Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
R545 KENDAL/BALMORAL RD - HAARTEBEESFONTEIN FARM WITBANK - Mpumalanga - 1035
Organization Type
GOVERNMENT
Published
28 Jul 2026
OCDS Reference
ocds-9t57fa-163672
ESKOM is seeking suppliers for the hiring, installation, and operation of mobile elevated and suspended work platforms for maintenance and outages on an 'as and when' required basis over a 5-year period. The tender is open to companies, close corporations, trusts, and individuals who must complete a paye questionnaire to determine their tax classification for withholding purposes.
Continue with tenders sharing this issuer, category, or province.
Return to this tender’s issuing organisation, province, or category.
Continue with tenders sharing this issuer, category, or province.
Categories
Request for Bid(Open-Tender)
R545 KENDAL/BALMORAL RD - HAARTEBEESFONTEIN FARM WITBANK - Mpumalanga - 1035
AI Document Analysis Stages
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Documents being finalised: Annex-c_Local content Declaration-Summary Schedule.pdf, Annex-e_Local Content Declaration-Supporting Schedule to Annex C.pdf, Annex-d_Imports Declaration-Supporting schedule to Annex C.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
28 Jul
2026
Tender Published
Tender was published
10 Aug
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Annex-c_Local content Declaration-Summary Schedule.pdf
Annex-d_Imports Declaration-Supporting schedule to Annex C.pdf
C1 2b TSC3 Data by Contractor.doc
Eskom is seeking a contractor for the hiring, installation, and operation of mobile elevated and suspended work platforms for maintenance and outages on an 'as and when' required basis over a 5-year period, located in the North West province. The tender closes on August 10, 2026.
SUSPEN~1.PDF
Eskom Kusile Power Station is seeking contractors for the hiring, installation, and operation of mobile elevated and suspended work platforms for maintenance and outages on an as-needed basis over a 5-year period. The tender includes strict environmental compliance requirements, including adherence to Eskom's environmental specifications, waste management, spill response, and submission of environmental documentation.
C0 TSC3 Contract cover pages_.doc
Eskom Holdings SOC Ltd is seeking a contractor for the hiring, installation, and operation of mobile elevated and suspended work platforms for maintenance and outages on an 'as and when' required basis, under a 5-year NEC3 Term Service Contract (TSC3). The tender is open for the North West province, with a closing date of August 10, 2026.
SUPPLI~1.PDF
Eskom's Kusile Power Station is seeking a contractor for the hiring, installation, and operation of mobile elevated and suspended work platforms for maintenance and outages on an 'as and when' required basis, for a 60-month (5-year) contract. The tender includes SDL&I (Supplier Development, Localisation and Industrialisation) objectives, with a preference point system based on B-BBEE status, and requires compliance with local procurement, black-owned enterprise spend, job creation, and skills development targets.
SUPPLI~2.PDF
This tender is for the hiring, installation, and operation of mobile elevated and suspended work platforms for Eskom's maintenance and outages, on an 'as and when' required basis, for a 5-year period. The document provided is a PAYE questionnaire that contractors must complete to determine their tax classification (independent contractor, personal service provider, labour broker, etc.) for tax withholding purposes.
STANDA~2.PDF
ESKOM is seeking a contractor for the hiring, installation, and operation of mobile elevated and suspended work platforms for maintenance and outages on an 'as and when' required basis over a 5-year period. The tender includes a mandatory local content declaration (SBD 6.2) requiring bidders to meet stipulated minimum local production thresholds, calculated per SATS 1286:2011, and to submit Annex C (Local Content Declaration: Summary Schedule) at bid deadline.
C3 1 TSC3 Employers Service Information latest.rev revised.doc
This tender from Eskom (Kusile Power Station) seeks a qualified contractor to provide Tube-Steam Oxide Life Optimization (Tube-SOLO) services for boiler pressure parts across Units 1-6. The contract is for 5 years, on an 'as and when' required basis, focusing on creep damage analysis of boiler tubes in superheater and reheater sections. The contractor will conduct ultrasonic testing (UT) and metallurgical sampling to estimate remaining tube life, supporting Eskom's target of 85% Energy Availability Factor (EAF).
UNPRIC~1.PDF
ESKOM is seeking a contractor for the hiring, installation, and operation of mobile elevated and suspended work platforms at Kusile Power Station, on an 'as and when' required basis for a 5-year period. The tender includes provision of site facilities (containers, ablutions), personnel (supervisors, operators, safety officers, drivers), training, and tools/equipment. Pricing is structured into three items: Preliminaries and General, Resources (day/night shifts, overtime, Sundays/public holidays), and Tools and Equipment.
Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf
Eskom is seeking a contractor for the hiring, installation, and operation of mobile elevated and suspended work platforms for maintenance and outages on an 'as and when' required basis for a 5-year period. The tender is open and requires compliance with Eskom's Standard Conditions of Tender, including strict submission deadlines, mandatory returnables, and adherence to South African procurement regulations.
SUSPEN~2.PDF
This tender from Eskom's Kusile Power Station seeks contractors for the hiring, installation, and operation of mobile elevated and suspended work platforms for maintenance and outages, on an 'as and when' required basis over a 5-year period. The document is an environmental specification outlining mandatory environmental compliance, including waste management, spill response, hazardous substance handling, and adherence to Eskom's environmental policies and South African legislation.
C2 TSC3 Pricing Data Option A.doc
This tender by Eskom is for the hiring, installation, and operation of mobile elevated and suspended work platforms for maintenance and outages at Kusile Power Station, on an 'as and when' required basis for a period of 5 years. The contract is a Term Service Contract (TSC3) with Option A (priced contract), where the price list includes lump sum items and rates for quantities of work. The tender includes detailed pricing data for resources, equipment, and consumables, and requires a plan linking operations to price list items.
Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf
ESKOM is seeking a contractor for the hiring, installation, and operation of mobile elevated and suspended work platforms on an as-needed basis for maintenance and outages over a 5-year period in the North West province. The tender includes a mandatory SBD4 bidder's disclosure form to ensure transparency and prevent conflicts of interest.
KUS-20260255 Kusile Power Station Tender Technical Evaluation Strategy.pdf
Eskom's Kusile Power Station is seeking a service provider for the hiring, installation, and operation of mobile elevated and suspended work platforms for maintenance and outages over a 5-year period. The tender includes mandatory and qualitative evaluation criteria, with a technical threshold of 70%.
Scope Of work.pdf
Eskom's Kusile Power Station is outsourcing the hiring, installation, and operation of mobile elevated and suspended work platforms for maintenance and outages on an as-needed basis over a 5-year contract. The scope includes supplying, erecting, dismantling, inspecting, testing, operating, and maintaining suspended platforms and mobile elevating work platforms to access high areas (e.g., boilers, smokestacks, FGD absorbers) for tasks like tube replacement, cleaning, welding, and structural repairs. The contractor must provide 24/7 support during outages, comply with strict safety and quality standards, and align with Eskom's outage philosophy (targeting 92% UCF).
Annex-e_Local Content Declaration-Supporting Schedule to Annex C.pdf
C1 2a TSC3 Data by Employer.rev (003).doc
Eskom is tendering for the hiring, installation, and operation of mobile elevated and suspended work platforms for maintenance and outages at Kusile Power Station, on an 'as and when' required basis for a 5-year period. The contract is a priced contract with a price list, using the TSC3 conditions of contract, and includes provisions for price adjustment, performance bond, low service damages, and task orders.
C1 1 TSC3 Offer Acceptance.doc
This tender from Eskom (Kusile Power Station) seeks a contractor to provide hiring, installation, and operation of mobile elevated and suspended work platforms for maintenance and outages on an 'as and when' required basis for a period of 5 years. The contract will be governed by the conditions in the tender documents, with pricing to be submitted in the Form of Offer and Acceptance.
