Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Portion 14 of Farm Rietfontein 314 JS - Emkhiweni site – Rietfontein 314 JS, Portion 14 - Middelburg - 1049
Organization Type
GOVERNMENT
Published
01 Jun 2026
OCDS Reference
ocds-9t57fa-157735
This tender, issued by ESKOM, invites bids for the design and construction of a system operating control (soc) building at emkhiweni in mpumalanga. The project has a 42-month duration and requires compliance with CIDB skills development, b-bbee, and sdl&i obligations.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Date & Time
Friday, 17 July 2026 - 10:00
Venue
Emkhiweni site – Rietfontein 314 JS, Portion 14, Mpumalanga
Important: Attendance at this briefing session is mandatory. Bids from suppliers who do not attend may be disqualified.
Categories
Request for Bid(Open-Tender)
Portion 14 of Farm Rietfontein 314 JS - Emkhiweni site – Rietfontein 314 JS, Portion 14 - Middelburg - 1049
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: Environmental.zip, Technical.zip, Health & Safety.zip and 2 more. You don’t need to refresh — this page will pick up the updated review automatically.
01 Jun
2026
Tender Published
Tender was published
17 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
NEC.zip
Technical.zip
The tender is for the design and construction of a System Operating Control (SOC) building at Emkhiweni, Mpumalanga, issued by Eskom's National Transmission Company South Africa. The project involves a multidisciplinary scope, including architectural, civil, structural, electrical, mechanical, and security systems design, as well as construction, supervision, and handover of a fully functional SOC building. The building will serve as a National Key Point (NKP) and must comply with stringent technical, safety, and security standards, including blast protection, fire suppression, access control, and HVAC systems. The tender evaluation is based on technical criteria, with a minimum threshold score of 70% required for consideration.
Commercial.zip
The tender is for the design and construction of a System Operating Control (SOC) building at Emkhiweni, Mpumalanga, issued by National Transmission Company South Africa SOC Ltd (NTCSA). The project requires electronic submission of tenders via the NTCSA e-tendering portal by 17 July 2026 at 10:00 AM SAST. A compulsory site briefing is scheduled for 10 June 2026. The evaluation will include functionality (70% minimum threshold), price (80 points), and B-BBEE Specific Goals (20 points). The contract will use NEC3 Professional Service Contract (PSC3) terms, and compliance with CIDB, SHEQ, and other regulatory requirements is mandatory.
SDL&I.zip
The tender is for the design and construction of a System Operating Control (SOC) building at Emkhiweni, issued by ESKOM in Mpumalanga. The project duration is 42 months, with a closing date of July 17, 2026. The tender includes mandatory skills development (SDL&I) and compliance requirements, such as CIDB skills development goals (CSDG), B-BBEE certification, and quarterly reporting. Penalties of 2.5% of invoice amounts apply for non-compliance with SDL&I obligations.
Quality.zip
The tender is for the design and construction of a System Operating Control (SOC) building at Emkhiweni, issued by Eskom in Mpumalanga. The closing date is July 17, 2026. The tender emphasizes stringent Supplier Quality Management (SQM) requirements, mandating compliance with ISO 9001 standards, detailed quality plans, and rigorous monitoring and auditing processes. Suppliers must demonstrate a robust Quality Management System (QMS) and submit comprehensive documentation as per the specified categories (1-4).
Health & Safety.zip
The tender is for the design and construction of a System Operating Control (SOC) building at Emkhiweni, Mpumalanga, by Eskom. The project involves creating a Transmission Security Nerve Centre (centralized security command and control center) with specific technical and safety requirements. The tender emphasizes strict compliance with Occupational Health and Safety (OHS) regulations, Eskom policies, and legal standards. Applicants must demonstrate capability in project management, engineering (architectural, electrical, structural, mechanical, fire, and security), environmental management, health and safety, and other specialized disciplines. The project requires adherence to Eskom’s SHEQ (Safety, Health, Environment, and Quality) policies, risk assessments, and incident management procedures. Financial penalties and work stoppages may apply for non-compliance with OHS or statutory requirements.
