    The Establishment of an Enabling Agreement with a maximum Panel of 40 Contractors for the Provision of Supervision, Labour, Equipment, Material (Except the “Big Five” material which include Meters, Poles/Cross Arms, Transformers, Cable and Conductor), Transport (as it will be required and authorised) for Electrification of New Household Connections (Above R3 000 000,00 per project) for a period of thirty (30) months (Twenty-Four (24) months for allocation of task orders and six (6) months for the close-out of projects and finalisation of the payment process) for Distribution Division in the KZN Operating Unit, Central East Cluster as and when required. (Awarded) | Contract Award