Farm No 502 JQ, Hartebeesthoek, Krugersdorp District - Hartebeeshoek - Mogale City -
Organization Type
GOVERNMENT
Published
28 May 2026
OCDS Reference
ocds-9t57fa-157337
Summary
This tender is for the provision of comprehensive gardening services at the south african national space agency's hartebeesthoek site for a period of three years. IT is aimed at qualified contractors capable of maintaining lawns, veld grass, flower beds, and performing tasks like weed removal and tree cutting across the secure facility. Bidders must comply with strict safety, operational, and documentation requirements due to the site's status as a national key point.
Key Requirements
Mandatory compulsory briefing session on 09 June 2026 at 10h00; attendees must bring safety boots and reflective clothing for site access.
Submission deadline is 01 July 2026 at 11h00; bids must be delivered physically to the specified SANSA office using a two-envelope system (one for documents, a separate sealed envelope for the financial offer).
Bidders must possess a valid CIDB contractor grading of 4SH or higher, R5 million public liability insurance, a COIDA letter of good standing, and proof of company-owned tractor.
Certified proof of five chainsaw operator certificates and five brush cutter operator certificates is required.
The evaluation uses the 80/20 preference point system, with 20 points for specific B-BBEE goals (black ownership, black women ownership, youth ownership).
The site is a National Key Point; operations are restricted to weekdays 08h00-17h00, and all personnel must provide valid ID/passport and work permit documentation.
A fully compliant Central Supplier Database (CSD) registration with tax status and submission of all required SBD forms and returnable schedules are mandatory for bid validity.
Farm No 502 JQ, Hartebeesthoek, Krugersdorp District - Hartebeeshoek - Mogale City -
Construction & Civil Engineering Industry Profile
Critical Requirements
CIDB Contractor Grading
Regulatory Bodies
ECSASACPCMPCIDBSAIA
Tenders in this industry often require registration with these bodies.
CIDB Registration
Construction Industry Development Board (CIDB) registration is mandatory for almost all public sector construction tenders. Ensure your grading matches the tender value.
Typical Documents
10 items
Company Registration (CIPC)
Tax Clearance Certificate
B-BBEE Certificate
CSD Registration
Company Profile
CIDB Registration Certificate
NHBRC Registration (if applicable)
Health & Safety Plan
Insurance Certificates
Previous Project Completion Certificates
Recommended Certifications
Having these can improve your winning chances: NHBRC Registration, ISO 9001:2015 (Quality Management), ISO 14001:2015 (Environmental Management), ISO 45001:2018 (Occupational Health & Safety), SACPCMP Registration, ECSA Registration
Review in progress · 1 of 4 document being finalised
AI Document Analysis Stages
Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
Review in progress
The information shown on this card is preliminary. Our procurement team is currently finalising the submission guidelines, evaluation criteria, technical specifications, financial requirements, and compliance sections so you have a clean, bid-ready summary to work from. Document being finalised: SCM-F-06 Bid Document - Gardening Services.pdf. You don’t need to refresh — this page will pick up the updated review automatically.
DocumentSCM-F-06 Bid Document - Gardening Services.pdfCompliance review in progress
Important Dates
28 May
2026
PUBLICATION
Tender Published
Tender was published
01 Jul
2026
DEADLINE
Closing Date
Tender closing date
Procurement Rules & Compliance ContextThis tender may be governed by South African public procurement rules covering fairness, transparency, preferential procurement, anti-corruption, administrative justice and access to information.
11 rules
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
Core procurement rules
These rules commonly apply to South African public-sector procurement.
7
Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
high
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Constitution of the Republic of South Africa, 1996 – Section 217
Act 108 of 1996 (s217)
high
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
Tender for gardening services at SANSA Hartebeesthoek site for 3 years, with extensive safety, health, environmental, and quality (SHEQ) documentation requirements.
This is not a tender document but an Ecological Impact Assessment report for SANSA's satellite antennae development at Hartebeesthoek. The document analyzes environmental impacts and provides specialist recommendations for amending an existing Environmental Authorisation.