To download these documents and access AI-powered analysis, visit the main tender page.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Matched by category & region
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubMedian Estimate
R 4 124 010
Range
Based on 4 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Description
Source: C1 2a TSC3 Data by Employer.rev (003).docThe service involves the hiring, installation, and operation of mobile elevated and suspended work platforms for maintenance and outages at Kusile Power Station, on an 'as and when' required basis for a period of 5 years. The contract is a priced contract with a price list, and includes various secondary options such as price adjustment, performance bond, low service damages, limitation of liability, and task orders. Additional conditions (Z1 to Z14) apply, covering cession, joint ventures, B-BBEE changes, confidentiality, health and safety, environmental compliance, tax invoices, compensation events, limitation of liability, termination, ethics, insurance, nuclear liability, and asbestos management.
Important Dates
Source: C1 2a TSC3 Data by Employer.rev (003).doc (unknown)Contact Information
Source: C1 2a TSC3 Data by Employer.rev (003).doc (unknown)Submission Guidelines
Source: C1 2a TSC3 Data by Employer.rev (003).doc (unknown)Evaluation Criteria
Source: C1 2a TSC3 Data by Employer.rev (003).doc (unknown)Technical Specifications
Source: C1 2a TSC3 Data by Employer.rev (003).doc (unknown)Financial Requirements
Source: C1 2a TSC3 Data by Employer.rev (003).doc (unknown)Compliance Requirements
Source: C1 2a TSC3 Data by Employer.rev (003).doc (unknown)Important Dates
Source: SUPPLI~1.PDF (unknown)Contact Information
Source: SUPPLI~1.PDF (unknown)Submission Guidelines
Source: SUPPLI~1.PDF (unknown)Evaluation Criteria
Source: SUPPLI~1.PDF (unknown)Technical Specifications
Source: SUPPLI~1.PDF (unknown)Methodology
Source: SUPPLI~1.PDFPricing Schedule
Source: SUPPLI~1.PDFFinancial Requirements
Source: SUPPLI~1.PDF (unknown)Compliance Requirements
Source: SUPPLI~1.PDF (unknown)B-BBEE Requirements
Source: SUPPLI~1.PDF (unknown)Health & Safety
Source: SUPPLI~1.PDFSpecial Conditions
Source: SUPPLI~1.PDF (unknown)Section
Source: SUPPLI~1.PDFCompliance Requirements
Source: Annex-c_Local content Declaration-Summary Schedule.pdf (unknown)Insufficient searchable text - AI extraction recommended
Description
Source: C0 TSC3 Contract cover pages_.docHiring, installation and operation of mobile elevated and suspended work platforms for Maintenance
Evaluation Criteria
Source: C0 TSC3 Contract cover pages_.doc (unknown)Specific eligibility criteria are not detailed in the provided excerpt, but typical requirements for Eskom tenders include: being a registered legal entity, having relevant experience in similar work, compliance with South African tax and B-BBEE requirements, and possibly having necessary licenses or certifications for operating elevated work platforms. The final criteria will be in the full tender document.
Compliance Requirements
Source: C0 TSC3 Contract cover pages_.doc (unknown)No specific requirements found
Submission Guidelines
Source: Annex-d_Imports Declaration-Supporting schedule to Annex C.pdf (unknown)Returnable Documents:
Description
Source: SUPPLI~2.PDFThe Fourth Schedule to the Income Tax Act (“the Act”) requires that Employees' Tax must be
withheld from "remuneration" paid by an "Employer" to an "Employee". This tool is intended to establish
whether an Individual, Close Corporation, Company or Trust should be classified as an Independent
Contractor, Personal Service Provider, Labour Broker or a Dependent Contractor, and the tax
consequences of such classification.
This Pack is applicable ONLY to Contractors who supply Eskom Holdings SOC Ltd (“Eskom”) and its
subsidiaries with services or Individual Contractors providing Eskom with labour.
The Contractor or its duly authorised representative must declare that all questions have been answered
truthfully.
Answering the questions will direct you to your next step.
Please note:
This Pack is based on tax legislation for the 2022/2023 tax year and is subject to change.
In the questions, any references to "you" refers to the Contractor.
In the questions, the term Contractor is used interchangeably with Individual/CC/Company/Trust.
Definitions as per the Income Tax Act are included in Appendix 10.
Any reference to “Eskom” refers to Eskom Holdings SOC Ltd and its subsidiaries:
Eskom Rotek Industries SOC Ltd
Eskom Enterprises SOC (Pty) Ltd
Escap SOC (Pty) Ltd
Eskom Finance Company SOC (Pty) Ltd
Eskom Foundation NPC
National Transmission Company SA
The Pack is based on legislation and case law applicable to the 2022/2023 tax year. We therefore
recommend that, if it is used outside of this period, you should first consult with your representative in
Eskom to refer it to Eskom’s Corporate Tax Department in Megawatt Park.
When you return the completed Pack; i.e. the signed summary sheet and signed affidavits to Eskom,
please copy Group Tax on Email address: [email protected]
The Contractor or its duly Authorised Representative acknowledges and accepts that:
ease of reading.
this Pack;
Disclaimer
Applicable to the 2022/2023 Tax Years
Eskom accepts no liability whatsoever for any loss or damages whatsoever and howsoever incurred, or
suffered, resulting, or arising, from the use of this Pack.
Contractor type
Supplier category
Please complete the following questionnaire for:
Company/Close Corporation/Trusts - EVALUATION PACK A on .
Individuals - EVALUATION PACK B on .
Applicable to the 2022/2023 Tax Years
Evaluation pack a
(To determine whether a Company, Close Corporation (CC) or Trust is a Personal
Service Provider)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for a company or close corporation or
Trust
Contractor’s Name* Vendor No.
Duly Authorised Representative Name Representative Surname
Capacity Representative ID No.*
Representative Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
CO/CC/Trust Registration No.* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box/Private Bag/Street Address
P O Box/Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number Bank Name
Branch Name Branch Number
Name of Account Holder Account Type (Delete where not applicable)
Current/ Savings/ Transmission/Credit Card/Bond
Account
Account Holder Relationship*
i.e. own, joint or 3rd party Own/Joint/3rd Party
Applicable to the 2022/2023 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
The term “You” will refer to the Company/CC/Trust in this Questionnaire.
Question 1(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a resident).
If the answer is Yes, go to Question 2(i).
If the answer is No:
Eskom to refer it to Eskom Group Tax Department in Megawatt Park.
Question 2(i)
Do you employ 3 (three) or more persons (excluding shareholders or members or
beneficiaries of the Company/CC/Trust)?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are these employees employed:
If the answer is Yes, go to Question 2(iii).
If the answer is No, go to Question 3(i).
Question 2(iii)
Are the above 3 employees connected to the shareholders or the members or the
beneficiaries of the Company/CC/Trust?
If the answer is Yes, go to Question 3(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the Evaluation Pack.
Applicable to the 2022/2023 Tax Years
Question 3(i)
Will/are any person who is a Connected person in relation to the Company/CC/Trust
render services personally to Eskom on behalf of the Company/CC/Trust? (Refer to
Appendix 10 for the definition of a Connected person).
If the answer is Yes, go to Question 4(i).
If the answer is No:
from your payments.
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Question 4(i)
During the current year of assessment:
received either directly or indirectly, from:
the definition of an Associated institution)
If the answer is Yes:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Question 5(i)
Must your duties be performed /are your duties performed mainly (more than 50%) at
the premises of Eskom,
And
Will you be subject /are you subject to Eskom’s control or supervision as to the
manner in which your duties are to be performed?
If the answer is Yes to BOTH questions:
Corporation/Trust” at the end of the evaluation Pack.
If the answer is No:
from your payments.
Applicable to the 2022/2023 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or
certain agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due if
and when a specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff,
raw materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you/will you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally or will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Question 6(vi)
Are/will you or the person rendering the service be obliged to be present and perform
the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom’s business or will Eskom’s business be critical to your financial/economic
survival?
Question 6(viii)
Does/will your position form part of Eskom’s organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status.
