25 Valley View Road - New Germany - Kwa-Zulu Natal - 3610
Organization Type
GOVERNMENT
Published
19 Jun 2026
OCDS Reference
ocds-9t57fa-159633
Summary
ESKOM is establishing a panel of five contractors for fibre optic cable installation on an as-needed basis across kwazulu-natal and free state operating units. The contract is a five-year nec3 engineering & construction enabling agreement, requiring comprehensive sdl&i documentation including b-bbee compliance and company registration.
Key Requirements
Bidders must submit a completed and signed SDL&I Bidders Document.
Provide a valid B-BBEE certificate from a SANAS accredited agency, or a sworn affidavit, or a CIPC-issued certificate for EMEs.
Submit CIPC Registration Document and identity documents of all owners/members/shareholders.
Include latest financial statements matching the date on the sworn affidavit.
If subcontracting, provide proof of subcontracting agreements and valid B-BBEE certificates for subcontractors.
Note that SBD 6.2 and Annexures C, D, and E are not applicable for this tender.
Bidders must be capable of operating in both KwaZulu-Natal and Free State provinces.
An enabling agreement for a panel of (5) five contractors for fibre optic cable installation on “as and when” required basis in the central east cluster (kwa-zulu natal and free state operating units) for a period of (5) five years.
Review in progress · 3 of 30 documents being finalised
AI Document Analysis Stages
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: Example on how to complete a QSE Sworn Affidavit.pdf, Example on how to complete an EME Sworn Affidavit.pdf, 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3 (003).docx. You don’t need to refresh — this page will pick up the updated review automatically.
Document20251020 SHE Specification CEC Fibre Optic Installation_Final.pdfReview complete
Important Dates
19 Jun
2026
PUBLICATION
Tender Published
Tender was published
24 Jul
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
12 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Eskom seeks to establish a 5-year enabling agreement with a panel of five contractors for fibre optic cable installation on an 'as and when required' basis in the Central East Cluster (KwaZulu-Natal and Free State). The tender includes a comprehensive Contract Quality Plan (CQP) template based on SANS 466/ISO 10005, mandating detailed quality management systems, documentation, and compliance processes.
This document is an Occupational Health and Safety Risk Assessment (HIRA) for Eskom's Central East Cluster Fibre Optic Cable Installation, Commissioning & Repair works. It details safety hazards and required control measures across numerous project activities, but does not contain the full tender's commercial, technical, or bidding requirements. It is a mandatory compliance document outlining the safety standards contractors must adhere to.
Part 5 - Environmental Submission Pack - E3011DXKZNOU.pdf
Eskom seeks to establish a 5-year enabling agreement with a panel of 5 contractors for fibre optic cable installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State). The tender focuses heavily on environmental, health, and safety compliance, with mandatory submission of an Environmental Management Plan, signed SHE policy, and ISO 14001 certification.
240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3 (003).docx
Eskom is establishing a 5-year enabling agreement for a panel of five contractors to perform fibre optic cable installation on an 'as and when required' basis in the Central East Cluster (KwaZulu-Natal and Free State). The tender includes a detailed Quality Control Plan (QCP) framework specifying inspection, testing, and approval procedures.
240-12248652_List of Tender Returnables_Cat 3_ Fibre Optic Installation and Repair.pdf
Eskom seeks to establish a 5-year enabling agreement with a panel of five contractors for fibre optic cable installation and repair on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State). The tender focuses heavily on quality management system compliance.
PART 6- FINANCIAL SUBMISSION PACK - E3011DXKZNOU.pdf
Eskom seeks to establish a 5-year enabling agreement with a panel of five contractors for fibre optic cable installation on an 'as and when required' basis in the Central East Cluster (KwaZulu-Natal and Free State). The tender focuses heavily on financial due diligence and compliance.
PART 1B - SDL&I SUBMISSION PACK - E3011DXKZNOU.pdf
Eskom seeks to establish a panel of five contractors for fibre optic cable installation on an 'as and when required' basis in the Central East Cluster (KwaZulu-Natal and Free State) for a five-year period under an NEC3 Engineering & Construction Contract framework.
KEY Elements when completing a Sworn Affidavit.pdf
Eskom is seeking to establish a panel of five contractors for fibre optic cable installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State) for a five-year period. The tender requires strict compliance with B-BBEE Sworn Affidavit guidelines.
Eskom seeks to establish a 5-year enabling agreement with a panel of five contractors for fibre optic cable installation on an 'as and when required' basis in KwaZulu-Natal and Free State. The tender includes a mandatory B-BBEE affidavit for Exempted Micro Enterprises.
Eskom is seeking to establish a panel of five contractors for fibre optic cable installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State) for a five-year period. The tender requires rigorous financial evaluation, including submission of audited or reviewed financial statements, tax assessments, and detailed notes on financial positions.
240-68099512 Form A_Cat 3_ Fibre Optic Installation and Repair.pdf
ESKOM is seeking to establish a panel of 5 contractors for fibre optic cable installation services on an 'as and when' required basis across the Central East Cluster (Kwa-Zulu Natal and Free State Operating Units) for a 5-year period. The tender requires ISO 9001 compliance and Category 3 quality requirements as per ESKOM specification 240-105658000. Contractors must accept ESKOM's supplier quality requirements and commit to post-contract quality monitoring, performance evaluations, and quality audit conditions.
Eskom is inviting tenders for an Enabling Agreement to establish a panel of five contractors for fibre optic cable installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State Operating Units) for a period of five years. The tender process is governed by Eskom's Standard Conditions of Tender, with a closing date of 24 July 2026.
Eskom Holdings SOC Ltd invites tenders for the establishment of a panel of five contractors to provide fibre optic cable installation services on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State Operating Units) for a period of five years. The tender is open, and submissions must be made electronically via Eskom’s e-tendering portal by 24 July 2026 at 10:00 AM UTC. The contract will be awarded based on a combination of price (80 points) and B-BBEE preference points (20 points) under the PPPFA 80/20 system.
Technical Evaluation Criteria for Fibre Optic Installation and Repair_.pdf
ESKOM tender for establishing a panel of 5 contractors for fibre optic cable installation (OPGW, ADSS, and DUCT) on an 'as and when' required basis in the Central East Cluster (Kwa-Zulu Natal and Free State) for a 5-year period. The evaluation process consists of 3 stages: Stage 1 (Mandatory Criteria - pass/fail gate), Stage 2 (Functional Criteria with 80% threshold), and Stage 3 (Contracting requirements).
Eskom is establishing a five-year enabling agreement for a panel of five contractors to perform fibre optic cable installation on an 'as and when required' basis in the Central East Cluster (KwaZulu-Natal and Free State). The tender focuses heavily on Occupational Health and Safety (OHS) compliance, with the provided document detailing a mandatory OHS evaluation template for high-risk work.
Bidders Document - Installation and Commissioning of Various Types of Fibre Optic Cables.docx
Eskom seeks to establish a 5-year enabling agreement with a panel of five contractors for fibre optic cable installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State). The tender uses an 80/20 scoring system (80 for price, 20 for B-BBEE), with mandatory subcontracting requirements for contracts above R30 million and significant Supplier Development, Localisation, and Industrialisation (SDL&I) obligations.
SDL & I Check list - Installation and Commissioning of Various types of Fibre Optic Cables.docx
Eskom seeks to establish a 5-year enabling agreement with a panel of five contractors for fibre optic cable installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State). The tender focuses heavily on compliance with Broad-Based Black Economic Empowerment (B-BBEE) and requires detailed company documentation.
NON - COMPULSORY ONLINE TENDER CLARIFICATION MEETING DETAILS - E3011DXKZN.pdf
ESKOM seeks to establish a 5-year enabling agreement with a panel of five contractors for fibre optic cable installation on an 'as and when required' basis in the Central East Cluster (KwaZulu-Natal and Free State).
PART 4 - QUALITY SUBMISSION PACK - E3011DXKZNOU.pdf
Eskom is establishing a 5-year enabling agreement for a panel of 5 contractors to perform fibre optic cable installation on an 'as and when required' basis in the Central East Cluster (KwaZulu-Natal and Free State). The tender focuses heavily on supplier quality management, requiring documented ISO 9001:2015-aligned quality systems.
Environmental Tender Evaluation and Scoring Card Medium risk FIBRE OPTIC INSTALLATION COMMISSIONING.pdf
Eskom is seeking to establish a panel of five contractors for fibre optic cable installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State Operating Units) for a five-year period. The tender emphasizes compliance with Eskom's Safety, Health, and Environment (SHE) rules and environmental management standards.
ESKOM seeks to establish a panel of 5 contractors for Fibre Optic Cable Installation on an 'as and when' required basis in the Central East Cluster (Kwa-Zulu Natal and Free State Operating Units) for 5 years. This is a NEC3 Engineering & Construction Contract (Enquiry Number: E3011DXKZNOU) with a comprehensive price list covering labour, materials, equipment, and installation services including ADSS and OPGW cable systems.
Part 3 - SAFETY SUBMISSION PACK - FIBRE OPTIC INSTALLATION.pdf
Eskom is seeking to establish a panel of five contractors for fibre optic cable installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State) for a 5-year period. The tender emphasizes strict Occupational Health and Safety (OHS) compliance, requiring extensive documentation, certifications, and adherence to Eskom’s and statutory OHS standards.
E-tendering Help Manual for supplier - 27 January 2025 (1).pdf
Eskom is establishing a 5-year enabling agreement for a panel of five contractors to perform fibre optic cable installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State). The tender uses an electronic submission system (eTendering), and the closing date is July 24, 2026.
20251020 SHE Specification CEC Fibre Optic Installation_Final.pdf
Eskom is establishing a 5-year enabling agreement for a panel of 5 contractors to perform fibre optic cable installation, commissioning, and repair work on an 'as and when required' basis in the Central East Cluster (KwaZulu-Natal and Free State). The tender is for high-risk construction work, and the primary document provided is a detailed Safety, Health, and Environment (SHE) specification outlining the mandatory compliance framework for contractors.
Eskom is seeking to establish a panel of five contractors for fibre optic cable installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State Operating Units) for a five-year period. The tender emphasizes stringent Supplier Quality Management (SQM) requirements, including compliance with ISO 9001 standards, submission of quality plans, and adherence to Eskom’s quality management specifications (Document Identifier: 240-105658000).
Eskom seeks to establish a 5-year enabling agreement with a panel of five contractors for fibre optic cable installation on an 'as and when required' basis in the Central East Cluster (KwaZulu-Natal and Free State). The tender includes comprehensive rate-based pricing for labour, transport, plant, materials, and specialized installation activities for ADSS and OPGW systems.
Eskom is seeking to establish a panel of five contractors for fibre optic cable installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State) for a five-year period. The tender emphasizes B-BBEE compliance, with specific ownership and revenue criteria for qualifying small enterprises.
Eskom is establishing a 5-year enabling agreement for a panel of 5 contractors to perform fibre optic cable installation on an 'as and when required' basis in the Central East Cluster (KwaZulu-Natal and Free State). The contract uses the NEC3 Engineering & Construction Contract framework. Evaluation is based on mandatory technical criteria and functional scoring.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Based on 3 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Description
Source: 20251020 SHE Specification CEC Fibre Optic Installation_Final.pdf
This document is a Safety, Health, and Environment (SHE) Specification for Eskom's Central East Cluster Fibre Optic Cable Installation, Commissioning & Repair project.
It outlines Eskom's minimum SHE requirements for contractors for the duration of the contract.
The contractor is expected to develop a SHE plan that meets these requirements and all applicable legislation.
Eskom does not assume the contractor's legal responsibilities; the contractor remains accountable for health and safety programme execution.
The specification reflects minimum requirements and is not all-encompassing.
Requirements listed are in relation to the contract and do not supersede existing organisational SHE requirements.
Where requirements are already in place, organisational requirements must be noted in SHE plans. Additional Eskom or legislative requirements in the specification must be addressed.
Evaluation Criteria
Source: 20251020 SHE Specification CEC Fibre Optic Installation_Final.pdf (unknown)
Principal contractors and their appointed contractors must be registered with the South African Council for the Project and Construction Management Professions (SACPCMP) at the required professional levels (e.g., Construction Manager, Safety Officer). They must be registered with the Compensation for Occupational Injuries and Diseases (COID) Commissioner and possess a valid Letter of Good Standing. The organizational SHE policy must be signed by the CEO or Section 16(2) appointee. Contractors must have the organizational structure and competent personnel to meet the statutory appointments required by the OHS Act Construction Regulations.
The document does not provide specific bid evaluation criteria. It references a three-stage risk assessment process (identification of hazards, evaluation of risks, measures to control risks) as part of SHE management, not bid scoring.
Technical Specifications
Source: 20251020 SHE Specification CEC Fibre Optic Installation_Final.pdf (unknown)
Scope of work: Installation, commissioning, and repair of various fibre optic cables in the Central East Cluster (KwaZulu-Natal and Free State).
Installations of OPGW, ADSS, and Duct Fibre Optic cable.
Installations of Fibre Optic Aerial Hardware.
Supply and install Joint Boxes.
Supply and install Patch Panels and accessories.
Supply and install Sarel boxes and accessories.
Provide labour for trenching, splicing, and testing (end-to-end from patch panel to patch panel).
Provide as-built drawings, test results, pictures, position of joint boxes, and GPS locations.
The detailed Bill of Quantities provides full activity details.
General SHE Requirements:
The contractor must develop a SHE plan meeting Eskom's minimum requirements and all applicable legislation.
The contractor remains legally accountable for health and safety programme execution.
The SHE specification lists legislative and Eskom requirements, including Local Authority/Municipal by-laws and Environmental legislation.
Key SHE and Quality Management Requirements:
A Section 37(2) agreement must be signed between all contracting parties and kept on file.
Substance Abuse: Zero tolerance for alcohol and drugs (0% permissible level). Contractors must comply with Eskom's Substance Abuse Procedure (32-37). Ad-hoc alcohol testing may be conducted.
Vehicle Safety: Maintain a 30-meter clearance between light vehicles and machinery. Vehicles are subject to client inspections and must be roadworthy.
Auditing: Principal contractors must conduct monthly internal audits on their SHE Plan implementation and submit findings and corrective actions to the Eskom project manager within one week.
