site de-establishment, repair of damaged and rusted cladding and support structures.
OHS returnable 3: detailed OHS costing, broken down and not a lump sum, based on the overall scope.
OHS returnable 4: Baseline OHS Risk Assessment with methodology covering the scope of work.
OHS returnable 5: valid Letter of Good Standing under COIDA or equivalent.
OHS returnable 6: OHS policy signed by the CEO, complying with OHS Act Section 7.
OHS returnable 7: OHS competency - CVs and certificates including legal liability, HIRA certificate, national diploma in safety management and SACPCMP registration.
Emergency Response Plan: required before commencement; must cover accidents, harsh weather, disasters, wildlife interactions, spillages and fires."}, {"sectionType": "environmental", "content": "Environmental policy: required, compliant with ISO 14001:2015 Environmental Management System.
Waste management: contractor must comply with the Duvha Waste Management Procedure ENVP0005; the station monitors compliance.
Emergency Response Plan: required before commencement; must cover accidents, harsh weather, disasters, wildlife interactions, potential spillages and fires in line with relevant legislation."}, {"sectionType": "methodology", "content": "Skills development: proposals required for developing skills of unemployed candidates in South Africa, addressing Eskom's core, scarce and critical skills from the 2020 high-demand occupations list in Government Gazette 43937.
Targets: N3 or equivalent boiler maker, mechanical fitter, welder or electrician - 2 candidates; matric or N6 or national diploma N3 technical students - 2 candidates.
Delivery: directly or through the supply network; SETA-accredited training providers may be used.
Costs: the tenderer bears the full cost of skills development; Eskom makes no financial contribution; tenderers may access SETA grants, subsidies and SARS tax rebates.
Exclusions: Eskom employees and registered learners are excluded from candidates."}, {"sectionType": "pricing_schedule", "content": "Pricing Schedule or BOQ: included in the tender documents in PDF and Excel format.
Prices: inclusive of Value Added Tax.
Arithmetical errors: corrected for evaluation purposes.
Contingencies: excluded from evaluation.
Variations: acceptable variations, deviations or alternative tenders adjusted per tender conditions.
Net present value: comparison may include tendered programme and prices, price adjustment factors, exchange rate fluctuations and other risk parameters.
Discounts: unconditional discounts considered; conditional discounts not considered for evaluation but applied at payment.
Cataloguing: if required, a cataloguing line item must be included in the Pricing Schedule; Eskom pays for cataloguing.
Upload limits: 500 MB per document; total submission 4 GB; PDF only; no zip files."}]}{
Description
Source: 240-105658000 - QM 58 Supplier Quality Management.pdfEskom Supplier Quality Management specification QM 58 (Document Identifier 240-105658000, Revision 2). It specifies the minimum quality requirements for all existing and potential Eskom suppliers and defines the quality criteria for supplier selection, evaluation, vendor registration, management, monitoring, assessment and auditing. Eskom requires suppliers to develop, implement, maintain and continually improve a QMS conforming to ISO 9001. The specification applies across Eskom Holdings SOC Ltd divisions and subsidiaries and forms part of all Eskom requests for information, requests for quotation and requests for proposal, and contracts for the procurement of products and services.
Submission Guidelines
Source: 240-105658000 - QM 58 Supplier Quality Management.pdf (unknown)Returnable documents — all must be completed, signed and submitted with the bid:
Evaluation Criteria
Source: 240-105658000 - QM 58 Supplier Quality Management.pdf (unknown)Evaluation is based on the supplier quality category assigned in the tender through Form A; no price/preference split, minimum qualifying score or 80/20 versus 90/10 threshold is stated in this specification.
Technical Specifications
Source: 240-105658000 - QM 58 Supplier Quality Management.pdf (unknown)Scope: Eskom Supplier Quality Management specification QM 58 (Document Identifier 240-105658000, Revision 2) sets the minimum quality requirements for selecting, evaluating, registering, managing, monitoring, assessing and auditing all Eskom suppliers and sub-suppliers. It applies across Eskom Holdings SOC Ltd divisions and subsidiaries and forms part of all Eskom RFI, RFQ and RFP processes and contracts for products and services.
