ESKOM is tendering for a five-year contract to conduct surface water, groundwater, and aquatic ecosystem monitoring at kusile power station in the north west province. The tender is for professional service providers who can perform regular sampling, analysis, and reporting to ensure environmental compliance. Bidders must demonstrate full adherence to occupational health and safety legislation and eskom's specific site requirements.
Key Requirements
The contract is for a five-year period for environmental monitoring at Kusile Power Station.
Bidders must submit a detailed, site-specific Occupational Health and Safety (OHS) plan that complies with all listed legislation and Eskom requirements.
All water samples must be analyzed by SANAS-accredited laboratories, with certificates attached to reports.
The contractor must have a valid Letter of Good Standing from the Compensation Commissioner and maintain it for the contract duration.
Key personnel appointments (e.g., Supervisor, Safety Officer, Health & Safety Representative) with specified competencies are mandatory.
Contractors must comply with Eskom's seven Life-Saving Rules and a zero-tolerance substance abuse policy.
A signed Section 37(2) agreement is required between Eskom and the main contractor, and between the main contractor and all sub-contractors.
Kusile Power Station R545 KENDAL/BALMORAL RD HAARTEBEESFONTEIN FARM WITBANK 1035 - R545 KENDAL/BALMORAL RD HAARTEBEESFONTEIN FARM - WITBANK - 1035
Professional Services & Consulting Industry Profile
Regulatory Bodies
SAICA
Tenders in this industry often require registration with these bodies.
Typical Documents
5 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
Review in progress · 1 of 15 document being finalised
AI Document Analysis Stages
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: 240-126469599_Method Statement template Rev2 final 18 Oct2021.docx. You don’t need to refresh — this page will pick up the updated review automatically.
DocumentKUS-20250797 Kusile Power Station Environmental Specification Rev 1 SW GW Env (1).pdfReview complete
Important Dates
05 Jun
2026
PUBLICATION
Tender Published
Tender was published
25 Jun
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
7 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Five-year surface, groundwater and aquatic monitoring contract at Kusile Power Station in North West. The tender focuses heavily on occupational health and safety (OHS) compliance, with mandatory OHS documentation and risk categorization determining submission requirements. The closing date is June 25, 2026.
Copy of 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf
Eskom seeks a 5-year contractor for surface, groundwater, and aquatic monitoring at the Kusile Power Station in North West. The tender emphasizes a functional Quality Management System (QMS) aligned with ISO 9001:2015, even if not formally certified. Key deliverables include a quality method statement, policy, objectives, organizational charts, and documented supplier control processes.
This is a baseline occupational health and safety risk assessment template for the Kusile Power Station, detailing hazards and controls for surface, groundwater, and aquatic monitoring activities over a 5-year period. It is not a full tender document but a risk management template that would form part of tender compliance.
240-129306525 Kusile Power Station Surface Groundwater and Aquatic Monitoring Scope of Work Rev 4 (002).pdf
Eskom seeks a contractor for a comprehensive 5-year environmental monitoring program at Kusile Power Station (North West). The scope includes surface water, groundwater, and aquatic ecosystem monitoring to comply with Water Use License (WUL) conditions. The contractor must conduct regular sampling, analysis, reporting, and provide specialized studies and ad-hoc services.
Invitation to Tender (ITT) or Request for Proposal (RFP) GroundWater.pdf
Eskom invites tenders for a 5-year surface, groundwater, and aquatic monitoring service at Kusile Power Station. The contract will be awarded via an 80/20 scoring system (80 for price, 20 for specific goals). Submission is electronic-only via Eskom's e-tendering portal.
This is Eskom's Supplier Quality Management Specification (QM 58), which defines the mandatory quality management system requirements for all suppliers. It is a generic quality framework document, not the specific tender for 'Surface, groundwater and aquatic monitoring at Kusile Power Station'. The tender described would require compliance with this specification.
Kusile Power Station Tender Technical Evaluation Strategy for surface groundwater and aquatic monitoring (003).pdf
ESKOM seeks a contractor for 5-year surface, groundwater, and aquatic monitoring at Kusile Power Station in North West. The tender uses a Technical Evaluation Strategy with mandatory and qualitative criteria, requiring a minimum 70% weighted score for qualification.
Kusile Power Station OHS Spec fo monitoring of surface, groundwater and aquatic.pdf
Eskom Kusile Power Station (North West Province) requires a contractor to conduct comprehensive surface water, groundwater, and aquatic ecosystem monitoring for a five-year period. The tender includes bi-weekly, monthly, quarterly, and annual sampling, analysis, reporting, and maintenance of monitoring infrastructure. The document is primarily an Occupational Health and Safety (OHS) specification outlining the mandatory safety, legal, and procedural framework the contractor must adhere to.
ESKOM seeks a contractor for surface, groundwater, and aquatic monitoring at Kusile Power Station in North West Province for a 5-year term service contract on an 'as and when required' basis. The contract uses the NEC3 Term Service Contract (TSC3) with Option A (Priced contract with price list). The scope includes regular sampling, reporting, modeling, and ad-hoc environmental monitoring services.
Eskom seeks a contractor for 5-year surface, groundwater, and aquatic monitoring at Kusile Power Station in North West. The tender emphasizes strict quality management compliance with Eskom's Specification 240-105658000 and ISO 9001 standards.
KUS-20250797 Kusile Power Station Environmental Specification Rev 1 SW GW Env (1).pdf
This is an environmental specification document for a 5-year surface, groundwater, and aquatic monitoring contract at Kusile Power Station in North West province. The document outlines Eskom's mandatory environmental requirements for contractors performing monitoring work to comply with the Water Use License and other regulations. It serves as a compliance framework rather than a detailed technical scope of work.
240-126469599_Method Statement template Rev2 final 18 Oct2021.docx
This is a tender document template for a 5-year surface, groundwater, and aquatic monitoring contract at Kusile Power Station in the North West province, issued by Eskom. The document is a structured method statement template requiring bidders to detail their approach across multiple quality management and operational domains.
Supplier Development Localisation Industrialisation (SDLI) Strategy The surface and groundwater and aquatic monitoring will be for five (5) year period..docx
Eskom seeks a contractor for 5-year surface, groundwater, and aquatic monitoring at Kusile Power Station (North West). The tender uses a preferential procurement system (80/20 for contracts over R50M) with specific goals (B-BBEE) accounting for up to 20 points. Key focuses include B-BBEE compliance, local content, job creation, skills development, and supplier development commitments, backed by financial penalties (3% of contract value) and performance security (3% invoice retention) for non-compliance.
Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders GroundWater.docx
Eskom tender for 5-year surface, groundwater, and aquatic monitoring at Kusile Power Station in North West. Evaluation uses preferential procurement (80/20 or 90/10 system) with strong emphasis on B-BBEE, local content, subcontracting, and SDL&I commitments.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Similar Tenders
Matched by category & region
Supplier Readiness Hub
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Document read
Compliance review
Bid-ready summary
Submission Guidelines
Source: KUS-20250797 Kusile Power Station Environmental Specification Rev 1 SW GW Env (1).pdf (unknown)
Submit these documents with your tender bid:
Environmental Policy (SHEQ Policy) signed by your CEO/Top Management.
Aspect/Impact register based on the tender scope of works.
Emergency Preparedness Plan.
Waste Management Plan.
Proof of SANAS accredited laboratory or an agreement with one.
Evidence of borehole drilling competency.
Ensure all documents are included to avoid disqualification.
Evaluation Criteria
Source: KUS-20250797 Kusile Power Station Environmental Specification Rev 1 SW GW Env (1).pdf (unknown)
Your tender will be evaluated on:
Compliance with this environmental specification, monitored during tender evaluation, ad-hoc inspections, and internal audits.
Demonstrated environmental management capability, including possession of a SANAS-accredited laboratory or agreement, proven borehole drilling competency, and a functioning Environmental Management System.
Ability to comply with all referenced Eskom work instructions and South African environmental legislation.
Technical Specifications
Source: KUS-20250797 Kusile Power Station Environmental Specification Rev 1 SW GW Env (1).pdf (unknown)
Scope: Surface and groundwater monitoring at Kusile Power Station for five years, as per the Water Use License.
You must:
Retain a copy of the detailed scope of works (document 240-129306525).
Implement an environmental management system (e.g., based on ISO 14001 principles).
Prepare and maintain an Environmental Aspect and Impact Register with mitigation measures aligned with Eskom's Operational Environmental Management Plan (OEMP).