Environmental.zip
Eskom Transmission tender for design and construction of a System Operating Control (SOC) building at Emkhiweni, Mpumalanga. The tender includes comprehensive environmental management requirements, referencing Eskom's Transmission Industry Waste Management Plan (2023-2028) and Environmental Requirements for Contractors standard. Bidders must demonstrate robust environmental management systems and compliance with South African waste and environmental legislation.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubLearn how to submit a winning bid with these related articles
Median Estimate
R 2 184 556
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Important Dates
Source: Environmental.zipClosing date: 17 July 2026 at 10:00 AM (SAST). - Outstanding environmental requirements must be submitted within 7 days post-contract award.
Contact Information
Source: Environmental.zipFor environmental queries: - Direct communication between tenderers and Environmental Practitioners is not permitted. - All queries must be submitted in writing to the Eskom Representative listed in the tender document. - Supply Chain Management (SCM) and Contract Custodians coordinate environmental requirements. - Eskom Transmission Environmental Management Team: Contact details are provided in the tender document.
Submission Guidelines
Source: Environmental.zipSubmit the following returnable documents with your tender: - Completed and signed Contractor Environmental Requirements Pro-Forma (240-110600836). - Environmental procedures/method statements aligned with Eskom Transmission requirements. - EMS documentation (policies, procedures, training records, audits, monitoring reports). - Organisation’s EMS records (as per Appendix D of 240-180100134). - Applicable permits (e.g., environmental authorisations, waste management licenses). - Corrective action reports for any non-conformances raised by Eskom or the contractor. - All documentation must be submitted to Eskom Transmission within 7 days after contract award. Note: Failure to submit outstanding environmental requirements within 7 days post-award will render the tender non-compliant, but this will not disqualify the bidder. Issues must be addressed during negotiations or post-contract award.
Evaluation Criteria
Source: Environmental.zipEvaluation is based on a weighted scoring system. - Minimum threshold: Tenderer must achieve a weighted average score of 80% or above to be considered. - Mandatory requirements: Documented Environmental Management System (EMS), preferably ISO 14001:2015 certified or conforming. Evidence of compliance with all applicable environmental legislation. Qualified environmental representative on site: National Diploma/Degree in Environmental Sciences/Management or related field (or for low-risk projects, a representative with two weeks of environmental training). Submission of all required environmental documentation as specified in tender returnables.
Technical Specifications
Source: Environmental.zipScope: Design and construction of a System Operating Control (SOC) building at Emkhiweni, Mpumalanga. Key requirements: - Compliance with Eskom’s Environmental Management System (EMS) and project-specific Environmental Management Programme (EMPr) or Environmental Authorisation (EA). - Waste management: Segregation, minimisation, and disposal per Transmission Industry Waste Management Plan (2023-2028) and NEM: Waste Act (Act No. 59 of 2008). - Site establishment: Access control, dust/noise management, landowner liaison. - Environmental controls: Vegetation management, water management (consumption, stormwater, testing), pollution control (dust suppression, bund walls, wash bays). - Hazardous substances: Proper handling, registers, and Safety Data Sheets (SDS). - Rehabilitation: Disturbed areas, erosion control (berms, access roads, fencing). - Monitoring and reporting: Incident registers, complaints/grievance management, waste statistics. - Appointment of a qualified environmental representative for on-site monitoring. - Submission of an Environmental File upon project completion, including all records (EMPr, EA, aspect/impact registers, audit reports).
Compliance Requirements
Source: Environmental.zipMandatory compliance: - Valid and authentic environmental documentation (EMS certification, permits, licenses). - Compliance with South African environmental legislation: National Environmental Management Act (NEMA), National Environmental Management: Waste Act (NEM:WA), National Water Act, National Environmental Management: Air Quality Act, Occupational Health and Safety Act. - Adherence to Eskom’s environmental standards and policies: 32-245 Waste Management Standard, 240-180100134 Environmental Requirements for Contractors/Suppliers. - B-BBEE: Minimum Level 2 compliance required. - CIDB registration (where applicable for construction works). - On-site registers/records: Environmental Authorisation and permits, project-specific EMPr/EMP, Aspect and Impact Register, incident and non-conformance registers, waste disposal and hazardous substance registers, training records for environmental personnel, energy efficiency checklists. Non-compliance risks: Work stoppages, contract suspension, or removal from Eskom’s supplier database.
