Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Matimba Power Station - Lephalale - Lephalale - 0556
Organization Type
GOVERNMENT
Published
29 May 2026
OCDS Reference
ocds-9t57fa-157654
This tender invites suppliers to provide and deliver dust handling plant (dhp) seal spares for matimba power station in limpopo over a 60-month period on an as-and-when-required basis. The spares must meet eskom’s technical and quality standards to support the station’s performance targets (eaf>85, pclf<8, uclf<5).
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 03 July 2026 - 10:00
Venue
Microsoft Teams
Categories
Request for Bid(Open-Tender)
Matimba Power Station - Lephalale - Lephalale - 0556
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: Good Manufacturing Practice (GMP), SABS Product Certification, NRCS Certification
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: DHP Seal Spares SOW.pdf, 240-109253698 Template for a Typical Contract Quality Plan (002).docx, Safety Requirements Annexure B (1).docx and 4 more. You don’t need to refresh — this page will pick up the updated review automatically.
29 May
2026
Tender Published
Tender was published
03 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Invitation to Tender (ITT) DHP Seals 2026.05.29.pdf
Eskom Holdings SOC Ltd invites tenders for the supply and delivery of Dust Handling Plant (DHP) Seals spares at Matimba Power Station in Limpopo for a 60-month period on an as-and-when-required basis. The tender (E2988GXLPMAT) closes on 03 July 2026 at 10:00 AM (UTC). Submissions must be electronic via Eskom’s e-tendering portal, with a validity period of 180 days post-closing. A non-compulsory clarification meeting is scheduled for 09 June 2026 via Microsoft Teams. The contract is open to eligible suppliers meeting technical, financial, and compliance criteria, including B-BBEE, tax clearance, and quality management system (QMS) requirements.
environmental requirements Low risk.xlsx
DHP Seal Spares SOW.pdf
Eskom is seeking a supplier for the provision and delivery of Dust Handling Plant (DHP) seals and spares for Matimba Power Station over a 60-month period on an as-and-when-required basis. The tender emphasizes adherence to quality standards (ISO 9001), compliance with Eskom policies, and timely delivery of specified materials to support power station performance targets (EAF>85, PCLF<8, UCLF<5).
Safety Requirements Annexure B (1).docx
The tender is for the supply and delivery of Dust Handling Plant (DHP) seals spares at Matimba Power Station over 60 months on an as-and-when-required basis. The supplier must comply with Eskom's Occupational Health and Safety (OHS) legal requirements, including statutory acts and Eskom-specific standards. The main supplier is accountable for ensuring OHS compliance among all subcontractors and suppliers, with penalties for non-conformance.
DHP Sealing Spares Tender Technical Evaluation Strategy - Drives - Sealing Spares 08.04.2026.pdf
ESKOM Matimba Power Station seeks suppliers for Dust Handling Plant (DHP) Sealing Spares for a 60-month period. The tender requires technical evaluation with a minimum threshold of 70%. Bidders must demonstrate experience supplying at least 10 of 28 listed items for 3+ years, provide complete technical documentation including data sheets and Schedule A, and show capability to supply all 32 items in the scope. The evaluation weighs technical compatibility (50%), experience/references (20%), warranty support (10%), compliance documentation (10%), and materials handling facilities (10%).
240-109253698 Template for a Typical Contract Quality Plan (002).docx
ESKOM tender for the supply and delivery of Dust Handling Plant Seals (DHP) spares at Matimba Power Station in Limpopo Province for 60 months on an as-and-when-required basis. The document provided is a Contract Quality Plan (CQP) template that outlines the quality management requirements suppliers must address. The tender references SANS 466:2005 Edition 1 and ISO 10005:2005 Edition 2 for quality planning guidelines.
NEC3 Supply Contract for DHP Seals spares for 60 months.docx
Eskom seeks a supplier for the supply and delivery of Dust Handling Plant (DHP) seals spares for Matimba Power Station in Limpopo over a 60-month period on an as-and-when-required basis. The contract is based on the NEC3 Supply Contract (SC3) and includes a detailed list of 19 specific seal and compensator items with defined quantities.
