Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Proposal
Delivery Location
66 Settlers way - East London - East London - 5201
Organization Type
GOVERNMENT
Published
29 May 2026
OCDS Reference
ocds-9t57fa-157674
This tender invites proposals for the modification and upgrade of HVAC systems at king phalo airport control centre over a 14-month period. IT is targeted at suppliers with proven expertise in large-scale HVAC projects, particularly in airport or commercial environments, and requires compliance with strict technical and legal standards.
Continue with tenders sharing this issuer, category, or province.
Return to this tenderβs issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Monday, 29 June 2026 - 12:00
Venue
King Phalo Airport
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
For any enquiries please contact zamo dlamini on [email protected]
Categories
Request for Proposal
66 Settlers way - East London - East London - 5201
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: East London Airport HVAC - NEC Contract ELA7943.pdf, 2413-M-HVAC-CR-01 - CAR RENTAL HVAC LAYOUT.pdf, 2413-M-HVAC-TB-03 - TERMINAL BUILDING ROOF HVAC LAYOUT.pdf and 7 more. You donβt need to refresh β this page will pick up the updated review automatically.
29 May
2026
Tender Published
Tender was published
29 Jun
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
East London Airport HVAC - NEC Contract ELA7943.pdf
The tender is a Request for Proposal (RFP) issued by the Airports Company of South Africa (ACSA) for the modification and upgrade of HVAC systems at King Phalo (East London) Airport. The project duration is 14 months, with a completion deadline of 6 months from the start date. The contract follows the NEC3 Engineering and Construction Contract (ECC) with Main Option B (Priced Contract with Bill of Quantities) and includes dispute resolution, performance bonds, retention, and liability limitations. The total contract value must be specified in the tender submission, inclusive of VAT. The project emphasizes compliance with occupational health and safety (OHS), environmental regulations, and BBBEE requirements. The tender closes on June 29, 2026, at 12:00 UTC.
2413-M-HVAC-FS-02 - FIRE STATION FIRST FLOOR HVAC LAYOUT.pdf
The tender is a Request for Proposal (RFP) issued by the Airports Company of South Africa (ACSA) for the modification and upgrade of HVAC systems at King Phalo Airport in the Eastern Cape. The project duration is 14 months, with a closing date for submissions on June 29, 2026. The scope includes HVAC modifications, piping, insulation, fire barriers, and compliance with national standards (e.g., SABS). The work involves stainless steel piping, structural supports, and adherence to engineering drawings and specifications.
2413-M-HVAC-CC-01 - CONTROL CENTRE HVAC LAYOUT.pdf
The tender is a Request for Proposal (RFP) issued by the Airports Company of South Africa (ACSA) for the modification and upgrade of HVAC systems at King Phalo Airport in the Eastern Cape. The project duration is 14 months, with a closing date for submissions on June 29, 2026. The scope includes HVAC modifications, piping, insulation, structural supports, and compliance with national standards (e.g., SABS, BS). The work involves chilled water systems, VRF units, ducting, and refrigeration piping, with detailed technical specifications provided in drawings and documents.
2413-M-HVAC-CR-01 - CAR RENTAL HVAC LAYOUT.pdf
The tender is a Request for Proposal (RFP) for HVAC modification and upgrade works at King Phalo Airport in the Eastern Cape, South Africa. The project duration is 14 months, and the scope includes piping, insulation, structural steelwork, fire barriers, and compliance with national standards (e.g., SABS). The work involves chilled water systems, refrigerant piping, ducting, and equipment like VRF units, cassettes, and grilles. The closing date for submissions is June 29, 2026.
2413-M-HVAC-RH-01 - RAMP HANDLERS HVAC LAYOUT.pdf
The tender is a Request for Proposal (RFP) for HVAC modification and upgrade works at King Phalo Airport in the Eastern Cape, South Africa. The project duration is 14 months, with a closing date of June 29, 2026. The scope includes piping, insulation, structural supports, fire barriers, and compliance with national standards (e.g., SABS). The document details technical specifications for HVAC systems, including VRF units, ducting, piping materials (e.g., stainless steel, galvanized steel), insulation thickness (e.g., 25mm, 0.6mm), and fire safety requirements. Drawings, shop approvals, and coordination with engineers are mandatory. The project involves chilled water systems, condensate drainage, and adherence to safety and health regulations.
