This tender invites bids for the refurbishment of the sludge sump at eskom’s matla power station in mpumalanga over a 12-month period. The project is governed by nec3 engineering & construction contract terms and requires compliance with strict technical, financial, and social investment obligations.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Tuesday, 07 July 2026 - 10:00
Venue
Microsoft Teams
Categories
Request for Bid(Open-Tender)
Delmas Road - Kriel - Mpumalanga - 2271
Tenders in this industry often require registration with these bodies.
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: SLUDGE SUMP CONCRETE REFURBISHMENT AND ISOLATIONS SCOPE OF WORK2.pdf, Signed Technical Evaluation for Sludge Sump 09March2026.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
05 Jun
2026
Tender Published
Tender was published
07 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Invitation to Tender (ITT) or Request for Proposal (RFP) - Sludge Sump Refurbishment.pdf
Eskom Holdings SOC Ltd invites tenders for the refurbishment of a sludge sump at Matla Power Station in Mpumalanga for a period of 12 months. The tender (E2982GXMPMAT) closes on 07 July 2026 at 10:00 AM UTC. Submissions must be electronic via Eskom’s e-tendering portal. A non-compulsory clarification meeting is scheduled for 18 June 2026 via Microsoft Teams. The contract will use NEC3 ECC terms with specific options and requires compliance with Eskom’s Standard Conditions of Tender, PPPFA regulations, and other mandatory contractual and legal requirements.
Sludge Sump wall Tender Returnables.xlsx
Analysis completed but response format was invalid
Signed Technical Evaluation for Sludge Sump 09March2026.pdf
SLUDGE SUMP CONCRETE REFURBISHMENT AND ISOLATIONS SCOPE OF WORK2.pdf
Eskom is seeking tenders for the refurbishment of a sludge sump at Matla Power Station in Mpumalanga, with a project duration of 12 months. The work includes acid-resistant flooring as part of the refurbishment scope.
HEALTH AND SAFETY REQUIREMENTS.pdf
Eskom is inviting tenders for the refurbishment of a sludge sump at Matla Power Station in Mpumalanga for a 12-month period. The tender emphasizes strict compliance with Occupational Health and Safety (OHS) requirements, including submission of a Safety File, Health and Safety Plan, risk assessments, and competency certificates. Non-compliance with OHS or document submission deadlines may result in disqualification.
SDL&I Strategy for Sludge Sump Walls Repair and Isolations project.pdf
Eskom is inviting tenders for the refurbishment of sludge sump walls and isolations at Matla Power Station in Mpumalanga. The project has a 12-month duration, and the tender evaluation includes B-BBEE status, price, and specific goals. SDL&I (Supplier Development, Localisation, and Industrialisation) objectives are contractual obligations but do not affect scoring. Local content, job creation, and skills development are key focus areas.
Environmental Contractors Assessment Form (002).pdf
The tender is for the refurbishment of a sludge sump at Matla Power Station in Mpumalanga, South Africa, over a 12-month period. The document outlines environmental management requirements for contractors, including hazardous substance handling, waste generation, storage needs, and compliance with permits and regulations. Contractors must adhere to Eskom's environmental policies, such as the non-conformance procedure (OMOP 2255) and the polluter pays principle.
Sludge Sump refurbishment NEC.pdf
Eskom tender for sludge sump refurbishment at Matla Power Station in Mpumalanga using NEC3 Engineering & Construction Contract (Option A: Priced contract with activity schedule). Contract period is 12 months with a 52-week defects liability period.
Slush Sump Wall Form A Tender & Contract Quality Requirements.pdf
The tender is for the refurbishment of sludge sump walls at Matla Power Station in Mpumalanga, South Africa, over a 12-month period. Issued by Eskom, it requires compliance with ISO 9001 quality standards and includes pre- and post-contract quality requirements, audits, and performance monitoring.
CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf
Eskom is inviting tenders for the refurbishment of a sludge sump at Matla Power Station in Mpumalanga, with a contract duration of 12 months. The tender emphasizes strict adherence to an Environmental Management System (EMS) compliant with ISO 14001:2015, including pollution prevention, legal compliance, and continual environmental performance improvement.
Qs Estimate - Sludge sump FOR BUYER.xlsx
The tender is for the refurbishment of a sludge sump at Matla Power Station over a 12-month period. It involves civil works (surface preparation, concrete repairs, sludge removal, gunite application, wire mesh, acid-resistant tiles), structural steel works (repairs, galvanized steel components, slide gates), mechanical works (pumps, plumbing), and professional engineering services (design, inspection). Compliance with Eskom standards and SHEQ requirements is mandatory.
Environmental Requirements.pdf
The tender is for the refurbishment of a sludge sump at Matla Power Station in Mpumalanga, South Africa, over a 12-month period. Issued by Eskom, it emphasizes strict environmental management, waste handling, compliance with legal standards, and submission of detailed plans (e.g., Environmental Management Plan, Waste Management Plan). The closing date is July 7, 2026.
Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdf
The tender is for the refurbishment of a sludge sump at Matla Power Station in Mpumalanga, South Africa, over a 12-month period. The document primarily focuses on tax classification and compliance requirements for contractors (individuals, companies, CCs, or trusts) providing services to Eskom. It includes questionnaires (Evaluation Pack A for entities and Evaluation Pack B for individuals) to determine the contractor's tax status (e.g., Independent Contractor, Personal Service Provider, Labour Broker, or Dependent Contractor) and whether PAYE (Pay-As-You-Earn) tax should be withheld. The tender requires adherence to South African tax laws, including affidavits and declarations to confirm compliance with criteria like employee count, income sources, and service conditions.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubWe refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: SDL&I Strategy for Sludge Sump Walls Repair and Isolations project.pdfProject scope: Refurbishment of sludge sump walls at Matla Power Station, including repair and isolation works. Duration: 12 months. Business Unit: Matla Power Station (Eskom).
Important Dates
Source: SDL&I Strategy for Sludge Sump Walls Repair and Isolations project.pdf (unknown)Closing date: 07 July 2026 at 10:00 AM (UTC).