Equipment Inspection: Detailed inspection of ladders must be conducted monthly by a competent person and before each use. Inspection checklists must be filed.
Lifting Operations: All lifting machines must be operated by a competent person, inspected daily, and undergo annual performance tests by an accredited person/company.
Temporary Works: Requires a competent person appointed in writing, design drawings on site, a risk assessment, and regular inspections (before use, before concrete pour, weekly, before stripping). An inspection register must be kept.
Excavations: Must be performed by a competent person with daily inspections. Must comply with Construction Regulation 13 of the OHS Act.
Non-Conformance: Principal contractors must implement a non-conformance procedure for issuing to contractors for transgressions, which can include quality-related issues.
Environmental Requirements:
The SHE specification lists requirements pertaining to Local Authorities/Municipal by-laws and Environmental legislation that must be met by the contractor.
It references the need for an Environmental Management Plan to ensure recommendations for enhancing positive impacts and limiting negative environmental impacts are implemented during the project lifecycle. This plan should preferably form part of Eskom's Environmental Management System.
Method Statements / Safe Work Procedures:
Method statements or written safe work procedures are control measures to prevent incidents.
They provide guidance on how to execute tasks safely.
A safe working procedure should be written when:
Designing a new job or task.
Changing a job or task.
Introducing new equipment or substances.
Contractor and Personnel Qualifications:
The principal contractor and all appointed contractors must have the appropriate qualifications and certificates.
Employees should always be under competent supervision.
Compliance Requirements
Source: 20251020 SHE Specification CEC Fibre Optic Installation_Final.pdf (unknown)
B-BBEE Minimum Level: 2.
General Legislative Compliance:
Contractors must comply with all legislation pertaining to the contract, including:
Constitution of the Republic of South Africa (particularly Section 24 of the Bill of Rights).
Occupational Health and Safety Act 1993 and its Regulations.
National Environmental Management Act 1998.
Environment Conservation Act 1989.
National Water Act 1998.
Civil and Building Work Act.
National Road Traffic Act.
Compensation for Occupational Injuries and Diseases Act.
SANS Standards (relative standards applicable to the project).
Specific Compliance Requirements:
A Section 37(2) agreement must be signed between Eskom and the principal contractor upon award, and between the principal contractor and all appointed contractors.
The principal contractor and all appointed contractors must be registered with the South African Council for the Project & Construction Management Professions (SACPCMP) at respective professional levels (SHE professionals, Construction Managers, Construction agents).
The principal contractor and all appointed contractors must be registered with an appropriate employment compensation commissioner and maintain a valid Letter of Good Standing (LoG) throughout the contract.
The principal contractor must notify the Provincial Director of the Department of Labour of intention to carry out construction work (Construction Regulation 4).
All contractors must compile an organisational SHE policy signed by the organisation's Chief Executive or appointed assistant (OHS Act Section 16(2)).
A COVID-19 Workplace Plan must be developed in accordance with the COVID-19 Occupational Health and Safety Measures in Workplaces Directive, 2020.
Contractors must appoint competent employees to meet OHS Act requirements for statutory appointments.
Comprehensive Safety, Health, and Environment (SHE) Requirements:
The specification details Eskom's SHE policy commitment and legislative obligations.
Contractors must develop and implement a SHE plan addressing all listed requirements.
Key areas covered include:
Legal Compliance: OHS Act, Construction Regulations, and other relevant legislation.
Construction Professional Registration with SACPCMP.
Notification of Construction Work to the Department of Labour.
SHE Policy development and display.
Compensation for Occupational Injuries and Diseases (COID) registration and Letter of Good Standing.
COVID-19 Workplace Plan.
Statutory Appointments of competent persons.
Eskom's Life-Saving Rules (zero tolerance).
Substance Abuse policy (0% alcohol/drugs).
Contractor organisational structure and organogram.
Risk assessment and safe work procedures/method statements.
Fire precautions, flammable liquids handling, and refuelling procedures.
First aid requirements and equipment.
SHE communication systems, training, and site establishment.
Construction vehicle and plant safety.
Housekeeping, stacking, signage, tools, and equipment maintenance.
Auditing (internal and by Eskom).
Smoking policy and cellular phone use restrictions.
Occupational health, hygiene, rehabilitation, and medical surveillance.
Working at heights, mobile elevated platforms, ladders, lifting operations, temporary works, excavations.
Personal Protective Equipment (PPE) requirements.
Incident investigation and emergency management.
Non-conformance and compliance procedures.
Health & Safety
Source: 20251020 SHE Specification CEC Fibre Optic Installation_Final.pdf
the user to ensure it is in line with the authorised version on the system.
Ltd, Reg No 2002/015527/30.
of 32
DocumentExample on how to complete a QSE Sworn Affidavit.pdfCompliance review in progress
Compliance Requirements
Source: Example on how to complete a QSE Sworn Affidavit.pdf (unknown)
Insufficient searchable text - AI extraction recommended
This tender is for an Enabling Agreement to establish a panel of 5 contractors for Fibre Optic Cable Installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State Operating Units) for a period of 5 years.
Submit the following mandatory returnables with your tender. Failure to provide any may lead to disqualification:
Organogram and Annexure I.
Evidence of previous recent experience (past 5 years) with installation of Fibre Optic cables.
Fully completed Tools and Equipment Register (Annexure C).
Fully completed Vehicle Register (Annexure D).
Technical Compliance Schedule AB (Annexure E).
Fibre Optic cable Installation Methodology.
Proof of HV Accredited Linesman.
Proof of Splicer and commissioning technician/engineer.
Affidavit - Declaration Form.
For vehicles (owned or hired): Proof of ownership or hire letter, and license documents clearly showing vehicle type and owner's name. For the truck-mounted crane, also submit the Crane Load test.
All documents must be submitted at the time of tender. Ensure all fields in the annexures are populated.
Mandatory criteria must be fully met for consideration. Must have recent (past 5 years) experience in fibre optic cable installation. Must own or have proof of hire for the specified vehicle types. Technical compliance (Annexure E) must be fully completed. Personnel certifications (ORHVS, splicer) must be from Eskom/accredited providers and certified by a Commissioner of Oaths. Methodology must cover installation, patch panels, testing, commissioning, and repair for all cable types (OPGW, ADSS, DUCT).
The scope requires contractors to perform Fibre Optic Cable Installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State) for 5 years.
Key technical requirements:
Tools and Equipment: Must have and register all necessary tools and equipment.
Vehicles: Must have minimum quantities: 1 bakkie, 1 truck with mounted crane (8T minimum, excluding drop side trucks), and 1 other vehicle for transporting staff. Vehicles can be owned or hired.
Related Project Experience: Must demonstrate recent experience (past 5 years) in Fibre Optic cable installation.
Installation Methodology: Must provide detailed methodologies for ADSS, OPGW, and DUCT fibre types, covering installation, patch panel/joint box installation, testing, commissioning, and repair.
Technical Compliance: Materials and installation must meet specified standards; complete Technical Compliance Schedule AB.
Skills and Training: Must have:
HV Accredited Linesman.
Splicer and commissioning technician/engineer.
Truck-mounted crane operator (trained or hired).
ORHVS trained personnel (certificates from Eskom or accredited provider).
You must provide a complete and detailed installation and repair methodology for each fibre installation type: OPGW, ADSS, and DUCT. The methodology must cover:
No specific compliance requirements such as CSD, tax, B-BBEE, CIDB, or CIPC are stated in the document. Focus is on technical and functional criteria.
DocumentBidders Document - Installation and Commissioning of Various Types of Fibre Optic Cables.docxReview complete
Description
Source: Bidders Document - Installation and Commissioning of Various Types of Fibre Optic Cables.docx
This tender is for an enabling agreement to establish a panel of five contractors for fibre optic cable installation on an 'as and when required' basis in the Central East Cluster, covering KwaZulu-Natal and Free State operating units, for a period of five years.
Important Dates
Source: Bidders Document - Installation and Commissioning of Various Types of Fibre Optic Cables.docx (unknown)
Contract duration: 5 years.
No other specific dates (e.g., briefings, site visits) are stated in the document.
Submission Guidelines
Source: Bidders Document - Installation and Commissioning of Various Types of Fibre Optic Cables.docx (unknown)
Submit all required returnables: SBD 6.2 Declaration Form and Annex C (Local Content Declaration-Summary Schedule).
If subcontracting is applicable, include: signed subcontracting agreement or letters of intent, subcontractor company registration documents, and valid B-BBEE certificate or sworn affidavit for each subcontractor.
Ensure B-BBEE documentation is valid: SANAS-accredited certificate, sworn affidavit (for EMEs with revenue ≤ R10m), or CIPC certificate for EMEs.
Failure to provide preference points documentation will not disqualify, but will result in scoring 0/20 for specific goals and only price points out of 80.
Submit all documents by the closing date and time; late submissions will be rejected.
Evaluation Criteria
Source: Bidders Document - Installation and Commissioning of Various Types of Fibre Optic Cables.docx (unknown)
Price and specific goals: maximum 20 points for specific goals (B-BBEE status level), added to price points (80/20 system).
Must meet objective criteria (designated sectors, CIDB skills development) as condition for award; failure may lead to second-ranked tenderer being recommended.
Mandatory subcontracting for contracts above R30 million at task order stage: subcontract up to 30% to designated groups (EMEs/QSEs with 51% black ownership, cooperatives, etc.).
Must achieve stipulated minimum local production and content thresholds; SBD 6.2 and Annex C are mandatory returnables.
Must commit to SDL&I obligations: skills development (1 skill per R2 million invoiced), job creation, and B-BBEE improvement plan.
B-BBEE improvement plan required within 30 days of contract signing; migration targets based on initial level (e.g., Level 4 must reach Level 3 by end of first year).
Technical Specifications
Source: Bidders Document - Installation and Commissioning of Various Types of Fibre Optic Cables.docx (unknown)
Scope: Installation and commissioning of various types of fibre optic cables.
Location: Central East Cluster, covering KwaZulu-Natal and Free State operating units.
Basis: 'As and when required' over a 5-year period.
Panel of 5 contractors will be appointed.
Financial Requirements
Source: Bidders Document - Installation and Commissioning of Various Types of Fibre Optic Cables.docx (unknown)
SDL&I penalty: 2.5% of contract value for failure to meet SDL&I obligations.
Retention: 2.5% of every invoice (excluding VAT) withheld as security for SDL&I obligations; released upon fulfilment and reporting.
Pricing must be submitted as per the price schedule included in the tender documents.
No other financial requirements (e.g., bonds, guarantees) are stated.
Compliance Requirements
Source: Bidders Document - Installation and Commissioning of Various Types of Fibre Optic Cables.docx (unknown)
B-BBEE: Valid certificate or sworn affidavit required for preference points and as condition for award. For EMEs (revenue ≤ R10m) sworn affidavit acceptable; QSEs (revenue ≤ R50m) must comply with QSE scorecard; above R50m need full certificate.
Local content: SBD 6.2 and Annex C are mandatory returnables; must meet minimum thresholds.
Submit the fully completed and signed Price List (PRICELIST – E3011DXKZNOU) at tender closing. Failure to price all items (except greyed-out items) will result in disqualification.
Submit the following mandatory returnables, fully completed and signed, by the tender closing date: Authorisation Form (Annexure A), Acknowledgement Form (Annexure B), Tenderer’s Particulars (Annexure C), Integrity Declaration Form (Annexure D), SBD 1, SBD 4, and E-Tendering Training Acknowledgement Form.
If any mandatory returnable is missing at closing, the Procurement Practitioner will request it within 5 working days. Failure to submit the completed returnable within this period will lead to disqualification.
Include the completed Invitation to Tender documentation.
Accept the NEC3 Engineering & Construction Contract terms by returning the signed Form of Offer and Acceptance.
Scope: Fibre optic cable installation on an "as and when" required basis across the Central East Cluster (KwaZulu-Natal and Free State Operating Units).
All supplied and installed items must comply with Eskom standards and specifications and/or be sourced from Eskom-approved suppliers.
Preliminary & General costs (e.g., site establishment, facilities, utilities, offices, storage, accommodation, ablution, tools, name boards) will be identified and agreed with the Eskom Project Manager per Task Order.
Health, Safety, and Environmental: Must comply with Eskom Health & Safety requirements, the OHS Act, and statutory environmental requirements including an Environmental Management Programme.
Site security must be provided during construction.
Deliverables include detailed "as built" records (3 soft copies, 1 hard copy) per project.
Site survey methodology must be agreed with the Eskom Engineer.
Works must be performed as per the detailed Works Information and Technical Specifications.
This is an enabling agreement to establish a panel of five contractors for fibre optic cable installation in the Central East Cluster (KwaZulu-Natal and Free State) on an "as and when" required basis for five years.
The panel will be a single list; work will be allocated rotationally to qualifying contractors.
Contractors must be able to work throughout the entire cluster, not dedicated to a specific Operating Unit.
At the time of work allocation, contractors must have valid authorisation, accreditation, and the correct CIDB registration level for the task order value.
You must complete and sign the extensive Price List (PRICELIST – E3011DXKZNOU) in its entirety.
The list includes hundreds of line items for Preliminary & General, Labour (normal and overtime), Transport & Plant, Supply & Install of materials (cables, hardware, panels, poles, pipes), Documentation & Testing, Earthworks, Site Clearance, Crossings, and Concrete Works.
All supplied items must be from Eskom-approved suppliers and meet Eskom standards.
For variations (items not on the list), follow the Compensation Event process: submit quotes for verification by Eskom's QS.
Pricing Format: Submit a fully completed and signed Price List (PRICELIST – E3011DXKZNOU). The list includes unit rates for supply and installation.
Mandatory Pricing: You must price all items on the price list. Failure to do so will result in disqualification. Do not price greyed-out items.
Price List Structure: Covers Preliminary & General items, Labour (normal, overtime), Transport & Plant, Supply & Install items (patch panels, cables, poles, pipes, hardware), Documentation & Testing, Earthworks, Site Clearance, Crossings, and Concrete Works.
Variations: For items not on the price list, the contractor must submit quotes for supply and/or install rates for verification by Eskom's Quantity Surveyor, following the Compensation Event process.
VAT: The contract uses VAT-exclusive pricing; VAT is calculated at 15%.
CSD Registration: Provide your CSD Registration Number (MAAA...). Proof of CSD registration must be submitted.