2413-M-HVAC-TB-03 - TERMINAL BUILDING ROOF HVAC LAYOUT.pdf
The tender is a Request for Proposal (RFP) issued by the Airports Company of South Africa (ACSA) for HVAC modification and upgrade works at King Phalo Airport in the Eastern Cape. The project duration is 14 months, with a closing date for submissions on June 29, 2026. The scope includes HVAC piping, insulation, structural supports, fire barriers, and compliance with national standards (e.g., SABS, BS). The work involves stainless steel piping, welding, insulation (e.g., polystyrene, vapor barriers), and coordination with existing building infrastructure.
2413-M-HVAC-TB-01 - TERMINAL BUILDING GROUND FLOOR HVAC LAYOUT.pdf
The tender is a Request for Proposal (RFP) issued by the Airports Company of South Africa for the HVAC modification and upgrade at King Phalo Airport in the Eastern Cape. The project duration is 14 months, with a closing date for submissions on June 29, 2026. The scope includes HVAC system upgrades, piping, insulation, fire barriers, structural supports, and compliance with national standards (e.g., SABS). The work must adhere to provided drawings, specifications, and safety regulations, with approvals required for all stages of execution.
CIDB Bid documet RFP.pdf
The Airports Company of South Africa (ACSA) invites tenders for the HVAC modification and upgrade at King Phalo Airport for a 14-month period. The tender (Reference: ELA7943/2025/RFP) closes on 29 June 2026 at 12:00 UTC. The project requires compliance with CIDB contractor grading of 5ME or higher, tax compliance, and mandatory site briefing attendance. Evaluation is based on functionality (80/20 split for price and preference), with a minimum 80/100 threshold for technical criteria.
2413-M-HVAC-FS-01 -FIRE STATION GROUND FLOOR HVAC LAYOUT.pdf
The tender is a Request for Proposal (RFP) issued by the Airports Company of South Africa (ACSA) for the modification and upgrade of HVAC systems at King Phalo Airport in the Eastern Cape. The project duration is 14 months, with a closing date for submissions on June 29, 2026. The scope includes HVAC piping, insulation, structural supports, fire barriers, and compliance with national standards (e.g., SABS, BS). The work must adhere to approved drawings, specifications, and safety regulations, with strict coordination between mechanical, structural, and fireproofing trades.
2413-M-HVAC-TB-02 - TERMINAL BUILDING FIRST FLOO HVAC LAYOUT.pdf
The tender is a Request for Proposal (RFP) issued by the Airports Company of South Africa (ACSA) for the modification and upgrade of HVAC systems at King Phalo Airport in the Eastern Cape. The project duration is 14 months, with a closing date for submissions on June 29, 2026. The scope includes HVAC modifications, piping, insulation, fire safety compliance, and adherence to national standards (e.g., SABS, BS). The work involves chilled water systems, condensate drainage, ducting, and equipment like VRF units, AHUs, and fans, with detailed technical specifications provided in drawings and schedules.
To download these documents and access AI-powered analysis, visit the main tender page.
Win ACSA tenders with AI Matching Engine, airport-infrastructure intelligence, compliance analysis, and application support for aviation operations.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
RΒ 1Β 476Β 851
Range
Based on 5 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Important Dates
Source: East London Airport HVAC - NEC Contract ELA7943.pdfTender closing date: 29 June 2026 at 12:00. Contract start date: upon signature by ACSA. Completion date: 6 months after starting date. Defects date: 12 months after completion. Defects correction period: 2 weeks. Preliminary programme due with tender; revised programmes every 2 weeks.
Contact Information
Source: East London Airport HVAC - NEC Contract ELA7943.pdfProject Manager: Samkelo Luyenge, Email: [email protected], Phone: +27 43 706 0358, Address: East London Airport, 66 Settlers Way, East London, 5201. Supervisor: Carifro Consulting Engineers, Address: 100 Mangold Street, Newton Park, Gqeberha, Eastern Cape, Phone: +27 41 392 9800, Fax: +27 41 392 9880, Email: [email protected]. Employer: Airports Company South Africa SOC Limited, Address: The Maples, River Woods, 24 Johnson Road, Bedfordview, Gauteng, 2008, Phone: +27 43 706 0306, Fax: +27 43 706 0313.