Applicable to the 2022/2023 Tax Years
To establish your tax status, you need to summarise the “Yes” and “No” as
answered on Question 6(i) to 6(xi) in the column below:
Question Yes No
6(i) Independent PSP
6(ii) PSP Independent
6(iii) PSP Independent
6(iv) Independent PSP
6(v) Independent PSP
6(vi) PSP Independent
6(vii) PSP Independent
6(viii) PSP Independent
6(ix) PSP Independent
6(x) PSP Independent
6(xi) PSP Independent
Decision
Independent
Psp
If you have answered “PSP” to any of the following questions 6 (i), 6(iii), 6(v), 6(vi),
6(ix);
or
If you have answered more than 50% “PSP” to questions 6(ii), 6(iv), 6(vii), 6(viii),
6(x), 6(xi):
and will be coded as 3601 on your IRP5 certificate.
Corporation/Trust” at the end of the evaluation Pack.
Alternatively:
If you have already signed Appendix 7 on Questions 4 or 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 4 or 5:
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2022/2023 Tax Years
Summary for ID No. Vendor No:
Company/Close Corporation/Trust Summary
Please sign
he
following
Questions Answer Appendix
(Appendices
)
1(i) Are you a Resident of the Republic of South Africa in terms of the Income
Tax Act?
2(i) Do you employ 3 (three) or more persons (excluding shareholders or
members or beneficiaries of the Company/CC/Trust and connected
persons in relation to the shareholder or member or beneficiaries)?
2(i ) Are these employees employed on a full time basis and are they engaged
in the business of the Company/CC/Trust?
2(iii) Are the above 3 employees connected to the shareholders or the members
or beneficiaries of the Company/CC/Trust?
3(i) Will/are any person who is a Connected person in relation to the
Company/CC/Trust render services personally to Eskom on behalf of the
Compa y/CC Trust?
4(i) During the current year of assessment will more than 80% of your income
or is it likely that more than 80% of your income will consist of amounts
received either directly or indirectly from any one client, or an Associated
institution in relation to that client?
5(i) Must your duties be performed / are your duties performed mainly (more
than 50%) at the premises of Eskom AND will you be /are you subject to
Eskom’s control or supervision as to the manner in which your duties are
performed or to the hours of work?
6( ) Do/will the payments by Eskom for services payable with reference to
output or certain agreed results, e.g. payment (be a fixed fee or an hourly
rate) be only due if and when a specific deliverable has been completed?
6(ii) Does/Will Eskom have the contractual right to control the tools or
equipment, staff, raw materials, routines, patents or technology used in the
provision of the services?
6(iii) Are you/will you prohibited from rendering services to any other
employers/clients during the period of service to Eskom?
6(iv) Do/will you have the right to sub-contract work?
6(v) Are you personally or will you personally be at risk for the quality of the
work done or to be done (risk for poor quality; time over-runs, project not
producing income)?
6(vi) Are/will you or the person rendering the service be obliged to be present
and perform the work at Eskom regardless of whether work is available or
not?
6(vii) Is Eskom’s business or will Eskom’s business be critical to your
financial/economic survival?
6(viii) Does/will your position form part of Eskom’s organisational structure?
6(ix) Does/will Eskom provide you with any of the following:
Pension fund / Provident fund / Retirement Annuity Fund; medical aid,
leave of any nature, salary increases, bonuses or any allowances.
6(x) Does/will Eskom provide you with an office?
6(xi) Does/will Eskom provide you with any equipment, tools, stationery and
material?
Tax Status
Particulars of person acting as representative of the company/close
Corporation/trust
I, the undersigned, confirm that the information provided above is accurate, and that the Company/CC/Trust will,
while contracted to Eskom, inform Eskom of any changes that take place pertaining to the information provided
above. Eskom shall be entitled to withhold from any payments to be made to the Company/CC/Trust, any taxes,
interest and penalties that it may be required to pay to SARS as a result of the above information being inaccurate.
Representative's Full Names Capacity Contact No.
Signature Date
Applicable to the 2022/2023 Tax Years
Evaluation pack b
(To determine whether an Individual is a Dependent Contractor)
Fields marked with an Asterisk (*) must be completed
Contractor’s details for an individual*
Trading Name* Vendor No.
First Names* Initials*
Surname* ID Number*
Passport No. (if no RSA ID) Country of Passport Issue
VAT Registration No. Income Tax Registration No.*
Date of Birth* E-Mail Address
Telephone Number* Fax Number
Contractor’s Physical Business Address*
Unit No
Complex Name
Street Number
Street Name
Suburb
City/Town
Postal Code
Contractor’s Postal Business Address*
Same as above (Mark with an X)
Address TYPE (Delete where not applicable) P O Box/Private Bag/Street Address
P O Box/Private Bag/Street NUMBER
Street Name
Suburb
Town
Postal Code
Contractor’s Bank Details*
Account Number Bank Name
Branch Name Branch Number
Name of Account Holder Account Type (Delete where not applicable)
Current/ Savings/ Transmission/Credit Card/Bond
Account
Account Holder Relationship*
i.e. own, joint or 3rd party Own/Joint/3rd Party
Applicable to the 2022/2023 Tax Years
Please answer the following questions by marking the appropriate column with an
"X".
Question 1(i)
Do/will you provide Eskom with a service or people?
If the answer is “Service”:
PAYE will be withheld from your payments.
If the answer is “People”, go to Question 2(i).
Question 2(i)
Do you provide Eskom with People and will these people be paid by you?
If the answer is Yes, go to Question 2(ii).
If the answer is No, go to Question 3(i).
Question 2(ii)
Are you in possession of an IRP30 exemption certificate which is valid for the period
under review?
If the answer is Yes:
from your payments.
provided, PAYE will be withheld from your payments until such time
the IRP30 certificate is provided.
Pack.
If the answer is No:
IRP30 certificate is provided.
Pack.
Question 3(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a Resident).
If the answer is Yes, go to Question 4(i).
If the answer is No:
Eskom to refer it to Eskom Group Tax Department in Megawatt.
Applicable to the 2022/2023 Tax Years
Question 4(i)
Do you employ:
If the answer is Yes, go to Question 4(ii).
If the answer is No, go to Question 5(i).
Question 4(ii)
Are these employees employed:
If the answer is Yes, go to Question 4(iii).
If the answer is No, go to Question 5(i).
Question 4(iii)
Are any of these employees Connected persons in respect of the Individual, e.g.
spouse, parent, adoptive parent, child, grandparent, cousin, etc.? (Refer to
Appendix 10 for the definition of Connected person).
If the answer is Yes, go to Question 5(i).
If the answer is No:
from your payments.
withheld from your payments.
Pack.
Question 5(i)
Must your duties be performed mainly (i.e. more than 50%) at premises of Eskom?
If the answer is Yes, go to Question 5(ii).
If the answer is No, go to Question 5(ii).
Question 5(ii)
Will you be /are you subject to Eskom’s control or supervision as to the manner in
which your duties are to be performed or as to the hours of work?
If the answers in both Questions 5(1) and 5(ii) are Yes:
If the answer is No:
from your payments.
Applicable to the 2022/2023 Tax Years
Question 6(i)
Do/will the payments by Eskom for services payable with reference to output or
certain agreed results, e.g. payment (be it a fixed fee or an hourly rate) be only due
if and when a specific deliverable has been completed?
Question 6(ii)
Does/Will Eskom have the contractual right to control the tools or equipment, staff,
raw materials, routines, patents or technology used in the provision of the services?
Question 6(iii)
Are you/will you prohibited from rendering services to any other employers/clients
during the period of service to Eskom?
Question 6(iv)
Do/will you have the right to sub-contract work?
Question 6(v)
Are you personally / will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Question 6(vi)
Are/will you or the person rendering the service be obliged to be present and
perform the work at Eskom regardless of whether work is available or not?
Question 6(vii)
Is Eskom’s business or will Eskom’s business be critical to your financial/economic
survival?
Question 6(viii)
Does/will your position form part of Eskom’s organisational structure?
Question 6(ix)
Does/will Eskom provide you with any of the following:
Question 6(x)
Does/will Eskom provide you with an office?
Question 6(xi)
Does/will Eskom provide you with any equipment, tools, stationery and material?
Please go to the next section to establish your tax status.