SDL&I Implementation Schedule due: 28 days after contract award.
Quarterly SDL&I reports: Due every 3 months during contract.
B-BBEE Improvement Plan: Due within 30 days of contract signing.
Contact Information
Source: SDL&I Strategy for Sludge Sump Walls Repair and Isolations project.pdf (unknown)Buyer: Gloria Marebane (Matla Power Station, Eskom Holdings SOC Ltd).
Compiled by: Thomas Chuene (Senior Advisor, Supplier Development, Localisation and Industrialisation).
Submission Guidelines
Source: SDL&I Strategy for Sludge Sump Walls Repair and Isolations project.pdf (unknown)Required returnable documents for submission:
Note: Failure to submit B-BBEE documentation does not disqualify but limits scoring to price only (90/80 points) and 0/10 or 0/20 for specific goals. Digital signatures on affidavits are not accepted.
Returnable Documents
Source: SDL&I Strategy for Sludge Sump Walls Repair and Isolations project.pdf (unknown)Mandatory returnables:
Note: Digital signatures on affidavits are not accepted.
Evaluation Criteria
Source: SDL&I Strategy for Sludge Sump Walls Repair and Isolations project.pdf (unknown)Scoring system:
B-BBEE Points Table:
Objective criteria: Not mandatory but failure to meet may lead to the second-ranked tenderer being awarded.
Documentation impact: Failure to submit B-BBEE docs results in scoring price only (90/80) + 0/10 or 0/20 for specific goals.
Technical Specifications
Source: SDL&I Strategy for Sludge Sump Walls Repair and Isolations project.pdf (unknown)Scope: Refurbishment of sludge sump walls at Matla Power Station, including repair and isolation works. Duration: 12 months.
Local Content Requirements:
Skills Development:
Job Creation:
Methodology
Source: SDL&I Strategy for Sludge Sump Walls Repair and Isolations project.pdfSkills Development Methodology:
Pricing Schedule
Source: SDL&I Strategy for Sludge Sump Walls Repair and Isolations project.pdfPricing Format:
Financial Requirements
Source: SDL&I Strategy for Sludge Sump Walls Repair and Isolations project.pdf (unknown)Pricing:
Performance Security:
Penalties:
Compliance Requirements
Source: SDL&I Strategy for Sludge Sump Walls Repair and Isolations project.pdf (unknown)B-BBEE Compliance:
R50M revenue: Valid B-BBEE certificate mandatory.
Local Content:
SDL&I Obligations:
B-BBEE Requirements
Source: SDL&I Strategy for Sludge Sump Walls Repair and Isolations project.pdf (unknown)B-BBEE Requirements:
Affidavit Validity:
Special Conditions
Source: SDL&I Strategy for Sludge Sump Walls Repair and Isolations project.pdf (unknown)SDL&I Objectives:
Objective Criteria:
Market Research:
Section
Source: SDL&I Strategy for Sludge Sump Walls Repair and Isolations project.pdfScoring:
B-BBEE Points Table (90/10 or 80/20 system):
Documentation:
Description
Source: Slush Sump Wall Form A Tender & Contract Quality Requirements.pdfProject: Sludge Sump Walls Repair and Isolations at Matla Power Station. Pre-contract award quality requirements apply (Category 3 selected). Bidder must confirm site assessment applicability. Main supplier and sub-supplier capability and capacity assessment may be required.
Important Dates
Source: Slush Sump Wall Form A Tender & Contract Quality Requirements.pdf (unknown)Closing date for quality-related submissions: 05 December 2025.
Evaluation Criteria
Source: Slush Sump Wall Form A Tender & Contract Quality Requirements.pdf (unknown)Evaluation is based on pre-contract award quality requirements (Category 3). Post-contract evaluation includes: contract execution, supplier quality performance monitoring, and quality audits. Applicable ISO 9001 clauses: Context of the Organisation, Leadership, Planning, Support, Operation, Performance Evaluations, and Improvement. Bidder must submit Form A with applicable clauses marked (X).
Technical Specifications
Source: Slush Sump Wall Form A Tender & Contract Quality Requirements.pdf (unknown)Scope: Sludge Sump Walls Repair and Isolations project at Matla Power Station. Quality requirements: Category 3 (Pre-Contract Award Quality Requirements) applies. Bidder must indicate whether site assessment is applicable. Main supplier and sub-supplier capability and capacity assessment may be required. Alignment with ISO 9001 principles is mandatory: Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence-based decision making, and Relationship Management.
Methodology
Source: Slush Sump Wall Form A Tender & Contract Quality Requirements.pdfBidder must demonstrate alignment with ISO 9001 principles: Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence-based decision making, and Relationship Management.
Quality Management
Source: Slush Sump Wall Form A Tender & Contract Quality Requirements.pdfQuality requirements: ISO 9001 standard compliance is mandatory. Applicable clauses: Context of the Organisation, Leadership, Planning, Support, Operation, Performance Evaluations, and Improvement. Eskom reserves rights to access, information, preservation, and quality audits. Management of nonconformities and nonconforming outputs is required.
Compliance Requirements
Source: Slush Sump Wall Form A Tender & Contract Quality Requirements.pdf (unknown)Bidder must be a registered supplier capable of meeting ISO 9001 and Eskom’s quality clauses. Submission of Form A (Tender & Contract Quality Requirements) with applicable clauses marked (X) is mandatory. Copyright compliance: No reproduction of documents without Eskom’s written consent.
Section
Source: Slush Sump Wall Form A Tender & Contract Quality Requirements.pdfPre-contract award quality requirements (Category 3) selected. Post-contract evaluation includes: contract execution, supplier quality performance monitoring, and quality audits. Applicable ISO 9001 clauses: Context of the Organisation, Leadership, Planning, Support, Operation, Performance Evaluations, and Improvement.
Description
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdfRefurbishment of sludge sump at Matla Power Station over a 12-month period. Work must align with the station’s Environmental Management System (EMS) and environmental compliance obligations.