240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docx
Eskom is inviting tenders for the supply and delivery of Dust Handling Plant (DHP) seals spares at Matimba Power Station in Limpopo for a 60-month period on an as-needed basis. The tender emphasizes a robust Quality Management System (QMS) aligned with ISO 9001:2015, operational evidence of QMS, a Contract Quality Plan (CQP), spare verification, and additional user-defined requirements like Form A completion and preservation procedures.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Contact Information
Source: DHP Seal Spares SOW.pdfSupply Chain Management department at Matimba Power Station. No direct contact details provided in the document.
Submission Guidelines
Source: DHP Seal Spares SOW.pdfSubmit all required returnable documents as per the tender. All contractual communication must be in written format on official letterhead, signed by authorised parties, and emailed in PDF. Attached documentation must be in Microsoft Word, Excel, or PowerPoint. Non-compliant or incorrectly delivered spares will be rejected. Supplier must collect rejected spares within 5 working days and deliver correct spares within the agreed timeframe. Default notifications will be issued for non-compliance.
Evaluation Criteria
Source: DHP Seal Spares SOW.pdfGeneral: Supplier must be a legally registered entity capable of fulfilling the scope of work. Compliance with Eskom’s Procurement and Supply Chain Management Policy (32-1033). Adherence to Preferential Procurement Policy Framework Act. Alignment with Eskom’s Supplier Terms Policy (240-165040111). Technical: Proven experience in supplying DHP spares or similar industrial seals and components. Ability to meet ISO 9001 quality standards. Capacity to provide materials that meet Eskom’s technical specifications and performance targets (EAF>85, PCLF<8, UCLF<5). Financial: Financial stability to manage the contract budget and expenses over 60 months. Ability to operate within Eskom’s budget constraints.
Technical Specifications
Source: DHP Seal Spares SOW.pdfSupply and delivery of Dust Handling Plant (DHP) spares for Matimba Power Station over 60 months on an as-and-when-required basis. Spares must support Matimba’s performance targets: EAF>85, PCLF<8, UCLF<5. Key items include: compensators (rubber, EPDM glass-reinforced), cylindrical seals (EPDM, two-ply Flextra fabric), split lip shaft seals (stainless steel), packing (braided ceramic, graphite), expansion joints, gaskets, wedge insulators, bypass pipes (reinforced rubber, flanged), and putty. All items must meet specified dimensions, materials, and drawing numbers (e.g., Eskom Rev 1 drawings). Spares must be accompanied by their related user specifications (URS).
Compliance Requirements
Source: DHP Seal Spares SOW.pdfAdherence to Eskom General Policies & Standards, including site regulations and Life Saving Rules. Compliance with ISO 9001 Quality Management Systems. Suppliers must align with Eskom’s Procurement and Supply Chain Management Procedure (32-1034) and Preferential Procurement Policy Framework Act. Electronic signatures and documentation must follow Eskom’s policies (240-141007195, 240-156280553).
Evaluation Criteria
Source: 240-109253698 Template for a Typical Contract Quality Plan (002).docxEligibility and evaluation guidance:
Technical Specifications
Source: 240-109253698 Template for a Typical Contract Quality Plan (002).docxScope and deliverables:
Quality Management System (QMS) requirements:
Deliverables and documentation:
Databook and records:
Traceability and preservation:
Post-delivery support:
Tools and equipment:
Sub-suppliers and subcontractors:
Evaluation Criteria
Source: Safety Requirements Annexure B (1).docxEvaluation will focus on: Compliance with South African OHS laws (OHS Act 85 of 1993, COID Act 130 of 1993). Technical ability to supply DHP seals spares as per Eskom’s specifications. Operational capacity to manage subcontractors/suppliers with adequate resources and competencies. Willingness to submit to Eskom’s verification and penalty processes. Prior experience in similar work (references may be required).
Compliance Requirements
Source: Safety Requirements Annexure B (1).docxMandatory compliance for all suppliers, contractors, and subcontractors: Eskom Contractor Health and Safety Requirements Standard 32-136. Occupational Health and Safety Act 85 of 1993. Compensation for Occupational Diseases and Illnesses Act 130 of 1993. Any additional OHS specifications/requirements provided by Eskom. Post-award, align company’s OHS policies, procedures, and standards with Eskom’s requirements. Penalties apply for non-compliance with Eskom or statutory OHS requirements. All employees (including contractors/suppliers) must complete Eskom’s induction and the company’s own induction. Main contractor/supplier must: Demonstrate process and selection criteria for appointing contractors/suppliers. Notify Eskom prior to appointing contractors/suppliers. Ensure contractors/suppliers have adequate resources and competencies. Manage contractors/suppliers to ensure compliance with legal and Eskom requirements. Monitor via audits/assessments for OHS compliance. Provide grounds for termination of non-compliant contractors/suppliers. Handle non-conformance issues directly. Eskom may verify compliance and request testimonials/references. Signed acknowledgement form (Annexure B) required.