Submission Guidelines
Source: Technical.zipSubmit the following technical returnables with your tender: 1) Construction program/technical schedule: High-level program with key milestones, completion dates for design and construction supervision (stages 1–6), and time durations for main activities. 2) Construction method statements: Detailed step-by-step procedures for all applicable scope (e.g., foundations, earthworks, roads, drainage, buildings, fencing, steelwork, security lighting, earthmat, substation electrical in buildings). For concrete works: specify method of placement (batching on site or ready mix), mix design, aggregate details, supplier location, and testing methods. For steel erection: confirm qualified rigger/crane operator or subcontractor details. 3) Concept design: 2D and 3D models clearly indicating building type, finishes (steel, concrete, masonry, sheeting), site layout, and spatial layout with room names. 4) Design strategy: Aesthetically pleasing, economical, and practical design. Confirm materials/finishes can be sourced in South Africa. 5) Relevant previous projects: Table of comparable projects (scope, substation name if applicable, completion date, project value, client contact details). Include completion certificates for at least 5 projects. 6) Key personnel: CVs for Architect, Civil Engineer, Structural Engineer, Mechanical Engineer, Electrical Engineer, Project Manager, Site Manager/Site Agent, and Site Supervisor. CVs must detail relevant project-specific work experience and academic qualifications. Include proof of certified academic and registration qualifications (e.g., SACAP for Architect, ECSA for Engineers, PrCM/PrCPM for Construction/Project Managers). All documents must be certified and not older than 3 months from tender closing date. Uncertified documents will not be accepted. For SHEQ requirements, refer to: 240-166910358 Rev 1 (Health and Safety Specification), 202211_OH&S Tender Returnable Documents for EPC & EPCM & Owner's Engineer_TPDMAN-FM-204_Rev2, 202211_(Form A) Tender Contract SHEQS Requirements for EPCM & or Owner's Engineer_TPDMAN-FM-197_Rev2.
Evaluation Criteria
Source: Technical.zipTechnical evaluation: Minimum 70% score required to qualify. Scoring method: Weighted qualitative criteria (100% total). Key criteria: 1) Design and construction program/technical schedule (20%): Activities listed in order (5), few irrelevant/missing (4), mostly irrelevant/missing (2), no submission (0). Time durations must align with project start/end dates. 2) Method statement (30%): Relevant, well-detailed, and includes all required information (5). Missing 20% of requirements or few important steps (4). Mostly irrelevant/basic (2). Irrelevant/none (0). 3) Concept design presentation (10%): Clear 2D/3D models, building requirements addressed, high draughting standards (5). Missing 20% of requirements (4). Mostly irrelevant/basic (2). Irrelevant/none (0). 4) Design strategy (10%): Economical, practical, aesthetically pleasing, materials/finishes sourcable in South Africa (5). Missing 20% of requirements (4). Mostly irrelevant/basic (2). Irrelevant/none (0). 5) Relevant previous projects (20%): >5 projects (5), 4-2 projects (4), 1 project (2), none (0). Each project must include scope, completion date, and client contact details (5 if all provided, 4 if 2 provided, 2 if 1 provided, 0 if none). Completion certificates for at least 5 projects (5 if all provided, 4 if missing any, 2 if missing >50%, 0 if none). 6) CVs and qualifications of key personnel (10%): All required CVs provided (5), missing 1 CV (4), none (0). All personnel meet minimum qualifications and 7+ years’ experience (5). Any key personnel not meeting requirements (2). Proof of certified qualifications (10): All provided and certified (5), not certified (2). Scoring table: 5 (100% - Compliant, no technical risks), 4 (80% - Compliant with acceptable risks/exceptions), 2 (40% - Non-compliant, unacceptable risks/exceptions), 0 (0% - Totally deficient/non-responsive). Note: Scores of 1 and 3 are not allowed. Previous experience in similar projects (e.g., SOC buildings, NKP sites, substation infrastructure) is highly weighted. Professional registrations (SACAP, ECSA, SACPCMP) are mandatory for key personnel.
