Province
Mpumalanga
Closing Date
26 February 2026 at 09:00
Estimated Value
Value not specified
AI Summary
Unlock the AI-generated summary for this tender
Already subscribed or have a bundle? Sign in
Quick Summary
- Department of Rural Development & Land Reform
- Mpumalanga
- Closes 26 February 2026 at 09:00 (Closed) — Section 24(1), municipalities were required—after public consultation—to adopt a
AI-Analyzed Compliance Requirements
Sign in or upgrade to see 40 deduplicated compliance points across 5 categories — submission and returnable-document rules, technical and financial requirements, B-BBEE / local-content obligations, and evaluation criteria, consolidated from every tender document.
Unlock with a subscription or Action Pack →Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
19 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Appointment of a service provider to review the land use schemes of dr js moroka, thembisile hani, victor khanye, emalahleni and emakhazeni local municipalities, mpumalanga.
Increase your winning chances
Most bidders are rejected due to compliance gaps. Use our Readiness Engine to verify your status for this specific Other service activities.
Check My ReadinessImportant Dates & Timeline
2 key dates
Tender Published
3 February 2026 at 22:00
Tender was published
Tender Closing Date
26 February 2026 at 09:00
Final deadline for submission
Submission Requirements
311 items · 21 mandatory
2.1 For decades, the Land Use Management System in South Africa had limited the ability
of municipalities to effectively address matters relating to land development planning,
development management, and the regularisation of land use activities.
2.2 Historically, municipalities regulated land use through Town Planning Schemes
developed in terms of provincial ordinances. However, these schemes were not “wall-
to-wall” and, in many cases, did not cover all areas within a municipality’s jurisdiction.
As a result, large portions of land remained unaudited, leading to municipalities losing
oversight and control over land use within their areas of jurisdiction.
of 30
2.3 This gap was addressed through the introduction of SPLUMA. In terms of Chapter 5,
Section 24(1), municipalities were required—after public consultation—to adopt and
approve a single Land Use Scheme for their entire area of jurisdiction within five years
of the Act’s commencement in 2015. This meant that all municipalities were expected to
have adopted a Land Use Scheme by 2020. This deadline was later extended by 12
months, as per Government Gazette Notice No. 43598.
2.4 A Land Use Scheme must give effect to, and be consistent with, the Municipal Spatial
Development Framework (SDF) and guide the use and development of land within the
municipal area. It must do so in a manner that promotes:
(i) Economic growth.
(ii) Social inclusion.
(iii) Efficient land development; and
(iv) Minimum impact on public health, the environment and natural resources.
2.5 SPLUMA uses the term Land Use Scheme instead of older terms such as Town Planning
Scheme or Zoning Scheme, in order to establish a single, standardised term for the
document described in Chapter 5, which regulates and manages land use.
2.6 Section 27. (1) of SPLUMA provides that a municipality may review its land use scheme
in order to achieve consistency with the municipal spatial development framework and
must do so at least every five years.
2.7 The Land Use Schemes of the subject municipalities were promulgated in 2020. In
accordance with the provisions of SPLUMA, the municipalities are therefore required to
conduct review of their Land Use Schemes as the prescribed five-year period has
lapsed.
3. PURPOSE AND OBJECTIVE OF THE PROJECT
3.1 The main objective of the project is to assist the five municipalities – Dr JS Moroka,
Thembisile Hani, Victor Khanye, Emalahleni and Emakhazeni to review their Land Use
Schemes in line with the provisions of SPLUMA and the By-Laws of the respective
of 30
municipalities. The review of the Land Use Schemes (LUSs) must take cognisance of
the following:
• Consistency with the municipal SDFs.
• Must cater for both rural and urban areas as well as formal and informal areas
found within the administrative boundaries of the Municipality.
• Promote a planning system that will better respond to the current challenges and
pro-actively put in place mechanisms that will respond to future development and
growth requirements.
• Must balance policy objectives with decision making.
• Provide clarity and reasons on what may or may not occur on specific parcels
of land.