Provide environmental induction and training to all personnel; keep proof.
Report environmental incidents within 24 hours to Kusile Environmental Department and investigate with their involvement.
Manage waste strictly: use designated bins, no mixing or burning, implement recycling.
Store hazardous substances in bunded areas (110% capacity) and keep Safety Data Sheets (SDS) onsite.
Submit corrective action plans for any non-conformances identified during Eskom audits.
Develop annual environmental objectives and improvement opportunities.
Have an Emergency Preparedness Plan and conduct periodic drills.
Display, communicate, and retain proof of your SHEQ Policy.
Onsite records you must maintain include:
Site-specific Environmental Management Plan.
Incident registers and investigation reports.
Waste disposal certificates.
Audit reports and corrective action records.
Training matrix and proof of awareness.
Emergency drill reports.
Quality Management
Source: KUS-20250797 Kusile Power Station Environmental Specification Rev 1 SW GW Env (1).pdf
You must:
Take immediate measures to minimise pollution during incidents (e.g., contain spills, extinguish fires).
Investigate incidents within 24 hours with Kusile Environmental representative involvement.
Remediate any environmental impact caused.
Include cause and corrective/preventive actions in non-conformance reports.
Maintain good housekeeping in your work and laydown areas.
Submit action plans for any non-conformances found during Eskom audits.
Develop annual environmental objectives.
Compliance Requirements
Source: KUS-20250797 Kusile Power Station Environmental Specification Rev 1 SW GW Env (1).pdf (unknown)
No specific compliance requirements (e.g., CSD, tax clearance, B-BBEE, CIDB) are stated in this environmental specification document.
Health & Safety
Source: KUS-20250797 Kusile Power Station Environmental Specification Rev 1 SW GW Env (1).pdf
Keep records of emergency drills and provide them on request.
Environmental
Source: KUS-20250797 Kusile Power Station Environmental Specification Rev 1 SW GW Env (1).pdf
Report spills and emergencies immediately to your Supervisor and the Environmental Officer.
Investigate incidents and perform clean-up/rehabilitation per Eskom procedure 240-110383662.
Contractual Terms
Source: KUS-20250797 Kusile Power Station Environmental Specification Rev 1 SW GW Env (1).pdf (unknown)
The effective date of this specification is from the date of signatures.
Requirements
Source: KUS-20250797 Kusile Power Station Environmental Specification Rev 1 SW GW Env (1).pdf (unknown)
Apply the most recent edition of all referenced documents.
This document provides guidelines for categorising services based on risk.
The list of services is not exhaustive.
For services not listed, a risk assessment must be conducted by the project manager together with the responsible OHS functionary.
Submission Guidelines
Source: Supplier risk category.docx (unknown)
Returnable Documents: Ensure all tender returnables are complete and submitted as required.
Evaluation Criteria
Source: Supplier risk category.docx (unknown)
Suppliers must be registered/compliant with the Compensation Fund (COID) or provide equivalent insurance (minimum R500,000 accidental death/disability cover for companies without employees).
All suppliers must undergo Eskom's OHS evaluation process.
Suppliers performing construction work as per the Construction Regulations, 2014 must meet additional requirements.
Joint ventures must submit documents in the joint venture's name or individual documents from each member.
Technical Specifications
Source: Supplier risk category.docx (unknown)
The tender involves surface, groundwater and aquatic monitoring at Kusile Power Station for five years.
The work is categorised by risk (high, medium, low) based on specific activities.
High-risk work examples: installation of equipment, line construction, work at heights, demolition, excavation, blasting, scaffolding, civil work, construction of roads or storage facilities.
Medium-risk work examples: maintenance work (live line, plant, boiler, transformer), transportation (employee, coal, hazardous goods), manufacturing/supply delivery to site, services (security, on-site consulting, industrial cleaning, aviation chartering, vegetation management).
Low-risk work examples: office-based labour broking, cleaning (not at heights), gardening, supply/delivery of consumables/stationery/catering to site, office-based consulting/auditing, professional services, training, event management planning.
For services not explicitly listed, a project-specific risk assessment must be conducted.
Compliance Requirements
Source: Supplier risk category.docx (unknown)
All contractors/suppliers must undergo an occupational health and safety (OHS) evaluation process for Eskom supplier registration.
For work classified as construction work, specific OHS requirements apply.
Eskom requires COID (Compensation for Occupational Injuries and Diseases Act) registration/compliance. Submit a valid letter of good standing from the Compensation Fund or a licensed compensation insurer (e.g., Rand Mutual Assurance, Federal Employer’s Mutual Association). The letter must reflect the company name.
Exemptions: Only employers with a Department of Labour certificate of exemption are exempt. Eskom also accepts a policy of insurance from a mutual association covering the contractor's full potential liability under the COID Act.
If a letter of good standing is not submitted for tender purposes, alternatives include:
An insurance letter equivalent to a COID letter, covering accidental death and disability to a minimum value of R500,000 (for companies with no employees).
Proof of assessment by the Compensation Commissioner and proof of corresponding payment.
For international suppliers: equivalent documentation from the country of origin, or relevant legislation if no such certificate exists. If the supplier has South African offices and employs South African citizens, a COID certificate is required.
Joint ventures: All submitted documents must reflect the joint venture company name, or each company must submit its individual COID letter.
OHS requirements are applicable to both local and international companies.
Document240-77471499 Annexure B (002).docxReview complete
Description
Source: 240-77471499 Annexure B (002).docx
This document is an Acknowledgement Form for Eskom's Occupational Health and Safety (OHS) legal and other requirements.
Evaluation Criteria
Source: 240-77471499 Annexure B (002).docx (unknown)
Must have experience with similar environmental monitoring work.
Must provide references, including previous work for Eskom.
Must have adequate resources and competencies.
Must understand and acknowledge Eskom's OHS requirements and the consequences of non-compliance.
Must be authorized by CEO/Director/Managing Director level.
Technical Specifications
Source: 240-77471499 Annexure B (002).docx (unknown)
Scope: Surface, Groundwater and Aquatic Monitoring at Kusile Power Station for a period of five (5) years.
Compliance Requirements
Source: 240-77471499 Annexure B (002).docx (unknown)
No specific requirements found
DocumentInvitation to Tender (ITT) or Request for Proposal (RFP) GroundWater.pdfReview complete
Important Dates
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) GroundWater.pdf (RFP)
Closing date and time: 25 June 2026 at 10:00.
Site visit: 18 June 2026 at 10:00.
Clarification queries deadline: 5 working days before tender submission deadline (exact date not specified).
Tender validity period: 180 days from closing date.
No clarification meeting specified.
Contact Information
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) GroundWater.pdf (RFP)
All queries/clarifications must be in writing to the Eskom Representative only. Responses posted on National Treasury e-tender portal and Eskom tender bulletin, not individually.
Deadline: 25 June 2026 at 10:00. Late submissions will not be accepted.
File limits: Maximum 50MB per file, total submission size 900MB. Submit PDF and Excel formats (pricing schedule must be in both). No zip/compressed files.
Mandatory returnables at closing (disqualifiable if incomplete/unsigned): Authorisation Form (Annexure A), Acknowledgement Form (Annexure B), Tenderer’s Particulars (Annexure C), Integrity Pact Declaration (Annexure D), CPA for local/imported goods (Annexure E/F), SBD 6.2 for local content (Annexure G1-G4), SBD 1 (Annexure H), SBD 4 (Annexure J).
Returnables for evaluation (non-disqualifiable but score zero if missing): SBD 6.1 Preference Points Claim Form (Annexure I).
Ensure submission status shows as 'complete'. Resubmissions replace all previous versions.
Supplier responsible for ensuring submission before closing time.
Evaluation Criteria
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) GroundWater.pdf (RFP)
Eligibility: Tenderer (or principals) must not be restricted from doing business with Eskom/state. Ineligible if: nationality is from a sanctioned country; submits multiple tenders (except for file size); JV/consortium without joint/several liability; has a conflict of interest; signs with non-authorised persons; is restricted by National Treasury; is on Tender Defaulters list; or subcontracts 100% of the work.
Functionality criteria apply: Minimum 3 years’ experience on similar work and proof of key personnel qualifications are mandatory.
Price scored out of 80 points; specific goals (B-BBEE, etc.) scored out of 20 points.
80/20 system used for ranking for tenders below R50 million.
