Documents available on tender detail page
Tender Type
Restricted Bidding
Delivery Location
Arnot Power Station - Arnot Power Station - Mpumalanga - 1087
Organization Type
GOVERNMENT
Published
22 May 2026
OCDS Reference
ocds-9t57fa-156845
This tender invites bids for a 4-year maintenance contract for eskom’s compressor plant at arnot power station, including routine services, repairs, and overhauls for various compressor types and auxiliary equipment. Suppliers must demonstrate technical expertise, OHS compliance, and the ability to provide on-site support for breakdowns and scheduled maintenance.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Categories
Restricted Bidding
Arnot Power Station - Arnot Power Station - Mpumalanga - 1087
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: She Spec.pdf, Tenderer - SDLI Strategy The provision of compressor maintenance at Arnot power station for a period of 4 years.docx, C2 TSC3 Pricing Data Option A.doc and 16 more. You don’t need to refresh — this page will pick up the updated review automatically.
22 May
2026
Tender Published
Tender was published
05 Jun
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
240-68099512 Form A_Cat 1_ Rev 9.docx
Eskom is inviting tenders for the provision of compressor maintenance at Arnot Power Station in the North West Province for a 4-year period. The tender emphasizes compliance with Eskom's Supplier Quality Requirements (Clause 240-105658000) and ISO 9001 standards, with a focus on pre-contract quality assessments, contract execution, and performance monitoring.
Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.doc
The tender is for the provision of compressor maintenance services at Eskom's Arnot Power Station for a period of 4 years. The document primarily focuses on tax classification and compliance requirements for contractors (individuals, companies, close corporations, or trusts) providing services to Eskom. It includes a detailed questionnaire to determine the tax status of the contractor (e.g., Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor) and outlines the necessary affidavits and declarations to be submitted.
Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docx
This tender is for the provision of compressor maintenance services at Eskom's Arnot Power Station in the North West Province, South Africa, over a 4-year period. The document provided is a Confidentiality Agreement outlining the terms under which Eskom (Disclosing Party) will share proprietary and confidential information with potential suppliers/tenderers (Receiving Party) during the tender process.
C1 1 TSC3 Offer Acceptance Maintenance of Compressor Plant.doc
The tender is for the provision of compressor maintenance services at Eskom's Arnot Power Station in the North West Province. The contract duration is 4 years, and the closing date for submissions is June 5, 2026. The successful bidder will be responsible for all obligations under the contract, including compliance with terms and conditions as outlined in the tender documents.
C0 TSC3 Contract cover pages Maintenance of Compressor Plant.doc
The tender is for the provision of compressor maintenance services at Eskom's Arnot Power Station in the North West Province. The contract is based on the NEC3 Term Service Contract (TSC3) framework and spans a period of 4 years. The successful bidder will be responsible for maintaining the compressor plant at the specified location.
Supplier Evaluation Pack Template for 01 March 2025 to 29 February 2026.xls
BEE_Affidavit-EME-Gen.pdf
This tender document is a B-BBEE exemption affidavit for Eskom's compressor maintenance contract at Arnot Power Station. The tender is for a 4-year service contract in North West province, closing in June 2026. The document is specifically for Micro Enterprises claiming exemption from full B-BBEE compliance based on revenue thresholds.
Tenderer - SDLI Strategy The provision of compressor maintenance at Arnot power station for a period of 4 years.docx
Eskom is inviting tenders for the provision of compressor maintenance at Arnot Power Station in the North West Province for a 4-year period. The tender emphasizes B-BBEE compliance, local procurement, skills development, subcontracting, and adherence to the National Industrial Participation Programme (NIPP) if applicable. Preference points are awarded based on B-BBEE status, and SDL&I (Socio-Economic Development, Localization, and Industrialization) objectives are contractual obligations but not part of the scoring.
C2 TSC3 Pricing Data Option A.doc
This tender is for the provision of compressor maintenance services at Eskom's Arnot Power Station in the North West Province for a period of 4 years. The contract follows the TSC3 (Term Service Contract) Option A framework, which is a priced contract where services are paid based on a predefined Price List. The scope includes maintenance, repairs, inspections, and provision of spares for various types of compressors, dryers, and cooling towers, with detailed breakdowns of labor, travel, accommodation, and consumables costs. The contract also includes standby allowance, health and safety compliance, and site establishment/de-establishment costs.
C3 1 TSC3 Employers Service Information.doc
This tender is for the provision of compressor maintenance services at Eskom's Arnot Power Station in the North West Province for a period of 4 years. The scope includes maintenance, repairs, overhauls, and emergency services for various types of compressors (Centrifugal, Rotary Screw, Diesel Rotary Screw) and their auxiliary equipment. The contractor must ensure 100% compressor availability and reliability, maintain system pressure, and adhere to strict health, safety, and environmental standards. The contract also includes procurement, installation, and commissioning of compressors and related systems when required.
C1 2a TSC3 Data by Employer Maintenance of Compressor Plant.doc
Eskom is seeking a contractor to provide compressor maintenance services (including control air and station air compressors and related plant) at Arnot Power Station for a 4-year period. The contract follows the NEC3 Term Service Contract (TSC3) framework with specific options, including dispute resolution, inflation adjustments, and key performance indicators. The tender includes strict compliance, safety, and ethical requirements, as well as limitations on liability and insurance obligations.
She Spec.pdf
This tender is for the provision of compressor maintenance at Eskom's Arnot Power Station in the North West Province for a period of 4 years. The scope includes maintenance, repairs, overhauls, and procurement of related equipment for various compressors and auxiliary systems. The contract emphasizes strict compliance with Occupational Health and Safety (OHS) regulations, Eskom’s SHEQ policies, and legal requirements, including COVID-19 protocols and life-saving rules.