• Promote certainty for land use and the management thereof to create investor
confidence.
• Promote amenity, efficient land use practices and reserve land for essential
services.
• Resolve conflicts between different land uses and to control negative
externalities.
• Enable the mix of convenient land uses, efficient movement processes and
promote economic development.
• Protect natural, cultural and religious resources, unique areas, ecosystem
services, areas of archaeological and historical significance, and land with
agricultural potential.
• Ensure public involvement in land management decision-making processes.
• Provide for sound local regulation and enforcement procedures.
• Recognize indigenous and local spatial knowledge, land use practices and land
allocation processes.
• Ensure the collaborative designation of areas for future land uses; and
• Ensure that the scheme is developed in a collaborative manner aiming at social
justice and the equitable regulation of contested spaces.
of 30
4. CHARACTERISTICS OF THE LAND USE SCHEME
4.1 The reviewed LUS must be simplified, in accordance with SPLUMA and must contain
provisions for special development zones linked with economic growth, environmental
management, built environment and other related special cases that may arise.
4.2 The LUS clauses and maps should also be reviewed. The reviewed LUS should be able
to achieve amongst others, the following:
• Bridge the gap between old order land uses and currently approved land uses.
• Resolve conflict between different land uses.
• Promote economic, social and environmental land use sustainability.
• Protect amenities of adjacent land uses.
• Conserve natural and agricultural resources.
• Protect and promote buildings and areas with heritage significance.
• Protect cultural resources and promote culture diversities.
• Protect both the formal and the informal economy.
• Cater for both formal and informal residential settlements.
5. SCOPE OF THE PROJECT
5.1 The scope of the project comprises reviewing the Land Use Schemes of:
5.1.1 Dr JS Moroka Local Municipality
5.1.2 Thembisile Hani Local Municipality
5.1.3 Victor Khanye Local Municipality
5.1.4 Emalahleni Local Municipality and
5.1.5 Emakhazeni Local Municipality
5.2 The project will be guided by the Land Use Scheme Guidelines (2017), the provisions
of the SPLUM By-Laws of Dr JS Moroka, Thembisile Hani, Victor Khanye,
Emalahleni and Emakhazeni Local Municipality and SPLUMA. The reviewed LUSs
should contain amongst others at least the following:
of 30
(i) Reflection of the development principles highlighted in SPLUMA.
(ii) Suitable categories of land use zoning and regulations for the entire municipal
area.
(iii) Cognizance of any environmental management instrument adopted by relevant
environmental management authority and must comply with environmental
legislation.
(iv) Reviewal of the provisions that permit land use management and regulation in
areas under traditional leadership, rural areas, informal settlements, slums
and areas not previously subject to a Land Use Scheme.
(v) Provisions to promote the inclusion of affordable housing in residential land
development.
(vi) Land use and development incentives to promote the effective
implementation of the SDF and other development policies.
(vii) Systems to manage and regulate both formalities and informalities found with a
municipal area.
(viii) Consistency with the relevant Municipal Spatial Development Framework; and
(ix) Processes relating to Land Use Scheme enforcement.
5.3 The review of each municipality’s Land Use Scheme should focus primarily on the
specific areas outline below:
5.3.1 Dr JS Moroka Local Municipality – the LUS review shall focus mainly on the following
areas:
5.3.1.1 Legislative compliance – review alignment with SPLUMA and Municipal SPLUM By-
Law; alignment with the SDF.
5.3.1.2 Assess current development trends, existing land use patterns and spatial form, density
patterns and settlement trends, growth pressures and investment hotspots,
environmental constraints.
5.3.1.3 Review and update definitions and terminology
5.3.1.4 Review and adjust land use and zoning categories to ensure relevance and
compatibility. Further consider introducing new zoning and land use categories or
joining others.
5.3.1.5 Define a process of rectifying errors on the Land Use Scheme
of 30
5.3.1.6 Formulate specific development regulations for certain land use categories and specific
areas.