Contractual requirements (e.g., CSD registration) assessed after evaluation, not as evaluation criteria.
Technical Specifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) GroundWater.pdf (RFP)
Scope: Surface, groundwater and aquatic monitoring at Kusile Power Station for five years.
Experience requirement: Minimum 3 years’ experience on similar work. Proof required: letters/contracts from previous/current clients with contactable references. Scoring: 3+ years continuous monitoring or similar projects (40%), 1-2 years (0%).
Key personnel requirements:
Project Manager: ±5 years experience, SACNASP registration as professional Geohydrologist.
Specialists (x2): ±3 years experience (e.g., Geologist/Environmentalist, Wetland specialist).
Junior: National diploma and 1-2 years fieldwork experience plus matric.
Assistant: Matric and 1-2 years fieldwork experience.
Provide CVs, qualifications, registration certificates, up-to-date references.
Organogram: Required showing Project Manager, Specialists, Junior, and their responsibilities.
Monitoring protocol: Submit sampling methodology protocol verifying it fulfils Water Use Licence (WUL) requirements.
Methodology
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) GroundWater.pdf
Submit surface and groundwater and aquatic monitoring protocol.
Sampling methodology must verify it fulfils the requirements of the Water Use Licence (WUL).
Experience & Qualifications
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) GroundWater.pdf
Minimum 3 years’ experience on similar work: Provide letters/contracts from previous/current clients as proof with contactable references.
Proof of relevant experience/qualifications of key personnel: Provide CVs, qualifications, registration certificates, up-to-date references.
Key personnel include Project Manager (±5 years, SACNASP Geohydrologist), Specialists (±3 years), Junior (National diploma + 1-2 years fieldwork + matric), Assistant (matric + 1-2 years fieldwork).
Organogram required showing team and responsibilities.
Laboratory accreditation certificate required.
Technical scoring definitions provided for compliance assessment.
Quality Management
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) GroundWater.pdf
Complete and sign Form A (Quality Management Specification 240-105658000/QM58 and ISO 9001).
Submit quality method statement based on ISO 9001 specific to scope.
Submit signed/approved quality policy aligned with strategic direction.
Submit copy of quality objectives.
Submit documented information for control of externally provided processes, products, and services.
Pricing Schedule
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) GroundWater.pdf
Pricing schedule/BOQ must be submitted (if not in NEC contract).
For e-tendering, submit in PDF and Excel format.
SBD 6.1 Preference Points Claim Form required for evaluation.
Specific goals scoring: Failure to submit proof results in 0 points, not disqualification.
Ranking uses 80/20 system combining price and specific goals scores.
Financial Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) GroundWater.pdf (RFP)
Pricing schedule/BOQ must be submitted in PDF and Excel format.
Payment terms: For contracts below R50 million (incl. VAT), Eskom pays within 30 days of undisputed invoice. For contracts above R50 million, within 60 days.
Price evaluation includes VAT, corrected for errors, excludes contingencies, uses NPV comparison.
Unconditional discounts considered in evaluation; conditional discounts applied at payment.
No performance security required.
Eskom reserves right to negotiate with preferred bidders if prices not market-related.
Compliance Requirements
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) GroundWater.pdf (RFP)
Mandatory contractual requirement: Proof of valid CSD registration (CSD number/report).
Safety requirements (minimum for tendering): Annexure B SHE requirement; OHS plan aligned with scope; costing for SHE management (medical, PPE, training); Baseline Risk Assessment with methodology; Valid Letter of Good Standing; OHS policy signed by CEO/MD; OHS competency (CVs, qualifications, LMI/LME certificates). Successful contractor must submit safety file within 2 weeks before site commencement.
Quality requirements: Complete/sign Form A (Quality Management Spec 240-105658000/QM58 & ISO 9001); submit quality method statement based on ISO 9001 specific to scope; quality policy signed/approved; quality objectives; documented info for control of externally provided processes/services; roles/responsibilities documentation.
B-BBEE: Proof of B-BBEE status level via certificate, sworn affidavit, or as per B-BBEE Act.
Tax: Tax clearance certificate required for foreign tenderers with SA footprint not on CSD, and local tenderers without SARS PIN/CSD verification. Foreign suppliers with no SA footprint complete SBD1 only.
Employment Equity: SA tenderers who are designated employers must provide proof of compliance and EE report submission.
CIDB: Not applicable.
Health & Safety
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) GroundWater.pdf
SHEQ requirements may apply as additional contractual requirement.
Safety minimum requirements for tendering: Annexure B SHE requirement; OHS plan aligned with scope; costing for SHE management (medical, PPE, training); Baseline Risk Assessment with methodology; Valid Letter of Good Standing; policy signed by CEO/MD; OHS competency (CVs, qualifications, LMI/LME certificates).
Successful contractor must submit safety file within 2 weeks before site commencement per OHS specification.
Environmental requirements: Environmental Policy (SHEQ) signed by CEO/top management; Aspect/Impact register; Emergency Preparedness Plan; Waste Management Plan; proof of SANAS accredited lab/agreement; borehole drilling competency.
Contractual Terms
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) GroundWater.pdf
Eligibility: Tenderers must not be nationals of countries on international sanctions lists; subcontractors/suppliers' nationalities also considered.
Multiple submissions allowed only due to E-Tendering size limits (900MB) with same tender number.
Payment terms: For contracts below R50 million (incl. VAT), payment within 30 days of undisputed invoice; above R50 million, within 60 days.
Section
Source: Invitation to Tender (ITT) or Request for Proposal (RFP) GroundWater.pdf
SBD 6.1 Preference Points Claim Form (Annexure I) required for PPPFA 2022 scoring.
Tax evaluation questionnaire required for personal service provider determination.
Functionality criteria apply as per mandatory technical evaluation criteria.
Price scored out of 80 points; specific goals scored out of 20 points.
80/20 system used for ranking for tenders below R50 million.
Contractual requirements assessed after evaluation, not as evaluation criteria.
The document is an Occupational Health and Safety Baseline Risk Assessment template for Kusile Power Station. It is not a tender scope description. It lists activities, hazards, risks, and controls for tasks like cleaning conveyors, coal handling, and general site work.
Not explicitly stated in this template. Eligibility would typically require proven experience in environmental monitoring, OHS compliance, relevant certifications, and financial capability, but these details are absent from the provided content.
The document is an Occupational Health and Safety Baseline Risk Assessment template for Kusile Power Station. It is not a tender specification. It lists activities, hazards, risks, and controls for tasks like cleaning conveyors, coal handling, and general site work, but does not define the technical scope, deliverables, or service levels for the 'Surface, groundwater and aquatic monitoring' tender. Bidders should refer to the actual tender specification document for technical requirements.
Quality Management
Source: Contractor basline risk assessment.pdf
The document is a risk assessment template and does not contain quality management or QA/QC requirements for a tender. It references procedures for incident reporting, medical surveillance, and equipment inspections as part of health and safety controls.
The document references Eskom's Occupational Health and Safety Risk Assessment Procedure 32-520 and Procedure 32-285. It also lists relevant legislation including the OHS Act and GSRs. For the tender, bidders must comply with all applicable health and safety laws and Eskom's internal procedures. No specific tax, B-BBEE, CIDB, or CIPC requirements are stated in this document.
Health & Safety
Source: Contractor basline risk assessment.pdf
This is a comprehensive health and safety risk assessment template for contractor work at Kusile Power Station.
The template follows Eskom's Occupational Health and Safety Risk Assessment Procedure 32-520.
It requires identification of activities, hazards, risks, consequences, existing controls, and control owners.
Referenced legal requirements include the OHS Act and GSRs.
The assessment covers a wide range of tasks including cleaning conveyors, ash handling, coal stacking, vehicle operations, and office work.
For each task, it lists specific hazards (e.g., fly ash inhalation, entanglement in moving parts, slips/trips/falls, noise exposure) and mandated controls (e.g., PPE, pre-job briefings, safety signs, medical surveillance).
The document emphasizes the use of preventative and reactive controls.
It includes references to Eskom procedures such as Procedure 32-285 for medical surveillance and defect reporting.
Document240-68099512 Form A_Cat 4_ Rev 9.docxReview complete
Description
Source: 240-68099512 Form A_Cat 4_ Rev 9.docx
The tenderer must complete and sign the form to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard.
Submission Guidelines
Source: 240-68099512 Form A_Cat 4_ Rev 9.docx (unknown)
Complete and sign the form to acknowledge and accept Eskom Supplier Quality Requirements as per specification 240-105658000 and ISO 9001 Standard.