Submission Guidelines
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf (unknown)Submit the following returnable documents: Signed Contractors Commitment and Indemnity Letter (Annexure D). Completed housekeeping check sheet (Annexure C) to the environmental department before commencement of work. Final housekeeping check sheet must be submitted at the end of the contract period for assessment.
Evaluation Criteria
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf (unknown)Evaluation criteria include: Open to contractors capable of executing sludge sump refurbishment work at a power station. Must demonstrate capacity to implement and maintain an ISO 14001:2015-compliant Environmental Management System (EMS). Must have a track record of adhering to environmental laws and regulations in South Africa. Experience in similar projects, particularly in power stations or industrial environments, is advantageous. Ability to provide and maintain required documentation (EMS file, check sheets, etc.).
Technical Specifications
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf (unknown)Scope: Sludge sump refurbishment at Matla Power Station for a 12-month period. Contractor must: Establish, implement, and maintain an Environmental Management System (EMS) consistent with ISO 14001:2015. Manage environmental aspects as per legislation, licenses, acts, regulations, and station-specific requirements (e.g., OMOP 4402 and OMOP 4090). Identify environmental risks and opportunities, set performance indicators, and develop management programs for significant aspects. Ensure continual improvement of environmental performance. Comply with environmental operational controls and planning as per OMOP 4402 and OMOP 4090. Polluter pays principle applies: Contractor is liable for any housekeeping or waste-related findings at the end of the contract. Maintain an EMS file as proof of compliance.
Quality Management
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf (unknown)Contractor must establish, implement, and maintain an Environmental Management System (EMS) consistent with the ISO 14001:2015 framework. Maintain an EMS file as proof of compliance.
Compliance Requirements
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf (unknown)Compliance with ISO 14001:2015 EMS. Fulfill all environmental compliance obligations (licenses, acts, regulations, etc.). Adhere to environmental operational controls and planning as per OMOP 4402 and OMOP 4090. Polluter pays principle: Contractor is liable for any housekeeping or waste-related findings at the end of the contract period. Maintain an EMS file as proof of compliance. Ensure all documentation is in line with the authorized version on the system. No reproduction of documents without Eskom’s expressed consent.
Environmental
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdfContractor must: Establish, implement, and maintain an EMS aligned with ISO 14001:2015. Fulfill all environmental compliance obligations (licenses, acts, regulations, etc.). Identify environmental risks and opportunities, set performance indicators, and develop management programs. Ensure continual improvement of environmental performance. Comply with environmental operational controls and planning as per OMOP 4402 and OMOP 4090. Polluter pays principle applies: Contractor is liable for any housekeeping or waste-related findings at the end of the contract. Submit housekeeping check sheet (Annexure C) to the environmental department before work commencement and at contract end. Maintain an EMS file as proof of compliance.
Contractual Terms
Source: CONTRACTORS COMMITMENT AND INDEMNITY LETTER.pdf (unknown)Contractor must ensure all documentation is in line with the authorized version on the system. No part of the document may be reproduced without Eskom’s expressed consent.
Important Dates
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Sludge Sump Refurbishment.pdf (RFP)Closing date: 07 July 2026 at 10:00 AM.
Non-compulsory clarification meeting: 18 June 2026 at 11:00 AM via Microsoft Teams (Join: https://teams.microsoft.com/meet/353290217651916?p=QatYNq9IetNVZVsp8N; Meeting ID: 353 290 217 651 916; Passcode: Yc9mG9qU). Confirm attendance with Eskom Representative (name, position, contact details of attendees).
Clarification queries deadline: 5 working days before tender closing (by 02 July 2026).
Tender validity period: 24 weeks (until 22 December 2026 at 10:00 AM).
Contact Information
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Sludge Sump Refurbishment.pdf (RFP)Eskom Representative: Gloria Marebane. Tel: 017 612 6573. Email: [email protected]. All queries and clarifications must be addressed in writing to the Eskom Representative only.
Fraud/corruption reporting: Hotline 0800 11 2722 or email [email protected].
Submission Guidelines
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Sludge Sump Refurbishment.pdf (RFP)Submit electronically via Eskom E-tendering portal (https://etendering.eskom.co.za) by 07 July 2026 at 10:00 AM. Late submissions are not accepted. All documents must be in PDF format (max 500MB per file, total submission max 4GB). Price list must be submitted in both PDF and Excel. No ZIP files or hard copies allowed. Resubmissions override previous versions—ensure submission status is marked as 'complete'.
Mandatory returnables (disqualifiable if missing/incomplete at tender closing):
Non-disqualifiable returnables (5-day grace period for completion if requested by Procurement Practitioner):
Returnables required for evaluation (not disqualifiable but score zero if missing/incomplete):
Additional notes:
Evaluation Criteria
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Sludge Sump Refurbishment.pdf (RFP)Evaluation follows the 80/20 PPPFA system:
Basic compliance requirements:
Functionality requirements:
Disqualification risks:
B-bbee:
Technical Specifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Sludge Sump Refurbishment.pdf (RFP)Scope: Sludge sump refurbishment at Matla Power Station for a fixed 12-month period.
Work includes all activities outlined in:
Tenderers must:
Quality Management
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Sludge Sump Refurbishment.pdfQuality requirements:
Pricing Schedule
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Sludge Sump Refurbishment.pdfSubmit a completed Pricing Schedule/Bill of Quantities (Annexure 1.1.20) in both PDF and Excel formats. If cataloguing is required, include a line item for it in the Pricing Schedule. Upload constraints: Max 500MB per document; total submission max 4GB.
Financial Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Sludge Sump Refurbishment.pdf (RFP)Pricing submission:
Payment terms:
Discounts:
Additional notes:
Compliance Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Sludge Sump Refurbishment.pdf (RFP)Mandatory compliance:
Additional contractual requirements (not evaluation criteria but mandatory for contract award):
Joint Ventures/Consortiums:
Contract type: NEC3 ECC with:
CIDB requirements apply for Engineering and Construction Works Contracts. Contract Skills Development Goals (CSDG) and Contract Participation Goals (CPG) are not applicable for this tender.