Scope of work.pdf
Eskom is seeking a contractor for a 4-year maintenance agreement for compressor systems at Arnot Power Station in the North West Province. The scope includes comprehensive maintenance (routine, corrective, preventative, and emergency) of 27 compressors (Cameron TA2000 and CompAir Screw types) and auxiliary equipment (dryers, cooling towers, filters, etc.) to ensure ≥92% availability and reliable control/station air supply (590–620 kPa). The contractor must provide on-site technicians, 24/7 breakdown support, spare parts management, and compliance with Eskom’s safety, environmental, and quality standards (ISO 9001:2008). The contract includes procurement, installation, and commissioning of new equipment if required. Performance penalties apply for non-compliance with KPIs (e.g., availability, pressure, scheduled maintenance).
Eskom Acknowlegement form for OHS legal requirement.pdf
Eskom tender for 4-year compressor maintenance at Arnot Power Station (North West). The document focuses on Occupational Health and Safety (OHS) compliance requirements for contractors.
Declaration of Shareholding and Directorship.pdf
Eskom is seeking bids for the provision of compressor maintenance services at Arnot Power Station in the North West Province for a 4-year period. The tender requires disclosure of shareholding and directorship details, including any conflicts of interest with Eskom employees or their close family members.
Risk identification.pdf
Eskom seeks a contractor to provide comprehensive compressor maintenance services at Arnot Power Station in North West province for a 4-year period. The tender document primarily consists of a detailed Health, Safety, and Environmental (HSE) risk assessment identifying numerous workplace hazards specific to the power station environment. Key risks include working at height, confined spaces, electrical hazards, fire/explosive atmospheres, contact with hazardous substances, and various environmental and ergonomic dangers. The closing date is June 5, 2026.
BEE_Affidavit-QSE-Gen.pdf
The tender is for the provision of compressor maintenance at Eskom's Arnot Power Station in the North West province for a 4-year period. The document includes a sworn affidavit for B-BBEE (Broad-Based Black Economic Empowerment) compliance, requiring applicants to declare ownership, revenue, and B-BBEE contributor level.
TEC.pdf
Eskom is seeking a contractor for comprehensive compressor maintenance and supply of OEM spares at Arnot Power Station in North West for a 4-year period. The tender involves maintaining various compressor types (CompAir, BAOFN screw compressors, Cameron centrifugal compressors) and auxiliary systems (aftercoolers, dryers, filtration, cooling towers). Technical evaluation focuses on maintenance capability, quality systems, and personnel qualifications.
Eskom_Standard_Conditions_of_Tender_(May_2022) new.pdf
Eskom seeks a contractor for 4-year compressor maintenance at Arnot Power Station (North West). This document outlines standard conditions of tender, focusing on compliance, submission protocols, and evaluation criteria. Specific tender data (e.g., eligibility thresholds, site visit details) is referenced but not included in this excerpt.
Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 27 - 30 October 2025 Conny.pdf
Eskom Holdings SOC Ltd invites tenders for the provision of compressor maintenance at Arnot Power Station in the North West Province for a 4-year period. The tender (E2896GXMPARN) closes on **05 June 2026 at 10:00 UTC**, with submissions via Eskom’s e-tendering portal in PDF (and Excel for pricing schedules). The contract will use the **NEC 3 Term Services Contract** with specific options (e.g., inflation adjustments, KPIs). Evaluation follows a **90/10 PPPFA scoring system** (price + B-BBEE points), with mandatory technical, commercial, and contractual compliance checks.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 242 880
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: She Spec.pdfClosing date for submissions: 16 February 2026. No other dates (e.g., briefings, site visits, clarification deadlines) are specified.
Contact Information
Source: She Spec.pdfEskom Service Manager: Gretchen Garner. Eskom’s SHE Officer: Hlengiwe Sibiya. Project address: Arnot Power Station, Next to N4 Road, Rietkuil, 1097. No email, phone, or department contacts provided for submission or queries.
Submission Guidelines
Source: She Spec.pdfSubmit the following returnable documents with your tender: Signed OH&S Policy (aligned with Section 8 of the OHS Act). Signed Covid-19 policy (by most senior person). Signed SHEQ policy (by CE or appointed assistant, per OHS Act Section 16(2)). Valid Letter of Good Standing (LoG) from the Compensation Commissioner. Section 37(2) agreement between Eskom and the main contractor, and between the main contractor and all appointed contractors. Organisational organogram on company letterhead, signed by the company's 16(1) or 16(2) appointee. Detailed OHS plan meeting Eskom’s minimum requirements. Covid-19 risk assessment and detailed prevention plan. Itemised OHS costing breakdown. All required statutory and non-statutory appointment documents.
Evaluation Criteria
Source: She Spec.pdfGeneral: Must be a registered legal entity in South Africa. Must have a valid tax clearance certificate. Must demonstrate financial stability and capacity to fulfill the 4-year contract. Must have no record of serious OHS violations or legal non-compliance. Technical: Minimum 3–5 years of experience in compressor maintenance for power stations or industrial facilities. Certified technicians/artisans with expertise in Cameron Centrifugal, CompAir Rotary Screw, Ingersoll-Rand, and BAOFN compressors. Proven track record of maintaining high availability and reliability of compressor systems. Ability to provide references from similar projects (preferably in the energy sector). OHS and Compliance: Valid OHS management system (ISO 45001 certification advantageous). Valid COID registration and LoG. Compliance with all South African labor laws, including prohibition of child labor. Documented SHEQ policy and COVID-19 compliance plan.