Technical Specifications
Source: Technical.zipScope: Design and construction of a National Key Point (NKP) System Operating Control (SOC) building at Rietfontein 314 JS, Portion 14, Mpumalanga, adjacent to the proposed eMkhiweni substation. The building must meet 32-894 NTCSA server room and data centre standards. Key deliverables: Design and construction of the building and all associated services/systems, including: Foundations, cable trenches, earthworks/terrace, roads, drainage, buildings, fencing, steelwork (main columns/beams, equipment supports, floodlight masts), security lighting, earthmat & earthtails, substation electrical in buildings (lighting, ventilation, electrical installation-DB). Functional areas: Control rooms, server rooms, administrative/office areas, boardrooms, computer centres, locker rooms, workshops, storages, kitchens, ablutions, and supportive service areas. Systems: HVAC with structural supports, electrical supply/distribution (earthing, lighting, small power), potable water, active/passive fire protection, fire detection, access control (card and biometric), blast protection, telecommunications, dual access unit, Building Management System (BMS), CCTV, security alarm, and PSIM integration. Design requirements: Green building and biophilic design principles, ergonomic design, blast-proof design, energy efficiency (SANS 204:2011, SANS 10400-XA), and compliance with National Building Regulations. Standards: ISO 9001, OHS Act 1993 (Construction Regulations 2014), SANS 1200, SANS 10400 series, SANS 204, SANS 10161, SANS 10100-1, SANS 10162, SANS 10163, SANS 10164, SANS 10252, and NTCSA-specific standards (e.g., 240-53113685 Design Review Procedure, 240-86056088 User Requirement Specification). Documentation: All drawings must comply with Engineering Drawing Standard 240-86973501, include Employer’s drawing numbers, and be signed off by registered professionals. Provide 3 hard copies and electronic copies for all revisions (design, construction, as-built). Handover documentation: Native/CAD files, PDFs, operating manuals, training sessions (minimum 4), computer design models, fenestration/structural/civil calculation reports, and other technical documents. Skills transfer: Consultant must provide skills transfer for at least 3 NTCSA civil engineers, including design tools, office space, and supervision to meet ECSA registration outcomes.
Compliance Requirements
Source: Technical.zipProfessional registrations: Architect must be registered with SACAP. Civil/Structural/Mechanical/Electrical Engineers must be registered with ECSA. Construction Manager and Project Manager must be registered with SACPCMP (PrCM/PrCPM). Site Manager/Site Agent and Site Supervisor must hold BTech/Diploma qualifications. Minimum experience: Key personnel must have a minimum of 7 years’ relevant experience. Academic qualifications: Architect (BSc Architecture), Civil Engineer (BSc Civil Engineering), Structural Engineer (BSc Structural Engineering), Electrical Engineer (N.Dip Electrical Engineering), Mechanical Engineer (BSc Mechanical Engineering), Construction Manager (BTech/Diploma), Project Manager (BTech/Diploma), Site Manager/Site Agent (BTech/Diploma), Site Supervisor (BTech/Diploma). Certification: All academic and registration qualifications must be certified and not older than 3 months from the tender closing date. Uncertified documents will not be accepted. Compliance with standards: OHS Act 1993 (Construction Regulations 2014), National Building Regulations (SANS 10400 series), SANS 1200, ISO 9001, ISO 14001:2015, OHSAS 18001, and NTCSA-specific standards (e.g., 240-53113685, 240-114967625). SHEQ requirements: Refer to 240-166910358 Rev 1 (Health and Safety Specification), 202211_OH&S Tender Returnable Documents for EPC & EPCM & Owner's Engineer_TPDMAN-FM-204_Rev2, and 202211_(Form A) Tender Contract SHEQS Requirements for EPCM & or Owner's Engineer_TPDMAN-FM-197_Rev2. Local content: Preference for South African materials and sourcing where possible. Environmental compliance: National Environmental Management Act 1998, National Environmental Management Waste Act 2008, National Water Act 1998, and Environmental Conservation Act. Security standards: Compliance with NTCSA security standards (e.g., 240-102220945 Integrated Access Control, 240-91190304 CCTV Surveillance, 240-86738968 Integrated Security Alarm, 240-170000096 Physical Security Integration, 240-78980848 NLEPDS).