5.3.1.7 Update development policies, e.g. inclusion of newly developed development policies.
5.3.1.8 Provide for differentiated application procedures for various forms of land tenure
arrangements, considering the specific context of the municipality.
5.3.1.9 Ensure that the scheme is aligned with municipal spatial policies, e.g. the SDF.
5.3.1.10 Provide overlay zones, particularly to regulate development on agricultural land and
protected areas.
5.3.1.11 Provide a GIS compatible scheme that would be accessible through the municipal GIS
system.
5.3.1.12 Provide a mechanism/tool for the monitoring and tracking of land use changes.
5.3.1.13 Provide for transitional arrangements
5.3.2 Thembisile Hani Local Municipality – the LUS review shall mainly focus on the
following areas:
5.3.2.1 Review and update definitions and terminology
5.3.2.2 Review and adjust land use and zoning categories to ensure relevance and
compatibility
5.3.2.3 Review legislative and policy context in line with changes in policy context, e.g.
SPLUMA Certificates court ruling
5.3.2.4 Formulate specific development regulations for certain land use categories and specific
areas.
5.3.2.5 Policies, guidelines and simplified requirements for small scale businesses and informal
trade as well as township economy.
5.3.2.6 Provide differentiated land use management schemes for urban, rural and informal
areas.
5.3.2.7 Align LUS with the SDF and SPLUM By-Law.
5.3.2.8 Formulate development guidelines and regulations for specific land uses, e.g. taverns,
carwash, spaza shops, etc.
5.3.2.9 Updating spatial data and scheme maps.
5.3.2.10 Land use survey to be conducted.
5.3.2.11 Review of Existing Zoning and Scheme Clauses
5.3.2.12 Review zoning categories and subcategories
of 30
5.3.2.13 Review development controls (height, coverage, FAR, building lines, parking
standards).
5.3.3 Emakhazeni Local Municipality – the LUS review shall focus mainly on the following
areas
5.3.3.1 Review and update the land use definitions and terminology sections
5.3.3.2 Development regulation – including the introduction of new development controls and
measures, e.g. defining area sizes for density use on each zone.
5.3.3.3 Zoning and Land Use Categories – revision of zoning and land use under each zone,
including addition of more land uses and ensuring alignment and compatibility, with due
consideration of development intensities. Further make revisions on development
controls in line with the spatial objectives of the municipality as depicted in the SDF and
the context of the municipality. i.e. proposed additions and subtractions of uses under
different zoning categories.
5.3.3.4 Land use survey (desktop) and zoning scheme maps – a thorough revision is required
to correct existing errors and ensure that maps are based on proclaimed zonings and
other approvals. It is suggested that the actual zonings of properties be thoroughly
investigated and correctly indicated on the proposed reviewed Scheme Map.
5.3.3.5 Review scheme maps to reflect historic zoning approvals and to rectify incorrectly
depicted zoning categories.
5.3.3.6 Review overlay zones to align with new legislation, policies and frameworks and depict
SDF directives while maintaining factual zoning rights depiction on scheme maps. The
current Scheme Map appears to reflect and focus more on the desired land use patterns
derived from the SDF. It is suggested that this be reviewed so that the SDF directives
are rather captured as Overlay zones, than being included in the Use Zones on the
maps. This will ensure that the actual zoning map remains a real indication of actual
zoning rights.
5.3.3.7 Provide provisions depicted on relevant policy and legislation.
5.3.3.8 Provide differentiated land use management schemes for urban, rural and informal
areas with due consideration to the different conditions defining the various localities.
5.3.3.9 Compliance, enforcement and transitional arrangements – to address properties with
existing right and ongoing applications.
5.3.3.10 Sections that are already contained in the By-law, such as the Law Enforcement
of 30
Procedures in Chapters 13 and 14, should not be duplicated in the Scheme provisions.