Health & Safety
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Sludge Sump Refurbishment.pdfSHEQ (Safety, Health, Environment, and Quality) requirements apply:
Contractual Terms
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) - Sludge Sump Refurbishment.pdfContract type: NEC3 Engineering and Construction Contract (ECC) with:
Applicable requirements:
Payment terms:
Additional notes:
Evaluation Criteria
Source: SLUDGE SUMP CONCRETE REFURBISHMENT AND ISOLATIONS SCOPE OF WORK2.pdf (unknown)Eligibility: Must be a registered Eskom vendor or meet Eskom’s supplier registration requirements. Experience: Prior experience in industrial refurbishment, particularly in power stations or similar environments, is required. Compliance: Must adhere to South African labor, health, and safety regulations.
Technical Specifications
Source: SLUDGE SUMP CONCRETE REFURBISHMENT AND ISOLATIONS SCOPE OF WORK2.pdf (unknown)Scope: Refurbishment of sludge sump at Matla Power Station. Specific requirement: Acid-resistant treatment for the floor.
Description
Source: Sludge Sump refurbishment NEC.pdfThe project involves sludge sump refurbishment at Matla Power Station, located approximately halfway between Bethal and Ogies on the R545, 13 km north-west of Kriel town. The site is situated in a summer rainfall area with specific climatic conditions, including average annual precipitation of 750 mm, primarily between October and April. The project requires compliance with Eskom’s standards and regulations, including health, safety, and environmental requirements.
Important Dates
Source: Sludge Sump refurbishment NEC.pdf (unknown)The period for reply is 3 working days. The starting date is to be confirmed post-award. The Contractor must submit revised programmes at intervals no longer than 2 days during project execution and once a week during procurement and engineering. The completion date for the whole of the works is to be confirmed. The defects date is 52 weeks after completion of the whole of the works. The defect correction period is 1 week, except for production loss and SHE requirements (24 hours) and low-risk defects (1 week).
Contact Information
Source: Sludge Sump refurbishment NEC.pdf (unknown)Project Manager and Supervisor are based at Matla Power Station, Delmas Road, Kriel, 2271. Contact phone: 013 699 7871. For additional support, contact Engineering Contract Strategies: Tel 011 803 3008, Fax 011 803 3009, or visit www.ecs.co.za.
Submission Guidelines
Source: Sludge Sump refurbishment NEC.pdf (unknown)Submit the following returnable documents: C1.1 Form of Offer and Acceptance (3 pages). The tenderer must be duly authorised to sign this form. The Employer accepts the Offer by signing the Acceptance part and returning one copy, including the Schedule of Deviations (if any), to the tenderer before the end of the period of validity stated in the Tender Data. A tenderer’s covering letter must not be included in the final contract document. Any deviations must be recorded in the Schedule of Deviations and incorporated into the final draft of the contract documents.
Returnable Documents
Source: Sludge Sump refurbishment NEC.pdf (unknown)C1.1 Form of Offer and Acceptance procurement of: Sludge Sump refurbishment and addenda thereto and by submitting this Offer has accepted the Conditions of Tender. contract including compliance with all its terms and conditions according to their true intent and meaning for an amount to be determined in accordance with the conditions of contract identified in the Contract Data. Value Added Tax @ 15% is The offered total of the amount due inclusive of VAT is (in words) Acceptance and returning one copy of this document including the Schedule of Deviations (if any) to the tenderer before the end of the period of validity stated in the Tender Data, or other period as agreed, whereupon the tenderer becomes the party named as the Contractor in the conditions of contract identified in the Contract Data. Signature(s) Name(s) tenderer: (Insert name and address of organisation) signature of Date witness Tenderer’s CIDB registration number (if applicable)
Evaluation Criteria
Source: Sludge Sump refurbishment NEC.pdf (unknown)Evaluation is based on compliance with the following: Contractor must be a legally registered entity, potentially CIDB registered (if applicable), and compliant with South African law. Must be able to provide required guarantees/insurance. Joint ventures are permitted but with joint and several liability. Contractor must spend 2% of the contract value on Corporate Social Investment (CSI) projects, as specified by Matla Power Station. Contractor must develop local skilled labour at Kriel and hire non-skilled employees from the Kriel community. The list of CSI projects and potential employees will be provided by Matla Power Station.
Technical Specifications
Source: Sludge Sump refurbishment NEC.pdf (unknown)Scope includes sludge sump refurbishment at Matla Power Station. Key technical requirements: Prior to applying spray concrete, all deteriorated or defective concrete must be removed. Carbonated concrete must be removed to a depth of at least 20mm behind rebar and 50mm into non-carbonated concrete. Concrete deteriorated due to chloride attack must be removed to a depth of at least 30mm behind rebar and 100mm into sound concrete. Sprayed concrete must not be used in temperatures below 2°C, on substrates exposed to windy conditions, or rainfall. Substrates must be damp but without free water prior to application. Repairs must follow Eskom Power Station remedial work standard (240-144332407) for civil concrete remedial work. A method statement for execution must be reviewed and signed off by the contractor’s Professional Engineer (ECSA registered). Sludge removal in launder channels and sump using a vacuum truck (approximately 30m³). 35 MPa Gunite concrete to walls, in accordance with Eskom Standards (240-144332407). Supply and installation of wire mesh (Ref 395, allow 700m²) and acid-resistant tiles (allow 645m²). Structural steel works include repair of existing grating and supply/installation of galvanised steel components (equal angle iron and I-beams of specified dimensions).
Methodology
Source: Sludge Sump refurbishment NEC.pdf (unknown)Contractor must develop a high-level programme and resource each activity to arrive at lump sum prices for the Activity Schedule. Activities must be well-defined, shown on a programme, and priced as lump sums. Contractor must link the Activity Schedule to their programme and ensure all activities are inclusive of everything necessary to complete the works. Method statements for execution must be reviewed and signed off by the contractor’s Professional Engineer (ECSA registered). Concrete repairs must follow Eskom’s standards, and sludge removal must use specified equipment (e.g., vacuum truck).