Applicable to the 2022/2023 Tax Years
To establish your tax status, you need to summarise the “Yes” and “No” as
answered on Question 6(i) to 6(xi) in the column below:
Question Yes No
6(i) Independent Employee
6(ii) Employee Independent
6(iii) Employee Independent
6(iv) Independent Employee
6(v) Independent Employee
6(vi) Employee Independent
6(vii) Employee Independent
6(viii) Employee Independent
6(ix) Employee Independent
6(x) Employee Independent
6(xi) Employee Independent
Decision
Independent
Psp
If you have answered “Employee” to any of the following questions 6 (i), 6(iii), 6(v),
6(vi), 6(ix);
or
If you have answered more than 50% “Employee” to questions 6(ii), 6(iv), 6(vii),
6(viii), 6(x), 6(xi):
Alternatively:
If you have already signed Appendix 7 on Questions 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 5:
withheld from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2022/2023 Tax Years
Summary for ID No. Vendor No:
Company/Close Corporation/Trust Summary
Please si n
the following
Important Dates
Source: SUPPLI~2.PDF (unknown)The Pack applies from 1 March 2022 to 28 February 2023. No other dates specified.
Contact Information
Source: SUPPLI~2.PDF (unknown)Group Tax email: [email protected]
For queries outside the applicable period, consult your Eskom representative to refer to Eskom's Corporate Tax Department in Megawatt Park.
Submission Guidelines
Source: SUPPLI~2.PDF (unknown)Returnable documents: Complete the PAYE Questionnaire Pack (Evaluation Pack A for Companies/CCs/Trusts, Evaluation Pack B for Individuals).
Evaluation Criteria
Source: SUPPLI~2.PDF (unknown)Eligibility is determined by tax classification questionnaire:
Technical Specifications
Source: SUPPLI~2.PDF (unknown)Purpose: Determine tax classification for PAYE withholding under the Fourth Schedule of the Income Tax Act.
Experience & Qualifications
Source: SUPPLI~2.PDF (unknown)The Company/CC/Trust undertakes to notify Eskom forthwith in writing should the statement in 3 above no longer be the case.
Pricing Schedule
Source: SUPPLI~2.PDFthe non-deduction is 07.
until such time that a valid IRP30 certificate is provided to Eskom.
Labour Broker Individual N/A X IRP5 / IT3(a) 3617 A
tax rates
Dependent Contractor Individual X X IRP5 / IT3(a) 3601 or “A” for
tax rates 3616 Individual
“E” for
Financial Requirements
Source: SUPPLI~2.PDF (unknown)PAYE withholding implications:
Compliance Requirements
Source: SUPPLI~2.PDF (unknown)No specific compliance requirements beyond tax classification questionnaire. Must be a resident of South Africa or sign Appendix 9 for non-residents. Must provide accurate information and notify Eskom of any changes.
Health & Safety
Source: SUPPLI~2.PDFCompany/close corporation/trust ..................................................................... 11
Evaluation pack b....................................................................................................................... 12
Contractor’s details for an individual* ..................................................................... 12
Question 1(i) .............................................................................................................................. 13
Question 2(i) .............................................................................................................................. 13
Question 2(ii) ............................................................................................................................. 13
Question 3(i) .............................................................................................................................. 13
Question 4(i) .............................................................................................................................. 14
Question 4(ii) ............................................................................................................................. 14
Question 4(iii) ............................................................................................................................ 14
Question 5(i) .............................................................................................................................. 14
Question 5(ii) ............................................................................................................................. 14
Question 6(i) .............................................................................................................................. 15
Question 6(ii) ............................................................................................................................. 15
Question 6(iii) ............................................................................................................................ 15
Question 6(iv) ............................................................................................................................ 15
Question 6(v) ............................................................................................................................. 15
Question 6(vi) ............................................................................................................................ 15
Question 6(vii) ........................................................................................................................... 15
Question 6(viii)........................................................................................................................... 15
Question 6(ix) ............................................................................................................................ 15
Question 6(x) ............................................................................................................................. 15
Question 6(xi) ............................................................................................................................ 15
Particulars of individual .............................................................................................. 17
Applicable to the 2022/2023 Tax Years
Appendix 1 ....................................................................................................................................... 18
Three or more full - time employees who are not connected persons . 18
Appendix 2 ....................................................................................................................................... 19
ESKOM ...................................................................................................................................... 19
Appendix 3 ....................................................................................................................................... 20
And/or shall not be controlled or supervised by ESKOM ............................. 20
Appendix 4 ....................................................................................................................................... 21
Affidavit confirming that not more than eighty percent (80 %) of income
Is or is likely to be received from any one client ............................................. 21
Appendix 5 ....................................................................................................................................... 22
Opposed to people ........................................................................................................... 22
Appendix 6 ....................................................................................................................................... 23
Declaration by ........................................................................................................................ 23
That the contractor is a labour broker ................................................................... 23
Appendix 7 ....................................................................................................................................... 24
Declaration by ........................................................................................................................ 24
Provider ................................................................................................................................ 24
Appendix 8 ....................................................................................................................................... 25
Declaration by ........................................................................................................................ 25
That the contractor is an independent supplier or contractor .................. 25
Appendix 9 ....................................................................................................................................... 26
Declaration by ........................................................................................................................ 26
That the contractor is a non-resident of the republic of south africa .... 26
Appendix 10 ..................................................................................................................................... 27
Definitions as per the income tax act, NO. , as amended. ................... 27
“Connected Person” .................................................................................................................. 27
"Associated Institution", in relation to any single employer, ...................................................... 28
"Labour Broker" ......................................................................................................................... 28
"Personal Service Provider” ...................................................................................................... 28
"Remuneration" ......................................................................................................................... 28
“Resident” .................................................................................................................................. 29
Applicable to the 2022/2023 Tax Years
Introduction
The Fourth Schedule to the Income Tax Act (“the Act”) requires that Employees' Tax must be
withheld from "remuneration" paid by an "Employer" to an "Employee". This tool is intended to establish
whether an Individual, Close Corporation, Company or Trust should be classified as an Independent
Definitions as per the Income Tax Act are included in Appendix 10.
Any reference to “Eskom” refers to Eskom Holdings SOC Ltd and its subsidiaries:
Eskom Rotek Industries SOC Ltd
Eskom Enterprises SOC (Pty) Ltd
Escap SOC (Pty) Ltd
Eskom Finance Company SOC (Pty) Ltd
Eskom Foundation NPC
National Transmission Company SA
The Pack is based on legislation and case law applicable to the 2022/2023 tax year. We therefore
recommend that, if it is used outside of this period, you should first consult with your representative in
Eskom to refer it to Eskom’s Corporate Tax Department in Megawatt Park.
When you return the completed Pack; i.e. the signed summary sheet and signed affidavits to Eskom,
please copy Group Tax on Email address: [email protected]
ease of reading.
this Pack;
Question 1(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a resident).
If the answer is Yes, go to Question 2(i).
Sign Appendix 9. Submit The Pack to your contractor representative in
Sign Appendix 1. If the Affidavit is not signed, PAYE will be withheld
from your payments.
from your payments.
Corporation/Trust” at the end of the Evaluation Pack.
Applicable to the 2022/2023 Tax Years
render services personally to Eskom on behalf of the Company/CC/Trust? (Refer to
Appendix 10 for the definition of a Connected person).
If the answer is Yes, go to Question 4(i).
from your payments.
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Question 4(i)
Corporation/Trust” at the end of the evaluation Pack.
from your payments.
Go to Question 5(i).
Sign Appendix 7. PAYE will be withheld from your payments.
Go to Question 6(i) to determine the correct disclosure code on the IRP5.
Sign “Particulars of person acting as representative of the Company/Close
Corporation/Trust” at the end of the evaluation Pack.
from your payments.
Applicable to the 2022/2023 Tax Years
Psp
If you have answered “PSP” to any of the following questions 6 (i), 6(iii), 6(v), 6(vi),
6(ix);
or
If you have answered more than 50% “PSP” to questions 6(ii), 6(iv), 6(vii), 6(viii),
6(x), 6(xi):
and will be coded as 3601 on your IRP5 certificate.
