Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Issuing Organization
South African Nuclear Energy Corporation LimitedLocation
Eastern Cape
Closing Date
05 Jun 2026
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
R104 Elias Motsoaledi Street (Church Street West Ext) - Pelindaba - Madibeng Municipality - 0240
Organization Type
GOVERNMENT
Published
21 May 2026
OCDS Reference
ocds-9t57fa-156659
The south african nuclear energy corporation (necsa) seeks quotations for the supply of three system control valves (pcv1601d, pcv1601f, pcv1602d) for its oil waste plasma gasification demonstration facility’s gas supply system. This RFQ targets suppliers capable of providing high-specification valves meeting strict technical, quality, and compliance standards.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Categories
Request for Quotation
R104 Elias Motsoaledi Street (Church Street West Ext) - Pelindaba - Madibeng Municipality - 0240
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: Good Manufacturing Practice (GMP), SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: ENS-OWPVR-SPE-25033.pdf, RFQ to Supply System Control Valves for Oil Waste Project for Gas Supply System.pdf, ENS-OWPVR-PID-24003 R5 - Gas Supply System.pdf and 3 more. You don’t need to refresh — this page will pick up the updated review automatically.
21 May
2026
Tender Published
Tender was published
05 Jun
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
ENS-OWPVR-SPE-25034.pdf
The tender is for the supply of a control valve (Argon Pressure Regulator PCV1601F) for the Contaminated Waste Oil Plasma Gasification Project at NECSA's Pelindaba facility. The valve must regulate argon gas supply to the Plasma Power Supply Y1201, with specific process conditions, material requirements (304/304L SS), and compliance with ASME B16.5 Class 1500 flange specifications. The project is non-safety-classified (SC-3) and non-quality-classified (QC-3).
ENS-OWPVR-SPE-25032.pdf
The South African Nuclear Energy Corporation Limited (Necsa) is requesting a quotation for the supply of a specific oxygen pressure regulator (PCV1602D) for the Contaminated Waste Oil Plasma Gasification Project. The regulator is required for the oxygen gas supply line to a plasma reactor, located at the Pelindaba site. The document provides detailed technical specifications, process conditions, and mechanical requirements for the valve.
Control Valve List for the Uranium Contaminated Oil Plasma Gasification Demonstration Project for Gas Supply System.pdf
The South African Nuclear Energy Corporation Limited (NECSA) is requesting quotations for the supply of control valves for the Gas Supply System of the Uranium Contaminated Waste Oil Plasma Gasification Demonstration Facility in the Eastern Cape. The tender involves specific, high-specification pressure regulators for handling argon and oxygen gases under controlled conditions.
ENS-OWPVR-PID-24003 R5 - Gas Supply System.pdf
The South African Nuclear Energy Corporation (Necsa) is requesting quotations for the supply of control valves and related gas supply system components for an Oil Waste Plasma Gasification (WOPG) demonstration facility. The tender involves detailed P&ID drawings for Oxygen (O2), Argon (Ar), LPG, and Methane (CH4) supply systems, with specific technical, safety, and compliance requirements.
RFQ to Supply System Control Valves for Oil Waste Project for Gas Supply System.pdf
Necsa requests quotations to supply three specific control valves (PCV1601D, PCV1601F, PCV1602D) for the Gas Supply System of an Oil Waste Plasma Gasification Demonstration Facility. The tender involves a two-phase evaluation: first a technical/functionality assessment (minimum 80/100 points), followed by a preferential procurement scoring (80/20 price-to-BBBEE).
ENS-OWPVR-SPE-25033.pdf
The tender is for the supply of a high-pressure argon control valve (PCV1601D) for the Contaminated Waste Oil Plasma Gasification Project at NECSA's Pelindaba facility. The valve must regulate argon gas pressure from 200 bar(g) to a controlled 600 kPa(g) for plasma gasification facilities in Building V-H2. The valve is a two-stage pressure regulator with strict material, performance, and safety specifications.
To download these documents and access AI-powered analysis, visit the main tender page.
Secure NECSA tenders with AI Matching & Recommendations, nuclear-science intelligence, compliance analysis, and structured support for research and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 158 950
Range
Based on 19 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Evaluation Criteria
Source: ENS-OWPVR-SPE-25033.pdfGeneral:
Technical:
Technical Specifications
Source: ENS-OWPVR-SPE-25033.pdfScope: Supply of an argon pressure regulator (PCV1601D) for the Contaminated Waste Oil Plasma Gasification Project at Necsa, Pelindaba, North-West Province.
Function: Control and maintain argon supply pressure to facilities at 600 kPa(g) by reducing inlet pressure from 200 bar(g).
Process Conditions:
Valve Specifications:
Mechanical Properties:
Process Connections:
Additional Requirements:
Reference Documents:
Important Dates
Source: RFQ to Supply System Control Valves for Oil Waste Project for Gas Supply System.pdfClosing date: 05 June 2026 at 12:00. Site briefing: Not compulsory but can be arranged if additional information is required.