Tax Compliance: Provide Income Tax Number, VAT Number, Company Registration Number, and Expiry Date as per your SARS Tax Clearance Certificate. A valid SARS Tax Clearance Certificate (original or certified copy) must be attached.
B-BBEE: Provide B-BBEE Status and Expiry Date as per a SANAS-accredited certificate or an affidavit (valid for 12 months from Commissioner of Oaths stamp).
COID: Provide a valid Compensation for Occupational Injuries and Diseases Act (COID) Certificate with the Nature of Business relevant to the scope.
CIDB: Provide your CIDB CRS Number and CIDB Class Grading. Contractors must be registered with the correct CIDB level for the proposed value of each Task Order. A minimum CIDB Level 3EP or higher is required.
Shareholder Disclosure: Declare all shareholders/beneficiaries and disclose if any are employed by or are close family members of Eskom employees.
Company Authority: Submit a signed authority certificate (for company, partnership, joint venture, or sole proprietor) authorising the signatory.
Fair Bidding Declaration: Declare that the tender is bona fide and competitive, with no price-fixing or collusion.
Eskom Vendor Registration: Not required for tender submission; non-registered companies will not be prejudiced.
Contract Basis: NEC3 Engineering & Construction Contract.
Offer & Acceptance: The tenderer must sign and return the Form of Offer and Acceptance.
Contract Documents: The contract comprises Part C1 (Agreements & Contract Data), Part C2 (Pricing Data), Part C3 (Scope of Work: Works Information), Part C4 (Site Information), and referenced drawings/documents.
Post-Award: Within two weeks of receiving the signed agreement, the contractor must contact the Employer's agent to arrange delivery of any required securities, bonds, guarantees, and proof of insurance.
Failure to provide these documents constitutes a repudiation of the agreement.
Contract Effect: The agreement becomes effective when the tenderer receives a fully completed, signed copy. The contractor has five working days to raise any objections.
Document240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3 (003).docxCompliance review in progress
Submission Guidelines
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3 (003).docx (unknown)
Prepare and submit a Quality Control Plan (QCP) or Inspection Test Plan (ITP) as part of your bid. This is a required returnable document.
The QCP/ITP must be fully completed, including all approval signature blocks (Contractor/Supplier, Subcontractor where applicable, Eskom, and Approved Inspection Authority if applicable).
Ensure the QCP/ITP includes the scope of work, item/plant/material descriptions, and a detailed activity schedule with inspection and test methods.
Submit the bid before the closing date and time as specified in the tender notice. Late submissions will be disqualified.
Follow all submission instructions in the tender document, including any required forms or returnables beyond the QCP/ITP.
Evaluation Criteria
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3 (003).docx (unknown)
Bidders will be evaluated on their ability to implement the Quality Control Plan (QCP) or Inspection Test Plan (ITP) as specified.
The QCP/ITP must demonstrate clear intervention points (Hold, Witness, Document Review, Surveillance, Verification) and appropriate inspection/testing methods.
Contractors must show capability to coordinate with Approved Inspection Authorities (AIA) and Third-Party Inspection (TPI) bodies where required.
The plan must address both statutory and non-statutory inspections and testing, with acceptance criteria for functionality, performance, and regulatory compliance.
Evaluation will likely consider the completeness and quality of the submitted QCP/ITP, as well as the bidder's overall compliance with the tender requirements.
Technical Specifications
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3 (003).docx (unknown)
Scope: Fibre optic cable installation on an 'as and when required' basis in the Central East Cluster (KwaZulu-Natal and Free State Operating Units) for a period of 5 years.
The contractor must develop and implement a detailed Quality Control Plan (QCP) or Inspection Test Plan (ITP) for all installation activities.
The QCP/ITP must include:
Scope of work and item/plant/material descriptions.
Approval signatures from the contractor/supplier, subcontractor (if applicable), Eskom, and Approved Inspection Authority (AIA) where applicable.
Defined intervention points: Hold Point, Witness Point, Document Review, Surveillance, and Verification.
A detailed activity schedule with inspection and test methods (e.g., visual, microscopy, NDT, liquid/dye penetrant, magnetic particle, eddy current, etc.).
Acceptance criteria for functionality, performance measures, and regulatory compliance.
Records of inspections by the supplier and Eskom, including third-party inspections (TPI/NOBO).
The contractor must comply with all statutory and non-statutory inspection requirements as identified in the plan.
Compliance Requirements
Source: 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP)-rev 3 (003).docx (unknown)
No specific compliance requirements are stated in the available document sections. However, bidders should ensure they meet all standard Eskom tender requirements, including valid tax clearance, CSD registration, and B-BBEE status, as per the main tender document.
The tender is for an enabling agreement for a panel of five contractors for fibre optic cable installation in the Central East Cluster (KwaZulu-Natal and Free State) on an 'as and when' required basis for five years.
Submit the following OHS returnables as part of your tender. All documents must be signed by the CEO/MD where indicated. Ensure each document includes the next review date where required. Missing or unsigned documents may lead to disqualification.
Annexure B: Signed acknowledgement of Eskom's OHS legal and other requirements, signed by CEO/MD and 2 witnesses.
OH&S Organogram: Including names and appointment references, approved by CEO/MD.
Occupational Health and Safety (OHS) Plan: Must address project/scope OHS risks, aligned with the SHE specification, include next review date, and be signed by CEO/MD.
Baseline Risk Assessment (BRA): Identification, assessment, and management of OHS risks related to scope, including driving. Provide methodology and risk matrix. Include next review date and sign by CEO/Director.
Valid Letter of Good Standing (COID or equivalent): Must state relevant services rendered (e.g., electrical construction work) in line with scope.
OHS Policy: Compliant with OHS Act Section 7, signed by Owner/CEO/MD, with next review date.
OHS Competency Proof: Training certificates and appointment letters for each listed role (e.g., Health and Safety Representative, First Aider, Fire Fighter, Risk Assessor, Construction Supervisor, Safety Officer, Fall Protection Planner, Fall Rescuer, Incident Investigator, Competent Person for Excavation). Accreditation certificates from training providers must be provided.
Medical Fitness Certificates: Including Annexure 3 template, done by Occupational Health Practitioner/Nurse/Doctor (minimum of 3).
Fall Protection Plan: As per CR 10, including rescue plan and fall risks. Include next review date, signed by fall protection planner and CEO/MD.
Substance Abuse Procedure or Policy: Signed by CEO/MD.
Costing for Health and Safety Management: Provide a detailed breakdown, not a lump sum, based on overall scope.
Evaluation will use Annexure C4: OHS Tender Evaluation Template. This template lists specific OHS returnables that will be assessed. Contractors must demonstrate robust OHS management systems. Essential criteria include:
Valid company registration and proven OHS compliance for high-risk construction work.
A valid Letter of Good Standing from the Compensation Fund (COID).
Appointed and certified personnel for all mandated OHS roles (e.g., Safety Officer registered with SACPCMP, Risk Assessor, First Aiders).
Submissions missing signed CEO/MD endorsements, review dates on plans, or required competency proofs will likely be non-compliant.
The scope involves fibre optic cable installation in the Central East Cluster (KwaZulu-Natal and Free State) on an 'as and when' required basis. The tender is for an enabling agreement for a panel of five contractors for a period of five years. Specific technical details are not provided in this document.
Costing for Health and Safety management must be provided. The cost should be broken down, not as a lump sum, and must be based on the overall scope of work/service.
Comprehensive OHS compliance documentation is required. Key documents include:
Signed acknowledgement of Eskom's OHS legal requirements (Annexure B).
OH&S Organogram approved by CEO/MD.
OHS Plan aligned with SHE specification.
Baseline Risk Assessment (BRA) with methodology.
Valid Letter of Good Standing (COID).
OHS policy compliant with OHS Act Section 7.
Proof of competency for roles: Health and Safety Representative, First Aid, Fire Fighters, Risk Assessor, Construction Supervisor, Safety Officer (SACPCMP), Fall Protection Planner, Fall Rescuer, Incident Investigator, Competent Person for Excavation.
Medical Fitness Certificates (minimum of 3).
Fall Protection Plan with rescue plan.
Substance Abuse Policy.
All documents must be signed by the CEO/MD where required and include next review dates where applicable.
The evaluation uses Annexure C4: OHS Tender Evaluation Template. This template lists specific OHS returnables for assessment.
Document240-12248652_List of Tender Returnables_Cat 3_ Fibre Optic Installation and Repair.pdfReview complete
Description
Source: 240-12248652_List of Tender Returnables_Cat 3_ Fibre Optic Installation and Repair.pdf
Project: Fibre Optic Installation and Repair.
Must include documented information for control of externally provided processes, products, and services, with criteria for evaluation, selection, monitoring, and re-evaluation.
Contact Information
Source: 240-12248652_List of Tender Returnables_Cat 3_ Fibre Optic Installation and Repair.pdf (TENDER)
Eskom representative: Noxolo Mngadi.
Date issued: 14-Apr-26.
Submission Guidelines
Source: 240-12248652_List of Tender Returnables_Cat 3_ Fibre Optic Installation and Repair.pdf (TENDER)
Returnable Documents:
Complete and sign Form A (E.1).
Ensure all required quality documents are submitted as per the List of Tender Returnables.
Returnable Documents
Source: 240-12248652_List of Tender Returnables_Cat 3_ Fibre Optic Installation and Repair.pdf (TENDER)
Complete and sign Form A (E.1).
Evaluation Criteria
Source: 240-12248652_List of Tender Returnables_Cat 3_ Fibre Optic Installation and Repair.pdf (TENDER)
Section A: Quality Management System Requirements (ISO 9001). Score: 5.
Section B: Evidence of QMS in operation. Score: 2.
Section C: Draft Contract Quality Plan specific to scope. Score: 1.
Section D: Draft/Example Inspection and Test Plan (ITP) or Quality Control Plan (QCP). Score: 1.
Section E: Form A completed and signed. Score: 1.
Open to contractors capable of fibre optic installation and repair. Key eligibility hinges on demonstrating a functional Quality Management System aligned with ISO 9001:2015 (certification not mandatory but compliance is). Must have experience evidenced by a previous example ITP/QCP. Must be willing and able to work in KwaZulu-Natal and Free State provinces for a 5-year period.
Technical Specifications
Source: 240-12248652_List of Tender Returnables_Cat 3_ Fibre Optic Installation and Repair.pdf (TENDER)
Scope: Fibre Optic Installation and Repair.
Must provide documented information for control of externally provided processes, products, and services, including criteria for evaluation, selection, monitoring, and re-evaluation of external providers (ISO 9001:2015 Clause 8.4).
Compliance Requirements
Source: 240-12248652_List of Tender Returnables_Cat 3_ Fibre Optic Installation and Repair.pdf (TENDER)
No specific compliance requirements stated.
DocumentSDL & I Check list - Installation and Commissioning of Various types of Fibre Optic Cables.docxReview complete
Description
Source: SDL & I Check list - Installation and Commissioning of Various types of Fibre Optic Cables.docx
This is an enabling agreement for a panel of five contractors for fibre optic cable installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State Operating Units) for a period of five years.
Use the SDL&I Check List as guidance for submission of documents.
Submission Guidelines
Source: SDL & I Check list - Installation and Commissioning of Various types of Fibre Optic Cables.docx (unknown)
Use the provided SDL&I Check List as guidance for document submission.
Ensure all required documents are completed, signed, and submitted.
Required documents include:
SDL&I Bidders Document.
Valid B-BBEE certificate from a SANAS accredited verification agency, or a valid sworn affidavit, or a BBBEE Certificate issued by CIPC for EME companies.
CIPC Registration Document.
Identity Documents of owners/members/shareholder(s).
Shares Certificate where applicable.
Latest Financial Statements corresponding to the financial date on the sworn affidavit.
Proof of sub-contracting agreement/s.
Sub-contractor/s valid B-BBEE certificate from a SANAS accredited verification agency, or valid sworn affidavit, or BBBEE Certificate issued by CIPC for EME companies.
Evaluation Criteria
Source: SDL & I Check list - Installation and Commissioning of Various types of Fibre Optic Cables.docx (unknown)
Companies must provide valid B-BBEE certification.
Must be registered with CIPC.
Demonstrate financial stability via latest financial statements.
Have established subcontracting arrangements.
Specific forms (SBD 6.2, Annexures C, D, E) are marked as not applicable for this submission.
Technical Specifications
Source: SDL & I Check list - Installation and Commissioning of Various types of Fibre Optic Cables.docx (unknown)
This tender is for an enabling agreement for a panel of five contractors for fibre optic cable installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State Operating Units) for a period of five years.
Use the SDL&I Check List as guidance for submission of documents.
Compliance Requirements
Source: SDL & I Check list - Installation and Commissioning of Various types of Fibre Optic Cables.docx (unknown)
Submit a valid B-BBEE certificate issued by a SANAS accredited verification agency, or a valid sworn affidavit, or a BBBEE Certificate issued by CIPC for EME companies.
Submit a CIPC Registration Document.
Submit identity documents of owners/members/shareholder(s).
Submit shares certificate where applicable.
Submit latest financial statements corresponding to the financial date on the sworn affidavit.
Submit proof of sub-contracting agreement/s.
Submit sub-contractor/s valid B-BBEE certificate issued by a SANAS accredited verification agency, or valid sworn affidavit, or BBBEE Certificate issued by CIPC for EME companies.
Source: PART 4 - QUALITY SUBMISSION PACK - E3011DXKZNOU.pdf (TENDER)
Enquiry Number: E3011DXKZNOU.
Submission Guidelines
Source: PART 4 - QUALITY SUBMISSION PACK - E3011DXKZNOU.pdf (TENDER)
Complete the Tenderer Name field on the form.
Submit the Quality Submission Pack as per the document.
Use the provided template for the Draft Contract/Project Quality Plan (reference: 240-109253698 CQP Template 2021.docx).
Include Form A_Cat 3_ Fibre Optic (reference: 240-68099512).
Returnable Documents
Source: PART 4 - QUALITY SUBMISSION PACK - E3011DXKZNOU.pdf (TENDER)
Tenderer Name must be completed on the form.
Evaluation Criteria
Source: PART 4 - QUALITY SUBMISSION PACK - E3011DXKZNOU.pdf (TENDER)
Demonstrate compliance with ISO 9001:2015 quality management standards.