Submission Guidelines
Source: DHP Sealing Spares Tender Technical Evaluation Strategy - Drives - Sealing Spares 08.04.2026.pdfMandatory returnable documents: (1) Data sheets and completed Schedule A for all items listed in the Scope of Work, confirming alignment with SAP and plant specifications. (2) Proof that the supplier has been supplying at least 10 of the 28 listed items for a minimum of 3 years. (3) Signed letter of intent to supply all 32 items in the Scope of Work within the required timeframes. Disqualification risk: Failure to submit any of the above (Yes/No criteria).
Evaluation Criteria
Source: DHP Sealing Spares Tender Technical Evaluation Strategy - Drives - Sealing Spares 08.04.2026.pdfMandatory technical criteria (all must be met with a 'Yes'): (1) Data sheets and Schedule A confirming sizes, design parameters, and alignment with SAP and plant specifications. (2) Proof of supplying at least 10 of the 28 listed items for a minimum of 3 years. (3) Signed letter of intent to supply all 32 items in the Scope of Work timeously. Qualitative criteria (weighted scoring): (1) Technical compatibility (50%): Submit data sheets (dimensions, materials, tolerances, certifications, standards, ratings for all 24 items), OEM authorisation or equivalency evidence, and completed Schedule A. (2) Technical experience and references (20%): List of previous orders for identical/similar items or supply completion certificates (minimum 3 orders with 2 reference letters). (3) Spares warranty and after-sales support (10%): Technical support statement (availability of engineers, manuals, troubleshooting) and warranty statement (coverage equivalent/better than OEM). (4) Compliance matrix and declarations (10%): Technical compliance matrix (Schedule A Excel sheet) and declaration of conformity. (5) Materials handling facility (10%): Proof of storage system (racks, shelving, bins) and transportation equipment (forklifts, pallet trucks). Minimum technical threshold: 70% weighted score to proceed.
Technical Specifications
Source: DHP Sealing Spares Tender Technical Evaluation Strategy - Drives - Sealing Spares 08.04.2026.pdfScope: Supply and delivery of Dust Handling Plant (DHP) Sealing spares for Matimba Power Station over 60 months on an as-and-when-required basis. System context: DHP evacuates ash from Electrostatic Precipitators (ESPs) via a fully enclosed En-masse chain conveyor system. Key components include: conveyor protections, casings, chains, tensioning systems, drive sprockets, Drive-End (DE) and Non-Drive-End (NDE) stations, chutes, compensators, control/aeration air piping, and A-frame piping. Requirements: All spares must meet Matimba Power Station’s technical specifications and operational standards as per the Bill of Quantities (BOQ).
Compliance Requirements
Source: DHP Sealing Spares Tender Technical Evaluation Strategy - Drives - Sealing Spares 08.04.2026.pdfProof of supply completion certificates or orders for similar items (minimum 3 years for at least 10 of the 28 listed items).
Important Dates
Source: NEC3 Supply Contract for DHP Seals spares for 60 months.docxClosing date for tender submission: 03 July 2026 at 10:00. Period for reply to contract-related queries: 5 working days. Starting date: To be confirmed (TBC). Delivery dates for goods and services: Will be stated in every purchase order. Supplier must submit a first programme for acceptance within 4 weeks of the contract date and revised programmes every 8 weeks. Defects date: 2 weeks after delivery. Defect correction period: 4 weeks. Defects access period: 5 days or as agreed by the parties.
Contact Information
Source: NEC3 Supply Contract for DHP Seals spares for 60 months.docxSupply Manager: S. Honono. Address: Eskom Holdings SOC Limited, Matimba Power Station, Private Bag X215, Lephalale 0555. Tel: 014 763 8803. Email: [email protected]. Purchaser’s registered office: Eskom Holdings SOC Ltd, Megawatt Park, Maxwell Drive, Sandton, Johannesburg, 2199. Adjudicator nominating body: Chairman of ICE-SA (www.ice-sa.org.za) or Arbitration Foundation of Southern Africa (AFSA). Arbitration tribunal: Association of Arbitrators (Southern Africa). Arbitration location: Gauteng, South Africa.