Quality management system:
Contract Quality Plan and Quality Control Plan:
Sub-supplier control:
Special processes:
Post-contract award (within 30 days of the contract date or award):
Eskom rights:
Quality Management
Source: 240-105658000 - QM 58 Supplier Quality Management.pdfQuality management system requirements (QM 58):
Contract Quality Plan:
Quality Control Plan:
Compliance Requirements
Source: 240-105658000 - QM 58 Supplier Quality Management.pdf (unknown)Quality management compliance:
Contractual Terms
Source: 240-105658000 - QM 58 Supplier Quality Management.pdfPreservation management programme:
Section
Source: 240-105658000 - QM 58 Supplier Quality Management.pdfSupplier selection and evaluation criteria under QM 58:
Submission Guidelines
Source: 240-12248652 Category3- List of Tender Returnables Documents Rev 5.xlsx (unknown)Returnable documents to submit with the bid (submission channel, address, copies and packaging are not stated in this document):
Evaluation Criteria
Source: SHEQ TENDER REQUEIREMENTS FOR SUPPLY OF BOILER HOUSE CLADDING REPLACEMENT.pdf (unknown)Evaluation is based on submission of mandatory OHS returnables. Each returnable is assessed and recommended or not recommended for contract award.
Mandatory returnables:
Non-compliance: bids may be assessed as 'not recommended' if mandatory returnables are omitted or unsigned.
Technical Specifications
Source: SHEQ TENDER REQUEIREMENTS FOR SUPPLY OF BOILER HOUSE CLADDING REPLACEMENT.pdf (unknown)Unit 3 Boiler House Sheeting and Cladding Replacement at Duvha Power Station. Duration: 6 months. Work: replacement of sheeting and cladding materials, site de-establishment, repair of damaged and rusted cladding and sheeting support structures. Category: Services: Civil.
Compliance Requirements
Source: SHEQ TENDER REQUEIREMENTS FOR SUPPLY OF BOILER HOUSE CLADDING REPLACEMENT.pdf (unknown)COIDA Letter of Good Standing (valid letter required). OHS Act compliance: OHS policy signed by CEO (Section 7). OHS competency requirements: Hira certificate, National diploma in safety management, Registration with SACPCMP. Legal liability documentation required.
Health & Safety
Source: SHEQ TENDER REQUEIREMENTS FOR SUPPLY OF BOILER HOUSE CLADDING REPLACEMENT.pdfHealth and safety requirements:
Description
Source: 240-68099512 FORM CATERGORY 3.docxDescription
Submission Guidelines
Source: 240-68099512 FORM CATERGORY 3.docx (unknown)Returnable documents
Evaluation Criteria
Source: 240-68099512 FORM CATERGORY 3.docx (unknown)Mandatory precondition
Compliance Requirements
Source: 240-68099512 FORM CATERGORY 3.docx (unknown)Quality compliance
Important Dates
Source: NEC ECSC3 for Unit 3 Boiler Sheeting and Cladding Replacement for a period of 06 (Six) Months at Duvha Power Station.pdf (unknown)Starting date: 03 May 2027
Completion date: 29 October 2027
Contract period: six months
Defects date: 52 weeks after Completion
Defect correction period: 2 weeks after notification of defect
Assessment day: 24th of each month
Period for reply: 4 days
Contact Information
Source: NEC ECSC3 for Unit 3 Boiler Sheeting and Cladding Replacement for a period of 06 (Six) Months at Duvha Power Station.pdf (unknown)Employer's representative
Name: Mlungisi Mfeka
Role: Employer's representative (delegated actions under clause 14.4)
Email: [email protected]
Telephone: 013 691 6520
Address
Duvha Power Station
PO Box 2199
Employer's registered office
Megawatt Park
Maxwell Drive
Sandton
Johannesburg
Technical Specifications
Source: NEC ECSC3 for Unit 3 Boiler Sheeting and Cladding Replacement for a period of 06 (Six) Months at Duvha Power Station.pdf (unknown)Works: Unit 3 Boiler House Sheeting and Cladding Replacement at Duvha Power Station, Unit 3 Boiler
Contract period: six months (starting date 03 May 2027; completion date 29 October 2027)
Governing contract: NEC3 Engineering and Construction Short Contract (April 2013) with additional conditions Z1 to Z13
Roof sheeting, flashings and side cladding work must comply with SANS 10237
Dismantle and removal of damaged cladding: 187 m²
Supply, installation and painting of sheeting to cover the Unit 3 boiler house structure: 348 m²
Supply and installation of cladding to cover the Unit 3 boiler house structure: 1 964 m²
Supply and installation of side fibreglass sheeting: 276 m²
Repair of damaged and rusted cladding and sheeting support structures: sum
Supply and installation or fixing of loose roof, cladding and flashing fasteners: sum
Supply and installation of louvers to match existing: sum
As-built drawings for the Employer's engineering representative approval: sum
Temporary works designed by a professionally registered structural engineer
Rope access, scaffolding, plant and equipment for manufacture and erection
Removal of damaged sheeting and cladding to an approved dumping site
Contractor supplies all labour, materials, services, temporary works, rope access and lifelines