Important Dates
Source: Health & Safety.zipClosing date: 17 July 2026 at 10:00 AM. Document effective date: March 2025. Review date: November 2025.
Submission Guidelines
Source: Health & Safety.zipSubmit the following returnable documents: Signed Annexure B (Acknowledgement Form for Eskom OHS legal and other requirements). Bidders will have one chance to submit omitted SHEQ documentation within seven (7) working days after the tender deadline. Only tenders submitted or responded to within the deadline will be considered; non-responsive submissions will be disqualified.
Evaluation Criteria
Source: Health & Safety.zipGeneral: Applicants must be registered and compliant with South African legal and regulatory requirements. Must demonstrate experience in similar projects (design and construction of control buildings or security centers). Must have a valid SHEQ management system (preferably ISO 45001:2018 certified or compliant). Must provide proof of financial and technical capability to execute the project. Technical: Must have a multidisciplinary team including project management, contract management, engineering (architectural, electrical, structural, mechanical, fire, security), environmental, health and safety, commercial, quantity surveying, and security management disciplines. Professional registrations required for key roles (e.g., SACAP for architects, ECSA for engineers). Must provide a detailed project plan, including risk assessments, method statements, and compliance strategies. OHS: Must have a valid OHS policy signed by the CEO. Must provide a valid Letter of Good Standing (COIDA). Must demonstrate compliance with Eskom’s OHS requirements, including Life Saving Rules, SHEQ Policy, and incident management procedures. Must have competent OHS professionals (e.g., SACPCMP-registered Construction Health and Safety Agent, Manager, or Officer). Environmental: Must comply with South African National Environmental Management Acts and regulations. Must provide an Environmental Management Programme (EMPr) and Waste Management Plan aligned with the project scope. Quality: Must have a Quality Management System (preferably ISO 9001:2015 certified or compliant). Must provide a Contract/Project Quality Plan and Inspection and Test Plan (ITP) or Quality Control Plan (QCP).
Technical Specifications
Source: Health & Safety.zipScope: Design and construction of a System Operating Control (SOC) building at Emkhiweni, Mpumalanga, for a Transmission Security Nerve Centre (centralized security command and control center). Key deliverables: Control room for 6 workstations (ISO 11064 ergonomic standards), server room (air temperature/quality, security, fireproof), office space for security staff (Shift Supervisor, Security Manager, support staff, investigators), meeting/conference room (backup as situation room), support infrastructure (HVAC, DC uninterrupted power and battery room, electrical supply main and backup generator), telecoms infrastructure (capable of receiving data from all monitored sites), and Integrated Physical Security Systems (IPSS). Team requirements: Must include disciplines such as project management, contract management, engineering (Professional Architect or Senior Architectural Technologist registered with SACAP, Electrical Engineer, Structural/Civil Engineer, Mechanical Engineer for HVAC, Fire Engineer/Specialist, Security Systems Specialist), environmental, health and safety, commercial, quantity surveying, and security management. All engineers must be registered with ECSA; architects with SACAP. Submission of final Health & Safety Plan (framework) is required before site establishment/access. Project timeline: Commencement and completion dates TBA.