Submission Guidelines
Source: NEC3 Supply Contract for DHP Seals spares for 60 months.docxSubmit a completed Form of Offer and Acceptance (Part C1.1) with all required signatures, witness details, and capacities. Include the Schedule of Deviations if applicable. Clearly state the offered total (exclusive and inclusive of VAT) in both numerical and written form. Submit one fully signed original copy to: Eskom Holdings SOC Ltd, Megawatt Park, Maxwell Drive, Sandton, Johannesburg, 2199. Within two weeks of receiving the signed agreement, arrange delivery of securities, bonds, guarantees, proof of insurance, and other required documentation to the Purchaser’s agent. Failure to comply constitutes repudiation of the agreement. Use another copy of the Form of Offer and Acceptance for alternative tenders.
Evaluation Criteria
Source: NEC3 Supply Contract for DHP Seals spares for 60 months.docxEvaluation is based on compliance with NEC3 Supply Contract (SC3) and the following criteria: Supplier must be experienced, well-established, and qualified to supply DHP seals spares. Must comply with South African law, B-BBEE requirements (notify Eskom of any B-BBEE status change within 7 days and submit updated verification certificate within 30 days). Must provide required guarantees, insurance, and adhere to Eskom’s Life Saving Rules and site regulations. Joint ventures are accepted but must assume joint and several liability. Supplier must not cede, delegate, or assign rights or obligations without Eskom’s written consent. Quality must comply with ISO 9001. Ethical compliance: Prohibited actions (corruption, fraud, collusion, coercion, or obstruction) may lead to termination.
Technical Specifications
Source: NEC3 Supply Contract for DHP Seals spares for 60 months.docxSupply and delivery of Dust Handling Plant (DHP) Seals spares for Matimba Power Station on an as-and-when-required basis over 60 months. Contract governed by NEC3 Supply Contract (SC3) and INCOTERMS 2010 (DDP - Matimba Power Station, Lephalale). Key items include: Compensator Rubber (400SQ), Expansion Joints (20-hole, 32-hole), B/Elevator Compensators, Inspection Door Seals, Packing (3mm graphite), Putty, Gaco Split Seals, Labyrinth Seals, Braided Packing (ceramic fibre), Split Lip Shaft Seals (stainless steel/NBR), and Bypass Pipes (reinforced rubber, flanged, 150mm ID, lengths 5m–9m). Materials must meet Eskom drawing specifications (e.g., EPDM glass-reinforced, stainless steel, NBR, ceramic fibre). All items must support Matimba’s performance targets: EAF>85%, PCLF<8%, UCLF<5%. Quality must comply with ISO 9001. Supplier must provide test results, maintenance manuals, packing lists, and delivery notes. Delivery place: Matimba Power Station. Transport, risk, and insurance obligations per INCOTERMS DDP. Supplier must submit a programme for acceptance within 4 weeks of contract date and revised programmes every 8 weeks.
Financial Requirements
Source: NEC3 Supply Contract for DHP Seals spares for 60 months.docxPricing must align with NEC3 Supply Contract (SC3) Part C2 (Pricing Data). Use the Price Schedule format: lump sum or rate × quantity. Prices must be fully inclusive of all costs (e.g., defect correction, compliance, overheads, and profit). VAT at 15% must be added to the total. Payment terms: As per Eskom’s vendor registration terms. Assessment interval: Once goods receipt and QC are accepted. Currency: South African Rand (ZAR). Interest rate for late payments: Standard Bank’s prime rate (for ZAR) or LIBOR (for other currencies). Price adjustment for inflation (Option X1): Base date is one month prior to tender closing; 15% non-adjustable, 85% adjustable via CPA after 16 months. Delay damages: 1%–10% of purchase order value per day for late or incorrect delivery (cumulative up to 10 days). Supplier’s liability limits: R250,000 for indirect/consequential loss; total liability capped at the total of the Prices. Insurance: Supplier must cover loss/damage to goods, third-party liability, and employee injuries (minimum amounts per Insurance Table A).