Eskom provides basic designs; the Contractor prepares detailed designs for submission to Eskom Engineers
Contractor provides portable ablution facilities and proper eating facilities
Site is approximately 15 km from Emalahleni, Mpumalanga, at 1 600 m above sea level
Mandatory site safety induction before any work; the safety file must be approved by the Eskom safety officer first
Employee list with arrival dates and times due at least 2 days before arriving on site
Daily alcohol testing for all persons entering Duvha Power Station
Quality Management
Source: NEC ECSC3 for Unit 3 Boiler Sheeting and Cladding Replacement for a period of 06 (Six) Months at Duvha Power Station.pdfAsbestos exposure measurements and reporting by an independent, SANAS-accredited and Department of Employment and Labour-approved approved asbestos inspection authority (AAIA)
The Contractor may carry out parallel measurements at its own expense; results are assessed against South African statutory limits
Control measures conform to the AAIA-approved asbestos work plan
Food hygiene: comply with Eskom's Food Hygiene and Safety Management procedure 39-113; compliance is verified during client audits and inspections
Financial Requirements
Source: NEC ECSC3 for Unit 3 Boiler Sheeting and Cladding Replacement for a period of 06 (Six) Months at Duvha Power Station.pdf (unknown)Retention: 10%
Delay damages: R 2 000 per calendar day, capped at 10% of the contract value
Assessment day: 24th of each month
Payment: tax invoice within one week of receiving the payment certificate, for the amount stated in the certificate
Value Added Tax: 15%; the Employer's VAT number 4740101508 must appear on each invoice
Defects date: 52 weeks after Completion
Defect correction period: 2 weeks after notification of defect
Pricing: preliminaries and general items priced as fixed or monthly sums over six months; mechanical work items priced in m² or as sums in the Price List
Compliance Requirements
Source: NEC ECSC3 for Unit 3 Boiler Sheeting and Cladding Replacement for a period of 06 (Six) Months at Duvha Power Station.pdf (unknown)Tenderer's CIDB registration number must be entered on the Form of Offer and Acceptance
Construction Regulations 2014 (issued under the Occupational Health and Safety Act): the Contractor warrants that prices include a sufficient amount for compliance and may be appointed Principal Contractor
Safety file compiled by the Contractor and approved by the Eskom safety officer before the site safety induction
B-BBEE: notify the Employer within seven days of any change in B-BBEE status; submit an updated verification certificate and supporting documents within thirty days; a decreased B-BBEE status may lead to renegotiation or termination; failure to notify may be grounds for termination
ASGI-SA: comply with the Accelerated and Shared Growth Initiative – South Africa compliance schedule; failure constitutes substantial failure
Insurance: provide the insurances in Insurance Table A from the starting date until the earlier of Completion and the termination certificate; certificates from the insurer or broker on request
Asbestos: comply with the Employer's Asbestos Standard 32-303 and the Asbestos Regulations; occupational exposure limit 0.2 regulated asbestos fibres per millilitre of air (4-hour TWA); short-term exposure limit 0.6 fibres per millilitre (10-minute TWA); removal and disposal of asbestos by a registered asbestos contractor instructed by the Employer at the Employer's expense
Tax invoice: comply with the Value Added Tax Act and include the Employer's VAT number 4740101508 on each invoice
Health & Safety
Source: NEC ECSC3 for Unit 3 Boiler Sheeting and Cladding Replacement for a period of 06 (Six) Months at Duvha Power Station.pdfConstruction Regulations 2014 (issued under the Occupational Health and Safety Act) apply to the works
The Employer may appoint the Contractor as Principal Contractor for the Site
The Contractor warrants that its prices include a sufficient amount for compliance with the Construction Regulations and all applicable health and safety laws
The Contractor, its subcontractors, employees and others under its direction must comply with the Construction Regulations and all applicable health and safety laws, rules, guidelines and procedures
All employees must attend a mandatory site safety induction before working on site
The Contractor's safety file must be approved by the Eskom safety officer before the induction
A list of all employees, with arrival dates and times, must be provided at least 2 days before arriving on site
All persons entering Duvha Power Station undergo daily alcohol testing; no intoxicated person is admitted
Asbestos occupational exposure limit: 0.2 regulated asbestos fibres per millilitre of air as a 4-hour TWA; short-term limit 0.6 fibres per millilitre as a 10-minute TWA
