Skip to main content
ToolsForensic Analysiskopana power

kopana power

Supplier Forensic Analysis · Scanned: 2026/05/25

Disclaimer: Statistical patterns flagged for review only. This tool does not determine or imply wrongdoing. All findings require independent verification.
Risk Score
Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK
Compliance
N/A/100
Awards
3
Total Value
R 4M

Recent Awards

3 awards · Total: R 4 030 695

Showing 5 of 3
DESIGN, MANUFACTURE, FACTORY ACCEPTANCE TESTING, DELIVERY, INSTALLATION, COMMISSIONING AND SITE ACCEPTANCE TESTING OF THE INVERTERS, AND THE DECOMMISSIONING AND REMOVAL OF THE EXISTING INVERTERS AT ANKERLIG AND GOURIKWA POWER STATIONS
ESKOM
Ref: WCPK1250ZM
R 4 030 695
17 Jul 2025
The design, development, manufacture, integrating, testing at works and site, development of user documentation, training of Eskom personnel, supply, delivery, off-loading at Eskom sites or warehouses and if required, installation and commissioning of Converters, Inverters and Siemens Retrofit Kits on an “as and when required” basis for Transmission Division for a period of five (5) years with an option to extend by an additional five (5) years.
ESKOM
Ref: MWP1735TX
R 0
01 Apr 2024
SUPPLY AND DELIVERY OF LEAD ACID BATTERIES TO PetroSA REFINERY IN MOSSEL BAY , WESTERN CAPE
PetroSA
Ref: AHT25332
R 0
04 Aug 2023

AI Analysis

Powered by Gemini

AI Forensic Analysis

Get AI-generated audit narratives with key findings and recommended actions.
Paid access from R499/mo

or upgrade to Pro Subscription

Risk Assessment

Forensic risk score: 0 out of 100. LOW RISK.Forensic risk score: 0 out of 100. LOW RISK.
0RISK SCORE
LOW RISK

Based on 0 forensic flags detected

Unlock Full Analysis

Get access to all forensic flags, evidence details, and AI-generated audit narratives.

View Full Intelligence Report

Get complete award history, director network, and compliance analysis.

View Report →