This signed form is a required returnable document.
Evaluation Criteria
Source: 240-68099512 Form A_Cat 4_ Rev 9.docx (unknown)
The tenderer must fall under Category 4 (refer to clause 3.5.5 of specification 240-105658000).
Must have a quality management system aligned with ISO 9001 principles.
Must accept Eskom's rights to conduct pre-contract capability assessments, quality audits, and performance monitoring.
Must designate a Quality Representative.
Technical Specifications
Source: 240-68099512 Form A_Cat 4_ Rev 9.docx (unknown)
The tenderer must acknowledge and accept Eskom Supplier Quality Requirements per specification 240-105658000 and ISO 9001 Standard.
Pre-contract award quality requirements apply.
Contract execution includes adherence to specified quality clauses.
Supplier quality performance will be monitored.
Standard conditions include Eskom's rights of access, rights to information, preservation, quality audits, and management of nonconformities.
Category 4 (clause 3.5.5 of 240-105658000) is the applicable category.
Document240-126469599_Method Statement template Rev2 final 18 Oct2021.docxCompliance review in progress
Submission Guidelines
Source: 240-126469599_Method Statement template Rev2 final 18 Oct2021.docx (unknown)
This document is a method statement template that must be completed and submitted as part of your bid. You must fill in all sections, including:
Scope of work as detailed in the contract document.
2-3 SMART objectives related to the scope outputs.
Explanation of how customer needs are identified and communicated.
Details of required human resources, skills, competencies, and training.
List of required PPE, tools, equipment, and infrastructure.
Description of the organisation's mission, vision, and values.
Risk assessment: list all risks and mitigation actions.
Process for improving business efficiencies.
Data to be collected and analysed.
Stakeholder analysis and management approach, including supplier selection if outsourcing is involved.
Ensure the method statement is properly compiled, reviewed, and approved as indicated in the template headers.
Evaluation Criteria
Source: 240-126469599_Method Statement template Rev2 final 18 Oct2021.docx (unknown)
While explicit scoring criteria are not listed, your bid will be evaluated based on your ability to comprehensively address all sections of the method statement. This includes demonstrating:
Technical competency and understanding of long-term environmental monitoring.
A robust quality management system focused on customer requirements.
Effective risk management and stakeholder engagement.
A process for continuous improvement and data analysis.
Relevant experience in environmental monitoring, particularly in the power generation sector, is implicitly required.
Technical Specifications
Source: 240-126469599_Method Statement template Rev2 final 18 Oct2021.docx (unknown)
The tender requires a detailed method statement for surface, groundwater and aquatic monitoring at Kusile Power Station for five years. You must provide:
Scope of work as detailed in the contract document.
2-3 SMART objectives related to the scope outputs.
Explanation of how customer needs are identified and communicated to personnel.
Details of required human resources, skills, competencies, and training.
List of required PPE, tools, equipment, and infrastructure (including testing/measurement equipment).
Description of the organisation's mission, vision, and values.
Risk assessment: list all risks associated with the work and mitigation actions.
Process for identifying and improving business efficiencies to meet regulatory requirements.
Data to be collected and analysed for future decision-making.
Stakeholder analysis and management approach, including supplier selection and monitoring if outsourcing is involved.
DocumentSupplier Development Localisation Industrialisation (SDLI) Strategy The surface and groundwater and aquatic monitoring will be for five (5) year period..docxReview complete
Description
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy The surface and groundwater and aquatic monitoring will be for five (5) year period..docx
Scope: Surface, groundwater, and aquatic monitoring at Kusile Power Station for a five (5) year period. This tender is part of Eskom’s Supplier Development, Localisation, and Industrialisation (SDLI) strategy, aligned with Reconstruction and Development Programme (RDP) goals.
Contact Information
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy The surface and groundwater and aquatic monitoring will be for five (5) year period..docx (unknown)
Buyer: Sbonelo Mlaba
Business Unit: Kusile Power Station
Submission Guidelines
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy The surface and groundwater and aquatic monitoring will be for five (5) year period..docx (unknown)
Required returnable documents:
SBD 6.2 Declaration Form (if applicable).
Annex C (Local Content Declaration-Summary Schedule) (if applicable).
Valid B-BBEE certificate issued by a SANAS accredited verification agency OR a sworn affidavit (for EMEs/QSEs meeting criteria).
Proof of ownership/shareholding (preferably CIPC documentation with shareholding breakdown).
Certified ID copies of shareholder(s).
Proof of Disability (if applicable).
Consolidated B-BBEE status level verification certificate for trusts, consortia, or joint ventures.
Note: Failure to provide preference point documentation does not disqualify, but limits scoring to price only (90/80 points) and scores 0 points for specific goals.
Evaluation Criteria
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy The surface and groundwater and aquatic monitoring will be for five (5) year period..docx (unknown)
Evaluation uses a preference point system:
Maximum 10/20 points awarded for specific goals (B-BBEE).
Points for specific goals added to price points and rounded to two decimal places.
Contract awarded to tenderer scoring highest total points.
Objective criteria (designated sectors, CIDB) are not mandatory for submission but are a condition for contract award. Failure to meet may lead to award to second-ranked tenderer.
SDL&I objectives do not form part of scoring but become contractual obligations.
Technical Specifications
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy The surface and groundwater and aquatic monitoring will be for five (5) year period..docx (unknown)
Scope of Work:
Surface, groundwater, and aquatic monitoring at Kusile Power Station.
Duration: Five (5) years.
SDL&I Requirements (form part of contractual obligations):
Local Procurement Content: Defined as value added in South Africa by South African resources. Tenderers must separate local and imported components in the Price Schedule.
Subcontracting to Designated Groups: Submit proposals for activities (as a proportion of local procurement content) to be subcontracted to designated black-owned enterprises.
Job Creation: Submit proposals for the type and number of jobs created and retained in South Africa.
Skills Development: Submit proposals for developing skills of unemployed candidates, aligned with Eskom’s core, scarce, and critical skills and the 2020 list of occupations in high demand (Government Gazette 43937). Candidates must be from all provinces and representative of South African demographics. Tenderer bears full cost; Eskom provides no financial contribution.
Procurement Spend: Winning tenderer encouraged to spend on entities with a minimum 51% black ownership (for both direct and indirect expenses).
Financial Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy The surface and groundwater and aquatic monitoring will be for five (5) year period..docx (unknown)
SDL&I Financial Provisions:
Penalty: 3% of the Contract Value for failure to meet SDL&I obligations.
Performance Security: Eskom will retain 3% of every invoice (excluding VAT) as security for fulfilment of SDL&I obligations. Retained amounts released only upon full fulfilment.
Reporting:
Quarterly SDL&I compliance reports required using the Data Collection Template.
Eskom reviews reports within 30 days and notifies supplier of any non-compliance.
Supplier must implement corrective measures before the next reporting period; failure invokes retention clauses.
SDL&I Implementation Schedule must be completed and returned to SDL&I representative within 28 days after contract award for monitoring.
Compliance Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy The surface and groundwater and aquatic monitoring will be for five (5) year period..docx (unknown)
Qualifying Small Enterprise (annual total revenue ≤ R50 million): Sworn Affidavit acceptable if entity is at least 51% Black owned; otherwise must comply with full QSE scorecard.
Large Enterprise (annual total revenue > R50 million): Valid B-BBEE certificate required.
CIDB CSDG mandatory percentage: Failure to meet renders tender non-responsive.
B-BBEE Improvement Plan:
Must be submitted within 30 days of signing the contract.
Level 1: Maintain status.
Level 2 or 3: Improve or maintain B-BBEE status over contract period.
Level 4: Must achieve B-BBEE Level 3 by end of first contract year, then improve annually.
Level 5 to 8 or Non-compliant: Must achieve Level 4 by end of first contract year, then improve by at least one level each subsequent year.
Sworn Affidavit Validity Requirements:
Deponent name and ID number as per identity document.
Complete and sign Form A (Tender and Contract Quality Requirements for Supplier Quality Management Specification 240-105658000/QM 58 and ISO 9001).
Submit quality documentation as per the tender's selected category (Category 1, 2, 3, or 4) indicated in Form A.
Use the List of Tender Returnables document (240-12248652) for specific requirements per tender.