Submission Guidelines
Source: East London Airport HVAC - NEC Contract ELA7943.pdfSubmit the following returnable documents with your tender: Form of Offer and Acceptance (C1.1), Pricing Schedule (C2), Schedule of Deviations (if applicable), Performance Bond (10% of contract value, pro-forma attached), Proof of Insurance (COID Act compliance, Public Liability, Aviation Liability as per ACSA requirements), Baseline Risk Assessment, Occupational Health & Safety Agreement (signed), CVs of Key Personnel, Preliminary Programme. Submission must be in hard copy and electronic format. Late submissions will be disqualified. Ensure all documents are signed by duly authorised representatives.
Evaluation Criteria
Source: East London Airport HVAC - NEC Contract ELA7943.pdfEvaluation is based on compliance, financial, technical, and general criteria. Compliance: Valid B-BBEE Certificate (annual submission required, non-compliance may lead to contract cancellation), adherence to ACSAβs ethical standards (no bribery, corruption, or illegal practices), and confidentiality/IP rights clauses. Financial: Performance bond (10% of contract value from an accepted bank), financial stability to cover liabilities (e.g., delay damages, defects correction), valid insurance (public liability, aviation liability). Technical: Experience in HVAC system upgrades/modifications (preferably in airport environments), priced Bill of Quantities, preliminary programme, competent personnel (CVs required). General: Registered legal entity, capacity to execute within 6 months, compliance with South African laws (OHS Act, COID Act, environmental regulations).
Technical Specifications
Source: East London Airport HVAC - NEC Contract ELA7943.pdfScope: Upgrading and modification of HVAC systems at East London Airport (King Phalo Airport). Contract type: NEC3 Engineering and Construction Contract (ECC) with Main Option B (Priced contract with Bill of Quantities). Key deliverables: HVAC system modifications, compliance with Works Information (Part C3), Site Information (Part C4), and drawings. Risk Register must address: availability of as-built information, site access, site constraints, constructability, availability of equipment/components. Works boundary: East London Airport precinct. Contractor must submit preliminary programme with tender and revised programmes every 2 weeks. Defects correction period: 2 weeks. Employer and others may access works during construction without relieving Contractor of liability.
Financial Requirements
Source: East London Airport HVAC - NEC Contract ELA7943.pdfPricing: Option B (Bill of Quantities) with re-measurement. Complete priced Bill of Quantities must be submitted within 5 working days of request from Project Manager/Supervisor. Payment terms: assessment interval every 4 weeks, payment within 4 weeks of assessment, currency: South African Rand. Interest rate: Nedbank prime lending rate. Performance Bond: 10% of contract value, unconditional, on-demand, valid until end of contract period. Retention: 5% of contract value. Delay damages: 0.05% per day, capped at 10% of contract value. Insurance: Contractor must provide COID Act compliance, Public Liability, and Aviation Liability (R100,000 for landside/OPEX, R300,000 for airside/CAPEX). Proof of insurance required before work starts and annually.
Compliance Requirements
Source: East London Airport HVAC - NEC Contract ELA7943.pdfMandatory: Valid B-BBEE Certificate (annual submission, non-compliance may lead to contract cancellation). Occupational Health & Safety: Compliance with OHS Act and Construction Regulations, signed OHS Agreement (Section 37(2)), baseline risk assessment, appointment of competent persons, COID Act compliance, no alcohol/drugs on site, incident reporting. Insurance: Proof of COID, Public Liability, and Aviation Liability as per ACSA clauses. CIDB registration implied (construction project). Professional registrations: Required for key personnel (CVs to be appended). Ethics: Anti-corruption compliance (Prevention and Combating of Corrupt Activities Act).
Important Dates
Source: 2413-M-HVAC-CR-01 - CAR RENTAL HVAC LAYOUT.pdfCommencement Date: 19 September 2025. Drawing Approval Date: 8 May 2024.
Contact Information
Source: 2413-M-HVAC-CR-01 - CAR RENTAL HVAC LAYOUT.pdfEngineering/Planning Department: Email: [email protected], [email protected]. Phone: 041 (ACSA), 043. Address: 100 Newton Street, Southernwood, Port Elizabeth, Eastern Cape.
Submission Guidelines
Source: 2413-M-HVAC-CR-01 - CAR RENTAL HVAC LAYOUT.pdfSubmit all required drawings, approvals, and specifications as per the tender document. Ensure shop drawings are approved prior to installation. Non-compliance with submission requirements may result in disqualification.