Technical Specifications
Source: She Spec.pdfScope: 4-year maintenance of compressor plant at Arnot Power Station. Includes: TA 2000 Cameron Centrifugal compressors and auxiliaries. CompAir L-Series Rotary Screw Compressors and auxiliaries. Ingersoll-Rand ML110 Turbine Forced Cooling Compressor. BAOFN RS7.5VSDFF full feature rotary screw compressors. Diesel compressors and auxiliaries. All equipment up to receiver inlets. Work includes: Daily inspections, minor/interim/major routine services, repairs, frontline maintenance, overhauls. Procurement, installation, and commissioning of compressors, driers, cooling towers, control, and condition monitoring systems when required. Requirements: Permanent qualified artisan/technician on-site for daily maintenance, fault finding, and breakdown response (after hours, weekends, public holidays). Specialised technicians for servicing, maintenance, and overhauls as needed. Compile a service and maintenance schedule. Take reasonable care to protect Compressed Air Plant and all on-site items. Auxiliaries include pipework, valves, gauges, control panels, solenoids, measuring devices, vessels, cooling towers, dryers, filters, fans, ducting, and condensate drains.
Financial Requirements
Source: She Spec.pdfItemised OHS costing required, based on project scope and associated risk. Must include: PPE, OHS training, OHS professionals, first aid equipment, ablution facilities, safety signs, safety campaigns, OHS equipment/instruments, medical examinations. Covid-19 costs: Non-profit; Eskom reserves right to accept/decline listed PPE. Applicable only for pandemic duration; costs cease once pandemic is declared over. Breakdown must reflect funds allocated for OHS at project commencement.
Compliance Requirements
Source: She Spec.pdfLegal: Compliance with Constitution of South Africa (Section 24), OHS Act 1993 and Regulations, National Environmental Management Act 1998, Environment Conservation Act 1989, National Water Act 1998, Civil and Building Work Act, National Road Traffic Act, COID Act, and relevant SANS Standards. OHS: Develop OHS plan meeting Eskom’s minimum requirements and all applicable legislation. Submit signed OH&S Policy (Section 8 of OHS Act). Submit signed Covid-19 policy. Submit SHEQ policy signed by CE or appointed assistant (OHS Act Section 16(2)). Valid LoG from Compensation Commissioner (must remain valid for contract duration). Section 37(2) agreement between Eskom/main contractor and all appointed contractors. Statutory and non-statutory appointments per OHS Act and Eskom requirements. Mandatory adherence to Eskom’s Life-Saving Rules (zero tolerance). Substance abuse program aligned with Eskom’s 32-37 procedure (0% alcohol/drug tolerance). Prohibition of child labor.
Contact Information
Source: Tenderer - SDLI Strategy The provision of compressor maintenance at Arnot power station for a period of 4 years.docxBuyer: Constance Ndhlovu (Arnot Power Station).
Evaluation Criteria
Source: Tenderer - SDLI Strategy The provision of compressor maintenance at Arnot power station for a period of 4 years.docxScoring: 90/10 or 80/20 system. Maximum 10/20 points for specific goals (added to price score). Contract awarded to highest total points. B-BBEE points table: Level 1 (10/20), Level 2 (9/18), Level 3 (6/14), Level 4 (5/12), Level 5 (4/8), Level 6 (3/6), Level 7 (2/4), Level 8 (1/2), Non-compliant (0/0). SDL&I objectives (jobs, skills development, local content, subcontracting) are contractual obligations but do not form part of scoring. Failure to submit B-BBEE documentation for preference points: scores 0/10 for specific goals and only price (out of 90) is considered.
Technical Specifications
Source: Tenderer - SDLI Strategy The provision of compressor maintenance at Arnot power station for a period of 4 years.docxScope: Provision of compressor maintenance at Arnot Power Station for 4 years. SDL&I contractual obligations (not scored):
Financial Requirements
Source: Tenderer - SDLI Strategy The provision of compressor maintenance at Arnot power station for a period of 4 years.docxPenalties and Performance Security:
Reporting:
Compliance Requirements
Source: Tenderer - SDLI Strategy The provision of compressor maintenance at Arnot power station for a period of 4 years.docxB-BBEE Compliance:
B-BBEE Improvement/Retention Plan:
National Industrial Participation Programme (NIPP):
Evaluation Criteria
Source: C2 TSC3 Pricing Data Option A.docScoring focuses on the following key areas:
Technical Specifications
Source: C2 TSC3 Pricing Data Option A.docScope: 4-year compressor maintenance contract at Arnot Power Station under TSC3 Option A framework.
Key deliverables:
Standards and requirements:
Service breakdown:
Capacity requirements:
Service levels:
Financial Requirements
Source: C2 TSC3 Pricing Data Option A.docPricing format: TSC3 Option A contract with a structured Price List.
Price List structure:
Pricing rules:
Payment terms:
Financial capacity:
Bonds/guarantees: Not explicitly stated; assume standard Eskom requirements (e.g., performance bond) may apply.
Contact Information
Source: C1 1 TSC3 Offer Acceptance Maintenance of Compressor Plant.docEmployer’s agent details are in the Contract Data. Contact the agent within two weeks of receiving the signed agreement to arrange delivery of securities, bonds, guarantees, proof of insurance, and other required documentation.
Submission Guidelines
Source: C1 1 TSC3 Offer Acceptance Maintenance of Compressor Plant.docSubmit a signed Form of Offer and Acceptance (C1.1 TSC3) including the Schedule of Deviations (if applicable). Return one copy to the Employer before the end of the validity period stated in the Tender Data. Alternative tenders require a separate Form of Offer and Acceptance. Covering letters are excluded from the final contract document.