Compliance Requirements
Source: NEC3 Supply Contract for DHP Seals spares for 60 months.docxSupplier must comply with NEC3 Supply Contract (SC3) core clauses and Z-clauses (Z1–Z15). Key requirements: Maintain B-BBEE status; notify Eskom within 7 days of any change in B-BBEE status and submit updated verification certificate within 30 days. Failure to notify may result in contract termination or renegotiation. Adhere to Eskom’s Life Saving Rules, site regulations, and ISO 9001 quality standards. All contractual communication must be in writing (PDF or Microsoft Word/Excel/PowerPoint) on official letterhead. Confidentiality: Supplier may not disclose contract-related information without Eskom’s consent. Health and safety: Comply with all applicable laws, Eskom’s procedures, and ensure subcontractors do the same. Environmental compliance: Adhere to all environmental laws and Eskom’s asbestos management standards (if applicable). Ethics: Prohibited actions (corruption, fraud, collusion, coercion, or obstruction) may lead to termination. Supplier must cooperate with investigations into alleged misconduct. Nuclear liability: Eskom waives recourse except for unlawful intent or unauthorised presence at Koeberg Nuclear Power Station. Tax compliance: Provide VAT-compliant invoices (include Eskom’s VAT number: 4740101508). CIDB registration and professional registrations (if applicable) are implied. Supplier must ensure subcontractors abide by all contractual undertakings.
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docxScoring is based on compliance with ISO 9001:2015 QMS requirements, operational evidence, and project-specific deliverables. Breakdown: Section A (QMS Documentation) = 7 points (manual, policy, objectives, document control, nonconformity, corrective action, internal audit). Section B (QMS in Operation) = 2 points (roles/responsibilities, supplier management). Section C (Contract Quality Plan) = 1 point (draft CQP per ISO 10005). Section D (Spare Verification) = 1 point (checksheet with specifications). Section E (Additional Requirements) = 2 points (Form A signed, preservation procedure). Total = 13 points. Minimum thresholds not specified.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docxSupply and deliver Dust Handling Plant (DHP) Seals spares for Matimba Power Station. Scope: As-and-when-required over 60 months. Deliverables: Spare parts must meet specifications in the spare verification checksheet. Quality: Draft Contract Quality Plan (CQP) required, aligned with ISO 10005, ensuring design consistency and resource allocation across all units. Roles, responsibilities, and expectations must be clearly defined.
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 3_ Rev 7.docxQuality Management System (QMS): Must comply with ISO 9001:2015 (certification not mandatory). Required documentation: QMS Manual, Quality Policy, Quality Objectives, Document/record control (Clause 7.5), Nonconforming output control (Clause 8.7), Corrective action (Clause 10.2), Internal audit (Clause 9.2). Operational evidence: Organization chart, responsibility matrix, supplier evaluation/selection/monitoring records. Contractual: Draft CQP per ISO 10005. Additional: Completed and signed Form A, Preservation procedure for delivered spares.
Important Dates
Source: Invitation to Tender (ITT) DHP Seals 2026.05.29.pdfClosing date: 03 July 2026 at 10:00 am. Non-compulsory clarification meeting: 09 June 2026 at 10:00 am via Microsoft Teams (Join: https://teams.microsoft.com/meet/333036242438776?p=qAuX3WLpwd5JFWkECZ, Meeting ID: 333 036 242 438 776, Passcode: N2zi2MK9). Tender validity period: 180 days from closing date. Clarification queries must be submitted at least 5 working days before the deadline.
Contact Information
Source: Invitation to Tender (ITT) DHP Seals 2026.05.29.pdfEskom Representative: Sharlotte Masopoga, Tel: 014 763 8816, Email: [email protected]. All queries must be directed to the Eskom Representative in writing. Fraud/corruption reporting: 0800 11 2722 or [email protected].