Experience & Qualifications
Source: Sludge Sump refurbishment NEC.pdfContractor must provide details of key personnel, including names, jobs, and responsibilities. CVs and further key personnel data must be appended to the Tender Schedule. Contractor must demonstrate experience in similar projects, particularly in civil concrete remedial work, sludge removal, and structural steel works. A method statement for execution must be reviewed and signed off by the contractor’s Professional Engineer (ECSA registered).
Quality Management
Source: Sludge Sump refurbishment NEC.pdfDefects date is 52 weeks after completion of the whole of the works. Defect correction period is 1 week, except for production loss and SHE requirements (24 hours) and low-risk defects (1 week). Contractor must promptly replace or repair loss of or damage to the Works, Plant, and Materials until the defects certificate is issued. Each party indemnifies the other against claims, proceedings, compensation, and costs due to an event at their risk. Liability is reduced proportionally if events at the other party’s risk contributed.
Pricing Schedule
Source: Sludge Sump refurbishment NEC.pdfPricing follows NEC3 ECC3 Option A (Priced contract with activity schedule). Work is broken down into activities, each priced as a lump sum. Only completed activities are assessed for payment at each assessment date. Activity Schedule is a pricing document and not Works Information. Contractor must link the Activity Schedule to their programme. Prices must include everything necessary to complete the works as per the Works Information. No adjustments are made for quantity differences; changes only occur due to compensation events. Activity Schedule format includes items such as preliminaries, civil works, and structural steel works.
Financial Requirements
Source: Sludge Sump refurbishment NEC.pdf (unknown)Contract is a priced contract with an activity schedule (NEC3 ECC3 Option A). Payment terms: Assessment interval is by the 25th of each successive month. Currency is South African Rand. Payment is made within 30 days from the date of submission of the invoice. Interest rate is the publicly quoted prime rate of interest (calculated on a 365-day year) charged by Standard Bank of South Africa. For foreign currency, the LIBOR rate applies. The Contractor must provide a tax invoice within one week of receiving a payment certificate from the Project Manager. The Employer’s VAT number (4740101508) must be included on each invoice. Retention is 5% of every payment made; 50% is paid after project completion, and the remaining 50% after 52 weeks. Performance bond amount to be advised at tender award stage. Delay damages for late completion are 1% of the total order value per week, up to a maximum of 2.5% of the order value.
Compliance Requirements
Source: Sludge Sump refurbishment NEC.pdf (unknown)Contractor must be a legally registered entity in South Africa. CIDB registration is required if applicable. Contractor must comply with all South African laws and regulations. B-BBEE compliance: Contractor must notify the Employer within 7 days of any change in B-BBEE status. An updated verification certificate and supporting documentation must be submitted to the Project Manager within 30 days of notification. Failure to notify may result in termination. If B-BBEE status decreases, the Employer may renegotiate or terminate the contract. Contractor must not cede, delegate, or assign rights without written consent from the Employer. Joint ventures are permitted but require joint and several liability. Contractor must provide proof of insurance as per the Insurance Table A and B. Contractor must comply with Construction Regulations 2014 and all applicable health, safety, and environmental laws. Asbestos handling must comply with Eskom’s Asbestos Standard 32-303 and South African regulations.
B-BBEE Requirements
Source: Sludge Sump refurbishment NEC.pdf (unknown)Contractor must spend 2% of the contract value on Corporate Social Investment (CSI) projects, as specified by Matla Power Station. Contractor must develop local skilled labour at Kriel and hire non-skilled employees from the Kriel community. The list of CSI projects and potential employees will be provided by Matla Power Station. Contractor must notify the Employer within 7 days of any change in B-BBEE status and submit an updated verification certificate within 30 days. Failure to notify may result in termination. If B-BBEE status decreases, the Employer may renegotiate or terminate the contract.
Health & Safety
Source: Sludge Sump refurbishment NEC.pdfContractor must take all reasonable precautions to maintain health and safety, including compliance with Construction Regulations 2014 and all applicable health and safety laws. Contractor may be appointed as the Principal Contractor for the site. Prices must include sufficient amounts for compliance with health and safety requirements. Contractor must ensure subcontractors, employees, and others under their control comply with health and safety regulations. Non-compliance with statutory SHE and legal requirements is included in the Risk Register. Covid-19 is also considered a risk. Asbestos handling must comply with Eskom’s Asbestos Standard 32-303. The OEL for asbestos is 0.2 fibres/ml (4-hour TWA) and 0.6 fibres/ml (10-minute TWA). Contractor’s personnel may stop work and leave contaminated areas until declared safe. Removal and disposal of asbestos must be done by a registered asbestos contractor at the Employer’s expense.
Environmental
Source: Sludge Sump refurbishment NEC.pdfContractor must comply with all applicable environmental laws, regulations, and procedures specified in the contract. Environmental risks include Matla Power Station stack emissions, dry dust (fly ash) handling, dust from coal stock yards, roads, and seasonal activities. Contractor must ensure subcontractors and employees comply with environmental requirements. Weather data for compensation events is recorded at Matla Power Station and available from the South African Weather Bureau. Adverse weather conditions beyond assumed 1-in-10-year return figures may qualify as compensation events. The site is in a summer rainfall area with specific climatic conditions, including high hail frequency and variable temperatures.
Contractual Terms
Source: Sludge Sump refurbishment NEC.pdfContract is governed by NEC3 Engineering and Construction Contract (ECC3), April 2013. Main Option A: Priced contract with activity schedule. Secondary Options include X2 (Changes in the Law), X5 (Sectional Completion), X7 (Delay Damages), X13 (Performance Bond), X16 (Retention), X17 (Low Performance Damages), and X18 (Limitation of Liability). Dispute resolution follows Option W1 with adjudication by ICE-SA or AFSA. Arbitration is conducted in Johannesburg under the Association of Arbitrators (Southern Africa) rules. Contractor’s liability for indirect or consequential loss is limited to R0.00. The end of liability date is one year after the defects date for latent defects. Termination is subject to clause 90 of NEC3 ECC3. Contractor must provide securities, bonds, guarantees, proof of insurance, and other documentation as specified in the Contract Data.