Evaluation Criteria
Source: C1 1 TSC3 Offer Acceptance Maintenance of Compressor Plant.docTenderer must: be duly authorized to sign the offer; have a valid CIDB registration number; examine and accept the Conditions of Tender and Contract Data. Evaluation also considers: ability to enter into a legally binding agreement with Eskom; compliance with South African legal and regulatory requirements.
Technical Specifications
Source: C1 1 TSC3 Offer Acceptance Maintenance of Compressor Plant.docScope: Maintenance of Compressor Plant at Arnot Power Station for 4 years. Contract terms are in Part C1 (Agreements and Contract Data), Part C2 (Pricing Data), and Part C3 (Scope of Work: Service Information), including referenced drawings/documents. Deviations from tender documents must be listed in the Schedule of Deviations and are limited to those permitted by the Conditions of Tender.
Financial Requirements
Source: C1 1 TSC3 Offer Acceptance Maintenance of Compressor Plant.docSubmit pricing as per Part C2 (Pricing Data). The offered total price is exclusive of VAT and required for budgeting only. Actual payments will follow contract conditions. Securities, bonds, guarantees, and payment terms are detailed in the Contract Data.
Compliance Requirements
Source: C1 1 TSC3 Offer Acceptance Maintenance of Compressor Plant.docMandatory: Valid CIDB registration number. Must comply with all contract terms, including Conditions of Tender. Proof of insurance and other documentation may be required as per Contract Data.
Contact Information
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.docSubmit completed PAYE Questionnaire and signed affidavits to your Eskom contractor representative. Copy Group Tax via email: [email protected]. For tax-related queries, contact the Eskom Group Tax Department in Megawatt Park.
Evaluation Criteria
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.docEvaluation is based on tax classification via a PAYE Questionnaire. Key points:
Technical Specifications
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.docScope: Provision of compressor maintenance at Arnot Power Station for a 4-year period. No additional technical specifications, deliverables, or service levels are provided in the document.
Compliance Requirements
Source: Supplier Evaluation Pack Template for 01 March 2025 to 28 February 2026.docTax Compliance:
Evaluation Criteria
Source: C0 TSC3 Contract cover pages Maintenance of Compressor Plant.docEvaluation based on: Legal status (valid South African registration required). Experience (proven track record in compressor maintenance, preferably in power generation or heavy industry; Eskom experience advantageous). Financial stability (capacity to sustain 4-year operations; may require financial statements or bank guarantees). Technical competence (certification for industrial compressor maintenance; compliance with ISO, OHSA, and relevant standards). B-BBEE compliance (prioritized by Eskom).
Technical Specifications
Source: C0 TSC3 Contract cover pages Maintenance of Compressor Plant.docContract type: NEC3 Term Service Contract (TSC3). Scope: Maintenance of Compressor Plant at Arnot Power Station. Duration: 4 years. Contracting parties: Eskom Holdings SOC Ltd (Reg No. 2002/015527/30) and the awarded service provider.
Evaluation Criteria
Source: 240-68099512 Form A_Cat 1_ Rev 9.docxGeneral: Must be a registered supplier capable of providing compressor maintenance services. Must demonstrate capacity and capability for the scope of work (Category 1 selection). Quality Standards: Certification or compliance with ISO 9001 is mandatory. Must align with Eskom’s Supplier Quality Requirements (240-105658000). Technical: Experience in compressor maintenance (preferably in power stations or industrial settings). Ability to meet Eskom’s technical and quality audit standards.
Technical Specifications
Source: 240-68099512 Form A_Cat 1_ Rev 9.docxScope: Provision of compressor maintenance at Arnot Power Station for 4 years. Pre-contract award: Category 1 applies (refer to clause 3.5.2 of specification 240-105658000). Post-contract award: Contract execution and supplier quality performance monitoring phases are mandatory. Quality requirements: Must comply with Eskom Supplier Quality Requirements (240-105658000) and ISO 9001 Standard. Standard conditions: Eskom retains rights of access, information, preservation, quality audits, and management of nonconformities. Special processes (clause 3.8.6) apply. ISO 9001 clauses: All clauses (4-10) and principles (1-7) are applicable, including context of the organisation, leadership, planning, support, operation, performance evaluation, and improvement. Submission requirement: Tenderer must complete and sign the form to acknowledge acceptance of the above.
Compliance Requirements
Source: 240-68099512 Form A_Cat 1_ Rev 9.docxQuality compliance: Must adhere to Eskom Supplier Quality Requirements (specification 240-105658000) and ISO 9001 Standard. Documentation: Signed acknowledgment form required from tenderer’s quality representative.
Contact Information
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docxEskom Holdings SOC Ltd: Physical address - Megawatt Park, Maxwell Drive, Sunninghill Ext. 3, Sandton, Republic of South Africa. Postal address - P.O. Box 1091, Johannesburg, 2000, South Africa. Telephone - +27 (number not specified). Contact person - Not specified. Supplier/Tenderer must insert their own details.
Evaluation Criteria
Source: Non-Disclosure Agreement (NDA) Vendors Template - 02 September 2024.docxGeneral: Must be a legally registered company with a valid registration number and country of incorporation. Must have the authority to enter into binding agreements. Confidentiality Compliance: Must demonstrate the ability to safeguard Confidential Information as per the Agreement. Must not have conflicts of interest or existing obligations that would prevent compliance with the Agreement. Technical: Proof of technical capability in compressor maintenance (e.g., experience, certifications, or references) is likely required, though not explicitly stated in the Confidentiality Agreement.