Returnables include Form A, ISO 9001 certificate (or evidence), audit reports, draft Contract Quality Plan (CQP), example Quality Control Plan (QCP)/Inspection and Test Plan (ITP), and other documented information as per category.
Quality evaluation based on ISO 9001 conformance and Eskom's specification.
References ISO 9001, ISO 10005, CIDB 1004, and PPPFA.
Defines key quality terms: Contract Quality Plan, Hold Point, Intervention Points, Inspection Agency.
Suppliers must demonstrate QMS commitment and capability.
Eligibility is based on demonstrating compliance with the QMS requirements. Key criteria include: 1) A valid ISO 9001 certificate (for Category 1, likely for high-value/long-term contracts like the Kusile monitoring tender). 2) The capability to produce and implement project-specific quality plans (CQP, QCP/ITP). 3) A track record of effective QMS implementation (e.g., audit reports). 4) Competent and qualified personnel, especially for special processes.
Quality Method Statement based on the scope of work, using Eskom template Ref 240-126469599 (Section A.1).
Quality Policy approved by top management (Section A.2).
Quality Objectives approved by top management (Section A.3).
Documented information for defined roles, responsibilities and authorities – organisation chart and responsibility matrix (must include quality management function/role) per ISO 9001:2015 Clause 5.3 (Section B.1).
Documented information for Control of Externally Provided Processes, Products and Services – including criteria for evaluation, selection, monitoring of performance, and re-evaluation of external providers per ISO 9001:2015 Clause 8.4 (Section B.2).
Any additional requirements as specified in the scope of work or specification (Section E.2).
Practical guidance: Prepare all documents above as separate, clearly labelled files. Ensure Form A is signed by an authorised signatory. The Quality Method Statement must follow the referenced Eskom template. The QMS evidence does not require formal ISO 9001 certification but must demonstrate compliance with the listed clauses.
Returnable Documents
Source: Copy of 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)
Full list of returnable documents for Category 4 (Quality Requirements):
Organisation chart and responsibility matrix including quality management role (ISO 9001:2015 Clause 5.3).
Documented procedure for Control of Externally Provided Processes, Products and Services (ISO 9001:2015 Clause 8.4).
Any additional requirements per scope of work/specification.
Evaluation Criteria
Source: Copy of 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)
Evaluation is based on a documented Quality Management System (QMS) aligned with ISO 9001:2015. Certification is not mandatory; the system must be operational and evidenced through the required deliverables.
Scoring structure (each section scored only if 'Apply = 1'):
Section A – Quality Management System Requirements: maximum 3 points (Option 2).
Section B – Evidence of QMS in Operation: maximum 2 points.
Section E – User-Defined Additional Requirements: maximum 2 points (Form A completed/signed = 1 point; additional scope-specific requirements = 1 point).
Minimum thresholds: Not explicitly stated in this document; assume all applicable sections must be submitted to avoid disqualification.
Preference points: Not mentioned in this extract.
Evaluation stages: Likely a two-stage process – compliance check (returnables) followed by technical/quality scoring.
Practical guidance: Focus on providing objective evidence for each clause. Missing any Section A, B, or E deliverable will likely result in a zero score for that section and may lead to disqualification.
Technical Specifications
Source: Copy of 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)
Technical/quality requirements derived from the returnables list:
Develop a Quality Method Statement specific to the scope: surface, groundwater and aquatic monitoring at Kusile Power Station for five years, using Eskom template Ref 240-126469599.
Establish and maintain a Quality Policy and Quality Objectives approved by top management.
Define and document organisational roles, responsibilities and authorities via an organisation chart and responsibility matrix that includes the quality management function (ISO 9001:2015 Clause 5.3).
Implement a documented process for Control of Externally Provided Processes, Products and Services covering evaluation, selection, performance monitoring, and re-evaluation of external providers (ISO 9001:2015 Clause 8.4).
Complete and sign Form A (Eskom-specific form).
Address any additional requirements stipulated in the scope of work or specification.
Practical guidance: Align your existing QMS documentation with the above clauses. If you lack a formal QMS, create the required documented information specifically for this bid. The Method Statement must be tailored to the monitoring scope – generic templates will not suffice.
Compliance Requirements
Source: Copy of 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)
Mandatory compliance items:
Documented Quality Management System complying with ISO 9001:2015 (certification not required).
Completed and signed Form A.
All Section A, B, and E returnables submitted as evidence.
Any further compliance requirements as defined in the scope of work or specification.
Implicit requirements (standard for Eskom tenders but not explicit in this extract):
CSD registration.
Valid tax clearance / SARS pin.
B-BBEE certificate or sworn affidavit.
CIDB registration (if applicable to the service category).
CIPC company registration.
Practical guidance: Treat the ISO 9001-aligned QMS as a gate requirement. Ensure your CSD, tax, B-BBEE, and CIPC documents are current and ready for the main bid submission. Verify whether CIDB grading is needed for environmental monitoring services.
Requirements
Source: Copy of 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf (unknown)
Additional requirements (Section E.2):
Bidders must satisfy any further requirements stipulated in the scope of work or specification.
These requirements are not detailed in this returnables list; obtain the full scope/specification document (Ref 240-105658000) to identify them.
Section
Source: Copy of 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf
Section E (User-Defined Additional Requirements) carries a maximum of 2 points:
1 point for completed and signed Form A.
1 point for any additional requirements specified in the scope of work or specification.
This section is scored only when 'Apply = 1' (indicated in the document).
DocumentSupplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders GroundWater.docxReview complete
Description
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders GroundWater.docx
The tender involves surface, groundwater and aquatic monitoring at Kusile Power Station for a period of five (5) years.
Evaluation Criteria
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders GroundWater.docx (unknown)
B-BBEE status level impacts scoring significantly.
Must meet local production/content thresholds if applicable.
For contracts above R30 million, mandatory subcontracting of at least 30% of contract value to designated groups: EME or QSE with 51% black ownership in rural/underdeveloped areas/townships.
If import content equals or exceeds USD 5 million, must enter a NIPP obligation agreement with the Department of Trade, Industry and Competition (dtic) before contract signing.
B-BBEE certificate or sworn affidavit is a condition for award; revenue thresholds apply: ≤R10m (EME affidavit), ≤R50m (QSE affidavit/compliance), >R50m (full B-BBEE certificate).
Objective criteria (designated sectors, CIDB, NIPP) are conditions for award; failure may lead to second-ranked tenderer being recommended.
Preference points: maximum 10/20 points for specific goals; points added to price score.
Tenderers failing to provide preference point documentation will score 0 for specific goals and only points out of 90/80 for price.
SDL&I objectives do not form part of scoring but become contractual obligations.
Compliance Requirements
Source: Supplier Development Localisation Industrialisation (SDLI) Strategy Setting Template for Bidders GroundWater.docx (unknown)
B-BBEE: Valid B-BBEE certificate from SANAS accredited verification agency, sworn affidavit, or CIPC affidavit required to claim preference points.
Proof of ownership/shareholding (preferably CIPC documentation) with shareholding breakdown.
Certified ID copies of shareholders.
Proof of disability where applicable.
Failure to provide preference point documentation results in scoring 0 for specific goals and only points out of 90/80 for price.
B-BBEE improvement/retention plan must be submitted within 30 days of contract signing, with specific migration milestones based on initial B-BBEE level.
Exempted Micro Enterprise (annual total revenue ≤ R10 million) may submit sworn affidavit.
Qualifying Small Enterprise (annual total revenue ≤ R50 million) must comply with QSE scorecard unless at least 51% black-owned, then sworn affidavit required.
Large enterprises (annual total revenue > R50 million) must submit valid B-BBEE certificate.
Local procurement content: SBD 6.2 Declaration Form and Annex C (Local Content Declaration-Summary Schedule) are mandatory returnables if applicable.
Source: Surface and groundwater monitoring NEC.pdf (unknown)
Submit the completed C1.1 Form of Offer and Acceptance as a returnable document.
The tenderer's representative must sign the Offer part, authorising the offer to perform all contract obligations.
The Employer may accept the offer by signing the Acceptance part and returning a copy before the validity period ends.
If awarded, the contractor must contact the Employer's agent within two weeks to arrange delivery of securities, bonds, guarantees, proof of insurance, and other required documentation.
Failure to fulfil these obligations constitutes a repudiation of the agreement.
Evaluation Criteria
Source: Surface and groundwater monitoring NEC.pdf (unknown)
Contractor must have a CIDB registration number (to be provided in the offer).