The Contractor's personnel may stop work and leave a contaminated area until it is declared safe
Asbestos removal and disposal is done by a registered asbestos contractor, instructed by the Employer at the Employer's expense
Environmental
Source: NEC ECSC3 for Unit 3 Boiler Sheeting and Cladding Replacement for a period of 06 (Six) Months at Duvha Power Station.pdfComply with all applicable environmental laws, regulations, rules, guidelines and procedures; subcontractors and employees must likewise comply
Maintenance of the laydown area and housekeeping of laydown and working areas is the Contractor's sole responsibility
All waste managed in accordance with Eskom Waste Management Procedure 32-245
Works in the red wetland area require a method statement and risk assessment
No work in the orange area unless 50 m away
The Contractor provides its own portable 380 V distribution boards and supply cables; each board needs a Certificate of Compliance from an accredited person; boards are earthed to the steel structure
The Contractor is responsible for sewage connection or other sewage management
The Contractor is responsible for any gas supply and all communications services
The Contractor must ensure activities do not interfere with overhead lines, pylons or transmission and distribution equipment
Contractual Terms
Source: NEC ECSC3 for Unit 3 Boiler Sheeting and Cladding Replacement for a period of 06 (Six) Months at Duvha Power Station.pdfContract: NEC3 Engineering and Construction Short Contract (April 2013) with additional conditions Z1 to Z13
Starting date: 03 May 2027
Completion date: 29 October 2027
Period for reply: 4 days
Retention: 10%
Delay damages: R 2 000 per calendar day, maximum 10% of the contract value
Defects date: 52 weeks after Completion
Defect correction period: 2 weeks after notification of defect
Assessment day: 24th of each month
Cession, delegation and assignment: the Contractor may not cede, delegate or assign rights or obligations without the Employer's written consent; the Employer may cede to subsidiaries or divisions
B-BBEE status change: notify the Employer within seven days of any change; submit an updated verification certificate within thirty days; a decreased status may lead to renegotiation or termination; failure to notify may be grounds for termination
Confidentiality: no disclosure of contract information except as required; images of the works require prior written consent and vest exclusively in the Employer
Health, safety and environment: comply with the Construction Regulations 2014 and all applicable laws; the Contractor warrants that prices include sufficient provision for compliance
Tax invoice: provide a tax invoice per the Employer's procedures; late invoices extend the payment period; include the Employer's VAT number 4740101508
Limitation of liability: the Employer's liability for indirect or consequential loss is limited to R0.00
Termination: grounds include business rescue, delay damages reaching the limit, and prohibited coercive, collusive, corrupt, fraudulent or obstructive action; the Employer may terminate without a court conviction
Ethics: no prohibited action during procurement or execution; full cooperation with investigations
Insurance: the Contractor provides Insurance Table A cover from the starting date until the earlier of Completion and the termination certificate; certificates on request; the Employer provides Insurance Table B per policy documents
Nuclear liability: the Employer, as operator of the Koeberg Nuclear Power Station, is solely responsible for nuclear damage and waives recourse, subject to statutory exceptions
Asbestos: comply with Asbestos Standard 32-303 and the Asbestos Regulations; SANAS-accredited AAIA monitoring; stop work and leave a contaminated area until declared safe; asbestos removal and disposal by a registered asbestos contractor at the Employer's expense
Description
Source: 240-109253698 CQP Template 2021.docxThis Contract Quality Plan template assists suppliers to identify and plan for meeting client and contract expectations and requirements for quality management. The template covers quality objectives, scope of work, communication channels, organizational structure, interfacing documents, supplier and sub-supplier management, monitoring procedures, item lists, quality control processes, special controls, documented information submission, record management, non-conformance handling, databook management, tool and equipment management, customer property handling, product preservation, identification and traceability, and commissioning activities.
Technical Specifications
Source: 240-109253698 CQP Template 2021.docx (unknown)Supply and delivery of boiler sheeting and cladding for Unit 3 at Duvha Power Station over a six-month period. Scope includes design, manufacturing, supply and delivery, construction/installation, and commissioning.