Evaluation Criteria
Source: 2413-M-HVAC-CR-01 - CAR RENTAL HVAC LAYOUT.pdfGeneral: Applicants must be registered and compliant with South African business regulations. Experience in large-scale HVAC projects, preferably in airport or commercial environments. Financial and technical capacity to undertake a 14-month project. Specific: Proven track record in HVAC modifications, piping, and insulation works. Certifications for working with refrigerant systems (e.g., VRF units). Compliance with Occupational Health and Safety (OHS) Act and other relevant legislation. Ability to provide performance guarantees and warranties for materials and workmanship.
Technical Specifications
Source: 2413-M-HVAC-CR-01 - CAR RENTAL HVAC LAYOUT.pdfScope: HVAC modification and upgrade at King Phalo Airport, including piping, insulation, and structural supports for a 14-month period. Key Requirements: All piping must be stainless steel, welded, and insulated with polystyrene (minimum 25mm thick for β 65mm, 30mm for β 200mm). Fire barriers and vapor proofing required. Shop drawings must be approved prior to installation. Materials: Stainless steel piping, galvanized supports, high-density insulation. Standards: Adhere to SABS, BS, and National Building Regulations. Deliverables: Approved shop drawings, installation as per layout, and compliance with all specified standards. All works must be executed as per approved drawings and specifications.
Compliance Requirements
Source: 2413-M-HVAC-CR-01 - CAR RENTAL HVAC LAYOUT.pdfB-BBEE Minimum Level: 4. Adherence to SABS and National Building Regulations. Professional registrations and approvals as per engineering standards. Compliance with Occupational Health and Safety (OHS) Act.
Contact Information
Source: 2413-M-HVAC-TB-03 - TERMINAL BUILDING ROOF HVAC LAYOUT.pdfEmail: [email protected]; [email protected]. Department/Unit: Engineering. Address: 100 Newton Street, Southernwood, London, Eastern Cape. Tel: (as per document, exact number unclear).
Submission Guidelines
Source: 2413-M-HVAC-TB-03 - TERMINAL BUILDING ROOF HVAC LAYOUT.pdfSubmit all required documents as listed in the tender. Ensure submissions are complete, accurate, and fully adhere to the provided specifications, drawings, and standards to avoid disqualification. Shop drawings must be submitted for prior approval before execution.
Evaluation Criteria
Source: 2413-M-HVAC-TB-03 - TERMINAL BUILDING ROOF HVAC LAYOUT.pdfGeneral
Technical
Technical Specifications
Source: 2413-M-HVAC-TB-03 - TERMINAL BUILDING ROOF HVAC LAYOUT.pdfImportant Dates
Source: 2413-M-HVAC-FS-01 -FIRE STATION GROUND FLOOR HVAC LAYOUT.pdfApproved Drawing Date: 2024-06-18. Project Commencement Date: 2025-09-19.
Contact Information
Source: 2413-M-HVAC-FS-01 -FIRE STATION GROUND FLOOR HVAC LAYOUT.pdfEngineering Contacts: Email: [email protected], [email protected]. Phone: 041 (ACSA), 043 (Southernwood). Address: King Phalo Airport, Eastern Cape.
Submission Guidelines
Source: 2413-M-HVAC-FS-01 -FIRE STATION GROUND FLOOR HVAC LAYOUT.pdfSubmit all required drawings, specifications, and approvals as per standard tender practices. Ensure shop drawings are approved prior to installation. Include proof of compliance with SABS standards and national regulations for all piping, structural supports, and fire safety measures.
Evaluation Criteria
Source: 2413-M-HVAC-FS-01 -FIRE STATION GROUND FLOOR HVAC LAYOUT.pdfGeneral: Applicants must be registered and compliant with South African business and tax regulations. Proof of valid insurance (e.g., public liability, professional indemnity) and demonstrated financial capacity to undertake the project are required. Technical: Proven experience in HVAC system modifications and upgrades, particularly in large-scale or airport environments, is mandatory. Certification or accreditation in HVAC engineering, fire safety, and structural compliance is required. Access to qualified personnel (e.g., engineers, technicians) with relevant certifications and ability to comply with ACSAβs specific technical and safety requirements are essential. Legal: No conflicts of interest with ACSA or its affiliates. Compliance with Broad-Based Black Economic Empowerment (B-BBEE) requirements (if applicable) and adherence to all labor laws and employment equity regulations are mandatory.