Joint ventures are permitted, but all members are jointly and severally liable.
Contractor must comply with South African law and ESKOM's additional conditions (Z-clauses).
B-BBEE status is critical; a decrease may lead to contract re-negotiation or termination.
Contractor must not cede, delegate, or assign rights without ESKOM's written consent.
Quality assurance requirements are referenced in section 3.3.
Evaluation includes health, safety, environmental, and quality assurance criteria as per section 3.
Technical Specifications
Source: Surface and groundwater monitoring NEC.pdf (unknown)
Perform surface, groundwater, and aquatic monitoring at Kusile Power Station on an as-and-when-required basis for five years.
Key tasks include sample analysis, bio-monitoring, flow measurements, infrastructure inspections, soil sampling, stakeholder notifications, presentations, model updates, and borehole purging.
Use SANAS-accredited laboratories for sample analysis.
Conduct ecological assessments and site walkdowns.
Maintain and update monitoring networks and databases.
Submit regular reports (bi-weekly, monthly, quarterly, annual) with compliance status, maps, and mitigation measures.
Provide ad hoc services such as methodology reviews, additional drilling, risk analyses, emergency sampling, and training.
Service period: Five years.
Defect correction: 24 hours after completion of each task order, or as agreed by parties.
Testing and defects handled as per core clause 40.
Contractor must comply with all applicable environmental laws, regulations, and contract guidelines.
Ensure subcontractors also comply.
Specific environmental tasks include water quality monitoring, bio-monitoring, soil sampling, and habitat assessments.
Ad hoc services include pollution source investigations and environmental committee meetings.
Reporting includes environmental compliance status and mitigation measures.
Contractor must provide details of key people, including names, jobs, responsibilities, qualifications, and experience.
CVs and further key person data must be submitted.
Price list includes resource items for personnel with relevant experience (e.g., Project Director, Specialist, Junior, Assistant, Safety Officer).
The contract is Option A: Priced contract with price list; tenderer must complete the price list with tendered total of Prices.
Experience & Qualifications
Source: Surface and groundwater monitoring NEC.pdf
Contractor must provide details of key people, including names, jobs, responsibilities, qualifications, and experience.
CVs and further key person data must be submitted.
Price list includes resource items for personnel with relevant experience (e.g., Project Director, Specialist, Junior, Assistant, Safety Officer).
The contract is Option A: Priced contract with price list; tenderer must complete the price list with tendered total of Prices.
Quality Management
Source: Surface and groundwater monitoring NEC.pdf
Service period: Five years.
Defect correction: 24 hours after completion of each task order, or as agreed by parties.
Testing and defects handled as per core clause 40.
Pricing Schedule
Source: Surface and groundwater monitoring NEC.pdf
Price list includes sections for preliminaries, resources, distribution, and ad hoc services.
Items are priced as lump sums or rates multiplied by expected quantities.
Tenderer must complete the price list, linking items to operations in the contractor's plan.
Pricing assumptions: Prices must be inclusive of all necessary costs; no adjustment for lump sum items unless due to compensation event.
Format: Include item number, description, unit, expected quantity, rate, and price.
Compliance Requirements
Source: Surface and groundwater monitoring NEC.pdf (unknown)
B-BBEE: Notify Eskom within 7 days of any change in B-BBEE status; submit updated verification certificate within 30 days. A decrease in status may lead to contract re-negotiation or termination.
Insurance: The contractor must provide insurance as per Insurance Table A, covering loss/damage to Employer's property, plant, materials, equipment, and liability for property damage and bodily injury.
Health and Safety: Comply with Construction Regulations 2014 and all applicable health and safety laws; the contractor may be appointed as Principal Contractor.
Environmental: Comply with all applicable environmental laws and regulations.
Confidentiality: Do not disclose contract-related information without consent; obtain written consent for taking images of the Affected Property.
Joint Ventures: If a joint venture, all members are jointly and severally liable; notify the Service Manager of the key person authorised to bind the contractor within two weeks of contract date.
Ethics: Prohibited actions include coercive, collusive, corrupt, fraudulent, or obstructive actions; may lead to termination.
Asbestos: Eskom ensures ambient air meets asbestos regulations; contractor may perform parallel measurements at own expense; stop work if asbestos is identified until area declared safe.
Nuclear Liability: Eskom indemnifies the contractor against nuclear damage liabilities, except due to unlawful intent or unauthorised presence at Koeberg Nuclear Power Station.
Contract duration: Five years.
Starting date to be determined.
Defect correction period: 24 hours after completion of each task order, or as agreed.
Payment terms: Assessment between 27th day of each month; payment within 4 weeks after invoice acceptance.
Interest on late payments: Prime rate (Standard Bank) for ZAR, LIBOR for other currencies.
Insurance: Contractor provides insurance per Insurance Table A; Eskom provides insurance per Insurance Table B.
Liability: Contractor's liability for indirect/consequential loss limited to R0; total liability limited to the total of the Prices, except for excluded matters.
Termination: As per core clause 90; includes termination for B-BBEE status decrease or prohibited actions.
Dispute resolution: Adjudicator from ICE-SA panel; arbitration under Association of Arbitrators (Southern Africa) rules.
Additional conditions: Include confidentiality, health and safety, environmental compliance, ethics, asbestos management, and nuclear liability provisions.
Contractor must take all reasonable precautions for health and safety.
Eskom may appoint contractor as Principal Contractor under Construction Regulations 2014.
Contractor warrants that prices include sufficient amount for compliance with health and safety laws.
Contractor must comply with Construction Regulations and ensure subcontractors do likewise.
Asbestos exposure limits: OEL of 0.2 regulated asbestos fibres per ml as 4-hour TWA; short-term limit of 0.6 as 10-minute TWA.
Contractor may stop work if asbestos is identified until area is declared safe.
Eskom manages asbestos per its Asbestos Standard 32-303.
Health & Safety
Source: Surface and groundwater monitoring NEC.pdf
Contractor must take all reasonable precautions for health and safety.
Eskom may appoint contractor as Principal Contractor under Construction Regulations 2014.
Contractor warrants that prices include sufficient amount for compliance with health and safety laws.
Contractor must comply with Construction Regulations and ensure subcontractors do likewise.
Asbestos exposure limits: OEL of 0.2 regulated asbestos fibres per ml as 4-hour TWA; short-term limit of 0.6 as 10-minute TWA.
Contractor may stop work if asbestos is identified until area is declared safe.
Eskom manages asbestos per its Asbestos Standard 32-303.
Environmental
Source: Surface and groundwater monitoring NEC.pdf
Contractor must comply with all applicable environmental laws, regulations, and contract guidelines.
Ensure subcontractors also comply.
Specific environmental tasks include water quality monitoring, bio-monitoring, soil sampling, and habitat assessments.
Ad hoc services include pollution source investigations and environmental committee meetings.
Reporting includes environmental compliance status and mitigation measures.
Contractual Terms
Source: Surface and groundwater monitoring NEC.pdf
Contract duration: Five years.
Starting date to be determined.
Defect correction period: 24 hours after completion of each task order, or as agreed.
Payment terms: Assessment between 27th day of each month; payment within 4 weeks after invoice acceptance.
Interest on late payments: Prime rate (Standard Bank) for ZAR, LIBOR for other currencies.
Insurance: Contractor provides insurance per Insurance Table A; Eskom provides insurance per Insurance Table B.
Liability: Contractor's liability for indirect/consequential loss limited to R0; total liability limited to the total of the Prices, except for excluded matters.
Termination: As per core clause 90; includes termination for B-BBEE status decrease or prohibited actions.
Dispute resolution: Adjudicator from ICE-SA panel; arbitration under Association of Arbitrators (Southern Africa) rules.
Additional conditions: Include confidentiality, health and safety, environmental compliance, ethics, asbestos management, and nuclear liability provisions.
Section
Source: Surface and groundwater monitoring NEC.pdf
Quality assurance requirements are referenced in section 3.3.
Evaluation includes health, safety, environmental, and quality assurance criteria as per section 3.
Document240-129306525 Kusile Power Station Surface Groundwater and Aquatic Monitoring Scope of Work Rev 4 (002).pdfReview complete
Description
Source: 240-129306525 Kusile Power Station Surface Groundwater and Aquatic Monitoring Scope of Work Rev 4 (002).pdf
The scope involves surface, groundwater, and aquatic monitoring at Kusile Power Station for 5 years to comply with Water Use Licence conditions. The purpose is to determine the impact of facility activities on water quality and the aquatic ecosystem, ensuring compliance, early detection of non-compliance, and decreased risk of penalties.