Compliance Requirements
Source: Health & Safety.zipMandatory legal compliance: Occupational Health and Safety Act 85 of 1993, Mine Health and Safety Act (where applicable), Compensation for Occupational Injuries and Diseases Act 130 of 1993, Electrical Installation Regulations (GNR.242 of 06 March 2009). Eskom-specific compliance: SHEQ Policy 32-727, OHS Risk Assessment Procedure 32-520, Life Saving Rules Procedure 240-62196227, Contractor Health and Safety Requirements Standards 32-136, OHS Incident Management Procedure 32-95, Employees’ Right of Refusal to Work in an Unsafe Situation Procedure 240-43848327, Vehicle and Driver Safety Management Procedure 240-62946386, Vehicle Safety Specification 32-345, Work at Heights 32-418, PPE 240-44175132, Protective Equipment for Work at Heights Specification 240-100979499, Substance Abuse 32-37, Behavioural Safety Observations 32-407. Contractual compliance: Section 37(2) OHS Act agreement must be signed between Eskom and the principal contractor, and between the principal contractor and sub-contractors. Valid Letter of Good Standing (LoGS) from the Compensation Commissioner (COIDA) required. Operational compliance: All employees must undergo Eskom induction. Substance abuse: 0% tolerance for alcohol and drugs; compliance with Eskom Procedure 32-37 and Life-Saving Rule 4 (BE SOBER). Medical surveillance: Annual medical fitness certificates (Annexure 3) for on-site employees, conducted by qualified Occupational Health Practitioners. Statutory appointments: Fire Fighter, Evacuation Warden, First Aider, Incident Investigator, Risk Assessor, SHE Representative, Project Supervisor/Manager, and 16(2) appointments under OHS Act. Risk assessments: Required for all activities, aligned with Eskom Procedure 32-520. PPE: Must comply with SANS standards; risk-based PPE matrix required. COVID-19: Policy and risk assessment required, aligned with Disaster Management Act; social distancing, disinfection, and hygiene protocols enforced. Non-compliance penalties: Financial penalties for non-conformance; work stoppages due to OHS issues will not warrant compensation claims.
Important Dates
Source: Commercial.zipClosing date and time: 17 July 2026 at 10:00 AM (South African Standard Time).
Contact Information
Source: Commercial.zipNTCSA Representative: Tsakani Mabunda, Tel: +27 11 800 2311, Email: [email protected].
Submission Guidelines
Source: Commercial.zipSubmission must be electronic via NTCSA E-tendering site (https://eTendering.eskom.co.za). No physical submissions accepted.
Evaluation Criteria
Source: Commercial.zipGeneral requirements:
Documentation requirements:
Joint Ventures (JV):
Evaluation process:
Technical Specifications
Source: Commercial.zipScope: Design and construction of System Operating Control (SOC) building at Emkhiweni, Mpumalanga.
Financial Requirements
Source: Commercial.zipPricing must be in South African Rand (ZAR) unless otherwise specified.
Compliance Requirements
Source: Commercial.zipMandatory compliance requirements:
Contact Information
Source: Quality.zipContact the Supply Chain Management (SCM) department for queries. Specific contact details (name, email, phone) are not provided in the document. Eskom Quality Representative: Nosimilo Mbele (Senior Quality Advisor, dated 15 May 2025).
Submission Guidelines
Source: Quality.zipSubmit the following returnable documents as per Category 1 (selected for this tender):
Note: All documents must be submitted as listed in the List of Tender Returnables (240-12248652). Failure to submit required documents may result in disqualification.
Evaluation Criteria
Source: Quality.zipEvaluation is based on the following criteria:
Technical Specifications
Source: Quality.zipScope: Design and construction of the System Operating Control (SOC) building at Emkhiweni.
Key Requirements:
Compliance Requirements
Source: Quality.zipMandatory Compliance:
Description
Source: SDL&I.zipScope: Design and construction of a System Operating Control (SOC) building at Emkhiweni. Project duration: 42 months. Buyer: Tsakani Mabunda (Eskom NTCSA DP).
Contact Information
Source: SDL&I.zipCIDB Contacts: Pranveer Harriparsadh, Email: [email protected], Phone: 012 482 7230. Thabelo Ramaru, Email: [email protected], Phone: 012 482 7249.
Eskom Buyer: Tsakani Mabunda (name only, no additional contact details provided).
Submission Guidelines
Source: SDL&I.zipRequired forms: Submit SBD 6.2 Declaration Form and Annex C (Local Content Declaration-Summary Schedule). Failure to submit these may disqualify the bid.
