Skip to main content
    Build 34km of Chickadee line at 33kV insulation level from the Rouxville Substation to the Bophelo Proposed Substation Site to de-load the existing Rouxville-Zastron 22kV (RVZ) rural line. Construct 2.9km 22kV Hare line from Bophelo Substation Proposed Site to Zastron to deload RVZ line of the Zatron Substation (Awarded) | Contract Award