Tender for gardening services at SANSA Hartebeesthoek site for 3 years, requiring comprehensive maintenance including lawn care, invasive plant eradication, and site-wide vegetation management.
This is a Safety, Health, Environmental, and Quality (SHERQ) specification document issued by the South African National Space Agency (SANSA) for a tender for gardening services at its Hartebeesthoek site for three years. The document outlines comprehensive SHERQ requirements and compliance obligations for the contractor, rather than detailing the technical scope of gardening work. It functions as a mandatory framework for managing all safety, health, and environmental risks on site.
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Based on 23 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
Compulsory briefing session: 09 June 2026 at 10h00 at SANSA Space Operations office, Farm JQ 502 Hartebeesthoek. Bring safety boots and reflective clothing; otherwise, you will not be allowed to enter the site.
Closing date and time: 01 July 2026 at 11h00.
Bid documents available from: 28 May 2026 after 09h00.
Offer validity: 120 working days from bid closing date.
Public bid opening: 01 July 2026 immediately after closing time.
Submit one original and two hard copies of the bid document, plus one original financial offer in a separate sealed envelope.
Use the two-envelope system: one envelope for bid documents and supporting documents, clearly marked with bid number and project name; a separate envelope for the financial offer (Pricing Schedule and Form of Offer and Acceptance), clearly marked with bid number and 'Financial Offer'.
Deliver bids to the bid box at SANSA Space Operations office reception, Farm 502 JQ, Hartebeesthoek, West Rand District, Gauteng, during working hours (08h00-16h00). Do not deliver to any other SANSA office.
Sign the submission register at reception when delivering your bid.
Closing date is 01 July 2026 at 11h00. Late bids will not be accepted.
Bids must be submitted on the original forms provided; do not retype or convert from PDF.
Failure to submit required documents by the closing date and time leads to automatic disqualification.
Bid documents are free and available from the SANSA website and National Treasury e-tender portal from 09h00 on 28 May 2026.
Telegraphic, telephonic, fax, and email submissions are not accepted.
The tender uses the 80/20 preference point system: 80 points for price, 20 points for specific goals.
Specific goals points: 51% black owned (10 points), 40% black women owned (6 points), 51% owned with Youth (4 points).
Minimum functionality threshold: Bidders must reach 80 points on functionality evaluation stage for their financial offer to be opened.
Public bid opening on 01 July 2026 after closing; bidders' names and specific goal percentages read out, financial offers not opened publicly.
Eligibility criteria (failure leads to disqualification): Fully completed and signed bid document; CSD registration with compliant tax status; compulsory briefing attendance; valid 4SH or above CIDB rating; R5 million+ public liability insurance; valid COIDA letter of good standing; company-owned tractor proof; five certified chainsaw operator certificates; five certified brush cutter operator certificates.
Scope: Provision of gardening services at SANSA Hartebeesthoek site for three years.
Areas include: Main campus, power generation plant, greater farm area, roads and towers, security fences, removal of refuse.
Services include: Lawn maintenance (cutting and edging), open area tractor work with slashers, plant and flower bed care (soil turning, pruning, planting), weed removal, cleaning driveways and external surfaces, disposal of garden rubbish, lawn replanting, cutting and removing hazardous dead trees.
Operations: Site is a National Key Point; access only Monday to Friday, 08h00-17h00, excluding public holidays. All personnel must have valid RSA ID/passport and work permit; certified copies must be submitted on contract date.
Labour: A supervisor must always be on site; sufficient gardening technicians to complete all work weekly. Provide job descriptions and inventory of equipment.
PPE: All employees must have safety shoes, reflective jacket, hardhat, safety glasses/face shield, hearing protection, dust masks, hand gloves, branded overalls.
Health and Safety: Contractor must sign a 37(2) agreement, submit a comprehensive SHE Plan and SHE File within seven working days, maintain operational files, and comply with all statutory requirements. Non-compliance may result in NCRs, SHE STOP certificates, or contract cancellation.
Contract Management: Monthly management meetings required; service provider to provide minutes. Monthly operational reports to SANSA.