5.3.3.11 Formulate a standard draft Amendment Scheme Map and Schedule (Annexure).
5.3.4 Victor Khanye Local Municipality – the LUS review shall focus mainly on the following
areas:
5.3.4.1 Revise land use definitions and terminology sections
5.3.4.2 Revise spatial data and scheme maps to rectify inconsistencies
5.3.4.3 Revise zoning categories and introduce overlay zones
5.3.4.4 Align regulatory framework and LUS provisions with recent legislative and policy
changes
5.3.4.5 Align the scheme with the latest SDF and rectify conflicts
5.3.4.6 Make provision for emerging issues – e.g. renewable energy sector
5.3.4.7 Revise scheme to strictly delineate and differentiate between certain land use
categories
5.3.4.8 Introduce zoning categories/ overlay zones to support informal settlement upgrading.
5.3.4.9 Agricultural and peri-urban land-use classification – introduce overlay conditions in the
scheme that link rezoning/development to service capacity and to map out constraints’
zones” e.g. dolomite risk areas.
5.3.5 Emalahleni Local Municipality – the LUS review shall focus on the following
areas:
5.3.5.1 Review land use definitions and terminology sections
5.3.5.2 Update spatial data and scheme maps – including update zoning and cadastral data
5.3.5.3 Review zoning categories to incorporate changes that have occurred over time
5.3.5.4 Provide differentiated land use management schemes for urban, rural and informal
areas.
5.3.5.5 Revise the regulatory framework of the scheme, e.g. to make provision for addressing
small and low intensity undertaken from residential properties, e.g. spaza shops.
5.3.5.6 Policies and guidelines – develop a guiding policy for small scale businesses and
provide for provisions for townships/informal/rural settlements
5.3.5.7 Align scheme with the SDF
of 30
5.4 The review of each Land Use Scheme must align with the provisions of Chapter 3 of
SPLUMA and the respective Municipal By-Laws.
5.5 The successful bidder may be required to undertake additional reviews beyond those
specified, as identified by the Project Management Committee, Project Steering
Committee, or arising from issues or areas highlighted during the public consultation
process.
6. PROJECT OUTCOMES
6.1 Each reviewed Land Use Scheme must include, amongst others, the following:
(i) Scheme Regulations (Scheme Clauses)
(ii) Scheme Maps
(iii) Zones
(iv) Scheme Controls
(v) Design and Layout Requirements
(vi) General Administrative powers of the LUS
(vii) Legal effect of LUS
(viii) Strategy to address illegal land uses
7. CRITICAL MILESTONES
7.1 The following Six (6) critical milestones/ phases should be used to review the five Land
Use Schemes.
7.1.1 Phase 1: Inception: This phase will involve the preparation of a Project Plan in
alignment with these Terms of Reference, clearly outlining all project phases, activities,
and deliverables. A Project Steering Committee (PSC) must be established by identifying
and confirming participation from all key stakeholders. The PSC will be responsible for
reviewing and approving the inception report and subsequent phase reports throughout
the project. The Inception Report and project plan must include but should not be limited
to:
of 30
• Project objectives and scope.
• Detailed work breakdown structure.
• Deliverables and timelines.
• Roles and responsibilities of project team members.
• Stakeholder engagement plan.
• Risk assessment and mitigation measures; and
• Reporting and approval process.
• Possible dates for Project Management Committee (PMC) and PSC
meetings.
7.1.2 Phase 2: Data Collection and Research Analysis: This phase involves the systematic
collection, verification, and analysis of all relevant data to inform the review of the Land
Use Schemes. The key data sources and components that must be addressed include
the following:
• Desktop Land Use Survey and Verification – including the identification of
existing land uses, non-conforming uses, and any deviations from the current
LUSs.
• Cadastral and Jurisdictional Boundaries – confirmation and mapping of municipal
boundaries and cadastral data.
• Municipal Planning Documents – review of the respective Integrated
Development Plans (IDPs) and the Spatial Development Frameworks (SDFs) to
ensure alignment.
• Aerial Photography – utilisation of up-to-date aerial imagery to verify and map
land uses and physical features.