Special Conditions
Source: Sludge Sump refurbishment NEC.pdf (unknown)Tenderer’s covering letter must not be included in the final contract document. Any deviations from tender documents must be limited to those permitted in the Conditions of Tender. The Schedule of Deviations must record all agreed deviations and amendments. No other matters, whether written, oral, or implied, have any effect in the contract unless contained in the Schedule of Deviations.
Section
Source: Sludge Sump refurbishment NEC.pdfEvaluation includes compliance with CSI and local labour development requirements. Contractor must spend 2% of the contract value on CSI projects provided by Matla Power Station. Contractor must develop local skilled labour at Kriel and hire non-skilled employees from the Kriel community. The list of potential employees will be provided by Matla Power Station. Any deviations from tender documents must be limited to those permitted in the Conditions of Tender and recorded in the Schedule of Deviations.
Evaluation Criteria
Source: Environmental Requirements.pdf (unknown)Evaluation will assess:
Required documentation for evaluation:
Technical Specifications
Source: Environmental Requirements.pdf (unknown)Scope requires implementation of an Environmental Management System (e.g., ISO 14001), including:
Submit an Environmental Management Plan (EMP) covering:
Submit a Waste Management Plan (WMP), including:
Include an Environmental Bill of Quantities (EBQ) for costs (e.g., purchase of waste bins).
Compliance Requirements
Source: Environmental Requirements.pdf (unknown)Mandatory compliance requirements:
Health and Safety Compliance:
Health & Safety
Source: Environmental Requirements.pdfHealth and Safety Requirements:
Environmental
Source: Environmental Requirements.pdfEnvironmental Requirements:
Contractual Terms
Source: Environmental Requirements.pdf (unknown)Contractual Terms:
Submission Guidelines
Source: Signed Technical Evaluation for Sludge Sump 09March2026.pdf (unknown)Returnable Documents: Not specified in the provided text.
Description
Source: Qs Estimate - Sludge sump FOR BUYER.xlsxProject involves refurbishment of the sludge sump at Matla Power Station over a 12-month period. Work includes:
Evaluation Criteria
Source: Qs Estimate - Sludge sump FOR BUYER.xlsx (unknown)General:
Technical:
Safety:
Technical Specifications
Source: Qs Estimate - Sludge sump FOR BUYER.xlsx (unknown)Scope: Refurbishment of sludge sump at Matla Power Station, including civil, structural steel, mechanical, and professional engineering services over 12 months.
Civil Works:
Structural Steel Works:
Mechanical Works:
Professional Services:
General Requirements:
Description
Source: Environmental Contractors Assessment Form (002).pdfProject scope: Refurbishment of sludge sump at Matla Power Station. Contractor must define their specific scope of work and confirm the duration is 12 months as per the tender title.
Submission Guidelines
Source: Environmental Contractors Assessment Form (002).pdf (unknown)Submit the completed Environmental Contractors Assessment Form (Annexure A). Required fields: contractor name, date of assessment, responsible person (contractor), and assessor details. Ensure all sections are filled, including scope, duration, hazardous substances, waste details, and facility requirements.
Evaluation Criteria
Source: Environmental Contractors Assessment Form (002).pdf (unknown)Evaluation focuses on: Compliance with Eskom’s Environmental Management System (EMS) and South African environmental laws. Valid MSDS for all hazardous substances used. Valid waste transportation and disposal certificates if applicable. Proof of adherence to relevant permits (e.g., Water Use License, Waste Permit). Acceptance of liability for environmental non-conformance and corrective actions (per OMOP 2255 and polluter pays principles). Prior experience in sludge sump refurbishment or similar power station projects may be advantageous.
Technical Specifications
Source: Environmental Contractors Assessment Form (002).pdf (unknown)Scope: Refurbishment of sludge sump at Matla Power Station over 12 months. Contractor must: Define their specific scope of work. Confirm duration aligns with the 12-month tender period. Declare all hazardous chemical substances (e.g., oil, grease, SAF-Heavy, hydrochloric acid, cleaning materials, pesticides) and provide a 16-point MSDS for each. Notify Matla of any waste generation and specify type (hazardous/domestic). Indicate if hazardous chemical storage area or workshop is required. Confirm if work is tied to Matla Permit or Record of Decision (e.g., Water Use License, Waste Permit).
Quality Management
Source: Environmental Contractors Assessment Form (002).pdfWork may be subject to Matla Permit or Record of Decision (e.g., Water Use License, Waste Permit). If transporting waste, provide valid transportation and disposal certificate to Matla Environmental Department. Contractor must be aware of non-conformance procedure OMOP 2255 and polluter pays principles; corrective actions are the contractor’s liability.
Compliance Requirements
Source: Environmental Contractors Assessment Form (002).pdf (unknown)Environmental compliance: Notify Matla of waste generation and specify type (hazardous/domestic). Provide valid waste transportation and disposal certificates to Matla Environmental Department if transporting waste. Demonstrate awareness of non-conformance procedure OMOP 2255 and polluter pays principles; corrective actions are the contractor’s liability. Work may be subject to Matla Permit or Record of Decision (e.g., Water Use License, Waste Permit). Hazardous materials: Declare all hazardous chemical substances and provide a 16-point MSDS for each. Document control: Verify alignment with the authorized version on Eskom’s system. No reproduction without expressed consent of Eskom Holdings SOC Ltd (Reg No 2002/015527/30).
Health & Safety
Source: Environmental Contractors Assessment Form (002).pdfHazardous materials: Declare all hazardous chemical substances (e.g., oil, grease, SAF-Heavy, hydrochloric acid, cleaning materials, pesticides) and provide a 16-point MSDS for each. Waste management: Notify Matla of any waste generation and specify type (hazardous/domestic). Facilities: Indicate if hazardous chemical storage area or workshop is required for execution.