Contact Information
Source: C3 1 TSC3 Employers Service Information.docService Manager: Primary contact for scheduling, approvals, and reporting. FSS Contact Centre for invoice queries: Tel 011 800 5060, Email [email protected]. Arnot Emergency Response Team and Safety Risk Management: Tel 013 297 9222 (Internal Pax 5222), Local Control Officer: Tel 013 297 9035 (Internal Pax 5035).
Submission Guidelines
Source: C3 1 TSC3 Employers Service Information.docSubmit tax invoices to: Finance Department (Accounts Payable Section), Arnot Power Station, P/Bag X2, Rietkuil, 1097. Each invoice must include: Contractor and Service Manager names/addresses, contract number/title, VAT numbers (Contractor and Eskom: 4740101508), service descriptions per Price List, amounts (excl. VAT, VAT, and incl. VAT). Email invoices in PDF format (one invoice per file) to [email protected]. Eskom order number and line number must be clearly indicated. For Cost Price Adjustment (CPA), issue separate invoices. Use NEC document formats for contractual communications (e.g., early warning, compensation event notifications). Submit Contractor’s plan at contract inception, including: service schedule (based on running hours/defects), spares/consumables management, and Quality Control Plan (QCP) with hold/witness/verification points for each service. All contractual communications must be in properly compiled letters/forms attached to emails, not as email messages.
Evaluation Criteria
Source: C3 1 TSC3 Employers Service Information.docGeneral: Must be a registered entity with valid VAT registration. Compliance with South African labor laws and Eskom’s contractor policies. Proof of financial stability and capacity to fulfill the contract. Technical: Minimum 5-10 years’ experience in maintenance of Centrifugal, Rotary Screw, and Diesel Rotary Screw Compressors. Certified technicians for TA2000 Cameron Centrifugal (Ingersoll Rand, Vignate, Italy) and CompAir L-Series Rotary Screw Compressors. Access to OEM spares, specifications, maintenance/commissioning procedures, and specialized tools/equipment. B-BBEE: Compliance with Broad-Based Black Economic Empowerment (B-BBEE) requirements. Preference for subcontracting to B-BBEE, Black Women-Owned (BWO), Small/Medium/Micro Enterprises (SMMEs), and Black Empowered Entities (BEE). Safety: Compliance with Occupational Health and Safety Act (OHSA) 85 of 1993. Provision of Personal Protective Equipment (PPE) and adherence to Eskom’s SHE (Safety, Health, and Environment) policies. All employees must undergo medical examinations and Eskom’s SHE induction. Performance: Penalties apply for system pressure below 590 kPa, compressor availability <92%, or non-compliance with scheduled maintenance (3/6/12-monthly).
Technical Specifications
Source: C3 1 TSC3 Employers Service Information.docScope: 4-year all-inclusive maintenance of compressor plant at Arnot Power Station. Equipment: TA2000 Cameron Centrifugal compressors, CompAir L-Series Rotary Screw Compressors, Ingersoll-Rand ML110 Turbine Forced Cooling Compressor, BAOFN RS7.5VSDFF compressors, Diesel compressors, and all auxiliaries (pipework, valves, gauges, control panels, dryers, filters, cooling towers, heatless absorption desiccant dryers, bag-filter house forced draught cooling fans, air ducts, intake filters, condensate drains). Services: Daily inspections, frontline maintenance, fault finding, minor/interim/major routine services, repairs, overhauls, procurement/installation/commissioning of new compressors/driers/cooling towers/control systems, and spares management. Staffing: Permanent on-site qualified artisan/technician (24/7 standby within 55km radius of Arnot Power Station). Specialized technicians for servicing/overhauls. Contract Manager (5-10 years’ experience on Centrifugal, Rotary Screw, Diesel Rotary Screw Compressors). Service Technicians (certified for TA2000 Cameron Centrifugal and CompAir L-Series Rotary Screw Compressors). Performance: Maintain 590 kPa system pressure (penalties for <590 kPa). 92% compressor availability, 5% planned maintenance, 3% breakdowns. Mobile compressors must be supplied at Contractor’s cost during outages to maintain system pressure. Spares: Bi-annual audits, OEM-specified parts, critical spares list, stock levels maintained at Arnot Power Station South Contractor’s Yard and Contractor’s Warehouse. Maintenance Schedules: Detailed routines for each compressor type (3-monthly, 6-monthly, 12-monthly services, overhauls, filter changes, V-belt replacements). Quality: ISO 9001:2008 compliance, QCP for each service, periodic audits, data package for each work section. Safety: OHSA compliance, PPE, MSDS for chemicals, 24/7 safety liaison, incident reporting, permit-to-work system, job observations, safety training. Environmental: Implement and maintain Environmental Management System (EMS), comply with Arnot Power Station policies (storm water separation, contaminated soil removal, waste management, spill clean-up, noise/pollution control).
Financial Requirements
Source: C3 1 TSC3 Employers Service Information.docInvoicing: Submit tax invoices within 2 working days of receiving Eskom’s payment certificate. Include Eskom order number and line number. Electronic invoices must be in PDF format (one invoice per file). Separate invoices recommended for Cost Price Adjustment (CPA). Payment terms: As per Eskom SAP system (goods receipt required for payment processing). Contractor responsible for all costs including: spares, consumables, labor, travel, accommodation, mobile compressors during outages, tools, equipment, PPE, arc protection clothing, transport, office setup, testing apparatus, and storage. Payment queries: Contact FSS Contact Centre (Tel 011 800 5060, Email [email protected]).