Corporation/Trust” at the end of the evaluation Pack.
If you have already signed Appendix 7 on Questions 4 or 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 4 or 5:
from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2022/2023 Tax Years
(Appendices
)
1(i) Are you a Resident of the Republic of South Africa in terms of the Income
Tax Act?
2(i) Do you employ 3 (three) or more persons (excluding shareholders or
members or beneficiaries of the Company/CC/Trust and connected
persons in relation to the shareholder or member or beneficiaries)?
2(i ) Are these employees employed on a full time basis and are they engaged
in the business of the Company/CC/Trust?
2(iii) Are the above 3 employees connected to the shareholders or the members
or beneficiaries of the Company/CC/Trust?
3(i) Will/are any person who is a Connected person in relation to the
Question 1(i)
Do/will you provide Eskom with a service or people?
If the answer is “Service”:
Complete and sign Appendix 5 Affidavit. If the Affidavit is not signed,
Sign Appendix 6. If the Agreement is not signed, PAYE will be withheld
from your payments.
provided, PAYE will be withheld from your payments until such time
the IRP30 certificate is provided.
No further questions must be answered.
Sign the “Particulars of Individual” Section at the end of the Evaluation
Sign Appendix 6. PAYE will be withheld from your payments.
PAYE will be withheld from your payments until such time the valid
IRP30 certificate is provided.
Question 3(i)
Are you a Resident of the Republic of South Africa in terms of the Income Tax Act?
(Refer to Appendix 10 for the definition of a Resident).
If the answer is Yes, go to Question 4(i).
spouse, parent, adoptive parent, child, grandparent, cousin, etc.? (Refer to
Appendix 10 for the definition of Connected person).
If the answer is Yes, go to Question 5(i).
from your payments.
withheld from your payments.
Question 5(i)
Must your duties be performed mainly (i.e. more than 50%) at premises of Eskom?
If the answer is Yes, go to Question 5(ii).
If the answer is No, go to Question 5(ii).
Question 5(ii)
Will you be /are you subject to Eskom’s control or supervision as to the manner in
which your duties are to be performed or as to the hours of work?
If the answers in both Questions 5(1) and 5(ii) are Yes:
Sign Appendix 7. PAYE will be withheld from your payments.
Go to Question 6(i) to determine the correct disclosure code on the IRP5.
Sign the “Particulars of Individual” at the end of the Evaluation Pack.
Sign Appendix 3. If the Affidavit is not signed, PAYE will be withheld
from your payments.
Applicable to the 2022/2023 Tax Years
Psp
If you have answered “Employee” to any of the following questions 6 (i), 6(iii), 6(v),
6(vi), 6(ix);
or
If you have answered more than 50% “Employee” to questions 6(ii), 6(iv), 6(vii),
6(viii), 6(x), 6(xi):
If you have already signed Appendix 7 on Questions 5:
disclosed on the IRP5 for payments received.
If you have not signed Appendix 7 on Questions 5:
withheld from your payments.
Corporation/Trust” at the end of the evaluation Pack.
Applicable to the 2022/2023 Tax Years
Applicable to the 2022/2023 Tax Years
Appendix 1
Thus signed and sworn to before me at ______________on this day
Of __________20.
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2022/2023 Tax Years
Appendix 3
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2022/2023 Tax Years
Appendix 4
Affidavit confirming that not more than eighty percent (80 %) of
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2022/2023 Tax Years
Appendix 5
Thus signed and sworn to before me at ______________on this day
Of __________20.
Applicable to the 2022/2023 Tax Years
Appendix 6
Applicable to the 2022/2023 Tax Years
Appendix 7
Applicable to the 2022/2023 Tax Years
Appendix 8
Applicable to the 2022/2023 Tax Years
Appendix 9
Applicable to the 2022/2023 Tax Years
Appendix 10
rendering any such service, other than any employee who is a shareholder or member of the
company or trust or is a connected person in relation to such person;
"Remuneration"
means -
any amount of income which is paid or is payable to any person by way of any salary, leave pay, wage,
overtime pay, bonus, gratuity, commission, fee, emolument pension, superannuation allowance, retiring
allowance or stipend, whether in cash or otherwise and whether or not in respect of services rendered,
including-
a) any amount referred to in paragraph (a), (c), (cA),(d), (e), (eA) or (f) of the definition of "gross
income" in section one of this Act;
any amount required to be included in such person's gross income under paragraph (i) of that definition;
Applicable to the 2022/2023 Tax Years
bA) ...
but not including-
ii) any amount paid or payable in respect of services rendered or to be rendered by any person
(other than a person who is not a resident or an employee contemplated in paragraph (b), (c),
(d) (e) or (f)of the definition of "employee") in the course of any trade carried on by him
independently of the person by whom such amount is paid or payable and of the person to
whom such services have been or are to be rendered: Provided that for the purposes of this
paragraph a person shall not be deemed to carry on a trade independently as aforesaid if the
services are required to be performed mainly at the premises of the person by whom such
amount is paid or payable or of the person to whom such services were or are to be rendered
and the person who rendered or will render the services is subject to the control or supervision
of any other person as to the manner in which his or her duties are performed or to be
performed or as to his hours of work. Provided further that a person will be deemed to be
carrying on a trade independently as aforesaid if he throughout the year of assessment employs
three or more employees who are on a full time basis engaged in the business of such person
of rendering any such service, other than any employee who is a connected person in relation to
such person;
iii) ...
“Resident”
means any-
(a) natural person who is-
(i) ordinarily resident in the Republic; or
(ii) not at any time during the relevant year of assessment ordinarily resident in the Republic, if that
person was physically present in the Republic-
a) for a period or periods exceeding 91 days in aggregate during the relevant year of
assessment, as well as for a period or periods exceeding 91 days in aggregate during each
of the five years of assessment preceding such year of assessment; and
b) for a period or periods exceeding 915 days in aggregate during those five preceding years
of assessment,
in which case that person will be a resident with effect from the first day of that relevant year of
assessment: Provided that-
(A) a day shall include a part of a day, but shall not include any day that a person is in transit
through the Republic between two places outside the Republic and that person does not
formally enter the Republic through a “port of entry” as contemplated in section 9 (1) of the
Immigration Act, 2002 (Act No. ), or at any other place as may be permitted by
the Director General of the Department of Home Affairs or the Minister of Home Affairs in
terms of that Act; and
(B) where a person who is a resident in terms of this subparagraph is physically outside the
Republic for a continuous period of at least 330 full days immediately after the day on
which such person ceases to be physically present in the Republic, such person shall be
deemed not to have been a resident from the day on which such person so ceased to be
physically present in the Republic; or
(b) person (other than a natural person) which is incorporated, established or formed in the Republic or
which has its place of effective management in the Republic,
but does not include any person who is deemed to be exclusively a resident of another country for
purposes of the application of any agreement entered into between the governments of the Republic
and that other country for the avoidance of double taxation;
Applicable to the 2022/2023 Tax Years
Contractual Terms
Source: SUPPLI~2.PDF (unknown)The Individual/Company/CC/Trust undertakes to notify Eskom Holdings SOC Ltd or its subsidiaries (hereinafter referred to as "Eskom") forthwith in writing should the status of the Individual/Company/CC/Trust change.
Section
Source: SUPPLI~2.PDFEvaluation pack a......................................................................................................................... 6
Are you personally or will you personally be at risk for the quality of the work done or
to be done (risk for poor quality; time over-runs, project not producing income)?
Corporation/Trust” at the end of the evaluation Pack.
Evaluation Criteria
Source: C1 2b TSC3 Data by Contractor.doc (unknown)Specific eligibility criteria are not detailed in the provided content, but typical Eskom tenders require: valid tax clearance, B-BBEE compliance, and relevant experience in similar work. Contractors must be registered on Eskom's supplier database and meet safety and technical competency requirements.
Technical Specifications
Source: C1 2b TSC3 Data by Contractor.doc (unknown)Description
Source: C1 1 TSC3 Offer Acceptance.docThe Employer, identified in the Acceptance signature block, has solicited offers to enter into a contract for the procurement of: Provision of Hiring, installation and operation of mobile elevated and suspended work platforms for Maintenance and Outages on an 'as and when' required basis for a period of 5 years.