Evaluation Criteria
Source: 240-129306525 Kusile Power Station Surface Groundwater and Aquatic Monitoring Scope of Work Rev 4 (002).pdf (unknown)
The document does not provide explicit evaluation criteria. It references normative standards (ISO 9001, Eskom SHEQ Policy) which may form part of the evaluation basis. Bidders should demonstrate understanding and capability to meet these referenced standards.
Technical Specifications
Source: 240-129306525 Kusile Power Station Surface Groundwater and Aquatic Monitoring Scope of Work Rev 4 (002).pdf (unknown)
The scope is for surface, groundwater, and aquatic monitoring at Kusile Power Station for a 5-year period to comply with Water Use Licence conditions.
Key deliverables and requirements:
Conduct bi-weekly, monthly, quarterly, and annual sampling and analysis at specified monitoring points (coordinates and parameters listed in the document).
Perform bi-annual aquatic biomonitoring at 10 points.
Monthly surface water flow measurements at 2 stream diversion points.
Annual inspection of stormwater infrastructure and turbidity levels.
Soil sampling at 12 points upstream and downstream when required.
Submit bi-weekly, monthly, quarterly, and annual reports with compliance status, water quality maps, and mitigation recommendations.
All samples must be analysed by SANAS-accredited laboratories; accreditation certificates must accompany reports.
Submit monitoring protocol and safety file for approval before commencement.
Provide a project team including a Professional Geohydrologist (Project Director), two Specialists (Geologist/Environmentalist and Wetland specialist), one Junior, and one Assistant.
Perform ad-hoc services including review of monitoring methodology, drilling additional boreholes, risk analysis, pollution source investigations, and emergency sampling.
Adhere to Eskom's SHEQ policy and lifesaving rules; submit a safety file.
Follow specific Eskom groundwater monitoring guidelines (GWG series) for procedures, surveys, test pumping, hydrocensus, borehole drilling, sampling, risk assessment, and remediation.
Methodology
Source: 240-129306525 Kusile Power Station Surface Groundwater and Aquatic Monitoring Scope of Work Rev 4 (002).pdf
The contractor must develop or amend a site-specific monitoring and sampling procedure based on Eskom's Groundwater Governance Guidelines. The methodology includes review, geophysical surveys, test pumping, hydrocensus, borehole drilling, sampling, risk assessment, and remediation planning as per the referenced Eskom GWG series.
Pricing Schedule
Source: 240-129306525 Kusile Power Station Surface Groundwater and Aquatic Monitoring Scope of Work Rev 4 (002).pdf
The document does not contain a pricing schedule, bill of quantities, or payment schedule. It lists the activities and resources required, which bidders must price, including all monitoring, reporting, laboratory analysis, team provision, and ad-hoc services.
Financial Requirements
Source: 240-129306525 Kusile Power Station Surface Groundwater and Aquatic Monitoring Scope of Work Rev 4 (002).pdf (unknown)
The document does not specify pricing format, bonds, guarantees, or payment terms. It lists required activities and resources which bidders must cost, including:
Laboratory analysis by SANAS-accredited facilities.
Provision of a project team (Project Director, Specialists, Junior, Assistant).
Maintenance of monitoring network (replacing destroyed points, drilling new boreholes).
Execution of ad-hoc studies and investigations.
All sampling, reporting, and presentation duties as per the detailed scope.
Compliance Requirements
Source: 240-129306525 Kusile Power Station Surface Groundwater and Aquatic Monitoring Scope of Work Rev 4 (002).pdf (unknown)
The document does not specify standard compliance documents like CSD, tax, B-BBEE, CIDB, or CIPC. It focuses on technical and regulatory adherence:
Compliance with Water Use Licence (WUL) conditions, National Water Act, and National Environmental Management Act.
Adherence to Eskom standards: SHEQ Policy (32-727), Procurement and Supply Chain Management Standards (32-288, 32-599).
Implementation of ISO 9001 (Quality Management) and ISO 14001 (Environmental Management) systems as referenced.
Use of SANAS-accredited laboratories for sample analysis.
Submission of a safety file for approval before work commencement.
Strict compliance with Eskom's 6 lifesaving rules and all health and safety requirements.
Health & Safety
Source: 240-129306525 Kusile Power Station Surface Groundwater and Aquatic Monitoring Scope of Work Rev 4 (002).pdf
Eskom has a zero-tolerance stance on its 6 lifesaving rules. All contractors must:
Comply with all health and safety requirements prescribed by law.
Submit a safety file for approval before starting monitoring activities.
Adhere to the Eskom Safety, Health, Environment and Quality (SHEQ) Policy available from the Kusile Safety Department.
Ensure every person working at or visiting Kusile Power Station returns home safely.
Environmental
Source: 240-129306525 Kusile Power Station Surface Groundwater and Aquatic Monitoring Scope of Work Rev 4 (002).pdf
The monitoring programme is driven by environmental compliance:
Fulfil conditions of the Water Use Licence (WUL) for stream diversion, abstraction, and waste disposal.
Monitor specified points to assess impact on water quality and aquatic ecosystems.
Update environmental plans annually: Water Conservation & Water Demand Management Plan, Integrated Waste and Water Management Plan.
Conduct habitat assessments, wetland delineation studies, and ecologist site walkdowns.
Perform source apportionment and pollution source investigations related to upstream mining and agricultural impacts.
DocumentKusile Power Station Tender Technical Evaluation Strategy for surface groundwater and aquatic monitoring (003).pdfReview complete
Submission Guidelines
Source: Kusile Power Station Tender Technical Evaluation Strategy for surface groundwater and aquatic monitoring (003).pdf (unknown)
You must submit the following documents as part of your tender returnables:
Letters from previous or current clients confirming at least 3 years of continuous experience in similar surface, groundwater and aquatic monitoring work. These letters must be contactable references.
CVs, qualifications, and professional registration certificates for all key personnel, with up-to-date references.
An organogram showing the project team structure, including roles and responsibilities.
A valid laboratory accreditation certificate.
A detailed surface, groundwater and aquatic monitoring protocol outlining sampling methodologies.
Ensure all documents are complete and meet the mandatory criteria to avoid disqualification.
Returnable Documents
Source: Kusile Power Station Tender Technical Evaluation Strategy for surface groundwater and aquatic monitoring (003).pdf (unknown)
The following tender returnables are required for qualitative evaluation:
Organogram indicating the team for the required service, including responsibilities.
Laboratory Accreditation certificate, valid and authorised to conduct water analysis.
Surface and groundwater and aquatic monitoring protocol detailing sampling methodologies.
Evaluation Criteria
Source: Kusile Power Station Tender Technical Evaluation Strategy for surface groundwater and aquatic monitoring (003).pdf (unknown)
Mandatory criteria (must be met for eligibility):
Minimum 3 years' experience on similar water and aquatic monitoring work, proven by client letters and contactable references.
Qualified personnel: CVs, qualifications, and proof of professional registration for key personnel.
Qualitative evaluation criteria (scored):
Experience (40% weight): 3+ years continuous monitoring experience scores 40%; 1-2 years scores 0%.
Key personnel (30% weight): Project Manager (5+ years experience, SACNASP registered Geohydrologist) scores 10%; Specialists (3+ years experience) score 10%; Junior (National diploma + 1-2 years field work) scores 5%; Assistant (Matric + 1-2 years field work) scores 5%.
Organogram (5% weight): Must show team structure with roles.
Monitoring protocol (15% weight): Protocol must verify sampling methodology meets Water Use Licence (WUL) requirements.
Overall minimum technical score threshold for qualification is 70%.
Unacceptable risks (lead to exclusion):
Exclusion of professional registration certificates for key personnel.
Exclusion of project-specific competence requirements.
Exclusion of proof/record of completed similar projects with traceable references.
Methodology
Source: Kusile Power Station Tender Technical Evaluation Strategy for surface groundwater and aquatic monitoring (003).pdf
You must submit a detailed surface, groundwater and aquatic monitoring protocol.
The protocol must outline sampling methodologies.
It must verify that the sampling methodology will fulfil the requirements of the Water Use Licence (WUL).
Experience & Qualifications
Source: Kusile Power Station Tender Technical Evaluation Strategy for surface groundwater and aquatic monitoring (003).pdf
Mandatory experience and qualifications:
Minimum 3 years' experience on similar work, proven by client letters and contactable references.