Contact Information
Source: RFQ to Supply System Control Valves for Oil Waste Project for Gas Supply System.pdfContact: Thulile Sokhela. Email: [email protected]. All queries must be submitted in writing to this contact only.
Submission Guidelines
Source: RFQ to Supply System Control Valves for Oil Waste Project for Gas Supply System.pdfSubmit quotation via email to [email protected] on or before 05 June 2026 at 12:00. Quotation validity: 90 days from closing date. Incomplete quotes may be disqualified. No goods or services to be delivered without an official Necsa Purchase Order. All queries must be directed in writing to the provided contact only; approaching other Necsa employees may result in disqualification.
Evaluation Criteria
Source: RFQ to Supply System Control Valves for Oil Waste Project for Gas Supply System.pdfTwo-phase evaluation: Phase 1 (Technical/Functionality) requires a minimum score of 80/100 to progress. Criteria: Suitability of Product (30 points, mandatory—failure here nullifies other technical scores), Quality of Product (40 points, requires ISO 9001:2015 or OEM accreditation), and Lead-Time (30 points, scored as 30 for ≤4 weeks, 20 for ≤6 weeks, 0 for ≤8 weeks). Phase 2: 80/20 PPPFA system—80 points for price, 20 points for B-BBEE status level (Level 1: 20, Level 2: 18, ..., Non-compliant: 0). Non-submission of B-BBEE proof forfeits preference points but does not disqualify the bid.
Technical Specifications
Source: RFQ to Supply System Control Valves for Oil Waste Project for Gas Supply System.pdfSupply 3 control valves for the Oil Waste Plasma Gasification Project Gas Supply System: 1) Pressure regulator PCV1601D (main argon gas supply), 2) Pressure regulator PCV1601F (argon gas supply to Plasma Power Supply), 3) Pressure regulator PCV1602D (oxygen gas supply line to Plasma Reactor R1205). Requirements: All process connections must be Female threaded, NPT, ASME B1.20.1 class 1500 (minimum). All valves must be controlled via 4-20mA signal and provide position feedback (4-20mA). Clearly indicate Valve Tags (PCV1601D, PCV1601F, PCV1602D) on all submitted specifications and drawings. Refer to attached specification sheets (ENS-OWPVR-SPE-25033, 25034, 25032) and valve list (ENS-OWPVR-LST-24008).
Financial Requirements
Source: RFQ to Supply System Control Valves for Oil Waste Project for Gas Supply System.pdfPricing must be fixed and firm, including all applicable taxes, freight, insurance until acceptance, duties, and disbursements. Quotation must be fully completed; incomplete quotes may be disqualified. Payment terms: Necsa’s General Conditions of Purchase apply. Orders above R30,000 are subject to PPPFA 80/20 evaluation.
Compliance Requirements
Source: RFQ to Supply System Control Valves for Oil Waste Project for Gas Supply System.pdfMandatory documents: Tax Clearance Certificate (SARS-issued), Declaration of Interest (SBD 4), B-BBEE Certificate or EME Affidavit, Letter of Good Standing (COID, if applicable), and any other requested certifications. Supply pump data sheets and curve documents. Failure to submit B-BBEE proof forfeits preference points. Subject to Necsa’s General Conditions of Purchase, PPPFA 2000, PPP Regulations 2022, and GCC.
Contact Information
Source: ENS-OWPVR-PID-24003 R5 - Gas Supply System.pdfTechnical contact: Mr W Ludwick, Senior Process Engineer, Department: (PSU) Y1201. No email, phone, or submission address provided in this document. Check the main tender notice for additional contacts.
Submission Guidelines
Source: ENS-OWPVR-PID-24003 R5 - Gas Supply System.pdfReturnable documents and submission instructions are not specified in this document. Refer to the main tender notice (NLM-QUO-26/095) for details on how and where to submit, required forms, and disqualification risks.
Evaluation Criteria
Source: ENS-OWPVR-PID-24003 R5 - Gas Supply System.pdfSuppliers must demonstrate capability in supplying nuclear-grade or high-safety industrial control valves and gas system components. Key evaluation points: Compliance with South African National Standards (SANS), particularly SANS 10087 for LPG systems. Experience with oxygen service piping and safety systems is essential. Adherence to intellectual property restrictions is required, as the document is confidential and property of Necsa.
Technical Specifications
Source: ENS-OWPVR-PID-24003 R5 - Gas Supply System.pdfScope: Supply of control valves and associated gas supply systems for Oxygen (O2), Argon (Ar), LPG, and Methane (CH4) for an Oil Waste Plasma Gasification project. Key deliverables: Bulk liquid storage tanks, evaporators, pressure regulators, safety relief valves, cylinder banks, and associated piping. Technical requirements: Oxygen line sizing uses a linear velocity of 4m/s (ALARA principle). Signals must be provided to the PLCs of the FDP and NW PlasGas facilities. Tanks are vendor packages requiring instrumentation for pressure and liquid inventory. Vents must discharge to safe outdoor locations above roof level. Pressure regulators require inlet/outlet pressure indicators. Piping must be as short as possible and chemically cleaned/degreased for Oxygen service. Suppliers must advise on pressure relief valve sizing based on nozzle area. Compliance with SANS 10087 for LPG systems is required. References other project P&IDs (e.g., ENS-WOPVR-PID-24001, ENS-FDP-PID-24005).