Contact Information
Source: C1 1 TSC3 Offer Acceptance.doc (unknown)Submission Guidelines
Source: C1 1 TSC3 Offer Acceptance.doc (unknown)Evaluation Criteria
Source: C1 1 TSC3 Offer Acceptance.doc (unknown)Technical Specifications
Source: C1 1 TSC3 Offer Acceptance.doc (unknown)Financial Requirements
Source: C1 1 TSC3 Offer Acceptance.doc (unknown)Compliance Requirements
Source: C1 1 TSC3 Offer Acceptance.doc (unknown)Description
Source: KUS-20260255 Kusile Power Station Tender Technical Evaluation Strategy.pdfContact Information
Source: KUS-20260255 Kusile Power Station Tender Technical Evaluation Strategy.pdf (TENDER)Supply Chain Management (department only; no specific contact details provided in document).
Submission Guidelines
Source: KUS-20260255 Kusile Power Station Tender Technical Evaluation Strategy.pdf (TENDER)Evaluation Criteria
Source: KUS-20260255 Kusile Power Station Tender Technical Evaluation Strategy.pdf (TENDER)Technical Specifications
Source: KUS-20260255 Kusile Power Station Tender Technical Evaluation Strategy.pdf (TENDER)Experience & Qualifications
Source: KUS-20260255 Kusile Power Station Tender Technical Evaluation Strategy.pdfQuality Management
Source: KUS-20260255 Kusile Power Station Tender Technical Evaluation Strategy.pdfCompliance Requirements
Source: KUS-20260255 Kusile Power Station Tender Technical Evaluation Strategy.pdf (TENDER)Section
Source: KUS-20260255 Kusile Power Station Tender Technical Evaluation Strategy.pdfDescription
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdfThe tender is for the hiring, installation, and operation of mobile elevated and suspended work platforms for maintenance and outages on an 'as and when' required basis for a period of 5 years. The document provided is SBD4, which is a disclosure form, and does not contain further technical description.
Contact Information
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)Department: Supply Chain Management. No specific contact name, email, phone, or address provided in the document.
Submission Guidelines
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)Complete and submit SBD4 (Bidder's Disclosure) as a returnable document. Ensure all declarations are true and complete; false declarations may lead to disqualification or legal action. Bidders listed on the Register for Tender Defaulters or the List of Restricted Suppliers will be automatically disqualified.
Returnable Documents
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)SBD4 (Bidder's Disclosure) must be completed and submitted. It requires declarations on: (1) whether the bidder or any directors/trustees/shareholders/members/partners or controlling persons are employed by the state; (2) any relationship with persons employed by the procuring institution; (3) any interest in other related enterprises. The bidder must certify that the information is true and complete, that the bid was arrived at independently, and that no collusive arrangements were made. False declarations may lead to disqualification or legal action.
Evaluation Criteria
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)Bidders must not be listed on the Register for Tender Defaulters or the List of Restricted Suppliers. They must not have any undisclosed conflicts of interest, including employment by the state (unless declared) or relationships with procuring institution staff. They must comply with all declarations in SBD4 and be capable of providing mobile elevated and suspended work platforms for maintenance and outages.
Technical Specifications
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)The document does not contain technical specifications for the work platforms. The tender title and description indicate hiring, installation, and operation of mobile elevated and suspended work platforms for maintenance and outages on an 'as and when' required basis for 5 years.
Compliance Requirements
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdf (TENDER)Complete SBD4 declaration. Disclose any employment by the state, relationships with procuring institution staff, and interests in related enterprises. Bidders must not be listed on the Register for Tender Defaulters or the List of Restricted Suppliers. Bidders must certify that they have not engaged in collusive bidding or undisclosed communication with competitors.
Section
Source: Standard_Bidding_Document_(SBD)_4_Bidders_Disclosure.pdfBidders must not have engaged in collusive bidding or undisclosed communication with competitors regarding quality, quantity, specifications, prices, or other bid terms. Bids that are suspicious will be reported to the Competition Commission and may lead to penalties or restrictions.
Description
Source: Scope Of work.pdfThe tender is for the hiring, installation, and operation of mobile elevated and suspended work platforms for maintenance and outages at Kusile Power Station, on an as-and-when-required basis for a period of 5 years. The station aims for 92% UCF, 6% PCLF, 2% UCLF. The scope includes supplying, erecting, dismantling, inspecting, testing, operating, maintaining, and replacing suspended platforms, mobile elevating work platforms, steel cabling/ropes, motor drives, and back-up drives. Access is needed for boiler and smokestack maintenance, tube replacement, cleaning, welding, structural repairs, FGD absorber access, burner nest inspections, and installation/removal of platforms. Exclusions: scaffolding, insulation, condition monitoring, electrical, C&I, lubrication.
Submission Guidelines
Source: Scope Of work.pdf (unknown)Returnable documents: Not specified in the provided document. Ensure all required forms and returnables are submitted as per the tender advertisement.
Evaluation Criteria
Source: Scope Of work.pdf (unknown)Eligibility criteria include: being a suitably qualified, experienced, and well-established contractor; ISO 9001:2015 certification; compliance with OHS Act and relevant SANS standards; having responsible persons (in terms of PSR) and authorised supervisors; personnel must be fluent in English and have Working at Heights and Confined Spaces training; proof of qualifications and competency must be provided on request; contractor must be able to provide 24/7 coverage and have the capacity to supply all necessary equipment and personnel.
Technical Specifications
Source: Scope Of work.pdf (unknown)Scope of Work: Hiring, installation, and operation of mobile elevated and suspended work platforms for maintenance and outages at Kusile Power Station, on an as-and-when-required basis for 5 years.
Standards: ISO 9001, OHS Act (PER 41256:2017), SANS 347, 39-71, OSHAS 18001, SANS 1700, SANS 10295, SANS 10375, SANS 18893, SANS 10148, SANS 2972, SANS 500, SANS 71.
Contractor responsibilities: comply with SHEQ standards, ISO 9001:2015, reinstate removed platforms/gratings/handrails, provide resources, approved quality plans and method statements, ensure KKS labelling integrity, have responsible persons and authorised supervisors, provide equipment/tools, final report within 30 working days, comply with Eskom vehicle standards, provide 24/7 on-site representation (shifts 07h00-19h00, 19h00-07h00), submit daily updated program, use Primavera or MS Project, attend all meetings, provide own consumables/tools/materials, comply with Outage Process Control Manual, provide recommendations for T-18-month scope.
Methodology
Source: Scope Of work.pdfProject implementation: Contractor to supply an outage execution plan per outage using Primavera P6 or agreed software, including site establishment, activities, resource-loaded manpower plan, organogram, skills required and associated cost per skill.
Manpower: Number of staff decided by contractor and approved by Employer; all staff fluent in English; proof of qualifications on request; personnel operating platforms must be trained per NQF, registered with IWH PB as Temporary Suspended Platform Erection Technician or Supervisor; Employer can require removal of incompetent personnel; supervision by trained and competent personnel; ensure proper behaviour and high morale.
Experience & Qualifications
Source: Scope Of work.pdf (unknown)Manpower requirements: Contractor to decide number of staff and submit for approval. All staff must be fluent in English. Proof of qualifications on request. Personnel operating mobile elevated work platforms and suspended powered platforms must be trained per NQF, registered as Professional Practitioner with Institute for Work at Heights Professional Body (IWH PB), as Temporary Suspended Platform Erection Technician or Supervisor. All staff must have Working at Heights and Confined Spaces training. Employer may object to and require removal of incompetent or negligent personnel.
Quality Management
Source: Scope Of work.pdfQuality standards: ISO 9001, OHSAS 18001, SANS 347, 39-71, and other listed SANS standards.
Quality control: Contractor must ensure all equipment calibrated, statutory tests available, equipment individually identified, personnel produce medicals and attend induction, adhere to all quality references and standards, and use Employer's quality documentation management system.