Technical Specifications
Source: 2413-M-HVAC-FS-01 -FIRE STATION GROUND FLOOR HVAC LAYOUT.pdfScope: HVAC modification and upgrade for King Phalo Airport Fire Station Ground Floor. Duration: 14 months. Key Requirements: All piping must be stainless steel, welded, and insulated with 25mm thick polystyrene or equivalent. Fire barriers and vapour proofing are required. Piping must adhere to SABS standards and national regulations. Shop drawings must be approved prior to installation. Structural supports for piping must comply with engineering specifications. Equipment includes VRF units (e.g., CASVRF-01, MWVRF-01, ODU-01), cassettes, diffusers, condensate management systems, and power supplies (230V/1Ph/50Hz or 400V/3Ph/50Hz). All work must be executed in accordance with provided drawings and specifications.
Contact Information
Source: 2413-M-HVAC-RH-01 - RAMP HANDLERS HVAC LAYOUT.pdfEmails: [email protected]; [email protected]. Address: 85 Southernwood Street, Belgrave, Port Elizabeth, Eastern Cape. Phone: 041 (incomplete number in document).
Evaluation Criteria
Source: 2413-M-HVAC-RH-01 - RAMP HANDLERS HVAC LAYOUT.pdfGeneral:
Technical:
Financial:
Technical Specifications
Source: 2413-M-HVAC-RH-01 - RAMP HANDLERS HVAC LAYOUT.pdfScope: HVAC modification and upgrade at King Phalo Airport, including piping, ducting, insulation, and equipment installation over 14 months.
Key Requirements:
Important Dates
Source: 2413-M-HVAC-TB-01 - TERMINAL BUILDING GROUND FLOOR HVAC LAYOUT.pdfDrawing approval deadline: 2024-06-18.
Contact Information
Source: 2413-M-HVAC-TB-01 - TERMINAL BUILDING GROUND FLOOR HVAC LAYOUT.pdfEmail: [email protected]. Additional contact: [email protected] (as referenced in document).
Submission Guidelines
Source: 2413-M-HVAC-TB-01 - TERMINAL BUILDING GROUND FLOOR HVAC LAYOUT.pdfSubmit all shop drawings, piping layouts, and structural drawings for approval prior to execution. Requirements: Drawings must be scaled, dimensioned, and comply with provided specifications and SABS standards. All changes require engineer approval. Non-compliance may result in disqualification.
Evaluation Criteria
Source: 2413-M-HVAC-TB-01 - TERMINAL BUILDING GROUND FLOOR HVAC LAYOUT.pdfGeneral: Must be registered and compliant with South African business regulations. Requires experience in similar HVAC projects (e.g., airports, large-scale commercial). Must demonstrate technical capability (HVAC installation, welding, fireproofing) and financial stability to complete within 14 months. Technical: Requires certification in HVAC systems, piping, and insulation (e.g., SABS, ISO). Experience with specified equipment (VRF systems, chillers, AHUs) and brands (e.g., Aquasnap, Carrier). Must interpret and adhere to complex technical drawings. Legal: Valid tax clearance certificate. Compliance with BBBEE requirements. Proof of insurance (public liability, professional indemnity).
Technical Specifications
Source: 2413-M-HVAC-TB-01 - TERMINAL BUILDING GROUND FLOOR HVAC LAYOUT.pdfScope: HVAC modification and upgrade for King Phalo Airport Terminal Building Ground Floor (14-month project). Deliverables: Piping (stainless steel, β 65mm to β 200mm), polystyrene insulation (25mmβ30mm thick), fire barriers, vapor barriers, and structural supports (galvanized, spaced per specs). Standards: SABS, National Building Regulations, and good engineering practice. Installation: Piping must be welded, insulated, and protected. Fireproofing and vapor barriers required where indicated. All drawings and shop details require pre-approval. Equipment: VRF units, AHUs, chillers, pumps, diffusers, grilles, ducting, and condensate systems as per schedules. Power: 230V/1Ph/50Hz or 400V/50Hz/3Ph as specified.
Important Dates
Source: 2413-M-HVAC-CC-01 - CONTROL CENTRE HVAC LAYOUT.pdfCommencement Date: 2025-09-19. Drawing Approval Date: 2024-06-18.
Contact Information
Source: 2413-M-HVAC-CC-01 - CONTROL CENTRE HVAC LAYOUT.pdfEmail: [email protected], [email protected]. Phone: 041 (ACSA), 043 (Southernwood London). Address: Port Elizabeth, Eastern Cape.