Submission Guidelines
Source: Invitation to Tender (ITT) DHP Seals 2026.05.29.pdfSubmit electronically via Eskom E-tendering portal by 03 July 2026 at 10:00 am. Late submissions are not accepted. Upload all documents in PDF format (max 50MB per file, total submission max 900MB). Price lists must be submitted in both PDF and Excel. Do not use ZIP files. Organize files under folders: Technical, Commercial, Financial, and Other. Ensure submission status is marked as 'complete'. If resubmitting, only the latest version is accepted; previous submissions are void. Mandatory returnables (disqualifiable if missing or incomplete): Authorisation Form (Annexure A), Acknowledgement Form (Annexure B), Tenderer’s Particulars (Annexure C), Integrity Declaration Form (Annexure D), CPA Requirements (Annexure E/F), SBD 6.2 (Annexures G1-G4 if applicable), SBD 1 (Annexure H), SBD 6.1 (Annexure I), SBD 4 (Annexure J), and E-tendering Help Manual acknowledgement. Non-disqualifiable returnables (5-day grace period if incomplete): Tax Clearance Certificate, Employment Equity compliance, COIDA certificate, CIDB grading (if applicable).
Evaluation Criteria
Source: Invitation to Tender (ITT) DHP Seals 2026.05.29.pdfEligibility: Must not be on international sanctions lists, Eskom’s Tender Defaulters list, or restricted by National Treasury. No conflict of interest (e.g., shared majority shareholders, access to rival bids). Tenders must be signed by authorised representatives. Joint ventures/consortia must explicitly state joint and several liability. Single entity or JV/consortium may submit only one tender (except for e-tendering size limits). Subcontracting 100% of scope is prohibited. Functionality: Minimum 70% threshold required to qualify. Technical evaluation criteria detailed in attached TES. Pricing: Scored out of 80 points. Inclusive of VAT, corrected for errors, excluding contingencies. Adjusted for deviations or acceptable variations. Net Present Value comparison applied. Unconditional discounts considered; conditional discounts implemented at payment. Specific Goals: Scored out of 20 points under PPPFA 2022. Failure to submit evidence results in 0 points for that goal but not disqualification. Ranking: 80/20 preferential point system (pricing + specific goals). Objective criteria may justify award to non-highest scorer.
Technical Specifications
Source: Invitation to Tender (ITT) DHP Seals 2026.05.29.pdfSupply and delivery of Dust Handling Plant (DHP) Seals spares at Matimba Power Station for 60 months on an as-and-when-required basis. Scope of Work is attached (Annexure 1.1.18). Pricing Schedule/BOQ is contained in the NEC Contract (PDF and Excel format). Cataloguing information may be required post-award. Successful tenderer must label materials per Eskom’s specifications. Alternative tenders are not allowed. Quality Requirements: Draft Contract Quality Plan, Quality Control Plan/Inspection and Test Plan (ITP), ISO 9001-compliant QMS (documented evidence required, certification not mandatory).
Financial Requirements
Source: Invitation to Tender (ITT) DHP Seals 2026.05.29.pdfPayment terms: For contracts below R50 million (incl. VAT), payment within 30 days of undisputed invoice receipt. For contracts above R50 million (incl. VAT), payment within 60 days. Pricing must be in ZAR, inclusive of VAT. Performance security (bond or demand guarantee) may be required from Eskom-approved financial institutions. Audited financial statements for the past 18 months (or last year if unavailable) are required. Joint ventures must submit statements for each participant. Start-ups (<12 months) are exempt but must provide statements after the first year if awarded.
Compliance Requirements
Source: Invitation to Tender (ITT) DHP Seals 2026.05.29.pdfMandatory: CSD registration (valid and current), Tax Clearance Certificate (local tenderers or foreign with SA footprint), Employment Equity compliance (if designated employer), COIDA certificate (SA tenderers only), CIDB grading (if applicable, within 21 working days of closing). B-BBEE status proof required (certificate, sworn affidavit, or other prescribed form). Integrity Pact Declaration (Annexure D) and Supplier Integrity Pact must be downloaded and signed. SBD forms (1, 4, 6.1, 6.2) are mandatory. Joint ventures must submit a valid JV agreement with joint/several liability clauses. Subcontracting 100% of scope is disqualifiable. Health and Safety: OHS policy (CEO-signed), valid COIDA, OHS plan, Baseline Risk Assessment, and competency proof. Environmental: Policy, Aspects/Impacts Register, and Method Statement. Contractual Requirements (SHEQ, Quality) are assessed post-evaluation.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Matimba Power Station - Lephalale - Lephalale - 0556
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
8
Last checked
12 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogMedian Estimate
R 841 500
Range
Based on 19 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Manufacture of basic metals. Unlock full pricing strategies, bid frequency, and historical win rates.