Approved quality plans and method statements required for assigned scope.
Compliance Requirements
Source: Scope Of work.pdf (unknown)No specific compliance requirements found in the document. However, the following are implied: ISO 9001:2015 certification, compliance with OHS Act and relevant SANS standards, responsible persons in terms of PSR, authorised supervisors, personnel trained in Working at Heights and Confined Spaces, and proof of qualifications on request.
Health & Safety
Source: Scope Of work.pdfHealth and safety requirements:
Contractual Terms
Source: Scope Of work.pdf (unknown)Contract type: NEC3 Term Service Contract (TSC).
Employer responsibilities: Provide updated outage plan, issue SOW in time, ensure contractor personnel trained in Eskom Plant Safety regulations and authorised for permits, inform contractor of schedule changes, carry out gas/environmental tests, commit to retention of critical skills, cost reduction, health & environment safety, and transfer of operational experience.
Contractor responsibilities: Comply with SHEQ standards, ISO 9001:2015, reinstate removed platforms/gratings/handrails, provide resources, approved quality plans and method statements, ensure KKS labelling integrity, have responsible persons and authorised supervisors, provide equipment/tools, final report within 30 working days, comply with Eskom vehicle standards, provide 24/7 on-site representation, submit daily updated program, use Primavera or MS Project, attend all meetings, provide own consumables/tools/materials, comply with Outage Process Control Manual, provide recommendations for T-18-month scope.
Re-commissioning: N/A.
Management and reporting: Reports agreed during negotiation; contractor represented at all outage and safety meetings; ad-hoc meetings as required.
Communication: All correspondence to include Kusile Power Station, contract number, description, subject, employer/contractor contact details, date; numbered sequentially with prefix; communicate via telephone and writing.
Process monitoring: Agreed per Purchase Order and according to Outage Process Control Manuals.
Description
Source: SUSPEN~2.PDFThis document is the Environmental Specification for the Kusile Power Station project: Hiring, installation and operation of mobile elevated and suspended work platforms for Maintenance and Outages. It applies to all contractors, partners, and suppliers working at Kusile Power Station. The purpose is to ensure compliance with environmental requirements during procurement and operation. The specification is effective from the date of signatures and references various normative and informative documents, including ISO 14001, NEMA, and Eskom's SHEQ policy.
Contact Information
Source: SUSPEN~2.PDF (unknown)Submission Guidelines
Source: SUSPEN~2.PDF (unknown)Evaluation Criteria
Source: SUSPEN~2.PDF (unknown)Technical Specifications
Source: SUSPEN~2.PDF (unknown)Quality Management
Source: SUSPEN~2.PDFQuality management is integrated with environmental management. The contractor must have a documented environmental management system, maintain an aspects/impacts register, conduct audits, and address non-conformances. Incident investigation and remediation are required. Good housekeeping and waste management are part of quality expectations.
Compliance Requirements
Source: SUSPEN~2.PDF (unknown)Health & Safety
Source: SUSPEN~2.PDFHealth and safety are covered under the SHEQ policy. The contractor must comply with Eskom's Safety, Health, Environmental and Quality Policy (32-727) and mandatory SHE requirements (32-726). Hazardous substances must be stored safely, and emergency preparedness plans must be developed and tested. Employees must be inducted and trained on environmental and safety requirements.
Section
Source: SUSPEN~2.PDFCompliance to this specification will be monitored during tender evaluation, ad-hoc inspections, and internal audits. Bidders must demonstrate alignment with environmental requirements and the SHEQ policy.
Description
Source: C2 TSC3 Pricing Data Option A.docC3 Term Service Contract (TSC3) core clauses and Option A states: The Price List is a pricing document only; the Contractor Provides the Service in accordance with the Service Information. The Contractor must link each item description on the Price List to operations on the plan submitted for acceptance. The Contractor must price items inclusive of everything necessary and incidental to Providing the Service, and correct any Defects not caused by an Employer's risk. Lump sum items are not adjusted if quantities change; only compensation events can change Prices.
Submission Guidelines
Source: C2 TSC3 Pricing Data Option A.doc (unknown)Returnable documents: Pricing Data (Part C2) including C2.1 TSC3/A Pricing assumptions and C2.2 TSC3/A Price List. Ensure all items in the price list are priced as per Option A (lump sum or rate x quantity). Submit before the closing date and time.
Evaluation Criteria
Source: C2 TSC3 Pricing Data Option A.doc (unknown)The document does not explicitly state eligibility criteria such as company size, financial requirements, or specific certifications. However, it implies that applicants must be capable of providing the services described, including supplying qualified personnel (e.g., Site Manager with 5 years experience, UT Technicians with relevant experience) and equipment (e.g., Olympus 38DL Plus, gas monitors). They must also be able to comply with Eskom's safety and security requirements (e.g., medicals, security clearance, training).
Technical Specifications
Source: C2 TSC3 Pricing Data Option A.doc (unknown)C3 Term Service Contract (TSC3) core clauses and Option A states: The Price List is a pricing document only; the Contractor Provides the Service in accordance with the Service Information. The Contractor must link each item description on the Price List to operations on the plan submitted for acceptance. The Contractor must price items inclusive of everything necessary and incidental to Providing the Service, and correct any Defects not caused by an Employer's risk. Lump sum items are not adjusted if quantities change; only compensation events can change Prices. The price list includes sections for Preliminary & General (fixed and time-related), Resources (normal hours, overtime, Sundays/public holidays), and Equipment and Consumables. Required resources include Site Manager (5 years experience), Safety Officer (3 years), Data Capturer (3 years), Planner (3 years), Storeman (3 years), UT Technicians Level 1-3 (3 years experience each), and Project Co-ordinator (3 years). Equipment includes Olympus 38DL Plus, probes, cables, step wedges, couplant, rags, gas monitors, and respirators.
Financial Requirements
Source: C2 TSC3 Pricing Data Option A.doc (unknown)Pricing must follow Option A: either lump sum (Price column only) or rate x expected quantity (Rate and Expected Quantity columns). The Price List includes fixed and time-related Preliminary & General items, resource rates for normal hours, overtime, and Sundays/public holidays, and equipment/consumables. No adjustment to lump sum prices if quantities change. Payment is based on the Price for Services Provided to Date.
Compliance Requirements
Source: C2 TSC3 Pricing Data Option A.doc (unknown)No specific requirements found in the document. However, the pricing data implies compliance with Eskom's safety and security requirements, including medicals, security clearance, and training (confined space, working at heights).
Description
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdfImportant Dates
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)Briefing Session
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)Contact Information
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)Submission Guidelines
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)Returnable Documents
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)Evaluation Criteria
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)Technical Specifications
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)Quality Management
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdfPricing Schedule
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdfFinancial Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)Compliance Requirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)Health & Safety
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdfContractual Terms
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdfRequirements
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdf (TENDER)Section
Source: Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025_(G20_Logo).pdfDescription
Source: SUSPEN~1.PDFThis document is an Environmental Specification for Kusile Power Station. It sets out minimum environmental requirements for contractors providing mobile elevated and suspended work platforms for maintenance and outages. The scope of work is detailed in document 240-156006006. The specification covers environmental management system requirements, waste management, spill response, hazardous substances, training, incident reporting, audits, and emergency preparedness.
Contact Information
Source: SUSPEN~1.PDF (unknown)Environmental Officer: Munzhedzi Mudau
Snr Advisor Environmental Management: Cylia Malebana
Project Manager: France Mabula
Note: No email, phone, or submission address provided in the document.
Submission Guidelines
Source: SUSPEN~1.PDF (unknown)Submit the following documentation with your tender:
Ensure all required environmental documentation (e.g., aspect/impact register, training matrix, incident registers) is prepared and available for evaluation.
Evaluation Criteria
Source: SUSPEN~1.PDF (unknown)Compliance to this environmental specification will be monitored during tender evaluation, ad-hoc inspections, and internal audits. The contractor must demonstrate capability to provide and operate mobile elevated and suspended work platforms and meet all environmental compliance requirements, including having a documented and implemented environmental management system.