Payment: Based on deliverables (proven progress); invoices required. Monthly checks by SANSA; incomplete work may result in non-payment.
Central Supplier Database (CSD): Must be registered on CSD at time of award with compliant tax status (does not apply to international bidders). Submit CSD summary report.
CIDB Rating: Valid 4SH or above rating required on closing date; attach proof. For joint ventures, attach CIDB JV calculator.
Public Liability Insurance: Certified valid letter proof of cover of R5 million and above; letter of intent from insurance company acceptable.
COIDA: Certified valid letter of good standing from Department of Labour required. For joint ventures, attach for both parties.
Equipment Ownership: Certified valid proof of company tractor ownership (NaTIS/Registration Certificate RC1).
Operator Certificates: Certified valid proof of five chainsaw operator certificates and five brush cutter operator certificates.
Tax Compliance: Submit SARS Tax Compliance Status PIN or printed TCS certificate; if not available, provide CSD number. For consortia/JVs/sub-contractors, each party must submit separately.
B-BBEE: Preference points claimed for specific goals: 51% black owned (10 points), 40% black women owned (6 points), 51% owned with Youth (4 points).
Other: No bids from persons in the service of the state or companies with directors/members in the service of the state.
SBD Forms: Must submit completed SBD 4 (Bidder's Disclosure) and SBD 6.1 (Preference Points Claim Form).
DocumentAnnexure B - HBK-IMS-GRP-SHE File Index.pdfReview complete
Evaluation Criteria
Source: Annexure B - HBK-IMS-GRP-SHE File Index.pdf (unknown)
Your bid will be evaluated based on the validity and completeness of required documentation. Ensure you include:
Letter of Good Standing.
Mandatory agreement (37(2) Agreement).
Valid medical fitness certificates.
Vehicle/machinery disk and roadworthy certificates.
Waste management accreditation certificates and permits.
All required safety plans: fall protection plan, rescue plan, emergency plan.
Technical Specifications
Source: Annexure B - HBK-IMS-GRP-SHE File Index.pdf (unknown)
You must prepare and submit a comprehensive Safety, Health, Environment, and Quality (SHEQ) file. The required documents include:
Task Method Statement.
Site Establishment Method Statement.
Signed Baseline Risk Assessment aligned to the scope of work.
Letter of Good Standing.
Agreement with Mandatory (37(2) Agreement).
Company Drug & Alcohol Abuse Policy.
Company SHEQ Plan.
Fall Protection Plan.
Rescue Plan.
Emergency Plan.
Hazardous Chemical Procedures.
Employee Site Safety Induction Forms.
Legal Appointments and valid Competency Certificates.
Valid Medical Fitness Certificates.
Toolbox Talks.
Inspection Registers and Checklists.
Incident Management documentation.
Safety Meeting forms.
Equipment List.
Plant and Machinery Documentation.
Vehicle/Machinery Disk and Roadworthy Certificates.
Environmental Management Plan, including waste management plan, accreditation certificates, and permits.
Copy of the Occupational Health and Safety Act.
Copy of Construction Regulations.
Note: All submitted SHE file contents remain the property of SANSA Safety Consultants and may not be reproduced without prior consent.
Compliance Requirements
Source: Annexure B - HBK-IMS-GRP-SHE File Index.pdf (unknown)
You must provide the following compliance documents:
Signed Baseline Risk Assessment aligned to the scope of work.
Agreement with Mandatory (37(2) Agreement).
Health & Safety
Source: Annexure B - HBK-IMS-GRP-SHE File Index.pdf
You must provide the following health and safety documents:
Signed Baseline Risk Assessment aligned to the scope of work.
Agreement with Mandatory (37(2) Agreement).
Environmental
Source: Annexure B - HBK-IMS-GRP-SHE File Index.pdf
You must provide the following environmental management documents:
Environmental Management Plan, including waste management plan, accreditation certificates, and permits.
Copy of the Occupational Health and Safety Act.
DocumentAnnexure C - SHE Specification.pdfReview complete
Description
Source: Annexure C - SHE Specification.pdf
This is a Safety, Health, Environment, and Quality (SHEQ) specification document for SANSA.