Evaluation Criteria
Source: Environmental Requirements for Duvha Power Station Unit 3 Boiler House Sheeting and Cladding Replacement.pdf (unknown)Environmental policy complying with ISO 14001:2015 assessed during evaluation stage
Compliance with Duvha Waste Management Procedure ENVP0005 - contractor activities monitored by the station
Emergency Response Plan must be compiled prior to project commencement - must address accidents, harsh weather conditions, disasters, wildlife interactions, potential spillages and fires in line with relevant legislation
Technical Specifications
Source: Environmental Requirements for Duvha Power Station Unit 3 Boiler House Sheeting and Cladding Replacement.pdf (unknown)Unit 3 boiler sheeting and cladding replacement at Duvha Power Station
Environmental policy complying with ISO 14001:2015
Compliance with Duvha Waste Management Procedure ENVP0005
Emergency Response Plan compilation required prior to project commencement
Plan must address accidents, harsh weather conditions, disasters, wildlife interactions, potential spillages and fires
Compliance Requirements
Source: Environmental Requirements for Duvha Power Station Unit 3 Boiler House Sheeting and Cladding Replacement.pdf (unknown)Environmental policy complying with ISO 14001:2015 required
Compliance with Duvha Waste Management Procedure ENVP0005 required
Emergency Response Plan must be compiled prior to project commencement
Health & Safety
Source: Environmental Requirements for Duvha Power Station Unit 3 Boiler House Sheeting and Cladding Replacement.pdfEmergency Response Plan must address accidents, harsh weather conditions, disasters, wildlife interactions, potential spillages and fires in line with relevant legislation
Environmental
Source: Environmental Requirements for Duvha Power Station Unit 3 Boiler House Sheeting and Cladding Replacement.pdfWork in compliance with Duvha Waste Management Procedure ENVP0005
Station will monitor contractor activities for compliance with waste procedure
Environmental policy complying with ISO 14001:2015 required
Section
Source: Environmental Requirements for Duvha Power Station Unit 3 Boiler House Sheeting and Cladding Replacement.pdfEnvironmental policy complying with ISO 14001:2015 assessed during evaluation stage
Compliance with Duvha Waste Management Procedure ENVP0005 - monitored by station
Emergency Response Plan compilation required prior to project commencement - must address accidents, harsh weather conditions, disasters, wildlife interactions, potential spillages and fires in line with relevant legislation
Description
Source: 382-170399 Tender Technical Evaluation Strategy U3 boiler sheeting replacement rev_2.0.pdfScope — Unit 3 boiler house, Duvha Power Station
Evaluation Criteria
Source: 382-170399 Tender Technical Evaluation Strategy U3 boiler sheeting replacement rev_2.0.pdf (unknown)Technical evaluation
Mandatory technical criterion
Qualitative technical criteria (total 100%)
Evaluation team
Technical Specifications
Source: 382-170399 Tender Technical Evaluation Strategy U3 boiler sheeting replacement rev_2.0.pdf (unknown)Scope of works — Duvha Power Station, Unit 3 boiler house, Mpumalanga
Methodology
Source: 382-170399 Tender Technical Evaluation Strategy U3 boiler sheeting replacement rev_2.0.pdfEvaluation methodology
Experience & Qualifications
Source: 382-170399 Tender Technical Evaluation Strategy U3 boiler sheeting replacement rev_2.0.pdfExperience and qualifications
Quality Management
Source: 382-170399 Tender Technical Evaluation Strategy U3 boiler sheeting replacement rev_2.0.pdfQuality management requirements
Compliance Requirements
Source: 382-170399 Tender Technical Evaluation Strategy U3 boiler sheeting replacement rev_2.0.pdf (unknown)Normative documents — most recent edition to be applied
Informative reference
Health & Safety
Source: 382-170399 Tender Technical Evaluation Strategy U3 boiler sheeting replacement rev_2.0.pdfHealth and safety — working at height and rope access
Section
Source: 382-170399 Tender Technical Evaluation Strategy U3 boiler sheeting replacement rev_2.0.pdfTechnical evaluation basis
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Duvha - Emalahleni - eMalahleni - 1034
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
12
Last checked
06 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Median Estimate
R 3 680 000
Range
Based on Industry avg. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Services: Civil. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
💡 Want more tendering tips and strategies?
Explore Our Blog