Technical Specifications
Source: SUSPEN~1.PDF (unknown)Scope: Hiring, installation and operation of mobile elevated and suspended work platforms for maintenance and outages at Kusile Power Station on an 'as and when' required basis for 5 years.
Records to keep onsite:
Quality Management
Source: SUSPEN~1.PDFEnvironmental incidents must be reported within 24 hours; immediate measures taken to prevent/minimise pollution.
Compliance Requirements
Source: SUSPEN~1.PDF (unknown)No specific compliance requirements (e.g., CSD, tax, B-BBEE, CIDB, CIPC) are stated in this document. However, the contractor must comply with all applicable environmental legislation and Eskom's SHEQ requirements.
Health & Safety
Source: SUSPEN~1.PDFThe document references Eskom's Safety, Health, Environmental and Quality (SHEQ) Policy and Mandatory SHE Requirements (32-726).
Environmental
Source: SUSPEN~1.PDFThis is an Environmental Specification for Kusile Power Station (KUS-20250797 Rev 1, effective August 2025, review August 2028).
Section
Source: SUSPEN~1.PDFCompliance to this environmental specification will be monitored during tender evaluation, ad-hoc inspections, and internal audits. The contractor must demonstrate capability to meet environmental requirements.
Description
Source: STANDA~2.PDFThe document does not provide a general scope description. It focuses on local content declaration requirements for designated sectors, with placeholders for service descriptions and minimum thresholds that are not filled in.
Important Dates
Source: STANDA~2.PDF (TENDER)No dates are stated in the document extract. The closing date is provided in the tender record.
Submission Guidelines
Source: STANDA~2.PDF (TENDER)Returnable Documents: The document references SBD 6.2 (Declaration Certificate for Local Production and Content) and Annex C (Local Content Declaration: Summary Schedule) as mandatory submissions. Failure to submit these by the stipulated deadline may lead to disqualification. No other submission details (e.g., delivery address, number of copies) are provided in this extract.
Evaluation Criteria
Source: STANDA~2.PDF (TENDER)Bidders must comply with the Preferential Procurement Regulations, 2022 (PPPFA) and local content requirements for designated sectors as prescribed by the dtic. The evaluation will consider the stipulated minimum local content threshold (not specified in this extract). The document references Regulation 9.1 of the PPPFA for remedies against incorrect data. No scoring method or stages are detailed.
Technical Specifications
Source: STANDA~2.PDF (TENDER)The document does not describe the scope of services, deliverables, or technical standards for the hiring, installation, and operation of mobile elevated and suspended work platforms. It only provides a template for declaring local content, including a table for exchange rates if imported content is used. No technical specifications are available.
Pricing Schedule
Source: STANDA~2.PDFBidders must declare the bid price excluding VAT, imported content value, and the calculated local content percentage. The declaration must be signed by a CFO or authorized person. No detailed pricing schedule or bill of quantities is provided.
Financial Requirements
Source: STANDA~2.PDF (TENDER)The document requires bidders to declare the bid price excluding VAT (y), imported content in Rand (x), and the calculated local content percentage using the formula LC = [1 - x / y]
Compliance Requirements
Source: STANDA~2.PDF (TENDER)Bidders must complete and sign the SBD 6.2 declaration certificate. The local content must be calculated per SATS 1286:2011. Annex C (Summary Schedule) must be submitted; Annexes D and E must be kept for 5 years for verification. The declaration cannot be delegated to an external representative. The document references the dtic and PPPFA but does not mention CSD, tax clearance, B-BBEE certificates, CIDB, or CIPC.
B-BBEE Requirements
Source: STANDA~2.PDF (TENDER)The document does not contain B-BBEE requirements. It focuses on local content under the dtic's designated sectors policy, which is separate from B-BBEE.
Health & Safety
Source: STANDA~2.PDFNo health and safety requirements are mentioned in the document.
Contractual Terms
Source: STANDA~2.PDFThe document states that a bid may be disqualified if the Declaration Certificate and Annex C are not submitted on time. It also notes that if challenges arise in meeting the local content threshold after award, the dtic must be informed for verification and directives. No other contract terms, duration, or penalties are specified.
Section
Source: STANDA~2.PDFThe document references the Preferential Procurement Regulations, 2022 under the PPPFA, 2000, but does not provide additional evaluation criteria beyond local content compliance.
Description
Source: UNPRIC~1.PDFThe document contains a column header 'UNIT QTY RATE AMOUNT' but no general scope description beyond the pricing schedule items. The tender title indicates hiring, installation, and operation of mobile elevated and suspended work platforms at Kusile Power Station for 5 years on an 'as and when' required basis.
Contact Information
Source: UNPRIC~1.PDF (unknown)The document contains a reference to 'QTY RATE AMOUNT' which appears to be a column header, not a contact. No name, email, phone, department, or address is provided for SCM or technical contacts.
Submission Guidelines
Source: UNPRIC~1.PDF (unknown)Returnable documents are mentioned but not specified in detail. The document only states 'Returnable Documents: ' without listing them. Bidders must check the full tender document for a complete list of required forms and submissions. No submission address, method, or deadline details are provided in the extracted text.
Evaluation Criteria
Source: UNPRIC~1.PDF (unknown)Evaluation criteria are not explicitly stated in the document. Based on the content, the following are likely required:
Technical Specifications
Source: UNPRIC~1.PDF (unknown)The scope of work involves hiring, installation, and operation of mobile elevated and suspended work platforms at Kusile Power Station for maintenance and outages on an 'as and when' required basis for 5 years.
Key technical requirements from the pricing schedule:
Pricing Schedule
Source: UNPRIC~1.PDF (unknown)The pricing schedule consists of three main items:
Financial Requirements
Source: UNPRIC~1.PDF (unknown)The pricing schedule is structured into three main items:
Compliance Requirements
Source: UNPRIC~1.PDF (unknown)The document does not explicitly list compliance requirements such as CSD, tax, B-BBEE, CIDB, CIPC, or local content. However, the evaluation criteria suggest that valid tax clearance, B-BBEE status, and ESKOM supplier database registration are likely required. Personnel must hold specific certifications and licenses as detailed in the technical specifications.
Health & Safety
Source: UNPRIC~1.PDFHealth and safety requirements are detailed in the preliminaries and general section:
Submission Guidelines
Source: C3 1 TSC3 Employers Service Information latest.rev revised.doc (unknown)The document does not specify a submission address, deadline, or list of required returnable forms. The currentAnalysis field is empty, and the extractedText contains no submission instructions. Bidders must refer to the main tender notice for submission details.
Evaluation Criteria
Source: C3 1 TSC3 Employers Service Information latest.rev revised.doc (unknown)The document states the following evaluation criteria:
Technical Specifications
Source: C3 1 TSC3 Employers Service Information latest.rev revised.doc (unknown)The scope of work involves Tube-SOLO (Tube-Steam Oxide Life Optimization) services for boiler pressure parts at Kusile Power Station. Key requirements:
Financial Requirements
Source: C3 1 TSC3 Employers Service Information latest.rev revised.doc (unknown)The document specifies:
Compliance Requirements
Source: C3 1 TSC3 Employers Service Information latest.rev revised.doc (unknown)The document references the following compliance requirements:
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Address
R545 KENDAL/BALMORAL RD - HAARTEBEESFONTEIN FARM WITBANK - Mpumalanga - 1035
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
19
Last checked
03 Aug 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Key Personnel
Provinces Active
Industries
Learn how to submit a winning bid with these related articles
Win consulting, legal, accounting, and engineering service contracts with government. Learn registration requirements and proposal strategies.
Win government insurance, banking, actuarial, and financial consulting contracts. FSCA licensing requirements and tender strategies for financial service providers.
Master the art of the consulting bid. How to structure your methodology, price your services competitively, and score maximum evaluation points.
A professional guide for law firms to join the provincial and municipal legal panels in Gauteng, covering compliance, specialization, and bidding.
💡 Want more tendering tips and strategies?
Explore Our BlogGet deep intelligence on Other service activities. Unlock full pricing strategies, bid frequency, and historical win rates.