Submission Guidelines
Source: ENS-OWPVR-SPE-25032.pdfNo submission method, address, deadline, or required forms are specified in the document. Only a technical specification sheet is provided.
Evaluation Criteria
Source: ENS-OWPVR-SPE-25032.pdfEligibility is primarily technical. Suppliers must demonstrate capability to manufacture or supply a valve conforming to the detailed engineering specification. Compliance with referenced standards (e.g., ASME B1.20.1 for threading) is mandatory. Suppliers may be vetted by Necsa for security and quality assurance due to the project's sensitive nature.
Technical Specifications
Source: ENS-OWPVR-SPE-25032.pdfSupply an oxygen pressure regulator (PCV1602D) for the Contaminated Waste Oil Plasma Gasification Project. Key requirements:
Submission Guidelines
Source: ENS-OWPVR-SPE-25034.pdfNo submission method, address, deadline, or required forms specified. This is a technical specification sheet only. Bidders must refer to the official RFQ document (NLM-QUO-26/095) for submission details.
Evaluation Criteria
Source: ENS-OWPVR-SPE-25034.pdfGeneral: Applicants must be registered suppliers capable of providing industrial-grade control valves. Experience in nuclear or high-purity gas systems (e.g., argon) is advantageous. Compliance with South African procurement regulations and NECSA’s vendor requirements is mandatory. Technical: Proven track record of supplying valves for similar applications (high-pressure gas, stainless steel construction). Ability to meet ASME B16.5 and ASTM A182-F304/304L standards. Capacity to deliver within the project timeline.
Technical Specifications
Source: ENS-OWPVR-SPE-25034.pdfScope: Supply of a two-stage argon pressure regulator (PCV1601F) for the Contaminated Waste Oil Plasma Gasification Project. Location: Necsa, Pelindaba, North-West Province (Equipment: Outside Laboratory 150, Building V-H2). Classifications: Safety - Non-classified (N) and SC-3 (C); Quality - Non-classified (N) and QC-3 (C). Process Fluid: Argon (Gas). Design Conditions: Temperature 50°C; Pressure 23910 kPa(g). Performance: Inlet Pressure Range 400–1000 kPa(g); Regulator Setpoint (Outlet) 400 kPa(g); Max Differential Pressure 600 kPa; Mass Flowrate 0–10 kg/h. Mechanical: Valve Rating Class 1500; Flange Spec Inlet/Outlet - SS, ASTM A182-F304/304L, ASME B16.5 Class 1500, Pipe Size 15 NB. Materials: Body/Bonnet/Cap/Wetted parts - 304/304L Stainless Steel. Supplier must advise on seat leakage class, bellows, spring, and seat materials. Additional: Must include local pressure indicators on inlet and outlet sides.
Evaluation Criteria
Source: Control Valve List for the Uranium Contaminated Oil Plasma Gasification Demonstration Project for Gas Supply System.pdfSuppliers must: - Provide nuclear-classified components (Safety Classes SC-2/SC-3). - Comply with international standards (e.g., ASME B1.20.1). - Demonstrate expertise in meeting stringent operational conditions (pressure, temperature, fluid compatibility). - Handle confidential information securely. - Possess certifications for supplying components to nuclear or high-hazard process industries.
Technical Specifications
Source: Control Valve List for the Uranium Contaminated Oil Plasma Gasification Demonstration Project for Gas Supply System.pdfSupply control valves for the Gas Supply System of a Uranium Contaminated Waste Oil Plasma Gasification Demonstration Facility. Requirements: - Valve types: Pressure regulators (e.g., PCV1601D, PCV1601F, PCV1602D). - Fluids: Argon Gas, Oxygen Gas. - Safety Class: SC-2 or SC-3, Non-classified. - Process Connection: THRD (Female), Flange Spec. ASME B1.20.1. - Size: 15. - Materials: CF3M/A351-CF8M. - Operating Conditions: Ambient temperature, pressure ranges (e.g., 20000/600 kPa(g), 600/400 kPa(g)). - Special Notes: Valve PCV1602D must be ATEX cleaned for Oxygen service. - Refer to specification sheets (e.g., ENS-OWPVR-SPE-24008) and P&ID drawings (e.g., ENS-OWPVR-PID-24003).
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
R104 Elias Motsoaledi Street (Church Street West Ext) - Pelindaba - Madibeng Municipality - 0240
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
6
Last checked
05 Jun 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Other manufacturing. Unlock full pricing strategies, bid frequency, and historical win rates.