Submission Guidelines
Source: 2413-M-HVAC-CC-01 - CONTROL CENTRE HVAC LAYOUT.pdfSubmit all required drawings, specifications, and approvals as per the tender document. Ensure piping, insulation, and structural modifications adhere to the provided technical drawings. All submissions must align with the approved engineering standards and client-provided specifications.
Evaluation Criteria
Source: 2413-M-HVAC-CC-01 - CONTROL CENTRE HVAC LAYOUT.pdfGeneral: Applicants must be registered and compliant with South African business regulations. Experience in HVAC systems, particularly in airport or large-scale commercial projects, is required. Proof of technical capacity to handle piping, insulation, and structural modifications is mandatory. Technical: Certification or accreditation in HVAC engineering, welding, and fire safety standards (e.g., SABS, BS) is required. Ability to interpret and execute work based on complex technical drawings and specifications is essential. Access to approved materials and equipment (e.g., stainless steel piping, VRF units) is necessary. Legal: Valid tax clearance certificates are required. Compliance with BBBEE (Broad-Based Black Economic Empowerment) requirements is mandatory. No conflicts of interest with ACSA or project stakeholders are permitted.
Technical Specifications
Source: 2413-M-HVAC-CC-01 - CONTROL CENTRE HVAC LAYOUT.pdfScope: HVAC modification and upgrade at King Phalo Airport Control Centre. Duration: 14 months. Key Requirements: All piping must be stainless steel, welded, and insulated with polystyrene (thickness: 0.6mm for small diameters, 25mm for larger). Fire barriers and vapor proofing are required. Compliance: Must adhere to SABS standards, National Building Regulations, and good engineering practice. Drawings: Must be scaled, approved, and strictly followed. Supports: Piping must be supported as per specifications (e.g., β 200mm, β 65mm). Equipment: Includes VRF units (e.g., 4.5kW, 7.1kW, 14.0kW), cassettes, diffusers, condensate management systems, and refrigerant piping. Materials: Galvanized steel, Mylar, and other approved materials. Installation: Must follow structural and safety standards, including fireproofing and insulation for exposed and concealed piping.
Compliance Requirements
Source: 2413-M-HVAC-CC-01 - CONTROL CENTRE HVAC LAYOUT.pdfB-BBEE Minimum Level: 2. Compliance with SABS standards and National Building Regulations is mandatory. Valid tax clearance certificates are required. Professional registrations for HVAC engineering and related trades may be necessary.
Important Dates
Source: 2413-M-HVAC-FS-02 - FIRE STATION FIRST FLOOR HVAC LAYOUT.pdfCommencement date: 2024-06-18. Drawing approval date: 2024-06-18. Project completion within 14 months from commencement.
Contact Information
Source: 2413-M-HVAC-FS-02 - FIRE STATION FIRST FLOOR HVAC LAYOUT.pdfEngineer contact: [email protected]. Additional contact: [email protected]. Phone: 041 (Port Elizabeth/Eastern Cape area code).
Evaluation Criteria
Source: 2413-M-HVAC-FS-02 - FIRE STATION FIRST FLOOR HVAC LAYOUT.pdfGeneral:
Technical:
Financial:
Technical Specifications
Source: 2413-M-HVAC-FS-02 - FIRE STATION FIRST FLOOR HVAC LAYOUT.pdfScope: HVAC modification and upgrade for King Phalo Airport (Fire Station First Floor). Duration: 14 months.
Key Requirements:
Contact Information
Source: 2413-M-HVAC-TB-02 - TERMINAL BUILDING FIRST FLOO HVAC LAYOUT.pdfEmail: [email protected]. Secondary contact: [email protected]. Physical address: Belgrave Southernwood, East London. Phone: 043 (as referenced in the document).
Submission Guidelines
Source: 2413-M-HVAC-TB-02 - TERMINAL BUILDING FIRST FLOO HVAC LAYOUT.pdfSubmit all required documents as listed in the tender. Omission of any returnable document may lead to disqualification. Ensure submissions are complete and adhere to the specified format.