Compliance Requirements
Source: C3 1 TSC3 Employers Service Information.docB-BBEE: Contractor must comply with Broad-Based Black Economic Empowerment requirements. ASGI-SA: Contractor must fulfill Accelerated Shared Growth Initiative - South Africa obligations as per compliance schedule and provide reports on delivery. Subcontracting: Submit detailed list of subcontractors (including labor hire and closed corporations) for approval. New subcontractors require prior approval. Prioritize B-BBEE/BWO/SMME/BEE entities. Local labor preferred; no hiring at Arnot Power Station entrances. Quality: ISO 9001:2008 certified quality management system, Contract Quality Management, periodic audits, stop orders for non-compliance. Safety: OHSA compliance, SHEQ Requirements, Eskom safety policies, PPE, MSDS for hazardous chemicals (must comply with GGSS1181), periodic audits, stop orders for unsafe work, incident reporting, 24/7 safety liaison, medical examinations, SHE induction. Environmental: Implement and maintain EMS, comply with Arnot Power Station environmental policies (storm water, contaminated soil, waste management, spill clean-up). Statutory: Statutory inspections/testing/repairs of receivers per pressure vessel regulations. Documentation: All maintenance records, data, and planning system information handed over to Service Manager at contract end.
Important Dates
Source: C1 2a TSC3 Data by Employer Maintenance of Compressor Plant.docContact Information
Source: C1 2a TSC3 Data by Employer Maintenance of Compressor Plant.docSubmission Guidelines
Source: C1 2a TSC3 Data by Employer Maintenance of Compressor Plant.docEvaluation Criteria
Source: C1 2a TSC3 Data by Employer Maintenance of Compressor Plant.docMandatory criteria:
Preferential criteria:
Technical Specifications
Source: C1 2a TSC3 Data by Employer Maintenance of Compressor Plant.docFinancial Requirements
Source: C1 2a TSC3 Data by Employer Maintenance of Compressor Plant.docCompliance Requirements
Source: C1 2a TSC3 Data by Employer Maintenance of Compressor Plant.docEvaluation Criteria
Source: BEE_Affidavit-QSE-Gen.pdfB-BBEE Status: Must be a Qualifying Small Enterprise (QSE) under the B-BBEE Act. Must declare ownership percentages for Black, Black Female, and Black Designated Groups. Revenue Threshold: Annual total revenue must be between R10,000,000 and R50,000,000, based on audited or latest financial statements. Business Type: Open to all entity types (CC, (Pty) Ltd, Sole Proprietor, etc.). Geographic Scope: Service delivery at Arnot Power Station, North West province. Compliance: Must adhere to B-BBEE Codes of Good Practice and submit a valid, sworn affidavit.
Financial Requirements
Source: BEE_Affidavit-QSE-Gen.pdfPricing Format: Not specified in the document. Financial Capacity: Annual total revenue must be between R10,000,000 and R50,000,000, verified by audited or latest financial statements. Bonds/Guarantees: Not specified in the document. Payment Terms: Not specified in the document.
Compliance Requirements
Source: BEE_Affidavit-QSE-Gen.pdfB-BBEE Compliance: A sworn B-BBEE affidavit for a Qualifying Small Enterprise (QSE) is mandatory. The affidavit must be completed by an authorised Member/Director/Owner. Must declare: Percentage of Black Ownership, Black Female Ownership, and Black Designated Group Ownership using the flow-through principle. Breakdown of Black Designated Group ownership percentages for: Black Youth, Black Disabled, Black Unemployed, Black People living in Rural areas, and Black Military Veterans. Must confirm B-BBEE level contributor: Level One (135% recognition) for 100% Black Owned, or Level Two (125% recognition) for at least 51% Black Owned. Affidavit Validity: Valid for 12 months from the date signed by the commissioner. Other Compliance: Must adhere to B-BBEE Codes of Good Practice.
Important Dates
Source: Eskom_Standard_Conditions_of_Tender_(May_2022) new.pdfContact Information
Source: Eskom_Standard_Conditions_of_Tender_(May_2022) new.pdfSubmission Guidelines
Source: Eskom_Standard_Conditions_of_Tender_(May_2022) new.pdfEvaluation Criteria
Source: Eskom_Standard_Conditions_of_Tender_(May_2022) new.pdfTechnical Specifications
Source: Eskom_Standard_Conditions_of_Tender_(May_2022) new.pdfFinancial Requirements
Source: Eskom_Standard_Conditions_of_Tender_(May_2022) new.pdfCompliance Requirements
Source: Eskom_Standard_Conditions_of_Tender_(May_2022) new.pdfImportant Dates
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 27 - 30 October 2025 Conny.pdfTender closing date: 05 June 2026 at 10h00. Deadline for clarification queries: 5 working days before tender submission closing date. Tender validity period: 120 days from the closing date.
Contact Information
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 27 - 30 October 2025 Conny.pdfEskom Representative for queries and clarifications: Constance Ndhlovu. Email: [email protected]. Telephone: +7 13 297 9684. All queries must be in writing and addressed only to the Eskom Representative. Fraud/corruption reporting: 0800 11 2722 or [email protected] (anonymous).