It sets out the working behaviors and safe work practices expected of all contractors, consultants, visitors, and suppliers on SANSA managed projects.
The purpose is to:
Acquaint contractors with the need to determine project-specific risks before submitting tenders.
Ensure SANSA's SHE specifications form the basis of the contractor's SHE Management Plan.
Provide a guideline for contractors to implement mitigation measures to protect people and the environment during service delivery.
The scope of work will be job-specific.
The document must be read in conjunction with the technical and tender specifications, the OHS Act, and all related regulations and safety standards.
Compliance with this document does not absolve the contractor from complying with minimum legal requirements; the contractor remains responsible for the health and safety of its employees and subcontractors.
Submission Guidelines
Source: Annexure C - SHE Specification.pdf (unknown)
Security and Access Control special conditions:
Contractors must adhere to SANSA security measures enforced by the National Key Point Act.
Contractors are responsible for safeguarding their own equipment and material on site.
Access control systems are implemented to control personnel, vehicles, equipment, and materials.
Security issues access control cards.
Private property taken through access points must be declared at the gate.
Property removal from site requires a waybill signed by an authorized senior employee.
Vehicle permits are issued by security after a safety officer declares the vehicle roadworthy and supervisor approval is obtained.
Evaluation Criteria
Source: Annexure C - SHE Specification.pdf (unknown)
The document does not specify tender evaluation criteria. It only references 'the analysis and evaluation of the risks and hazards identified' as a component of the required risk assessment process.
Technical Specifications
Source: Annexure C - SHE Specification.pdf (unknown)
This is a Safety, Health, Environment, and Quality (SHEQ) specification for contractors working at SANSA.
The scope is job-specific gardening services at the Hartebeesthoek site.
Contractors must comply with the Occupational Health and Safety Act and all applicable environmental legislation.
The specification outlines required safe work practices and behaviors for all personnel on SANSA projects.
Key contractor responsibilities include:
Providing and maintaining safe systems of work, plant, and machinery.
Taking steps to eliminate or mitigate hazards before using personal protective equipment (PPE).
Ensuring all employees are medically fit for work, especially in elevated positions.
Including health and safety costs in the tender price.
Contractors must develop and submit:
Risk Assessments, Standard Working Procedures (SWP), and Method Statements for each activity.
A baseline risk assessment incorporating site-specific SHE rules.
An approved SHE Plan.
A Health and Safety File must be maintained on site and include documents like the Letter of Good Standing, SHE Policy, risk assessments, training records, and environmental management procedures.
Specific site risks to address include noise exposure, working at heights, vehicle movement, fire hazards, and hazardous chemical exposure.
All equipment and machinery must be in good working order and comply with legal requirements.
Contractors must provide their own compliant equipment and are not permitted to operate SANSA equipment (e.g., cranes, forklifts) without authorization.
Strict housekeeping and waste disposal (at registered sites) are required.
An Environmental Management Plan (EMP) must be submitted before work commences, detailing scope, roles, and management arrangements to prevent environmental impacts.
Methodology
Source: Annexure C - SHE Specification.pdf
The Principal Contractor is required to develop Standard Working Procedures (SWP) and Method Statements for each activity executed in the contract or project.
Experience & Qualifications
Source: Annexure C - SHE Specification.pdf
The document references 'experience, qualifications, authority, position in the organization etc.' as factors a reasonable person would consider when foreseeing a hazard, as part of the legal liability discussion. No specific bidder experience or personnel qualifications are stipulated.
Compliance Requirements
Source: Annexure C - SHE Specification.pdf (unknown)
The document focuses on SHEQ compliance, not standard tender compliance certificates.
Contractors must have a valid Letter of Good Standing from the Workmen's Compensation Fund or a licensed insurer to work for SANSA.
The certificate must show the company name, expiry date, and registration number without alterations.
Contractors must comply with the Occupational Health and Safety Act (OHS Act) and all applicable environmental legislation.
A Section 37(2) Agreement must be completed, signed by the contractor's CEO, and returned to the SANSA project manager. This agreement confirms the contractor remains responsible for its employees.