Contractual Terms
Source: Environmental Contractors Assessment Form (002).pdf (unknown)Document control: When downloaded, this document is uncontrolled. Users must verify alignment with the authorized version on Eskom’s system. No reproduction without expressed consent of Eskom Holdings SOC Ltd (Reg No 2002/015527/30).
Submission Guidelines
Source: HEALTH AND SAFETY REQUIREMENTS.pdf (unknown)Submit all returnable documents during tender close-out. Outstanding documents must be submitted within 7 working days of request. Failure to submit within this period may result in disqualification as non-responsive. OHS requirements are mandatory and must be complied with prior to contract signing. No work may commence until the Safety file is approved by Matla Power Station’s Contract Custodian and OHS professional.
Returnable Documents
Source: HEALTH AND SAFETY REQUIREMENTS.pdf (unknown)Tenderers have ONE opportunity to submit outstanding documents within 7 working days. Failure to comply may result in disqualification as non-responsive.
Evaluation Criteria
Source: HEALTH AND SAFETY REQUIREMENTS.pdf (unknown)Evaluation occurs after mandatory and functionality evaluations are completed. Mandatory criteria include: submission of all required OHS documentation, compliance with OHS Act and ISO 45001 standards, provision of valid competency certificates, detailed OHS costing and risk assessments, and three-year incident statistics. Disqualification risks: failure to submit outstanding documents within 7 working days, non-compliance with OHS requirements, incomplete or non-aligned Health and Safety Plan or Baseline Risk Assessment (BRA).
Financial Requirements
Source: HEALTH AND SAFETY REQUIREMENTS.pdf (unknown)Provide detailed OHS costing, broken down (not lump sum). Costing must align with the scope of work and risk assessment. The scope of work and risk assessment may serve as a guideline for costing.
Compliance Requirements
Source: HEALTH AND SAFETY REQUIREMENTS.pdf (unknown)Submit the following: Signed acknowledgement of Eskom’s OHS legal and other requirements form. Health and Safety Plan addressing project OHS risks, aligned with specifications. Valid Letter of Good Standing (COIDA or equivalent). Occupational Health & Safety policy signed by CEO, compliant with OHS Act Section 7 and ISO 45001 Clause 5.2. OHS Baseline Risk Assessment (BRA) with methodology. Competency certificates for: Health and Safety Officer (NQF 6 National Diploma in Safety Management or SAMTRAC NQF 5), Risk Assessment (HIRA), Incident Investigation, First Aid, ISO 45001 awareness. Health and safety statistics for the past three years, including medicals, lost time injuries, occupational diseases, and fatalities. Safety file must be approved by Matla Power Station’s Contract Custodian and OHS professional before work commences.
Health & Safety
Source: HEALTH AND SAFETY REQUIREMENTS.pdfWork may not commence until the Safety file is approved by Matla Power Station’s Contract Custodian and OHS professional. Required submissions: Health and Safety Plan addressing project OHS risks, aligned with specifications. Detailed OHS costing (broken down, not lump sum), based on scope of work and risk assessment. OHS Baseline Risk Assessment (BRA) with methodology. Valid Letter of Good Standing (COIDA or equivalent). Occupational Health & Safety policy signed by CEO, compliant with OHS Act Section 7 and ISO 45001 Clause 5.2. Competency certificates for: Health and Safety Officer (NQF 6 or SAMTRAC NQF 5), Risk Assessment (HIRA), Incident Investigation, First Aid, ISO 45001 awareness. Health and safety statistics for the past three years (medicals, lost time injuries, occupational diseases, fatalities).
Special Conditions
Source: HEALTH AND SAFETY REQUIREMENTS.pdf (unknown)OHS requirements are mandatory and form part of the procurement process. Compliance is required prior to contract signing.
Section
Source: HEALTH AND SAFETY REQUIREMENTS.pdfEvaluation will take place once mandatory and functionality evaluations are completed.
Description
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdfThe tender involves sludge sump refurbishment at Matla Power Station for a period of 12 months. The primary focus is the tax classification of the bidder, which determines PAYE withholding requirements.
Important Dates
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdf (unknown)Pack validity period: 1 March 2026 to 28 February 2027. Tender closing date: 7 July 2026 at 10:00.
Contact Information
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdf (unknown)Submit completed documents to your Eskom contractor representative. For tax-related queries, contact Eskom Group Tax Department in Megawatt Park. Copy all submissions to: [email protected]. Required contractor details include: Name, Vendor No., Duly Authorised Representative Name, Surname, Capacity, ID No., Passport No. (if no RSA ID), Country of Passport Issue, VAT Registration No., Income Tax Registration No., CO/CC/Trust Registration No., Email Address, Telephone Number, Fax Number, Physical and Postal Business Address, and Bank Details (Account Number, Bank Name, Branch Name, Branch Number, Account Holder Name, Account Type, Account Holder Relationship).
Submission Guidelines
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdf (unknown)Submit the completed Pack (signed summary sheet and signed affidavits) to your Eskom contractor representative. Copy Group Tax via email: [email protected]. All fields marked with an asterisk (*) must be completed. Failure to sign required affidavits or declarations will result in PAYE being withheld from payments. Eskom disclaims all liability for loss or damages arising from the use of this Pack. Bidders are responsible for the accuracy and completeness of all information provided. The Pack will not be automatically updated with legislative changes.
Returnable Documents
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdf (unknown)Appendix 9 (Non-Resident Declaration) requires: Confirmation of non-resident status in South Africa. Undertaking to notify Eskom of status changes.
Evaluation Criteria
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdf (unknown)Tax classification is determined via a structured questionnaire with yes/no answers. For Companies/CCs/Trusts (Evaluation Pack A) and Individuals (Evaluation Pack B), responses to questions in the Dominant Impression Test (Section 6) and other sections determine whether the bidder is classified as a Personal Service Provider (PSP), Dependent Contractor, Independent Contractor, or Labour Broker. Key criteria: Independent Contractors must not be controlled by Eskom, must not derive >80% income from Eskom, and must employ 3+ non-connected full-time employees. PSPs or Dependent Contractors are subject to PAYE withholding if they fail the Dominant Impression Test or other criteria. Labour Brokers must provide a valid IRP30 exemption certificate to avoid PAYE withholding; otherwise, PAYE applies. Non-residents must sign Appendix 9. Failure to answer truthfully or provide required declarations may result in PAYE withholding.