Provide documented quality management system.
Provide evidence of previous similar work through example quality control plans.
Submit all required quality documentation as specified in sections A through E.
Use Eskom's provided templates for certain submissions.
Technical Specifications
Source: PART 4 - QUALITY SUBMISSION PACK - E3011DXKZNOU.pdf (TENDER)
Scope: An Enabling Agreement for a Panel of five Contractors for Fibre Optic Cable Installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State Operating Units) for five years.
Quality Requirements (Category 3) include:
A1: QMS Manual or document defining and describing the QMS and its scope.
A.2: Quality Policy approved by top management.
A.4: Control of documented information (document and record control) per Clause 7.5 of ISO 9001:2015.
A.6: Documented information for nonconformity and corrective action.
A.7: Documented information for internal audit per Clause 9.2 of ISO 9001:2015.
B.1: Documented information for defined roles, responsibilities, and authorities, including organization chart and responsibility matrix covering quality management function/role per Clause 5.3 of ISO 9001:2015.
B.2: Documented information for control of externally provided processes, products, and services, including criteria for evaluation, selection, monitoring, and re-evaluation of external providers per Clause 8.4 of ISO 9001:2015.
C1: Contract Quality Plan requirements: draft contract quality plan specific to the scope of work per ISO 10005.
Draft Contract/Project Quality Plan with important QA deliverables; refer to attached template (240-109253698 CQP Template 2021.docx).
SECTION D: Quality Control Plan requirements (QCP/Checklist/ITP) as per scope of works per ISO 10005 & QM 58; provide example of an ITP or QCP from similar or previous work.
SECTION E: Additional requirements and miscellaneous; include Form A_Cat 3_ Fibre Optic (240-68099512).
Compliance Requirements
Source: PART 4 - QUALITY SUBMISSION PACK - E3011DXKZNOU.pdf (TENDER)
No specific compliance requirements stated in the provided document.
Section
Source: PART 4 - QUALITY SUBMISSION PACK - E3011DXKZNOU.pdf
Supplier Quality Management and Quality Requirements (Category 3).
Quality Policy approved by top management.
Criteria for evaluation, selection, monitoring, and re-evaluation of external providers.
Contract Quality Plan specific to the scope of work.
Draft Contract/Project Quality Plan with important QA deliverables.
Quality Control Plan (QCP)/Checklist/ITP (Inspection and Test Plan) as per scope of works.
Example of an Inspection and Test Plan (ITP) or Quality Control Plan (QCP) from similar or previous work.
DocumentRequirements for Financial Evaluation.pdfReview complete
Important Dates
Source: Requirements for Financial Evaluation.pdf (TENDER)
Closing date: 6 August 2024.
Submission Guidelines
Source: Requirements for Financial Evaluation.pdf (TENDER)
Returnable documents must include financial statements and reports as specified.
Information requested by the Procurement Office must be provided within five working days from the date of Finance request, otherwise the financial evaluation will be closed.
Draft, bi-annual, management accounts and unsigned financial statements are not accepted.
Soft copies of Annual Financial Statements (AFS) submitted with the tender may be requested later.
Returnable Documents
Source: Requirements for Financial Evaluation.pdf (TENDER)
Latest approved financial statements including comparative amounts; must be valid and not outdated, received within 18 months after year-end.
A signed director’s/member’s report.
Signed Compilers/Accounting Officers/Independent Reviewers/Audit report as applicable based on PIS; if PIS requires Audit or Independent Reviewers report, Compilers/Accounting Officers report must still be submitted.
Evaluation Criteria
Source: Requirements for Financial Evaluation.pdf (TENDER)
Financial evaluation requires Public Interest Score (PIS) and calculations (refer to annexure).
Must demonstrate financial stability via audited/reviewed statements and tax compliance.
All required financial documents must be complete, valid, and signed.
ITA-34C assessments must align with financial statements for non-audited companies.
Applicants must respond to additional document requests within 5 working days.
Financial Requirements
Source: Requirements for Financial Evaluation.pdf (TENDER)
Submit latest approved financial statements including comparative amounts; must be valid and not outdated, received within 18 months after year-end.
Approved Annual Financial Statements must comprise: statement of financial position, statement of comprehensive income, statement of changes in equity, statement of cash flows, notes to the financial statements.
For companies not audited: provide ITA 34C Income Tax Assessment for current and previous financial years; turnover in income statement must match ITA-34C.
Notes to AFS must give complete breakdown of Accounts Receivable and Accounts Payable, distinguishing Trade Debtors/Creditors from other receivables/payables, and show amounts subject to interest and terms.
Notes must clearly specify current and non-current liabilities subject to interest.
If a subsidiary, provide name of Holding company; Latest Signed Group Annual Financial Statements of the Holding Company may be requested later.
Compliance Requirements
Source: Requirements for Financial Evaluation.pdf (TENDER)
Provide Public Interest Score (PIS) and calculations (refer to annexure).
PIS letter must specify: whether AFS were internally or externally prepared; and whether company was owner managed or not.
PIS does not apply to audited companies.
Submit signed director’s/member’s report.
Submit signed Compilers/Accounting Officers/Independent Reviewers/Audit report as applicable based on PIS; if PIS requires Audit or Independent Reviewers report, Compilers/Accounting Officers report must still be submitted.
Provide ITA 34C Income Tax Assessment for non-audited companies for current and previous financial years; turnover must correspond between income statement and ITA-34C.
Scope: An enabling agreement for a panel of five contractors for fibre optic cable installation.
Service basis: Work is on an 'as and when' required basis.
Coverage: Central East Cluster, including KwaZulu-Natal and Free State Operating Units.
Contract duration: Five years.
Bidders must be capable of providing fibre optic cable installation services across the specified regions.
Document240-68099512 Form A_Cat 3_ Fibre Optic Installation and Repair.pdfReview complete
Description
Source: 240-68099512 Form A_Cat 3_ Fibre Optic Installation and Repair.pdf
Scope: An enabling agreement for a panel of five contractors for fibre optic cable installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State Operating Units) for a period of five years.
Contract number: E3011DXKZNOU.
This is a Category 3 contract. Pre-contract award quality requirements apply.
Important Dates
Source: 240-68099512 Form A_Cat 3_ Fibre Optic Installation and Repair.pdf (unknown)
Closing date: 14 April 2026.
Quality requirements review date: January 2027.
Contact Information
Source: 240-68099512 Form A_Cat 3_ Fibre Optic Installation and Repair.pdf (unknown)
Eskom's Quality Representative: Noxolo Mngadi, Assistant Data Officer.
Evaluation Criteria
Source: 240-68099512 Form A_Cat 3_ Fibre Optic Installation and Repair.pdf (unknown)
The tenderer must acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard.
Pre-contract award quality requirements are applicable.
Post-contract award, contract execution and supplier quality performance monitoring will be evaluated.
Quality audits related conditions are applicable.
Only one quality category may be selected; Category 3 is specified for this tender.
Main Supplier and Sub-supplier Capability and Capacity Assessment is not a requirement for this tender.
Site assessment applicability is not indicated.
Technical Specifications
Source: 240-68099512 Form A_Cat 3_ Fibre Optic Installation and Repair.pdf (unknown)
Scope: An enabling agreement for a panel of five contractors for fibre optic cable installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State Operating Units) for a period of five years.
Contract number: E3011DXKZNOU.
This is a Category 3 contract (refer to clause 3.5.-105658000).
Pre-contract award quality requirements are applicable.
Eskom retains rights of access, rights to information, preservation, and will manage nonconformities.
Special processes are applicable.
The contractor must comply with ISO 9001 quality management system clauses 4 through 10.
The contractor's quality management system must address ISO 9001 clauses: Context of the Organisation, Leadership, Planning, Support, Operation, Performance Evaluation, and Improvement.
The system must embody the ISO 9001 principles: Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence-based decision making, and Relationship management.
Quality Management
Source: 240-68099512 Form A_Cat 3_ Fibre Optic Installation and Repair.pdf
The tenderer must comply with Eskom's Supplier Quality Requirements (specification 240-105658000) and ISO 9001 Standard.
Eskom retains rights of access, rights to information, preservation, and will conduct quality audits.
Management of nonconformities and special processes are required.
ISO 9001 clauses 4 through 10 are applicable.
This is a Category 3 contract; pre-contract award quality requirements apply.
DocumentBEE_Affidavit-QSE-Gen.pdfReview complete
Submission Guidelines
Source: BEE_Affidavit-QSE-Gen.pdf (unknown)
Submit a sworn B-BBEE affidavit as a returnable document. The affidavit must be:
Signed by a duly authorised Member/Director/Owner of the enterprise.
Valid for 12 months from the date signed by the Commissioner of Oaths.
Completed with all required enterprise details (name, registration number, VAT number, physical address, entity type, nature of business).
Evaluation Criteria
Source: BEE_Affidavit-QSE-Gen.pdf (unknown)
Evaluation will consider the following:
Enterprise must be a Qualifying Small Enterprise (QSE) as per B-BBEE Act.
Must meet minimum Black ownership percentages (implied to align with Level One or Two B-BBEE status).
Annual revenue must fall within R10M–R50M range.
Must be a registered entity (CC, (Pty) Ltd, Sole Proprietor, etc.) with valid registration and VAT numbers (if applicable).
Must be capable of operating in KwaZulu-Natal and Free State.
Must adhere to B-BBEE Act and Amended Codes of Good Practice.
Financial Requirements
Source: BEE_Affidavit-QSE-Gen.pdf (unknown)
Annual total revenue must be between R10,000,000.00 and R50,000,000.00 based on the latest audited financial statements or available financial information.
Compliance Requirements
Source: BEE_Affidavit-QSE-Gen.pdf (unknown)
B-BBEE Compliance Requirements:
Minimum B-BBEE Level: One (1).
Enterprise must be a Qualifying Small Enterprise (QSE) with annual total revenue between R10,000,000.00 and R50,000,000.00 based on the latest audited financial statements.
B-BBEE ownership declarations required:
Percentage Black Owned (flow-through principle, Amended Code Series 100).
Percentage Black Female Owned (Amended Code Series 100).
Percentage Black Designated Group Owned (Amended Code Series 100).
Black Designated Group Ownership Breakdown (if applicable):
Black Youth %.
Black Disabled %.
Black Unemployed %.
Black People Living in Rural Areas %.
Black Military Veterans %.
B-BBEE Level Contributor Confirmation:
100% Black Owned: Level One (135% procurement recognition level).
At least 51% Black Owned: Level Two (125% procurement recognition level).
Definitions:
Black People: Africans, Coloureds, and Indians who are South African citizens by birth/descent or naturalised before/on 27 April 1994 (or entitled to naturalisation prior to that date).
Black Designated Groups: Unemployed black people, black youth, black people with disabilities, black people in rural/underdeveloped areas, or black military veterans.
B-BBEE Requirements
Source: BEE_Affidavit-QSE-Gen.pdf (unknown)
B-BBEE Level Contributor Confirmation:
Tick the applicable box for:
100% Black Owned: Level One (135% B-BBEE procurement recognition level).
At least 51% Black Owned: Level Two (125% B-BBEE procurement recognition level).
Scope: Enabling Agreement for a Panel of 5 Contractors for Fibre Optic Cable Installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State Operating Units) for a period of 5 years.
Signed Annexure B (Acknowledgement of Eskom's OHS legal and other requirements) by CEO/MD and 2 witnesses.
OH&S Organogram, including names and appointment references, approved by CEO/MD.
Occupational Health and Safety Plan (OHS Plan) addressing project-specific risks, aligned with Eskom's SHE specification, signed by CEO/MD, with next review date.
Baseline Risk Assessment (BRA) for the scope of work, including methodology and risk matrix, signed by CEO/Director, with next review date.
Valid Letter of Good Standing (COID or equivalent) stating relevant services rendered.
OHS Policy compliant with OHS Act Section 7, signed by CEO/MD, with next review date.
Proof of OHS Competency: Training certificates and appointment letters for all required roles.
Medical Fitness Certificates (Annexure 3 template) for at least 3 personnel.
Fall Protection Plan (per CR 10) with Rescue Plan and Fall Risks, signed by the fall protection planner and CEO/MD, with next review date.
Substance Abuse Procedure or Policy, signed by CEO/MD.
Costing for Health and Safety Management, broken down and aligned with the scope of work.
Scope: Fibre Optic Cable Installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State Operating Units) for a period of 5 years.
The agreement is for a panel of 5 contractors.
OHS Plan must address project-specific risks and align with Eskom's SHE specification.
Baseline Risk Assessment (BRA) must include methodology, risk matrix, and driving-related risks.
Fall Protection Plan must include Rescue Plan and Fall Risks, signed by the fall protection planner and CEO/MD.
All documents must be signed by CEO/MD and include next review dates where applicable.
OHS Plan must address project-specific risks and align with Eskom's SHE specification. Must be signed by CEO/MD and include next review date.
Baseline Risk Assessment (BRA) must be in line with the scope of work, include next review date, and be signed and approved by CEO/MD. Must include methodology and applicable risk matrix.
Valid Letter of Good Standing (COID or equivalent) must state relevant services rendered (e.g., electrical construction work).
OHS Policy must comply with OHS Act Section 7, be signed by CEO/MD, and include next review date.
OHS Competency: Proof of training certificates and appointment letters for all required roles, including:
Section 17 Health and Safety Representative.
GSR 3(4) First Aid Training.
CR 29(h&i) Fire Fighters.
CR 9(1) Risk Assessor.
CR 8(7) Construction Supervisor with Supervision Certificate and MV/LV line Construction.
CR 8(5) Safety Officer (Registered with SACPCMP).
CR 10(1) Fall Protection Planner/Developer.
Fall Rescuer (Training Certificate only).
GAR 9(2) Incident Investigator.
CR 13(1) Competent Person for Excavation Work.
Medical Fitness Certificates (Annexure 3 template) for at least 3 personnel, issued by an Occupational Health Practitioner/Nurse/Doctor.
Fall Protection Plan (per CR 10) must include Rescue Plan and Fall Risks, next review date, and be signed by the fall protection planner and CEO/MD.
Substance Abuse Procedure or Policy must be signed by CEO/MD.
Compliance Standards:
Eskom contractor Health and Safety requirements standards 32-136.