Contractors must effect their own insurance cover for the full duration of the contract, covering the full value of all material, plant, and equipment brought to site.
Insurance policies must be approved by SANSA, premiums paid on time, and proof of payment submitted if requested.
Policies cannot be cancelled without SANSA's prior written consent.
Contractors must adhere to SANSA security measures under the National Key Point Act and are responsible for safeguarding their own equipment and materials.
Health & Safety
Source: Annexure C - SHE Specification.pdf
Comprehensive Health and Safety requirements for contractors at SANSA:
The Principal Contractor must develop Risk Assessments, Standard Working Procedures (SWP), and Method Statements for each activity.
Risk assessments must be performed by a competent person appointed in writing, completed one week before job execution, and submitted to the Project Manager for approval.
Risk assessments must include hazard identification, analysis, safe work procedures, a monitoring plan, and a review plan.
A baseline risk assessment must be conducted, incorporating standard working procedures and method statements.
Specific risks listed include exposure to noise, working at heights, vehicle movement, fire hazards, and hazardous chemicals.
A Health and Safety File must be kept on site at all times, containing documents like the Letter of Good Standing, SHE Plan, risk assessments, training records, and PPE registers.
SANSA SHERQ Office will conduct SHE inspections at communicated frequencies.
Strict housekeeping rules are enforced, with waste to be disposed of at registered dump sites.
Personal Protective Equipment (PPE) is a last resort; engineering controls must be attempted first. Required PPE includes hand and head protection, non-slippery shoes, steel-toe footwear, and SABS 1451-approved hearing protection. Short trousers/pants are not allowed.
All employees must attend SANSA SHE Induction before work, scoring 80% on a competency test.
Employees require general and site-specific SHE induction training.
Annual medical surveillance is required for contractor employees, including hearing, vision, and lung function tests.
All injuries and incidents must be reported immediately to the SANSA Project Manager and SHERQ Department.
The Principal Contractor is responsible for investigating and reporting incidents as per the OHS Act.
SANSA's target for disabling injuries is zero; contractors must work safely and report on disabling incident frequency rates monthly.
Environmental
Source: Annexure C - SHE Specification.pdf
Environmental management requirements for contractors:
The provided SHE specification is a guideline to ensure the environment is protected from potential negative impacts during service delivery.
Contractors must comply with all applicable environmental legislation at all times on the work site.
They must ensure compliance with SANSA's Integrated Management System.
An Environmental Management Plan (EMP) must be submitted for SANSA review well before work commences.
The EMP must detail measures to manage and prevent environmental impacts and include:
A description of the scope of planned works.
Appointments, roles, and responsibilities of staff for environmental management.
Management and communication (reporting) arrangements.
Site housekeeping rules emphasize pollution control, waste disposal, and proper management of oil, grease, water, waste, rubble, and glass.
All waste, rubble, and scrap must be disposed of at a registered dump site, with records maintained. If impractical, alternatives must be sought and approved by the client.
Contractual Terms
Source: Annexure C - SHE Specification.pdf
Key contractual terms from the SHEQ specification:
Insurance: The contractor must effect insurance at their own cost to cover loss or damage to SANSA or third-party property.
Within four weeks of contract award, the contractor must submit insurance policies and premium receipts to the Engineer.
Insurance must be maintained for the contract duration with insurers and terms approved by SANSA.
The contractor must certify they carry insurance covering the full value of all material, plant, and equipment brought to site.
The insurance policy must:
Be in full force from the commencement date.
Not be cancelled or terminated without SANSA's prior written consent.
The contractor must:
Pay premiums promptly.
Submit proof of payment if requested.
Not do anything to invalidate or cause cancellation of the policy.
Legal Liabilities: Discusses common law and legislation criteria for negligence based on foreseeability of hazards and taking precautionary measures.
DocumentAnnexure A - HBK-IMS-Ecological Report_v4.pdfReview complete
Description
Source: Annexure A - HBK-IMS-Ecological Report_v4.pdf
Project: Amendment application for Environmental Authorisation (EA Gaut: 002/09-10/N0227) to construct additional satellite antennae at SANSA Hartebeesthoek.
