Skip to main content
    Refurbishment of Building, Mechanical and Electrical Infrastructure at the Dimbaza Wastewater Treatment Works –phase 1 Required Grading 6 Gb or Higher the Evaluation Criteria Is as Follows: Mandatory Requirement Stage 1: Local Content Stage 2: Functionality Stage 3: Preferential Procurement Points (Awarded) | Contract Award