SDL&I reporting: Monthly/quarterly compliance reports must be submitted to Eskom using the Data Collection Template. SDL&I Implementation Schedule must be completed and returned within 28 days of contract award.
Penalties: 2.5% of invoice amount (excluding VAT) applies for failure to meet SDL&I obligations or submit quarterly reports. Retention clauses may be invoked for non-compliance.
Returnable Documents
Source: SDL&I.zipMandatory Forms:
SDL&I Reporting:
Training Documentation:
Evaluation Criteria
Source: SDL&I.zipGeneral: Must be a registered contractor with valid CIDB grading. Compliance with PPPFA (Preferential Procurement Policy Framework Act) for objective criteria. Ability to meet technical and financial requirements for a 42-month project.
B-BBEE: Valid certification (Level 1-8) or sworn affidavit (for exempted micro-enterprises) required to claim preference points. Objective criteria, if included, must align with PPPFA and will disqualify non-compliant bidders.
Skills Development: Commitment to achieving Construction Skills Development Goal (CSDG) of 0.25% through approved training methods (Method 1: structured workplace learning, Method 2: apprenticeships, Method 3: work-integrated learning, Method 4: professional registration candidates).
Legal: No mandatory subcontracting, but compliance with Eskom’s terms is required.
Technical Specifications
Source: SDL&I.zipScope: Design and construction of a System Operating Control (SOC) building at Emkhiweni. Duration: 42 months.
CIDB Skills Development: Mandatory compliance with CIDB Standard for Developing Skills through Infrastructure Contracts (Government Gazette 36760, March 2020). Construction Skills Development Goal (CSDG) of 0.25% applies to contracts exceeding R20M or with a duration of 12+ months.
Training Methods: Structured workplace learning (Method 1), apprenticeships (Method 2), work-integrated learning (Method 3), professional registration candidates (Method 4).
Local Content: Not a designated sector, but SBD 6.2 and Annex C forms are mandatory for contract award.
Methodology
Source: SDL&I.zipTraining Methods for CSDG Compliance:
Baseline Training Plan Example:
Financial Requirements
Source: SDL&I.zipPenalties: 2.5% of invoice amount (excluding VAT) for failure to meet SDL&I obligations or submit quarterly performance reports. Retention clauses may be invoked for non-compliance.
Reporting: Monthly/quarterly SDL&I compliance reports required. SDL&I Implementation Schedule must be completed and returned within 28 days of contract award.
Compliance Requirements
Source: SDL&I.zipB-BBEE: Valid certificate from SANAS-accredited agency, sworn affidavit, or CIPC affidavit required to claim preference points. Affidavits must include: deponent’s full name (as per ID), ID number, designation (director/owner/member), enterprise name (as per CIPC), business address, black ownership percentages (including black female and designated groups), total revenue (audited or management accounts), financial year-end, B-BBEE status level, and empowering supplier status. Must be signed in the presence of a Commissioner of Oath (not an employee of the enterprise) on the same date.
CIDB: Skills development compliance mandatory for contracts exceeding R20M or 12+ months duration.
Local Content: SBD 6.2 Declaration Form and Annex C (Local Content Declaration-Summary Schedule) are mandatory for contract award.
B-BBEE Requirements
Source: SDL&I.zipB-BBEE Documentation:
Sworn Affidavit Validity Requirements:
Local Content: Not a designated sector, but SBD 6.2 and Annex C forms are mandatory for contract award.
Special Conditions
Source: SDL&I.zipSDL&I Penalties and Performance Security:
Supervisor/Learner Agreement:
Requirements
Source: SDL&I.zipCSDG Targets by Discipline:
Mandatory Requirements:
Section
Source: SDL&I.zipCIDB Skills Development Agencies:
Eskom Buyer: Tsakani Mabunda (NTCSA DP).
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Portion 14 of Farm Rietfontein 314 JS - Emkhiweni site – Rietfontein 314 JS, Portion 14 - Middelburg - 1049
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
7
Last checked
12 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Services: Professional. Unlock full pricing strategies, bid frequency, and historical win rates.