OHS specification/requirements provided by Eskom.
Occupational Health and Safety Act.
Compensation for Occupational Diseases and Illnesses Act.
Submission of signed Annexure B (Acknowledgement of Eskom's OHS legal and other requirements).
OH&S Organogram approved by CEO/MD.
OHS Plan addressing project-specific risks, aligned with Eskom's SHE specification, signed by CEO/MD, with next review date.
Baseline Risk Assessment (BRA) including methodology and risk matrix, signed by CEO/Director, with next review date.
Valid Letter of Good Standing (COID or equivalent).
OHS Policy compliant with OHS Act Section 7, signed by CEO/MD, with next review date.
Proof of OHS Competency for all required roles, including training certificates and appointment letters.
Medical Fitness Certificates for at least 3 personnel.
Fall Protection Plan with Rescue Plan and Fall Risks, signed by the fall protection planner and CEO/MD, with next review date.
Substance Abuse Procedure or Policy, signed by CEO/MD.
Detailed costing for Health and Safety Management, broken down and aligned with the scope of work.
DocumentE-tendering Help Manual for supplier - 27 January 2025 (1).pdfReview complete
Description
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).pdf
This is a user manual for Eskom's eTendering system.
The system is web-based and replaces physical submission of tender documents at Eskom offices.
Suppliers must register, providing details and a CSD number, to gain access.
Login requires OTP verification sent to registered phone and email.
The manual provides step-by-step instructions for uploading tender documents, finalising submissions, and managing registrations.
Important Dates
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).pdf (TENDER)
The document does not state any specific tender-related dates (e.g., briefing, site visits, clarification deadlines) beyond the general closing date provided in the tender record.
Contact Information
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).pdf (TENDER)
For system difficulties, contact the buyer responsible for the published tender.
You must register on the system with your details, including a valid CSD number.
An OTP (One Time Pin) will be sent to your registered cell phone and email for verification.
Upload all required tender documents, categorising them correctly (e.g., Technical, Commercial, Finance).
Individual file size must not exceed 50MB; total submission size must not exceed 900MB.
Verify all documents are uploaded before clicking 'Finalize Submission'.
After finalising, you will receive a confirmation email with a submission ID. Save this email for future reference.
If you encounter difficulties, contact the buyer responsible for the published tender.
Returnable Documents
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).pdf (TENDER)
Upload required documents via the 'Add file' button.
Categorise each file correctly (e.g., Technical, Commercial, Finance).
Verify all required documents are uploaded before finalising.
File size limits: max 50MB per file, max 900MB total submission.
You can view submitted tenders and documents under 'My Submissions'.
Evaluation Criteria
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).pdf (TENDER)
The document does not specify detailed evaluation criteria for this tender.
It references 'selection and evaluation criteria' for closed tenders but provides no details.
Contact the buyer for specific selection and evaluation criteria.
Technical Specifications
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).pdf (TENDER)
This is a panel tender for Fibre Optic Cable Installation on an 'as and when' required basis.
The scope covers the Central East Cluster (KwaZulu-Natal and Free State Operating Units).
The panel agreement is for a period of five (5) years.
The provided document is a user manual for the eTendering system, not technical specifications for the fibre optic work.
The system is web-based and replaces physical submission of tender documents at Eskom offices.
Suppliers must register, providing details and a CSD number, to gain access.
Login requires OTP verification sent to registered phone and email.
Compliance Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).pdf (TENDER)
A valid Central Supplier Database (CSD) number is mandatory to gain access to the eTendering system to submit a bid.
No other compliance requirements (e.g., tax, B-BBEE, CIDB) are specified in the provided document.
Requirements
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).pdf (TENDER)
Click 'Create New Submission' to begin submitting tender documents.
Review and note any disclaimers on the submission landing page.
Section
Source: E-tendering Help Manual for supplier - 27 January 2025 (1).pdf
The document references 'selection and evaluation criteria' for closed tenders but provides no details.
DocumentKEY Elements when completing a Sworn Affidavit.pdfReview complete
Submission Guidelines
Source: KEY Elements when completing a Sworn Affidavit.pdf (unknown)
Submit all required returnable documents as per the tender instructions.
Incomplete submissions may be disqualified.
Ensure the B-BBEE Sworn Affidavit is correctly completed and valid, as per the key elements listed in the document.
The Sworn Affidavit must be signed in the presence of a Commissioner of Oaths, and the dates must match.
Do not submit affidavits that are 'true copies' or attested by a Commissioner with an interest in the enterprise.
Evaluation Criteria
Source: KEY Elements when completing a Sworn Affidavit.pdf (unknown)
General requirements:
Must be a registered enterprise with valid CIPC documentation.
Must comply with South African B-BBEE regulations.
Must provide a valid, correctly completed Sworn Affidavit.
Exclusions (disqualification risks):
Enterprises with incomplete or incorrectly filled B-BBEE Affidavits.
Affidavits attested by a Commissioner of Oath with ties to the enterprise.
Affidavits marked as 'true copies'.
Technical Specifications
Source: KEY Elements when completing a Sworn Affidavit.pdf (unknown)
Scope: Fibre optic cable installation on an 'as and when' required basis.
Geographic coverage: Central East Cluster, comprising KwaZulu-Natal and Free State operating units.
Contract duration: Five (5) years.
Panel size: A panel of five (5) contractors will be appointed.
Specific technical details, deliverables, standards, or capacity requirements are not provided in the extracted content.
Compliance Requirements
Source: KEY Elements when completing a Sworn Affidavit.pdf (unknown)
B-BBEE Sworn Affidavit must include:
Deponent's full name and ID number as per identity document.
Designation (director, owner, or member) to confirm authority.
Enterprise name as per CIPC registration and business address.
Percentages for black ownership, black female ownership, and designated groups. For specialised enterprises under Statement 004, show black beneficiary percentages. No blank spaces.
Total revenue for the year under review, indicating whether based on audited financial statements or management accounts.
Financial year end date (day/month/year) as per registration documents.
B-BBEE status level (only one level allowed).
Empowering supplier status; for QSEs, select the basis.
Date signed by deponent and Commissioner of Oath must be the same; signed in Commissioner's presence.
Commissioner of Oath cannot be an employee or ex officio of the enterprise.
Affidavits with a 'true copy' stamp are not accepted.
DocumentEnvironmental Tender Evaluation and Scoring Card Medium risk FIBRE OPTIC INSTALLATION COMMISSIONING.pdfReview complete
Submission Guidelines
Source: Environmental Tender Evaluation and Scoring Card Medium risk FIBRE OPTIC INSTALLATION COMMISSIONING.pdf (unknown)
Submit a signed copy of Eskom's SHE rules and requirements form (Annexure B).
Submit an Environmental Management Plan for the scope of work, covering at minimum: waste management (reduction, re-use, recycling, disposal), environmental induction, environmental incident management, and emergency planning for environmental incidents.
Submit an Environmental (or SHE/SHEQ) policy signed by the Company Owner/CEO/MD, committing to compliance with environmental obligations and environmental duty of care.
Submit an ISO 14001 Environmental Management Standard certificate.
Each required document is scored: 0 if not submitted or does not meet minimum requirements; 1 if submitted and content satisfies minimum requirements.
Returnable Documents
Source: Environmental Tender Evaluation and Scoring Card Medium risk FIBRE OPTIC INSTALLATION COMMISSIONING.pdf (unknown)
Scoring for Returnable Documents:
Each required document is scored: 0 if not submitted or if submitted but does not satisfy minimum requirements; 1 if submitted and content satisfies minimum requirements.
This applies to documents like the signed SHE acknowledgement form, Environmental Management Plan, Environmental policy, and ISO 14001 certificate.
Evaluation Criteria
Source: Environmental Tender Evaluation and Scoring Card Medium risk FIBRE OPTIC INSTALLATION COMMISSIONING.pdf (unknown)
Mandatory: Submission of all required documentation (Annexure B, EMP, SHE policy, ISO 14001 certificate).
Mandatory: Compliance with Eskom's SHE and environmental standards.
Mandatory: Ability to perform fibre optic cable installation in the specified regions.
Scoring: Each required document is scored 0 (not submitted or does not satisfy minimum requirements) or 1 (submitted and satisfies minimum requirements).
Technical Specifications
Source: Environmental Tender Evaluation and Scoring Card Medium risk FIBRE OPTIC INSTALLATION COMMISSIONING.pdf (unknown)
Scope: Fibre optic cable installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State Operating Units).
This is a medium-risk work category.
The tender requires submission of specific environmental management documents as part of the technical evaluation.
Key deliverables include adherence to Eskom's SHE rules and environmental management standards.
Environmental Management Plan must address: waste management (reduction, re-use, recycling, disposal), environmental induction, environmental incident management, and emergency planning for environmental incidents.
Company must have an Environmental (or SHE/SHEQ) policy signed by the Owner/CEO/MD, committing to environmental compliance obligations and environmental duty of care.
ISO 14001 Environmental Management Standard certificate must be provided.
Quality Management
Source: Environmental Tender Evaluation and Scoring Card Medium risk FIBRE OPTIC INSTALLATION COMMISSIONING.pdf (unknown)
Submit an ISO 14001 Environmental Management Standard certificate as part of the tender submission.
Compliance Requirements
Source: Environmental Tender Evaluation and Scoring Card Medium risk FIBRE OPTIC INSTALLATION COMMISSIONING.pdf (unknown)
Environmental Compliance: Acknowledge and comply with Eskom's SHE rules and requirements via a signed form (Annexure B).
Submit an Environmental Management Plan covering waste management, induction, incident management, and emergency planning.
Have a company Environmental (or SHE/SHEQ) policy signed by the Owner/CEO/MD, demonstrating commitment to environmental compliance and duty of care.
Possess an ISO 14001 Environmental Management Standard certificate.
Note: This section focuses on environmental compliance; other standard compliance requirements (CSD, tax, B-BBEE, etc.) are not detailed in the provided text.
Health & Safety
Source: Environmental Tender Evaluation and Scoring Card Medium risk FIBRE OPTIC INSTALLATION COMMISSIONING.pdf
Sign and submit Eskom's SHE rules and requirements form (Annexure B).
Environmental Management Plan must address environmental induction, incident management, and emergency planning.
Company must have a signed SHE/SHEQ policy from the Owner/CEO/MD.
Environmental
Source: Environmental Tender Evaluation and Scoring Card Medium risk FIBRE OPTIC INSTALLATION COMMISSIONING.pdf
Submit an Environmental Management Plan covering at minimum: waste management (reduction, re-use, recycling, disposal), environmental induction, environmental incident management, and emergency planning for environmental incidents.
Have a company Environmental (or SHE/SHEQ) policy signed by the Owner/CEO/MD, committing to environmental compliance obligations and environmental duty of care.
Provide an ISO 14001 Environmental Management Standard certificate.
Submit a complete original tender in paper form plus one complete copy in paper form by the closing date and time. Failure to submit both will result in disqualification.
For e-tendering, submit via Eskom Tender Bulletin site on the Eskom E-tendering page. Do not deposit a tender into the Eskom tender box; only electronic submission is accepted.
Ensure all documents (PDF/Excel) are submitted, accessible, not corrupt, and readable. It is your sole responsibility to finalise submission before the closing time.
Submit the original and copy as separate packages marked "ORIGINAL" and "COPY". If required, include an additional electronic copy separately marked "ELECTRONIC COPY".
Seal separate packages together in an outer package marked "Confidential" and include the Eskom submission address, Invitation to Tender number, your company name, physical address, email, and contact phone number.
For e-tendering, upload documents into the relevant Technical, Commercial, and Financial folders as indicated.
Sign the original tender (or electronic tender for e-tendering). Eskom will hold the signatory liable.
Return all mandatory tender returnables by the closing date and time. All documents must be completed, valid, current, and original where stipulated.
No late tenders will be accepted. Tenders not received in the stipulated manner by the closing time will be considered late.
Eskom takes no responsibility for misplacement, premature opening, courier delays, network issues, or incorrect references.
Attend any compulsory site visit or clarification meeting; failure will result in disqualification.
Basic compliance: Tender must meet all basic compliance requirements stated in the Invitation to Tender; failure renders the tender non-responsive.
Mandatory returnables: Tender must include all mandatory documents and information by closing time; missing items lead to disqualification.
Pre-qualification criteria: If stipulated, must comply; Eskom will not measure a criterion twice (no 'double dipping').
Functionality: If applicable, scored against functionality criteria; must meet minimum threshold stated in Tender Data to proceed.
Financial analysis: Eskom will assess financial risk; may require mitigating factors or exclude if risk is too high.
Price evaluation: Evaluated per Tender Data criteria, considering CPA, FOREX, commodity exposure, discounts, technical adjustments, PV, and forecasted invoicing.
B-BBEE: Scored as per CSD report or certificate/affidavit; if pre-qualification, proof must be provided at closing time or tender disqualified.
Specific Goals: Scored with supporting documentation; failure to meet or submit proof results in zero points for Specific Goals.
Ranking: Price and Specific Goals scores added; suppliers ranked highest to lowest per PPPFA.
Objective criteria: May be used only if stipulated in Invitation to Tender; functionality and B-BBEE elements cannot be used as objective criteria.
Arithmetical errors: Checked and corrected; discrepancies between figures and words favour words; errors in unit rates, omissions, or additions corrected with your concurrence.
Scope: Fibre optic cable installation on an "as and when" required basis in the Central East Cluster (KwaZulu-Natal and Free State Operating Units) for a period of five years.
Communication must be made only with the Eskom Representative, in writing, in English.
Check Invitation to Tender documents on receipt and notify the Eskom representative of any discrepancies or omitted documents.
Submit an Acknowledgement Form with the tender, clearly stating if the tender is for the whole or part of the works/services/supply.
Include all duties, taxes (including VAT), and levies in your rates and prices, applicable 14 days prior to closing.
Provide fixed rates and prices for the contract duration, not subject to adjustment unless provided for.
State rates and prices in South African Rand unless instructed otherwise.
Do not make alterations except to comply with Eskom Representative instructions or correct your errors; all alterations must be initialed.
Submit alternative tenders only if permitted and alongside a main tender.
Provide clarification and documents as requested during evaluation, but mandatory returnables cannot be submitted after closing.
