This tender has been awarded to PHAPHAMA ELECTRICAL ENGINEERING for Undisclosed Amount.
PHAPHAMA ELECTRICAL ENGINEERING
Issuing Organization
ESKOM
Location
KwaZulu-Natal
Award Date
7 December 2022
Award Date
7 December 2022
Status
Active / AwardedScoring
eTenders ID
16530
GOVERNMENT
Get a full report on PHAPHAMA ELECTRICAL ENGINEERING including tender win history, total contract values, and bidding patterns.
Supply , delivery and commissioning of wireless wi-fi temperature data loggi...
For the provision of consulting services - TRANSNET soc
Thekwini tvet college backup wide area network(6 campuses) - thekwini tvet
Thekwini tvet college primary wide area network (6 campuses) - thekwini tvet
The rbidz labour desk - the richards
The Provision of Bulk Earth and Civil Works, Stringing, Cabling, Earthing, Erection, and Commissioning of Feeder 6 at Ferrum Substation Including Upgrading of the 400kv Scada System
Transactional & Management Advisory Services for TSO Establishment & Eskom Restructuring for 21 Months
The provision of Ferrum Mookodi 2 400kv Line Section B (117.078km from Tower 193 to 441).
the provision of Ferrum – Mookodi 2 400kv Line Section A(90.277 km from Ferrum Substation to Tower 193)
The provision of dry cleaning and laundry services at Eskom Transmission, Simmerpan, Victoria Lake Inn on, as and when required basis.
Learn how to submit a winning bid with these related articles
Everything South African general contractors need to know about how to write a winning tender proposal without an in-house bid team in gauteng — covering CSD, BBBEE, step-by-step processes, common disqualification mistakes, and how Tenders-SA.org helps you find and win relevant contracts in Gauteng.
Security contractors in Gauteng must now navigate a tightening regulatory landscape that intertwines ICT procurement with stringent safety and compliance standards. In 2026, every tender is scrutinised for PSIRA validity, CSD clearance, BBBEE status, SARS TCS compliance, and COIDA standing. Missing or outdated documentation can instantly disqualify a bid, jeopardising lucrative contracts and exposing firms to legal penalties. Understanding the updated framework is therefore not optional—it is essential for survival and growth in the provincial market.
As we navigate the complex regulatory environment of 2026, Construction contractors in Gauteng must prioritize compliance to access the lucrative government procurement opportunities. With the Construction Industry Development Board (CIDB) playing a crucial role in regulating the industry, understanding the CIDB contractor registration process, required documents, and common mistakes is essential for small and medium-sized enterprises (SMEs) to successfully bid for tenders. In this article, we will break down the regulatory framework, required documentation, and provide a step-by-step compliance approach to help Gauteng SMEs overcome barriers to entry.
The construction sector in Gauteng is buzzing with procurement opportunities, driven by government infrastructure projects. For small to medium-sized enterprises (SMEs), accessing these tenders requires compliance with the Construction Industry Development Board (CIDB) contractor registration framework. As a seasoned technical advisor, I'll guide you through the documents, process, and common mistakes to avoid. With the current regulatory environment emphasizing transformation and compliance, understanding the CIDB grading certificate and related requirements is crucial for construction suppliers in Gauteng.
💡 Want more tendering tips and strategies?
Explore Our BlogThe establishment of an enabling agreement for a panel of 30 Contractors to cater for the provision of electrical works performed within the breakdown portfolio on an “As and When required basis, for a period of thirty – six (36) months in the KZN Operating Unit, Central East Cluster.
The Establishment of an Enabling Agreement with a maximum Panel of 30 Contractors for the Provision of Supervision, Labour, Equipment, Material (except the “Big Five” material: Meters, Poles/Cross Arms, Transformers, Cable & Conductor), Transport (as it will be required and authorised) for Electrification of Low Value New Household and Infills Connections (Below R3 000 000,00 per project) for a period of two (2) years and a further six (6) months for the close out of projects, for the Distribution Division in the KwaZulu-Natal Operating Unit, Central East Cluster on an as and when required.
An enabling agreement to establish a panel of 60 Contractors to execute Minor works Project on an “As and When required basis, for a period of 36 months in the KZN Operating Unit, Central East Cluster.
The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required.