Background: Original EA issued 22 September 2010. Construction ongoing since 2011 (~3 antennae/year). EA remains valid (no expiry date).
Proposed Amendments:
Update client name from CSIR SAC to SANSA Space Operations.
Clarify parameters: specify number of antennae (81) and their locations.
Update listed activities from 2006 to 2014 NEMA EIA Regulations.
Amend the Environmental Management Plan (EMP).
This ecological impact assessment report provides input for the amendment application to the Department of Environment, Forestry and Fisheries (DEFF).
Important Dates
Source: Annexure A - HBK-IMS-Ecological Report_v4.pdf (unknown)
Site visit conducted on 11 June 2020. No other tender-related dates (e.g., closing, briefing) are stated.
Contact Information
Source: Annexure A - HBK-IMS-Ecological Report_v4.pdf (unknown)
For ecological report enquiries: CES Environmental and Social Advisory Services, [email protected], phone 010 045 1372, address 70 Regency Drive, Route 21 Business Park, Centurion, 0178. No tender submission contacts are provided.
Prepared for: The South African National Space Agency (SANSA) Farm No 502JQ Hartebeesthoek District Krugersdorp PO Box 484, Silverton, 0127.
Prepared by: CENTURION 70 Regency Drive Route 21 Business Park, Centurion, 0178 010 045 1372 Also in Cape Town, East London, Grahamstown, Port Elizabeth, Maputo (Mozambique) and Romsey (UK) www.cesnet.co.za.
Client Name & Address: South Africa National Space Agency (SANSA) Space Operations Farm No 502 JQ Hartebeeshoek Krugersdorp, 1740.
Source: Annexure A - HBK-IMS-Ecological Report_v4.pdf (unknown)
Not applicable - this is an environmental assessment document, not a tender with vendor eligibility criteria. The 'applicant' referenced is SANSA seeking authorization amendment.
Technical Specifications
Source: Annexure A - HBK-IMS-Ecological Report_v4.pdf (unknown)
Scope: Construction of 81 additional satellite antennae and associated infrastructure at Hartebeesthoek Radio Astronomy Observatory, Gauteng.
Antennae: 81 planned, each footprint 225m², height 3-7m. Total impacted area 1.8ha.
Infrastructure: Internal tarred access road, 4m wide, up to 244m long, impacting 0.1ha.
Site: Eight identified sites on Farm Hartebeesthoek 502 JQ. Three larger sites (1,2,8) for 22 antennae each; five smaller sites (3-7) for 3 antennae each.
Existing facility: 40 antennae already present. Construction of 22 platforms already underway at north-eastern (Galileo) sites as of June 2020.
Purpose: To track satellites in orbit, supporting SANSA's space science programmes.
Key environmental findings and requirements:
Sensitive environments on site: Cradle of Humankind World Heritage Site, Endangered Witwatersberg Skeerpoort Mountain Bushveld ecosystem, Critical Biodiversity Area (CBA), Ecological Support Area (ESA), Class 1 Ridge and buffer, wetlands.
Ecological impacts identified (from original 2010 assessment): Habitat destruction, impacts on flora/fauna/avifauna and Red Data List species, wetland/riparian zone impacts, water quality impacts, soil impacts (compaction, contamination, erosion).
Recommended mitigation measures:
Keep vegetation clearing to a minimum within demarcated areas.
Utilise already disturbed areas.
Eradicate and actively manage alien invasive species; implement an Alien Invasive Control Programme.
Amend proposed layout to avoid development on the Class 1 Ridge, ESA, and within the wetland.
Incorporate all measures into the Environmental Management Plan (EMP).
Implement all mitigation measures recommended in the original 2010 EnviRoss CC report.
Methodology
Source: Annexure A - HBK-IMS-Ecological Report_v4.pdf
Assessment methodology for the ecological study:
Two-phased approach: desktop assessment and site visit.