Arithmetical errors will be checked and corrected with your concurrence.
Cataloguing may be required after award; include a line item for cataloguing in the Pricing Schedule.
Use at least 4 decimal places for exchange rates and ensure correct exchange rates are used.
If security for performance is required, indicate at least two financial institutions you are likely to approach; Eskom may reject unsuitable institutions.
Comply with eligibility criteria in Tender Data; ensure you or your principals are not restricted from doing business with Eskom or State-Owned Companies.
Do not sub-contract 100% of the scope of work; such tenders will be deemed ineligible and disqualified.
Provide proof of Safety, Health, Environment, and Quality (SHEQ) systems, policies, and capabilities at closing time and/or contract award; all SHEQ costs and personnel must be reflected in the tender.
If CIDB grading is stipulated, be registered with the Construction Industry Development Board at closing time or capable of registration within 21 working days. Proof of registration is mandatory at closing time; if only proof of application is available, submit it by closing time and actual proof by contract award.
If awarded, achieve Contract Skills Development Goals (CSDG) for contracts meeting specified duration and value thresholds.
If awarded, achieve Contract Participation Goals (CPG) relating to engagement of targeted enterprises for applicable construction works contracts.
Submit a valid B-BBEE certificate/affidavit at closing time if required; misrepresentation or fronting may lead to disqualification, reporting to the B-BBEE Commission, suspension for up to 10 years, or jail.
Complete and submit the SDL&I Undertaking by contract award; failure will result in no consideration for award.
Comply with relevant legislation including National Treasury instructions, CIDB Regulations, PPPFA Regulations, Amended B-BBEE Codes, COIDA, OHS Act, and Eskom SHEQ requirements.
Eskom reserves the right to enter into mandated negotiations with selected tenderers per approved procurement policies.
Hold your tender valid for acceptance within the validity period after closing; extend validity if requested by Eskom. Refusal to extend excludes you from further consideration.
Treat all procurement matters as confidential; use Eskom documents only for tender preparation.
Obtain and familiarise yourself with standardised specifications or other documents referenced in the Invitation to Tender.
Attend compulsory site visits or clarification meetings; failure results in disqualification.
Sign the final draft contract provided by the Eskom Representative.
If security for performance is required, indicate at least two financial institutions you are likely to approach; Eskom may reject unsuitable institutions.
Enterprise information: Trading name, VAT number, type of entity (CC, Pty Ltd, Sole Proprietor, etc.).
Evaluation Criteria
Source: BEE_Affidavit-EME-Gen.pdf (unknown)
Must be an Exempted Micro Enterprise with annual revenue ≤ R10M. Must complete and submit the sworn B-BBEE affidavit. Must specify Black ownership percentages (100%, ≥51%, or <51%). The affidavit must be signed by an authorized representative (Member/Director/Owner) and commissioned by a Commissioner of Oaths.
Compliance Requirements
Source: BEE_Affidavit-EME-Gen.pdf (unknown)
B-BBEE Requirements:
Bidders must submit a sworn affidavit for B-BBEE Exempted Micro Enterprises.
The affidavit defines 'Black People' as Africans, Coloureds, and Indians who are South African citizens by birth, descent, or naturalisation under specific conditions.
It defines 'Black Designated Groups' as unemployed Black people, Black youth, Black persons with disabilities, Black people living in rural/underdeveloped areas, and Black military veterans.
Bidders must declare Black ownership percentages (Black Owned, Black Female Owned, Black Designated Group Owned) and provide a breakdown of designated group ownership.
The enterprise must have an annual total revenue of R10 million or less.
B-BBEE Level Contributor must be confirmed: Level One (100% Black Owned), Level Two (at least 51% Black Owned), or Level Four (less than 51% Black Owned).
The affidavit is valid for 12 months from the date signed by a commissioner of oaths.
B-BBEE Requirements
Source: BEE_Affidavit-EME-Gen.pdf (unknown)
B-BBEE Affidavit Requirements:
Definition of 'Black People': Africans, Coloureds, and Indians who are South African citizens by birth, descent, or naturalisation (before 27 April 1994, or after if entitled before that date).
Definition of 'Black Designated Groups': Unemployed Black people, Black youth, Black persons with disabilities, Black people living in rural/underdeveloped areas, Black military veterans.
Declaration of ownership percentages: Black Owned, Black Female Owned, Black Designated Group Owned.
Breakdown of Black Designated Group ownership: Youth, Disabled, Unemployed, Rural, Military Veterans.
Revenue threshold: Annual total revenue must be R10 million or less.
B-BBEE Level Contributor selection: Level One (100% Black Owned), Level Two (at least 51% Black Owned), Level Four (less than 51% Black Owned).
Enabling agreement for panel of 5 contractors for fibre optic cable installation on 'as and when' basis in Central East Cluster (KZN and Free State) for 5 years.
Functionality (technical) threshold: 80% minimum. Weightings: Tools & equipment 10%, Vehicles 10%, Related project experience 40%, Installation methodology for 3 fibre types 20%, Technical compliance 10%, Skills & training 10%.
Price scored out of 80 points: inclusive of VAT, corrected for arithmetic errors, excluding contingencies, adjusted for variations, NPV comparison, unconditional discounts considered.
Specific goals (B-BBEE) scored out of 20 points per PPPFA 80/20 system. Points table: Level 1=20, 2=18, 3=14, 4=12, 5=8, 6=6, 7=4, 8=2, non-compliant=0.
Total score = price points + specific goal points. Highest total wins.
Deadlock: highest specific goal points; if still tied, drawing of lots.
Eligibility: no sanctions, no conflict of interest, only one tender per entity, JV must state joint and several liability, no 100% subcontracting, not restricted by Treasury/Eskom.
Provide installation methodology for 3 types of fibre (20% weight).
Demonstrate related project experience (40%).
Provide details of tools/equipment (10%) and vehicles (10%).
Technical compliance (10%) and skills/training (10%).
Skills development: deliver 1 skill per R2 million invoiced, from list (N1-N6 Electrical Engineering), candidates from KZN and Free State, representative demographics.
Quality requirements are part of contractual requirements; specific details not provided in extracted text. Ensure compliance with Eskom's quality standards as per tender documents.
Eligibility: no sanctions, no conflict of interest, only one tender per entity, JV must state joint and several liability, no 100% subcontracting, not restricted by Treasury/Eskom.
Mandatory registrations: CIDB grade 3 EP or higher (or proof of application), CSD registration (MAAA number) prior to award.
B-BBEE certificate (SANAS-accredited or CIPC for EMEs) or sworn affidavit for preference points.
Tax clearance certificate if required.
Compliance with Eskom Standard Conditions of Tender, OHS Act, environmental laws, and SHEQ policies.
Submit all mandatory returnables in respective folders.
Provide valid B-BBEE certificate (SANAS-accredited or CIPC for EMEs) or sworn affidavit.
Supporting documents may be requested: proof of ownership, ID copies, disability proof.
Local procurement content: 100% target; submit proposal for spend on black-owned entities (targets: Black Owned 4%, Black Women Owned 3%, Black Youth Owned 2%, Black Persons with Disability 1%).
Jobs: submit proposals for jobs created/retained.
Skills development: deliver 1 skill per R2 million invoiced, from list (N1-N6 Electrical Engineering), candidates from KZN and Free State.
Submit signed acknowledgement of Eskom's OHS requirements (Annexure B).
Provide OHS organogram approved by CEO/MD.
Occupational Health and Safety Plan aligned to SHE specification, signed by CEO/MD, with next review date.
Baseline OHS Risk Assessment (BRA) including driving risks, with methodology and risk matrix, signed by CEO/Director.
Valid Letter of Good Standing (COIDA) stating relevant services.
OHS policy signed by CEO, complying with OHS Act Section 7.
Provide training certificates and appointment letters for: Section 17 Health & Safety Rep, First Aid (GSR 3(4)), Fire Fighters (CR 29(h&i)), Risk Assessor (CR 9(1)), Construction Supervisor (CR 8(7)), Safety Officer (CR 8(5) registered with SACPCMP), Fall Protection Planner (CR 10(1)), Fall Rescuer, Incident Investigator (GAR 9(2)), Competent Person for Excavation (CR13(1)).
Medical fitness certificates (minimum 3) from occupational health practitioner.
Fall Protection Plan with rescue plan, signed by planner and CEO/MD.
Substance abuse policy signed by CEO/MD.
Provide detailed costing for health and safety management (not lump sum).
Option A: Submit signed acknowledgement of Eskom's SHE rules (Annexure B), Environmental Management Plan covering waste management, environmental induction, incident management, emergency planning, competency/training, and signed environmental policy.
Option B: Submit signed Annexure B and ISO 14001 certificate.
Environmental documents must be uploaded in SHEQ folder.
Contract will be NEC 3 Engineering and Construction Contract (ECC).
Performance bond may be required if financial evaluation unfavourable; choose from Eskom-approved financial institutions (ABSA, DBSA, FirstRand, Investec, Land Bank, Nedbank, Standard Bank).
Payment terms: ≤R50m – 30 days; >R50m – 60 days from undisputed invoice.
Eskom may negotiate prices if not market-related.
Subcontracting with subsidiaries discouraged; must be declared.
Joint ventures must have joint and several liability.
Source: Part 5 - Environmental Submission Pack - E3011DXKZNOU.pdf
Scope: Appointment of contractors or suppliers for the commencement of work, specifically for fibre optic cable installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State) for a period of five years.
Submission Guidelines
Source: Part 5 - Environmental Submission Pack - E3011DXKZNOU.pdf (unknown)
Complete and sign Annexure B (Acknowledgement of Eskom's SHE rules and requirements) by CEO/Member/Director, with two witness signatures.
Attach the signed Annexure B to the tender submission.
Submit an Environmental Management Plan for the scope of work, covering waste management, environmental induction, incident management, emergency planning, and environmental competency/training/appointments.
Attach an Environmental (or SHE/SHEQ) policy signed by Company Owner/CEO/MD, committing to environmental compliance obligations and duty of care.
For Part B, attach a valid ISO 14001 Environmental Management Standard certificate.
Ensure all required documents are completed and submitted as per the tender instructions.
Returnable Documents
Source: Part 5 - Environmental Submission Pack - E3011DXKZNOU.pdf (unknown)
Returnable Documents:
Annexure B must be signed by CEO/Member/Director and two witnesses.
Company/Supplier Name, Authorised person details, signatures, and dates must be completed.
Witness signatures required.
Evaluation Criteria
Source: Part 5 - Environmental Submission Pack - E3011DXKZNOU.pdf (unknown)
Pre-requisite: Signed Annexure B acknowledging Eskom's SHE rules and requirements.
Environmental Management Plan addressing medium-risk items: waste management, environmental induction, incident management, emergency planning, and competency/training/appointments.
Environmental (or SHE/SHEQ) policy signed by senior leadership, committing to compliance and duty of care.
ISO 14001 certification (Part B).
Compliance with Eskom OHS requirements and statutory acts.
Capability to manage subcontractors/suppliers, including selection criteria, notification, monitoring, and termination processes.
Technical Specifications
Source: Part 5 - Environmental Submission Pack - E3011DXKZNOU.pdf (unknown)
Scope: Fibre optic cable installation on an 'as and when' required basis in the Central East Cluster (KwaZulu-Natal and Free State) for a period of five years.
Main contractor must demonstrate process and selection criteria for appointing subcontractors/suppliers.
Notify Eskom prior to appointing subcontractors/suppliers.
Ensure subcontractors/suppliers have adequate resources and competencies.
Manage subcontractors/suppliers to ensure compliance with legal and Eskom requirements.
Monitor subcontractors/suppliers through OHS audits and assessments.
Provide grounds for termination of subcontractor/supplier work.
Address non-conformances directly with subcontractors/suppliers via performance and penalty processes.
Eskom reserves the right to verify and may request testimonials/references from previous similar work.
Compliance Requirements
Source: Part 5 - Environmental Submission Pack - E3011DXKZNOU.pdf (unknown)
Submit signed Annexure B acknowledging Eskom's SHE rules and requirements.
Submit Environmental Management Plan covering waste management, induction, incident management, emergency planning, and competency/training/appointments.
Submit signed Environmental/SHE/SHEQ policy committing to environmental compliance obligations and duty of care.
Submit ISO 14001 Environmental Management Standard certificate (Part B).
Comply with Eskom contractor Health and Safety requirements standards 32-136, OHS specifications, Occupational Health and Safety Act, and Compensation for Occupational Diseases and Illnesses Act.
Align company processes to Eskom's OHS requirements post-award.
Penalties apply for non-conformance to Eskom or statutory OHS requirements.
Ensure all employees undergo relevant Eskom induction.
Demonstrate contractor management processes: selection criteria, notification, resource adequacy, compliance management, monitoring, termination grounds, and non-conformance handling.
Health & Safety
Source: Part 5 - Environmental Submission Pack - E3011DXKZNOU.pdf
Health and Safety Requirements:
Submit signed Annexure B acknowledging Eskom's SHE rules and requirements.
Environmental Management Plan must address waste management, induction, incident management, and emergency planning.
Submit signed Environmental/SHE/SHEQ policy committing to environmental compliance obligations and duty of care.
Comply with Eskom contractor Health and Safety requirements standards 32-136, OHS specifications, Occupational Health and Safety Act, and Compensation for Occupational Diseases and Illnesses Act.
Align company processes to Eskom's OHS requirements post-award.
Penalties apply for non-conformance to Eskom or statutory OHS requirements.
Ensure all employees undergo relevant Eskom induction.
Environmental
Source: Part 5 - Environmental Submission Pack - E3011DXKZNOU.pdf
Environmental Requirements:
Submit signed Annexure B.
Submit ISO 14001 Environmental Management Standard certificate.
Environmental/SHE/SHEQ policy must commit to environmental compliance obligations and duty of care.
Section
Source: Part 5 - Environmental Submission Pack - E3011DXKZNOU.pdf
Environmental Evaluation Criteria: Tenderers must submit information for Part A (pre-requisite and environmental management plan) and Part B (Annexure B and ISO 14001 certificate).
Document20251020 BRA CEC Fibre Optic installation.pdfReview complete
Description
Source: 20251020 BRA CEC Fibre Optic installation.pdf
The work involves construction trades such as painting, tiling, paving, and brickwork. It includes the use of small plant and equipment, like compactors. Bidders must note the associated safety risks.