Submission Guidelines
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 27 - 30 October 2025 Conny.pdfSubmit electronically via Eskom E-tendering site only. No hard copies accepted. Closing date: 05 June 2026 at 10h00. Late submissions will not be accepted. Upload all documents in PDF format. The price schedule must also be submitted in Excel format. Maximum upload size is 500 MB per document, with a total submission limit of 4 GB. No zip/compressed files allowed. Ensure the submission status is marked as 'complete'. The latest resubmitted version will be accepted, voiding previous submissions. Mandatory returnables required at closing (disqualifiable if incomplete/missing): Authorisation Form (Annexure A), Acknowledgement Form (Annexure B), Tenderer’s Particulars (Annexure C), Integrity Declaration Form (Annexure D), CPA for local/imported goods (Annexure E/F if applicable), SBD 6.2 for local content (Annexure G1-G4), SBD 1 (Annexure H), SBD 4 (Annexure J), and SBD 6.1 Preference Points Claim Form (Annexure I). Failure to upload required documents by the deadline will render the tender non-responsive.
Evaluation Criteria
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 27 - 30 October 2025 Conny.pdfEvaluation stages: Basic compliance (Stage 1), Technical (Stage 2), Financial (Stage 3), PPPFA scoring (90/10 system, Stage 4), Contractual requirements (Stage 5). Functionality criteria (80% threshold to pass): Method Statements (20%), Company Experience (20%), Contract Manager (10%), Engineer (10%), Artisan Fitter and Diesel Mechanic (10%), Multi-Brand Maintenance Capability (10%), C&I Technician and Electrician (10%), Quality Control Process (10%). Price evaluation: Scored out of 90 points, inclusive of VAT, corrected for errors, adjusted for deviations, and compared via Net Present Value. Specific Goals: Scored out of 10 points per PPPFA. B-BBEE points allocation: Level 1 (10), Level 2 (9), Level 3 (6), Level 4 (5), Level 5 (4), Level 6 (3), Level 7 (2), Level 8 (1), Non-compliant (0). Disqualification risks: Not meeting eligibility criteria, missing mandatory returnables, failing functionality threshold, or submitting multiple bids (individually or via JV/consortium).
Technical Specifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 27 - 30 October 2025 Conny.pdfScope: Provision of compressor maintenance at Arnot Power Station for 4 years. Contract form: NEC 3 Term Services Contract with Main Option A (Priced contract with price list) and secondary options (W1, X1, X2, X18, X19, X20, Z). Mandatory technical deliverables: Method statements for preventive, predictive, and breakdown maintenance of screw/centrifugal compressors, airends, dryers, filters, cooling systems, and diesel engines. Required personnel: Contract Manager, Engineer, Artisan Fitter, Diesel Mechanic, C&I Technician, Electrician, and multi-brand maintenance capability. Quality requirements: ISO 9001 QMS (certified or documented compliance), Quality Policy, Quality Objectives, control procedures, internal audit reports, management review records, draft Contract Quality Plan, and Quality Control Plan/ITP. Safety and environmental: Compliance with OHS Act and Eskom rules; submit Environmental Policy, Environmental Management Plan, Waste Management Plan, and Environmental Impact and Aspect Register. Subcontracting: Minimum 10% of contract value must be subcontracted to EME/QSEs 51% black-owned in rural/underdeveloped areas/townships. Subcontracting agreements or letters of intent are required.
Financial Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 27 - 30 October 2025 Conny.pdfPricing format: Submit price schedule in PDF and Excel format. Payment terms: 30 days for contracts ≤ R50M (incl. VAT), 60 days for contracts > R50M (incl. VAT). Financial capacity: Latest approved annual financial statements (not drafts) for the tendering company, including director’s report, auditor’s report, financial position, comprehensive income, changes in equity, cash flows, and notes. For unincorporated JVs/SPVs, each partner must submit statements. Additional requirements: Signed public interest score (for non-audited SA entities) and ITA34C copies for current/previous years (if applicable). No performance security required.
Compliance Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) Template Rev. 27 - 30 October 2025 Conny.pdfCSD registration: Proof of valid CSD registration is mandatory for contract award. B-BBEE: Valid certificate from SANAS-accredited agency, sworn affidavit (no electronic signatures), or CIPS affidavit. Provide proof of ownership/shareholding (CIPC documentation) and certified ID copies of shareholders. For trusts/consortia/JVs, submit a consolidated B-BBEE certificate. Tax compliance: Tax clearance certificate or SARS e-filing PIN for verification. Foreign tenderers with a South African footprint must provide tax clearance; those without footprint complete SBD1 only. Local content: Complete SBD 6.2 and annexures (G1-G4) for local production and content declaration if designated materials are included. Safety: COIDA certificate of good standing or proof of application (South African tenderers only). Employment Equity: Proof of compliance with Employment Equity Act and submission of report to Department of Labour (South African designated employers only). Integrity: Complete and submit Integrity Declaration Form (Annexure D) and acknowledge Supplier Integrity Pact. Subcontracting: Commitments form part of contractual obligations.
Evaluation Criteria
Source: BEE_Affidavit-EME-Gen.pdfCompliance Requirements
Source: BEE_Affidavit-EME-Gen.pdfSubmission Guidelines
Source: TEC.pdfRequired returnable documents for submission:
Evaluation Criteria
Source: TEC.pdfEvaluation consists of two stages: mandatory and qualitative.
Mandatory criteria (must all be met to proceed):
Qualitative criteria (minimum 80% weighted score required):
Scoring scale for qualitative criteria:
Technical Specifications
Source: TEC.pdfScope: Maintenance and supply of spares for the compressor plant at Arnot Power Station for a 4-year period.
Equipment covered:
Deliverables:
Compliance Requirements
Source: TEC.pdfMandatory compliance documents:
Additional notes:
Submission Guidelines
Source: Declaration of Shareholding and Directorship.pdfSubmit a completed Declaration of Shareholding and Directorship form. Requirements: Disclose all shareholders/beneficiaries in your company, including their names, company/trust registration numbers, and share percentages. If any shareholder or beneficiary is an Eskom employee or a close family member of an Eskom employee, provide details of their position/relationship and their interest in your organisation. The form must be signed, dated, and include the designation of the authorised representative. Ensure all returnable documents (e.g., T2.2 Tender Schedules) are included.