Desktop assessment: Reviewed original EnviRoss CC (2010) report, latest vegetation maps (Mucina & Rutherford 2018), Gauteng Conservation Plan (C-Plan), ridge guidelines, other regional literature.
Site visit: Conducted on 11 June 2020 (winter) to ground-truth desktop findings, assess site-specific ecology, land-use, sensitive ecosystems, and plant species.
Species of Conservation Concern (SCC): Data compiled from known distributions, conservation status, Red Data Lists, NEMBA, National Forest Act.
Vegetation mapping: Used SANBI National Vegetation Map (2018), compared with 2010 map and actual site conditions.
Site sensitivity analysis: Based on 10 criteria (topography, habitat extent, conservation status, SCC presence, habitat fragmentation, biodiversity, visibility, erosion potential, rehabilitation potential, disturbance). Zones mapped as high, medium, low sensitivity.
Experience & Qualifications
Source: Annexure A - HBK-IMS-Ecological Report_v4.pdf (unknown)
Lead Author: Mr Aidan Gouws.
Reviewer: Ms Tarryn Martin.
Study Leader/ Registered Environmental Assessment Practitioner – Approval: Dr Anthony Avis.
Compliance Requirements
Source: Annexure A - HBK-IMS-Ecological Report_v4.pdf (unknown)
The report focuses on environmental legislation compliance for an EA amendment, not standard tender compliance. Key legislative considerations include:
National Environmental Management Act (NEMA) and EIA Regulations (2014 as amended).
National Environmental Management: Biodiversity Act (NEMBA) and its Alien Invasive Species Regulations.
National Environmental Management: Protected Areas Act (NEMPAA) – site is within the Cradle of Humankind World Heritage Site.
The Constitution – right to a protected environment.
National Forest Act – no protected trees or forests identified in construction footprint.
Conservation of Agricultural Resources Act (CARA).
National Veld and Forest Fire Act.
Note: No standard tender compliance requirements (e.g., CSD, tax, B-BBEE, CIDB) are specified.
Health & Safety
Source: Annexure A - HBK-IMS-Ecological Report_v4.pdf
The report does not contain specific occupational health and safety requirements for contractors. It is an ecological impact assessment. References to safety are within the context of environmental legislation and fire management (National Veld and Forest Fire Act).
Contractual Terms
Source: Annexure A - HBK-IMS-Ecological Report_v4.pdf
Document copyright and usage terms:
Report prepared by CES Environmental and Social Advisory Services for SANSA.
Contains intellectual property protected by copyright.
May not be reproduced, used, or distributed to any third party without prior written consent from CES.
CES accepts no liability for any use of the document other than by its client (SANSA) and only for the intended purposes.
Subject to South African confidentiality, copyright, trade secrets, and intellectual property laws.
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Prevention and Combating of Corrupt Activities Act (PRECCA)
Act 12 of 2004
high
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Public Procurement Act, 2024 (PPA)
Act 28 of 2024
high
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Promotion of Access to Information Act (PAIA)
Act 2 of 2000
medium
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Promotion of Administrative Justice Act (PAJA)
Act 3 of 2000
medium
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
Sector-specific rules
These rules are linked to the work category, industry, or regulated service area.
4
Construction Industry Development Board Act (CIDB Act)
Act 38 of 2000
high
Important for public-sector construction and infrastructure tenders that require contractor grading or construction procurement standards.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
National Environmental Management Act (NEMA)
Act 107 of 1998
high
Relevant where environmental authorisations, EIAs or environmental compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Occupational Health and Safety Act (OHS Act)
Act 85 of 1993
high
Sets health and safety duties for contractors, employers and service providers working on public-sector sites.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
National Building Regulations and Building Standards Act
Act 103 of 1977
medium
Relevant where building standards, renovations, maintenance or construction compliance may apply.
Relevant because this tender appears to involve construction, building work, infrastructure, or site-based delivery.
Website
www.sansa.org.za/category/spaceoperations/
Address
Farm No 502 JQ, Hartebeeshoek, Krugersdorp, 1740, South Africa
Document-Backed
Source Snapshot Available
AI Enhanced
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
4
Last checked
15 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.