Evaluation Criteria
Source: 20251020 BRA CEC Fibre Optic installation.pdf (unknown)
Not specified in this document. The HIRA implies contractors must have demonstrable competence in managing high-risk construction activities, trained personnel, and robust safety systems. Full eligibility criteria (e.g., CIDB grading, financial standing, past experience) would be in the main tender documents.
Technical Specifications
Source: 20251020 BRA CEC Fibre Optic installation.pdf (unknown)
The scope includes construction trades such as painting, tiling, paving, and brickwork. The work involves the use of small plant and equipment, including compactors. Contractors must be aware of associated safety risks.
Compliance Requirements
Source: 20251020 BRA CEC Fibre Optic installation.pdf (unknown)
No specific compliance requirements are stated in the extracted text. However, the document is a detailed Occupational Health and Safety Risk Assessment (HIRA) for fibre optic cable installation. It lists numerous hazards and required control measures across all project activities. Key safety risks include:
Transport and vehicle operations (fatigue, speeding, accidents).
Manual handling leading to strains and injuries.
Use of hand tools, plant, and machinery (defective equipment, untrained operators).
Excavation and trenching risks (collapse, damage to services).
Working at heights and with temporary structures.
Hot works (welding, grinding) and storage of flammable materials.
Public safety and site access.
Exposure to dust, noise, vibrations, and hazardous chemicals.
Contractors must implement controls including elimination, engineering controls, administrative procedures, signage, and PPE.
DocumentTechnical Evaluation Criteria for Fibre Optic Installation and Repair_.pdfReview complete
Description
Source: Technical Evaluation Criteria for Fibre Optic Installation and Repair_.pdf
This document sets the technical evaluation criteria for tender submissions for the installation and repair of Fibre Optic Cables (OPGW, ADSS, DUCT) in Eskom's Central East Cluster (KwaZulu-Natal and Free State).
Contact Information
Source: Technical Evaluation Criteria for Fibre Optic Installation and Repair_.pdf (unknown)
Manager: Central East Senior Manager: Central East Cluster.
Submission Guidelines
Source: Technical Evaluation Criteria for Fibre Optic Installation and Repair_.pdf (unknown)
Submit all required returnables by the tender closing date. Failure to meet any mandatory criterion will result in disqualification.
Mandatory returnables: signed organogram with Annexure I for each employee; completed project experience register (Annexure B); tools and equipment register (Annexure C); vehicle register (Annexure D); technical compliance schedule (Annexure E); three separate fibre installation methodologies (ADSS, OPGW, DUCT); linesman register (Annexure A); splicer/commissioning technician certificates; and a completed affidavit declaration (Annexure H).
All documents requiring certification by a Commissioner of Oaths must be clearly legible, dated, and not older than three months from the tender closing date. The Commissioner's name, date, position, address, and signature must be visible.
Do not modify any template forms or tables. Only populate the relevant data. Modifications will lead to exclusion of data and impact scoring.
Submissions with suspected fraudulent evidence will be referred for forensic investigation.
Evaluation Criteria
Source: Technical Evaluation Criteria for Fibre Optic Installation and Repair_.pdf (unknown)
Must meet ALL Stage 1 Mandatory Criteria to proceed: Organogram and Annexure I, Previous 5-year fibre optic installation experience, Tools and Equipment Register, Vehicle Register, Technical Compliance Schedule AB, Fibre Optic Installation Methodology for all three types, minimum 1 HV Accredited Linesman, minimum 1 Splicer/Commissioning Technician, and signed Affidavit Declaration. Stage 2 requires achieving minimum 80% weighted score across tools/equipment (10%), vehicles (10%), project experience (40%), methodology (20%), technical compliance (10%), and skills/training (10%).
The evaluation uses a staged approach: mandatory pass/fail, followed by functional scoring against weighted criteria, with an 80% threshold (may be reduced to 70%).
Technical Specifications
Source: Technical Evaluation Criteria for Fibre Optic Installation and Repair_.pdf (unknown)
Scope of work for fibre optic cable installation and repair in Eskom Distribution Central East Cluster (KwaZulu-Natal and Free State) includes:
Installation of OPGW, ADSS, and Duct fibre optic cables.
Installation of Fibre Optic Aerial Hardware.
Supply and installation of patch panels, accessories, Sarel boxes.
Providing labour for trenching, splicing, and testing (end-to-end from patch panel to patch panel).
Providing as-built drawings, test results, pictures, positions of joint boxes, and GPS locations.
Work must comply with relevant Eskom standards and National Rationalised Specifications (NRS) including NRS 061, NRS 078, and NRS 088 series.
This document sets the technical evaluation criteria for tender submissions for the installation and repair of Fibre Optic Cables (OPGW, ADSS, DUCT) in Eskom's Central East Cluster (KwaZulu-Natal and Free State).
Work must comply with relevant Eskom standards and National Rationalised Specifications (NRS).
Referenced standards include: OPGW hardware and installation (240-110403330), fibre joint enclosures (240-72274816), system acceptance testing (240-70732888), patch panels (240-70733995), and guidelines for suspension/strain assemblies (240-60777474).
Informative reference is made to ISO 9001 Quality Management Systems.
No specific environmental requirements are stated beyond the general need to repair cables damaged by environmental wear.
You must provide detailed installation methodologies for each fibre type (ADSS, OPGW, DUCT).
Each methodology should cover: Cable Installation, Patch Panel/Joint Box Installation, Fibre Testing and Commissioning, and Fibre Repair.
Use Annexure F as a guide for required content, but submit methodologies in your own template.
Scoring for methodology is weighted at 20% of the total functional score.
You must demonstrate relevant project experience and qualified personnel.
Provide a completed project experience register (Annexure B) for work in the past 5 years, including client references. This is weighted at 40% of the functional score.
Have a minimum of one HV Accredited Linesman (with specific training/experience) and one Splicer/commissioning technician with valid certificates.
Personnel training certificates must be from accredited providers (SETA or equivalent) and certified by a Commissioner of Oaths.
Methodology
Source: Technical Evaluation Criteria for Fibre Optic Installation and Repair_.pdf
You must provide detailed installation methodologies for each fibre type (ADSS, OPGW, DUCT).
Each methodology should cover: Cable Installation, Patch Panel/Joint Box Installation, Fibre Testing and Commissioning, and Fibre Repair.
Use Annexure F as a guide for required content, but submit methodologies in your own template.
Scoring for methodology is weighted at 20% of the total functional score.
Experience & Qualifications
Source: Technical Evaluation Criteria for Fibre Optic Installation and Repair_.pdf
You must demonstrate relevant project experience and qualified personnel.
Provide a completed project experience register (Annexure B) for work in the past 5 years, including client references. This is weighted at 40% of the functional score.
Have a minimum of one HV Accredited Linesman (with specific training/experience) and one Splicer/commissioning technician with valid certificates.
Personnel training certificates must be from accredited providers (SETA or equivalent) and certified by a Commissioner of Oaths.
Quality Management
Source: Technical Evaluation Criteria for Fibre Optic Installation and Repair_.pdf
Work must comply with relevant Eskom standards and National Rationalised Specifications (NRS).
Referenced standards include: OPGW hardware and installation (240-110403330), fibre joint enclosures (240-72274816), system acceptance testing (240-70732888), patch panels (240-70733995), and guidelines for suspension/strain assemblies (240-60777474).
Informative reference is made to ISO 9001 Quality Management Systems.
Pricing Schedule
Source: Technical Evaluation Criteria for Fibre Optic Installation and Repair_.pdf
Pricing schedule details are not included in this technical criteria document. Refer to the main tender documentation for pricing forms, rates, and payment schedules.
Financial Requirements
Source: Technical Evaluation Criteria for Fibre Optic Installation and Repair_.pdf (unknown)
Financial requirements are not detailed in this technical criteria document. Refer to the main tender documentation for pricing format, bonds, guarantees, and payment terms.
Pricing schedule details are not included in this technical criteria document. Refer to the main tender documentation for pricing forms, rates, and payment schedules.
Compliance Requirements
Source: Technical Evaluation Criteria for Fibre Optic Installation and Repair_.pdf (unknown)
Mandatory compliance documents and registrations required:
Company organogram signed by MD/CEO/Owner and certified by a Commissioner of Oaths.
Project experience register for past 5 years, certified by a Commissioner of Oaths.
Tools and equipment register (Annexure C) and vehicle register (Annexure D), both certified.
Three separate fibre installation methodologies (ADSS, OPGW, DUCT) per relevant NRS standards.
Minimum of one HV Accredited Linesman (registered in Annexure A) with accredited courses plus 2 years' experience or 5 years' experience with RPL.
Minimum of one Splicer and commissioning technician/engineer with SETA or equivalent certificates certified by a Commissioner of Oaths.
Completed Affidavit - Declaration Form (Annexure H) signed by MD/CEO/Owner in presence of a Commissioner of Oaths.
At contracting stage: Valid Department of Labour registration as an Electrical Contractor (regulation 6(4) of Electrical Installation Regulations).
Specific contractual terms are not detailed in this technical criteria document. Refer to the main contract documentation for terms, duration, termination, and penalties.
Specific health and safety requirements include mandatory tools and equipment:
Safety equipment such as Safety Harness, Earth kit, Webbing & Slings.
Other safety-related tools: Running Earths, Ladders (including Live line ladders), Hand line/rope.
Vehicle requirements include a truck with a mounted crane (minimum 8T) which requires a load test certificate.
Mandatory criteria are 'must meet' gatekeepers. Failure on any single criterion leads to disqualification. This includes providing all specified returnables correctly certified and completed.
Health & Safety
Source: Technical Evaluation Criteria for Fibre Optic Installation and Repair_.pdf
Specific health and safety requirements include mandatory tools and equipment:
Safety equipment such as Safety Harness, Earth kit, Webbing & Slings.
Other safety-related tools: Running Earths, Ladders (including Live line ladders), Hand line/rope.
Vehicle requirements include a truck with a mounted crane (minimum 8T) which requires a load test certificate.
Environmental
Source: Technical Evaluation Criteria for Fibre Optic Installation and Repair_.pdf
No specific environmental requirements are stated beyond the general need to repair cables damaged by environmental wear.
Contractual Terms
Source: Technical Evaluation Criteria for Fibre Optic Installation and Repair_.pdf
Specific contractual terms are not detailed in this technical criteria document. Refer to the main contract documentation for terms, duration, termination, and penalties.
Requirements
Source: Technical Evaluation Criteria for Fibre Optic Installation and Repair_.pdf (unknown)
Mandatory criteria are 'must meet' gatekeepers. Failure on any single criterion leads to disqualification. This includes providing all specified returnables correctly certified and completed.
Section
Source: Technical Evaluation Criteria for Fibre Optic Installation and Repair_.pdf
The evaluation uses a staged approach: mandatory pass/fail, followed by functional scoring against weighted criteria, with an 80% threshold (may be reduced to 70%).
All supplied and installed items must comply with Eskom standards and specifications.
Materials must be sourced from Eskom-approved suppliers.
Scope includes site establishment, labour (normal and overtime), transport and plant, supply and install of patch panels, patch leads, etc., documentation and testing, earthworks, extra over, site clearance, crossings, concrete works, ADSS items, and OPGW assemblies.
For ADSS and OPGW items, installation only is required; supply is covered under national contracts.
Site clearance must follow TRMSCAAC6 and Environmental Management Plan, including photographic evidence of original condition before use.
Rehabilitation of damage caused during construction is required per ROD, EMP, TRMSCAAC5, and ESKASABG3.
Pricing is required on a rates-only basis for all listed items.
The pricing schedule includes categories such as Site Establishment, Labour (normal and overtime), Transport and Plant, Supply & Install of components, Documentation and Testing, Earthworks, Extra Over, Site Clearance, Crossings, Concrete Works, ADSS items, and OPGW assemblies.
Compensation events/variations for items not on the pricelist require submission of quotes and follow Eskom's event register process.
All costs for preliminary and general items will be identified and agreed with the Eskom Project Manager per task order.
This document is a Contract Quality Plan template provided by Eskom. Its purpose is to assist the supplier in identifying and planning how to meet the client's quality management expectations and contract requirements. The template guides the supplier in documenting quality processes, procedures, and responsibilities to ensure compliance with the contract.
Complete and submit the Contract Quality Plan (CQP) template as part of your bid. The template is mandatory and must be filled in fully. Ensure all sections are addressed, including definitions, scope of work, communication channels, organogram, interfacing documents, supplier lists, monitoring processes, and all other required elements. The CQP must be compiled by a representative from the tenderer and approved by the owner of the organisation. Rev 0 is used during tender evaluation and will change to Rev 1 after contract signing. Leave commencement and completion dates blank; they will be filled after award. The CQP must be submitted prior to commencement of work.
Bidders must demonstrate the ability to implement a formal Quality Management System (QMS) and provide a comprehensive Contract Quality Plan. The plan must cover all required elements, including quality objectives, risk management, method statements, and compliance with standards such as SANS 466:2005 / ISO 10005:2005. The evaluation will assess the completeness and quality of the CQP, the bidder's capacity to manage sub-suppliers, and the proposed processes for quality control, inspection, and documentation. No explicit pre-qualification barriers are stated, but a robust and detailed quality plan is essential for consideration.
No specific compliance requirements are stated in the document. However, bidders must be registered on the Central Supplier Database (CSD) and comply with all applicable tax and B-BBEE requirements as per Eskom's standard procurement policies. The CQP must align with ISO 9001 and SANS 466:2005 / ISO 10005:2005 standards.
This is the Supplier Quality Management Specification (Document Identifier: 240-105658000, Revision 3).
It applies to Eskom Holdings SOC Ltd and its suppliers/sub-suppliers.
The specification defines minimum quality requirements and criteria for selection, evaluation, registration, management, monitoring, assessment, and auditing of suppliers.
Eskom partners with suppliers committed to a QMS conforming to ISO 9001 and encourages continual improvement.
No submission contact details, emails, phones, or addresses are provided in this specification. Refer to the main tender documents for submission contacts.
Development team contacts (for specification development, not submission): Andrew Else, Bongi Tshabalala, Feziwe Mogamisi, Lesego Garegae, Patrick Thwane, Xolani Zuma.