Evaluation Criteria
Source: 2413-M-HVAC-TB-02 - TERMINAL BUILDING FIRST FLOO HVAC LAYOUT.pdfEvaluation is based on three categories: General, Technical, and Compliance. General: Must be registered and compliant with South African business and tax regulations; proof of experience in similar HVAC modification/upgrade projects, especially in airport or large commercial facilities; financial and technical capacity to complete the project within 14 months. Technical: Requires certification or accreditation in HVAC engineering, piping, and fire safety compliance; demonstrated ability to work with SABS, BS, and National Building Regulations; access to qualified engineers, technicians, and labor for HVAC, piping, and insulation work. Compliance: Valid health and safety certifications (e.g., OHSA); proof of insurance (e.g., liability, workers' compensation); adherence to ACSAβs vendor requirements and pre-qualification criteria (if applicable).
Technical Specifications
Source: 2413-M-HVAC-TB-02 - TERMINAL BUILDING FIRST FLOO HVAC LAYOUT.pdfScope: HVAC modification and upgrade at King Phalo Airport Terminal Building (First Floor) over 14 months. Key deliverables: All piping must be stainless steel, welded, and insulated (minimum 0.6mm thickness or as specified). Fire barriers and vapor barriers must comply with SANS/SABS standards. Piping must adhere to National Building Regulations and good engineering practice. Structural supports for piping must align with provided drawings. Exposed piping must be insulated with polystyrene or equivalent. Shop drawings require approval prior to installation. Work must follow issued specifications, drawings, and relevant codes. Chilled water piping must include condensate drains and insulation. Electrical and mechanical components (e.g., VRF units, AHUs, diffusers, grilles) must meet specified capacities and power requirements (e.g., 400V/50Hz/3Ph or 230V/1Ph/50Hz). Equipment schedules detail unit types, quantities, and power ratings.
Important Dates
Source: CIDB Bid documet RFP.pdfContact Information
Source: CIDB Bid documet RFP.pdfSubmission Guidelines
Source: CIDB Bid documet RFP.pdfEvaluation Criteria
Source: CIDB Bid documet RFP.pdfMandatory Requirements:
CIDB contractor grading of 5ME or higher.
Attendance at compulsory briefing session (10 June 2026).
Tax compliance: Submit SARS TCS PIN or printed TCS certificate (or CSD registration if no TCS PIN).
Valid COIDA registration (Letter of Good Standing with Workers Compensation Fund).
Submission of all returnable documents (e.g., Form C1.1, pricing schedules, SBD4, Non-Disclosure Agreement).
Acceptance of ACSA Terms and Conditions.
Functionality Evaluation (Minimum 80/100 to qualify for Price/Preference stage):
Company Experience (40 points):
β₯3 HVAC projects valued at β₯ R3M: 20 points (3-5 projects), 40 points (>5 projects).
Valid client reference letters (β€10 years old) required, including scope, value, client contact details.
Human Resources (60 points):
Health and Safety Officer:
SACPCMP Certification: 15 points.
Relevant H&S Training (SAMTRAC NQF Level 5): 10 points.
5 years in HVAC upgrades/modifications: 15 points; 3-5 years: 10 points.
Site Supervisor:
National Diploma in Mechanical Engineering + Trade Test in Safe Handling of Refrigerant Gases: 15 points.
Trade Test in Safe Handling of Refrigerant Gases only: 10 points.
8 years in HVAC maintenance/refurbishment: 15 points; 5-8 years: 10 points.
Price and Preference (80/20 Split):
Price: 80 points (lowest acceptable tender scores highest).
Preference: 20 points (based on B-BBEE status, Black youth/women ownership, or local entity in Eastern Cape).
Preference Points Breakdown:
B-BBEE Level 1: 5 points, Level 2: 4.5, Level 3: 4, Level 4: 3, Level 5: 2, Level 6: 0.5, Level 7: 0.3, Level 8: 0.1.
Black youth majority-owned: 5 points.
Black women majority-owned: 5 points.
Entity located in Eastern Cape: 5 points.
Proof required: Original/certified B-BBEE certificate (SANAS-accredited) or sworn affidavit. For JVs, consolidated certificate required.
Technical Specifications
Source: CIDB Bid documet RFP.pdfFinancial Requirements
Source: CIDB Bid documet RFP.pdfCompliance Requirements
Source: CIDB Bid documet RFP.pdfSets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
66 Settlers way - East London - East London - 5201
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
10
Last checked
05 Jun 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
π‘ Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Construction of buildings. Unlock full pricing strategies, bid frequency, and historical win rates.