Technical Specifications
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdf (unknown)The tender requires classification of the bidder for tax purposes as one of the following: Independent Contractor, Personal Service Provider (PSP), Labour Broker, or Dependent Contractor. The classification determines whether PAYE will be withheld from payments. The scope involves sludge sump refurbishment at Matla Power Station for a period of 12 months. Employees’ Tax (PAYE) rates and codes: PSP: 28% (coded 3601 or 3616 on IRP5, nature 'H'). Labour Broker with IRP30: No PAYE (IT3(a) code 3617, reason code 07). Labour Broker without IRP30: PAYE withheld at individual rates (IRP5 code 3617). PAYE is calculated on VAT-exclusive amounts.
Pricing Schedule
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdfTax implications for payments: Labour Brokers with valid IRP30 certificate: No PAYE withheld; IT3(a) certificate issued (code 3617, reason code 07). Labour Brokers without valid IRP30 certificate: PAYE withheld at individual tax rates until certificate is provided; IRP5 certificate issued (code 3617). Dependent Contractors or PSPs: PAYE withheld at 28% (or applicable rates); coded as 3601 or 3616 on IRP5. Independent Contractors: No PAYE withheld. PAYE is calculated on the VAT-exclusive amount.
Financial Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdf (unknown)If classified as a Labour Broker: With valid IRP30 certificate, no Employees' Tax withheld; IT3(a) certificate issued with code 3617 (reason code 07). Without valid IRP30 certificate, Employees' Tax withheld at individual tax rates until certificate is provided; IRP5 certificate issued with code 3617. If classified as Dependent Contractor or PSP: Employees' Tax withheld at 28% (or applicable rates) and coded as 3601 or 3616 on IRP5. Independent Contractors: No PAYE withheld. PAYE is calculated on the VAT-exclusive amount.
Compliance Requirements
Source: Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.docx.pdf (unknown)Bidders must complete the PAYE Questionnaire to determine tax classification. Required documents include: Signed summary sheet, signed affidavits (Appendices 1-9, as applicable), valid IRP30 exemption certificate (for Labour Brokers), proof of residency, VAT registration, income tax registration, and company/CC/trust registration (where applicable). Bidders must complete the appropriate Evaluation Pack (A for Companies/CCs/Trusts, B for Individuals) and answer all questions truthfully. Fields marked with an asterisk (*) are mandatory. Non-compliance or failure to notify Eskom of changes may result in PAYE withholding and liability for taxes, penalties, and interest imposed by SARS.
Description
Source: Sludge Sump wall Tender Returnables.xlsxThe tender involves the refurbishment of a sludge sump at Matla Power Station for a period of 12 months. Bidders must select the applicable category (e.g., Category 1-4) based on their compliance and documentation capabilities, as outlined in the returnable documents template. Categories define the required deliverables, such as ISO certificates, audit reports, Draft CQP, ITP, and roles/responsibilities documentation.
Submission Guidelines
Source: Sludge Sump wall Tender Returnables.xlsx (unknown)Submit the following returnable documents based on the selected category: Form A, ISO 9001:2015 certificate (if applicable), internal and external management system audit reports (including Nonconformity, Correction, and/or Corrective Action Reports), Draft Contract Quality Plan (CQP) and Inspection and Test Plan (ITP) as per Scope of Works (Reference: ISO 10005), and documented roles, responsibilities, and authorities. Save the completed template in PDF format, sign, and preferably lock the sheet before submission. Ensure the print area fits on one page.
Evaluation Criteria
Source: Sludge Sump wall Tender Returnables.xlsx (unknown)Evaluation is based on a weighted scoring system across five sections: Section A (Quality Management System Requirements, 25%), Section B (Evidence of QMS in operation, 25%), Section C (Contract Quality Plan Requirements, 20%), Section D (Quality Control Plan Requirements, 20%), and Section E (User-defined additional requirements, ~10%). Each section has specific criteria, such as QMS manuals, audit reports, and corrective action records, with scores allocated per requirement. Bidders must meet the minimum thresholds for each section to qualify.
Compliance Requirements
Source: Sludge Sump wall Tender Returnables.xlsx (unknown)Compliance with ISO 9001:2015 is mandatory. Bidders must provide evidence of a Quality Management System (QMS) either through: Option 1: Valid ISO 9001:2015 certification (with defined product/service scope, authorized certification body, recognized accreditation, and valid expiry date), OR Option 2: Operational evidence of QMS, including QMS manual, quality policy and objectives approved by top management, documented information for control of nonconforming outputs, corrective actions, internal audits, roles and responsibilities, and control of externally provided processes, products, and services. Additional requirements include internal and external audit reports with Nonconformity, Correction, and/or Corrective Action Reports.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2000
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 107 of 1998
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 85 of 1993
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Act 103 of 1977
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Address
Delmas Road - Kriel - Mpumalanga - 2271
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
13
Last checked
12 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
A practical guide for small and medium building contractors on winning government tenders for schools, clinics, housing, and municipal buildings in South Africa.
How to structure a dedicated bid team that consistently wins South African government tenders — covering roles, responsibilities, workflow processes, review gates, tools, and scaling strategies.
How Tenders-SA built the JV Suite — a complete toolkit for joint venture formation in South African government procurement, covering CIDB grade calculation per Practice Note 29, B-BBEE consolidated scoring for unincorporated JVs, fronting risk detection, and the partner finder that matches companies by complementarity.
How consulting engineers, engineering firms, and multidisciplinary practices can win public sector infrastructure contracts in South Africa — from ECSA registration and CESA membership to fee proposals, QBS scoring, and building a winning tender response.
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 1 803 379
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Services: Building. Unlock full pricing strategies, bid frequency, and historical win rates.