Specification authorisation dates: 15/10/2021 and 17 October 2021.
Complete, sign, and return Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001).
Submit quality documentation as per the tender selected category (Category 1, 2, 3, or 4) indicated in Form A.
Use the List of Tender Returnables document (240-12248652) to determine specific required documents for your category.
Returnables include: valid ISO 9001 certificate (or evidence of QMS), internal/external audit reports, draft Contract Quality Plan (CQP), example Quality Control Plan (QCP)/Inspection and Test Plan (ITP), documented information for control of externally provided processes, roles/responsibilities, and management review records.
Failure to submit required returnables may result in disqualification.
Existing/potential suppliers must complete, sign, and return Form A with other returnables as listed in the List of Tender Returnable document (240-12248652).
This specification outlines minimum quality requirements for all existing and potential Eskom suppliers.
Suppliers must develop, implement, maintain, and continually improve a Quality Management System (QMS) conforming to ISO 9001.
The QMS must drive business processes to consistently meet Eskom's requirements.
Where specified, suppliers must provide a Contract Quality Plan (CQP) addressing quality assurance elements and a Quality Control Plan (QCP)/Inspection and Test Plan (ITP) addressing quality control elements related to the scope of work.
Suppliers are responsible for their sub-suppliers' QMS and quality programmes, ensuring they support Eskom requirements.
Eskom reserves rights to access, review, inspect, audit, and perform assessments on suppliers and sub-suppliers at any time.
Quality Control Plans/Inspection and Test Plans must include clear description of equipment/locations, identification of quality verification activity/stage, details of reference documents/procedures/method statements.
Preservation programme requires review/tracking of compliance with Eskom and supplier engineering specifications, evaluation of storage sites, preservation work plan development/execution evaluation, oversight of material quality preservation plans, and development of a records management process.
Quality audits and related performance reviews must be carried out by trained, accredited, and experienced personnel in accordance with documented procedures.
Suppliers must have a formal QMS conforming to ISO 9001 or applicable standard.
QMS must include documented information: quality manual, plans, procedures, work instructions, method statements.
Unless excluded, a valid ISO 9001 certificate from an accredited body is required.
Supplier must inform Eskom of proposed QMS or staff changes affecting quality before implementation.
Main supplier must develop and implement a performance management programme for sub-suppliers, including QMS verification, audits, CQP/QCP reviews, nonconformity management, inspection/test plans, and risk management.
Suppliers must comply with Eskom's Supplier Quality Management Specification (240-105658000).
References are made to PPPFA (Preferential Procurement Policy Framework Act) and CIDB 1004 (Best Practice Guideline for Evaluating Quality).
Specific B-BBEE, tax, CSD, CIDB, or CIPC compliance levels are not detailed in this specification. Refer to the main tender documents.
Suppliers must adhere to Eskom's Procurement and Supply Chain Management Policy and Procedure.
Suppliers must prepare and submit quality documentation as per the tender selected category (1, 2, 3, or 4) using the list of tender returnables.
Only one category applies per procurement process.
Supplier capability and capacity assessments will be performed prior to contract award for high-risk products/services, work on critical plant/equipment, supply of critical components, or provision of special processes.
Special processes require pre-qualified procedures, qualified operators, submission for Eskom review/acceptance, and maintenance of qualification records.
The supplier must ensure clear, unambiguous documentation of preservation requirements for equipment/materials in purchase orders and communications with sub-suppliers.
Eskom has free and unrestricted access to all preservation records for inspection and audit.
Supplier must designate sub-supplier responsibility for execution of preservation management programme elements.
References Eskom's SHEQ Policy (32-727) and other policies/procedures.
Source: PART 6- FINANCIAL SUBMISSION PACK - E3011DXKZNOU.pdf (TENDER)
Submit all required financial documents as specified in the tender documents.
Ensure the Public Interest Score (PIS) letter and calculations are attached.
Attach the latest approved financial statements, signed director's/member's report, and the applicable signed audit/independent reviewer/accounting officer/compiler report.
Failure to provide requested information within five working days from the date of a finance request may result in the financial evaluation being closed.
Draft, bi-annual, management accounts, and unsigned financial statements will not be accepted.
Returnable Documents
Source: PART 6- FINANCIAL SUBMISSION PACK - E3011DXKZNOU.pdf (TENDER)
Public Interest Score (PIS) and calculations to arrive at the score (refer to annexure for PIS calculation). The PIS letter must specify: whether AFS were internally or externally prepared, and whether the company is owner-managed.
Latest approved financial statements including comparative amounts; must be valid and not outdated, received within 18 months after year-end.
A signed director's/member's report.
Signed compiler's/accounting officer's/independent reviewer's/audit report as applicable based on PIS.
Attach: PIS and calculations, latest approved financial statements, signed director's/member's report, and applicable audit/compiler report.
Evaluation Criteria
Source: PART 6- FINANCIAL SUBMISSION PACK - E3011DXKZNOU.pdf (TENDER)
Financial evaluation includes a Public Interest Score (PIS) calculation; provide the PIS letter specifying whether AFS were internally/externally prepared and if the company is owner-managed.
Submit latest approved annual financial statements (valid within 18 months after year-end), including comparative amounts.
Provide a signed director's/member's report.
Submit the applicable signed audit, independent reviewer, accounting officer, or compiler report based on PIS.
If the company is a subsidiary, provide the name of the holding company; group financial statements may be requested later.
Draft, bi-annual, management accounts, and unsigned financial statements are not accepted.
Soft copies of AFS may be requested later.
Failure to respond to finance requests within five working days may lead to an inconclusive evaluation report.
Pricing Schedule
Source: PART 6- FINANCIAL SUBMISSION PACK - E3011DXKZNOU.pdf
Notes to the AFS must clearly show amounts subject to interest and the terms and conditions of interest.
Notes must specify current and non-current liabilities subject to interest.
Member/director loans require a note detailing loan terms, security status, repayment terms, and interest rates.
If the company is a subsidiary, provide the name of the holding company.
Financial Requirements
Source: PART 6- FINANCIAL SUBMISSION PACK - E3011DXKZNOU.pdf (TENDER)
Submit latest approved annual financial statements comprising: statement of financial position (balance sheet), statement of comprehensive income (income statement), statement of changes in equity, statement of cash flows, notes to the financial statements, and ITA 34C Income Tax Assessment for companies not audited.
Notes to the AFS must provide a complete breakdown of accounts receivable and payable, distinguishing trade debtors/creditors from other receivables/payables, and specify amounts subject to interest, terms, and conditions.
Notes must clearly specify current and non-current liabilities subject to interest.
Member/director loans require a note detailing loan terms, security status, repayment terms, and interest rates.
If the company is a subsidiary, provide the name of the holding company; group financial statements may be requested later.
Compliance Requirements
Source: PART 6- FINANCIAL SUBMISSION PACK - E3011DXKZNOU.pdf (TENDER)
Submit valid annual financial statements not outdated, received within 18 months after year-end.
Provide ITA 34C Income Tax Assessment for companies that have not been audited.
Ensure notes to financial statements clearly detail accounts receivable/payable breakdown and interest-bearing liabilities.
Provide the Public Interest Score (PIS) letter and calculations, specifying whether AFS were internally/externally prepared and if the company is owner-managed.
Provide a signed director's/member's report.
Provide the applicable signed audit, independent reviewer, accounting officer, or compiler report based on PIS.
Requirements
Source: PART 6- FINANCIAL SUBMISSION PACK - E3011DXKZNOU.pdf (TENDER)
Notes to the AFS must give a complete breakdown of amounts, distinguishing trade debtors/creditors from other receivables/payables.
Notes must clearly show amounts subject to interest and the terms and conditions of interest.
Notes must specify current and non-current liabilities subject to interest.
Financial statements must be valid and not outdated, received within 18 months after year-end.
Source: PART 1B - SDL&I SUBMISSION PACK - E3011DXKZNOU.pdf
Eskom seeks to establish a panel of five (5) contractors for Fibre Optic Cable Installation services on an "as and when" required basis. The contract covers the Central East Cluster operating in Kwa-Zulu Natal and Free State provinces. The enabling agreement will run for a period of five (5) years under the NEC3 Engineering and Construction Contract form. This is a framework arrangement where work orders will be issued as needed rather than a fixed-volume contract.
Contact Information
Source: PART 1B - SDL&I SUBMISSION PACK - E3011DXKZNOU.pdf (TENDER)
Only the enquiry number E3011DXKZNOU is provided in the document. No specific contact name, email, phone, or physical address for submissions is stated in the extracted text. Bidders should refer to the tender listing or additional tender documents for contact details.
Submission Guidelines
Source: PART 1B - SDL&I SUBMISSION PACK - E3011DXKZNOU.pdf (TENDER)
Returnable Documents Required:
SDL&I Bidders Document (completed and signed)
Valid B-BBEE certificate issued by a SANAS accredited verification agency, OR valid sworn affidavit, OR B-BBEE Certificate issued by CIPC for EME companies
CIPC Registration Document
Identity Documents of owners/members/shareholders
Shares Certificate (where applicable)
Latest Financial Statements corresponding to the financial date reflected on the sworn affidavit
Proof of sub-contracting agreements (if applicable)
Sub-contractor(s) valid B-BBEE certificate issued by SANAS accredited agency, OR valid sworn affidavit, OR B-BBEE Certificate issued by CIPC for EME companies (if applicable)
Note: SBD 6.2, Annexure C, Annexure D, and Annexure E are listed as N/A (not applicable) for this tender.
Bidder Guidance: Ensure all documents are properly completed, signed where required, and submitted before the closing deadline. Incomplete submissions may result in disqualification.
Returnable Documents
Source: PART 1B - SDL&I SUBMISSION PACK - E3011DXKZNOU.pdf (TENDER)
SDL&I Checklist - Documents to be completed, signed and submitted:
Latest Financial Statements (corresponding to sworn affidavit date)
Proof of sub-contracting agreements (if applicable)
Sub-contractor B-BBEE certificate (if applicable)
Not Applicable: SBD 6.2, Annexure C, Annexure D, Annexure E
Evaluation Criteria
Source: PART 1B - SDL&I SUBMISSION PACK - E3011DXKZNOU.pdf (TENDER)
Eligibility hinges on providing complete SDL&I documentation, including valid B-BBEE compliance proof, company registration (CIPC), ownership verification, and financial statements. Sub-contractors must also meet B-BBEE requirements if used.
Technical Specifications
Source: PART 1B - SDL&I SUBMISSION PACK - E3011DXKZNOU.pdf (TENDER)
Scope: Fibre Optic Cable Installation on an "as and when" required basis
Contract Type: NEC3 Engineering & Construction Contract
Location: Central East Cluster covering Kwa-Zulu Natal and Free State Operating Units
Panel Size: Five (5) contractors will be appointed
Duration: Five (5) years
Nature: Enabling Agreement (framework arrangement for ongoing work as required)
Bidder Guidance: This is a panel contract where multiple contractors will be appointed. Work will be allocated on an as-needed basis rather than a guaranteed volume. Bidders should have capacity to operate in both Kwa-Zulu Natal and Free State provinces.
Compliance Requirements
Source: PART 1B - SDL&I SUBMISSION PACK - E3011DXKZNOU.pdf (TENDER)
B-BBEE: Valid B-BBEE certificate from SANAS accredited verification agency, OR valid sworn affidavit, OR B-BBEE Certificate from CIPC (for EME companies)
Ownership Documentation: Identity Documents of owners/members/shareholders required
Share Certificates: Required where applicable
Financial Statements: Latest Financial Statements corresponding to the financial date reflected on the sworn affidavit
Sub-contractors: Must provide valid B-BBEE certificate (SANAS accredited / sworn affidavit / CIPC for EME) if sub-contracting is intended
Bidder Guidance: Ensure B-BBEE documentation is current and from an accredited source. Financial statements must align with the sworn affidavit date. Sub-contractor B-BBEE certificates are required if using sub-contractors.
B-BBEE Requirements
Source: PART 1B - SDL&I SUBMISSION PACK - E3011DXKZNOU.pdf (TENDER)
B-BBEE Requirements:
Primary bidder: Valid B-BBEE certificate from SANAS accredited verification agency, OR valid sworn affidavit, OR B-BBEE Certificate from CIPC (for EME companies)
Sub-contractors: Valid B-BBEE certificate from SANAS accredited verification agency, OR valid sworn affidavit, OR B-BBEE Certificate from CIPC (for EME companies)
Bidder Guidance: Ensure your B-BBEE certificate is current and from an accredited source. EME companies can use CIPC-issued B-BBEE certificates. Sworn affidavits must correspond with the financial date reflected in your submitted financial statements.
Section
Source: PART 1B - SDL&I SUBMISSION PACK - E3011DXKZNOU.pdf (TENDER)
Only the enquiry number E3011DXKZNOU is provided. No specific contact person, email address, phone number, or physical submission address is stated in the document. Bidders should consult the official tender listing or additional tender documentation for procurement contact details.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Prevention and Combating of Corrupt Activities Act (PRECCA)
Act 12 of 2004
high
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Public Procurement Act, 2024 (PPA)
Act 28 of 2024
high
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Promotion of Access to Information Act (PAIA)
Act 2 of 2000
medium
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Promotion of Administrative Justice Act (PAJA)
Act 3 of 2000
medium
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Sector-specific rules
These rules are linked to the work category, industry, or regulated service area.
5
Electricity Regulation Act (ERA)
Act 4 of 2006
high
Relevant to electricity, generation, transmission, distribution and energy-service procurement.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
National Environmental Management Act (NEMA)
Act 107 of 1998
high
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Occupational Health and Safety Act (OHS Act)
Act 85 of 1993
high
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance. Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
Mineral and Petroleum Resources Development Act (MPRDA)
Act 28 of 2002
medium
Relevant to mineral resources, mining rights, prospecting and mining-related procurement.
Relevant because this tender appears to involve petroleum, oil, gas, fuel, or energy-resource services.
National Energy Regulator Act
Act 40 of 2004
medium
Relevant to regulated electricity, piped-gas and petroleum-pipeline activities.
Relevant because this tender appears to involve electricity, power supply, energy infrastructure, generators, or energy maintenance.
25 Valley View Road - New Germany - Kwa-Zulu Natal - 3610
Document-Backed
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
30
Last checked
02 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.