Proof of relevant experience (CVs and qualifications) for key personnel, with up-to-date references and proof of professional registration.
Specific roles required: Project Manager (5+ years experience, SACNASP registered Geohydrologist), Specialists (e.g., Geologist/Environmentalist, Wetland specialist with 3+ years experience), Junior (National diploma + 1-2 years field work), and Assistant (Matric + 1-2 years field work).
Compliance Requirements
Source: Kusile Power Station Tender Technical Evaluation Strategy for surface groundwater and aquatic monitoring (003).pdf (unknown)
No specific compliance requirements such as CSD, tax, B-BBEE, CIDB, or CIPC are stated.
The tenderer must meet all mandatory technical requirements and achieve the minimum technical score threshold of 70% to be eligible for evaluation.
Unacceptable risks that can lead to exclusion include: lack of professional registration certificates for key personnel, exclusion of project-specific competence requirements, and exclusion of proof/record of completed similar projects with traceable references.
Environmental
Source: Kusile Power Station Tender Technical Evaluation Strategy for surface groundwater and aquatic monitoring (003).pdf
The tender scope is environmental monitoring: surface water, groundwater, and aquatic systems at Kusile Power Station.
The Technical Evaluation Team includes Environmental Management and Senior Advisor Environmental personnel.
The area of applicability for this strategy is Environmental.
Requirements
Source: Kusile Power Station Tender Technical Evaluation Strategy for surface groundwater and aquatic monitoring (003).pdf (unknown)
To be eligible for evaluation, the tenderer must meet all mandatory requirements.
The minimum weighted final technical score threshold is 70%.
Unacceptable risks include: exclusion of professional registration certificates for key personnel, exclusion of project-specific competence requirements, and exclusion of proof/record of completed similar projects with traceable references.
Unacceptable exceptions include exclusion of proof/record of completed similar projects with traceable references.
Section
Source: Kusile Power Station Tender Technical Evaluation Strategy for surface groundwater and aquatic monitoring (003).pdf
The technical evaluation uses weighted scoring:
Experience (40%): Minimum 3 years' continuous monitoring experience required for full score.
Key personnel (30%): Specific experience and registration requirements for Project Manager, Specialists, Junior, and Assistant roles.
Organogram (5%): Must show team structure with roles.
Source: Kusile Power Station OHS Spec fo monitoring of surface, groundwater and aquatic.pdf (unknown)
Eligible contractors must:
Be registered as an employer with the Compensation Commissioner and possess a valid Letter of Good Standing.
Demonstrate full compliance with the Occupational Health and Safety Act and all other relevant legislation listed in the document.
Possess or be able to appoint personnel with the required competencies (e.g., Supervisor with 3 years' experience, trained Safety Officer, H&S Representatives).
Have the organizational capacity to execute a five-year, high-risk environmental monitoring contract.
Use SANAS-accredited laboratories for all sample analysis.
Technical Specifications
Source: Kusile Power Station OHS Spec fo monitoring of surface, groundwater and aquatic.pdf (unknown)
Scope of Work Monitoring Requirements:
Carry out specific surface and groundwater sample analysis bi-weekly, monthly, quarterly, and annually at specified points.
Collect and record surface and groundwater information (dates, location, time, groundwater levels).
Conduct bi-annual bio-monitoring analysis at 10 upstream/downstream monitoring points.
Perform monthly surface water flow measurements at 2 stream diversion points.
Inspect stormwater infrastructure and turbidity levels annually.
Conduct soil sampling at 12 monitoring points upstream/downstream when required.
Notify stakeholders if water quality objectives/targets are exceeded.
Prepare and present quarterly water quality presentations to the EMC.
Update geohydrological model, Water Conservation & Water Demand Plan, and Integrated Waste and Water Management Plan annually.
All samples must be submitted to SANAS-accredited laboratories.
Conduct source apportionment, wetland delineation, and habitat assessment studies.
Provide recommendations to improve water quality or address non-compliances.
Maintain monitoring network and replace destroyed/lost points.
Hold monthly progress meetings with the client.
Methodology
Source: Kusile Power Station OHS Spec fo monitoring of surface, groundwater and aquatic.pdf
Safe Work Procedure Development: Procedures must list known controls, record steps to rectify insufficient controls, and be approved by the Eskom project manager representative.
Experience & Qualifications
Source: Kusile Power Station OHS Spec fo monitoring of surface, groundwater and aquatic.pdf
Experience and Qualifications:
Main contractors and appointed contractors must have appropriate qualifications, certificates, and competent supervision.
Specific competency requirements are defined for roles such as Health & Safety Representative, Supervisor, and Safety Officer.
Quality Management
Source: Kusile Power Station OHS Spec fo monitoring of surface, groundwater and aquatic.pdf
Quality and Safety Management:
All contractors must follow Eskom's Substance Abuse Procedure (32-37).
A zero-tolerance policy for alcohol and drugs is enforced (0% allowable level).
Ad-hoc alcohol testing will be conducted on site.
Contractors must report and manage non-conformances, incidents, and corrective actions.
Safety promotion activities include planned job observations, OHS training, and incident announcements.
Compliance Requirements
Source: Kusile Power Station OHS Spec fo monitoring of surface, groundwater and aquatic.pdf (unknown)
Legal and Eskom Requirements:
The contractor must develop an OHS plan that meets all legislative and Eskom Kusile Power Station requirements.
The contractor remains accountable for the health and safety programme for their employees and appointed contractors.
Key legislative compliance includes: Occupational Health and Safety Act, National Environmental Management Act, National Water Act, Compensation for Occupational Injuries and Diseases Act, and relevant SANS standards.
A Section 37(2) agreement must be signed between Eskom and the main contractor, and between the main contractor and all appointed sub-contractors.
The use of child labour is prohibited.
All contractors must be registered with the Compensation Commissioner and possess a valid Letter of Good Standing.
Contractors must comply with Eskom's seven Life-Saving Rules and Substance Abuse policy (zero tolerance for alcohol/drugs).
Required appointments include: Health and Safety Representative, Supervisor, Safety Officer, First Aider, and others as per OHS Act.
Specific competency requirements are listed for Health & Safety Representatives, Supervisors, and Safety Officers.
An organisational OHS policy, signed by the CEO, must be displayed and filed.
A detailed, site-specific OHS plan must be submitted and approved before work commences.
Safety file package must be submitted to the OHS department 2 weeks before the project start date.
Health & Safety
Source: Kusile Power Station OHS Spec fo monitoring of surface, groundwater and aquatic.pdf
OHS Communication: Statutory health and safety committees must be established. Meetings must have agendas covering incidents, non-conformances, training, etc. Minutes and action items with target dates must be kept.
Environmental
Source: Kusile Power Station OHS Spec fo monitoring of surface, groundwater and aquatic.pdf
Environmental Monitoring Scope:
The scope includes purging boreholes annually, determining monthly surface water flow rates, calculating contaminant loading, measuring turbidity levels, and conducting ecological site walkdowns.
Key deliverables: Provide recommendations to improve water quality, maintain monitoring networks, conduct source apportionment and wetland delineation studies, update water management plans annually.
All samples must be analyzed by SANAS-accredited laboratories.
Environmental housekeeping: Prompt disposal of waste materials in designated areas, secure storage of materials to prevent falling objects, and site clearance on project completion.
Requirements
Source: Kusile Power Station OHS Spec fo monitoring of surface, groundwater and aquatic.pdf (unknown)
General Training & Vehicle Management: Supervisors must inform employees of hazards and control measures. Vehicle requirements: drivers and passengers must wear seatbelts, loads secured, no overloading, valid driver medical certificates, vehicles roadworthy with first aid box, fire extinguisher, triangles, and specific safety features.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Prevention and Combating of Corrupt Activities Act (PRECCA)
Act 12 of 2004
high
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Public Procurement Act, 2024 (PPA)
Act 28 of 2024
high
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Promotion of Access to Information Act (PAIA)
Act 2 of 2000
medium
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Promotion of Administrative Justice Act (PAJA)
Act 3 of 2000
medium
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
Kusile Power Station R545 KENDAL/BALMORAL RD HAARTEBEESFONTEIN FARM WITBANK 1035 - R545 KENDAL/BALMORAL RD HAARTEBEESFONTEIN FARM - WITBANK - 1035
Document-Backed
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
15
Last checked
14 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.