• Land Ownership Verification – assessment of ownership records to inform land
management and planning decisions.
• Land Tenure – identification of different forms of land tenure and their spatial
distribution.
• Settlement Patterns – mapping and classification of defined urban areas, rural
settlements, and other settlement types.
• Physical Environment – analysis of geology, soil characteristics, topography, and
slope, to determine development suitability.
of 30
• Existing LUS Review – evaluation of the current Land Use Scheme’s provisions,
implementation, and enforcement.
• Environmentally Sensitive Areas – identification of ecologically important or
protected areas requiring special planning consideration.
• Engineering Services and Infrastructure – assessment of existing service levels,
current demand, available capacity, and associated operational costs.
7.1.3 Phase 3: Draft Land Use Scheme and Supporting Documents: The purpose of this
phase is to plan, conceptualise, and prepare the draft Land Use Schemes. The draft
LUSs should integrate the findings from Phase 2. Proposals contained in the SDFs
should be translated into broad land use proposals that will inform and give effect to the
Land Use Schemes. Additionally, existing general and land use definitions should be
reviewed to ensure consistency and relevance.
7.1.4 Phase 4: Consultation and Amendments: Once the draft Land Use Schemes have
been completed, public participation must be conducted. This consultation should
involve all relevant stakeholders, including Traditional Councils (if relevant) and affected
communities. Feedback received during this process should be carefully considered and
incorporated into the LUSs through the necessary amendments.
7.1.5 Phase 5: Adoption and Application Procedures: this phase includes preparing and
submitting the final draft Land Use Schemes, including all clauses, maps, and supporting
documents, to the PSC for review and approval. once adopted, the LUSs will be
submitted to the respective Municipal Councils for final adoption. Following adoption by
the Councils, the LUSs will be formally promulgated and implemented.
7.1.6 Phase 6: Close Out Process: Final Land Use Schemes, data and supporting material
should be handed over to the client. A close-out report must be prepared and submitted
to the client.
7.2 All milestones outlined in Section 7.1 must be executed individually, separately, and
simultaneously for each of the five municipalities, ensuring consistent quality and
compliance across all areas.
of 30
No specific requirements found
Department of Rural Development & Land Reform
Contact Information
Key Personnel
AI Document Analysis Stages
- Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
- Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
- Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
- Document read
- Compliance review
- Bid-ready summary
AI Document Analysis
Unlock the full AI-extracted sections, compliance review, and bid-ready summaries from this tender's documents
Already subscribed or have a bundle? Sign in
Bid document LUS Final (1).pdf
Share this tender
APPOINTMENT OF A SERVICE PROVIDER TO REVIEW THE LAND USE SCHEMES OF DR JS MOROKA, THEMBISILE HANI, VICTOR KHANYE, EMALAHLENI AND EMAKHAZENI LOCAL MUNICIPALITIES, MPUMALANGA.
Department of Rural Development & Land Reform tender in Mpumalanga. Closing 2/26/2026. APPOINTMENT OF A SERVICE PROVIDER TO REVIEW THE LAND USE SCHEMES OF DR JS MOROKA, THEMBISILE HANI, VICTOR KHANYE, EMALAHLENI AND EMAKHAZENI LOCAL MUNI...
Smart Assistant
Check if your company qualifies for this tender before you apply.
How it Works
Organization
Department of Rural Development & Land Reform
Contact Person
Alpheus Nkuna
Phone
012-312-8364
[email protected]
Address
17 van rensburg street,sonheuwel mbombela - mbombela - mbombela - 1201
26 February 2026 at 09:00
Location
Mpumalanga
Closing Date
26 February 2026 at 09:00
Organization
Department of Rural Development & Land Reform
Urgent: Closing Soon
This tender closes in less than 3 days
Mandatory Requirements
This tender has mandatory submission requirements
Are you a news editor or niche publisher? Embed this tender data directly on your site for free.
Get Embed CodeAI-generated Document Analysis for Tender by Department of Rural Development & Land Reform. 0 business days remain.