Evaluation Criteria
Source: Declaration of Shareholding and Directorship.pdfEvaluation focuses on transparency and compliance. Key points: Full disclosure of shareholding structure and any potential conflicts of interest with Eskom is mandatory. Compliance with Eskom’s procurement policies, including ethical and transparency standards, is required. Bid must be submitted by an authorised representative of the company. All required returnable documents (e.g., T2.2) must be completed and submitted accurately.
Compliance Requirements
Source: Declaration of Shareholding and Directorship.pdfDeclare all shareholders/beneficiaries in your company, including their names, registration numbers, and share percentages. Disclose if any shareholder or beneficiary is an Eskom employee or a close family member (defined as related by birth, marriage, domestic partnership, adoption, or guardianship) of an Eskom employee. Provide details of their position/relationship and interest in your organisation. The declaration must be signed and dated by an authorised representative.
Evaluation Criteria
Source: Scope of work.pdfMandatory requirements:
Preferred requirements:
Technical Specifications
Source: Scope of work.pdfScope: Comprehensive 4-year maintenance of the entire compressor plant at Arnot Power Station, including Control and Station Air Systems for Units 1–6.
Maintenance activities:
Equipment covered:
Performance targets:
Staffing and qualifications:
Operational requirements:
Boundaries:
Training and technology transfer:
Financial Requirements
Source: Scope of work.pdfInvoicing:
Payment terms:
Cost responsibilities:
Evaluation Criteria
Source: Risk identification.pdfEligibility and evaluation focus on health, safety, and environmental (HSE) competency. Bidders must demonstrate: - Proven experience in maintaining industrial equipment in high-risk environments (e.g., power generation, heavy industry). - Qualified personnel for working at heights, in confined spaces, with electricity, and handling hazardous chemicals. - A track record of implementing Hazard Identification and Risk Assessment (HIRA) and safe work systems. - Competent lifting machinery operators. - Ability to manage contractor/vendor interfaces and coordinate with third parties.
Technical Specifications
Source: Risk identification.pdfScope: Compressor maintenance at Arnot Power Station (4-year contract). Working environment includes high-risk hazards. Bidders must address and mitigate: - Access/egress delays (e.g., traffic at main gate). - Falls from heights, ladders, scaffolds. - Slips, trips, confined spaces. - Electrical shock, fire, explosive atmospheres, vibration. - Lifting operations, vehicle incidents, manual handling. - Machinery/tool contact, hot processes, hazardous substances (chemicals, dust, fumes). - Environmental risks (open waters, radiation, temperature extremes, noise). - Lone working, non-adherence to procedures, poor ergonomics, excavation. - Third-party interfaces (collision risks, unknown personnel). - Inclement weather, vehicle/pedestrian safety, system design flaws, mismanaged change.
Compliance Requirements
Source: Risk identification.pdfNo explicit compliance mandates (e.g., CSD, tax, B-BBEE, CIDB, CIPC) are stated. However, the high-risk environment implies strict adherence to: - Occupational health and safety (OHS) regulations. - Industry-specific safety certifications for hazardous work (e.g., confined spaces, electrical, heights). - Hazardous substance handling protocols. - Lifting machinery operator certification.
Submission Guidelines
Source: Eskom Acknowlegement form for OHS legal requirement.pdfSubmit a signed Acknowledgement Form (Annexure B) to confirm understanding of OHS requirements. Requirements: completed by an authorised person (CEO/Director/Managing Director), include company name, signature, date, and witness details. Non-submission or incomplete forms may lead to disqualification.
Evaluation Criteria
Source: Eskom Acknowlegement form for OHS legal requirement.pdfEvaluation focuses on: acknowledgment and understanding of all OHS requirements; ability to align company processes with Eskom’s OHS policies, procedures, and standards; provision of references/testimonials for similar past work if requested; and signed acknowledgment form by an authorised person (CEO/Director/MD).
Technical Specifications
Source: Eskom Acknowlegement form for OHS legal requirement.pdfMain contractor/supplier must: demonstrate process and selection criteria for appointing subcontractors/suppliers; notify Eskom prior to appointing subcontractors/suppliers; ensure subcontractors/suppliers have adequate resources and competencies; manage subcontractors/suppliers to comply with Eskom and legal OHS requirements; monitor subcontractors/suppliers via audits/assessments for OHS compliance; provide grounds for termination of subcontractor/supplier work; handle all non-conformances of subcontractors/suppliers directly. Eskom reserves the right to verify compliance and request testimonials/references for similar past work.
Compliance Requirements
Source: Eskom Acknowlegement form for OHS legal requirement.pdfMandatory compliance with: Eskom Contractor Health and Safety Requirements Standard 32-136; OHS specifications/requirements provided by Eskom; Occupational Health and Safety Act; Compensation for Occupational Diseases and Illnesses Act. Post-award, align company processes with Eskom’s OHS policies, procedures, and standards. Ensure all employees (including contractors/suppliers) undergo Eskom induction. Penalties apply for non-conformance with Eskom or statutory OHS requirements. Eskom may request copies of testimonials/references and client contact details for verification of past similar work.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Arnot Power Station - Arnot Power Station - Mpumalanga - 1087
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
20
Last checked
12 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: General. Unlock full pricing strategies, bid frequency, and historical win rates.