Broad-Based Black Economic Empowerment Act (B-BBEE Act)
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Documents available on tender detail page
Tender Type
Request for Quotation
Delivery Location
1 Niblick Way - Firgrove rural - Somerset West - 7137
Organization Type
GOVERNMENT
Published
02 Jul 2026
OCDS Reference
ocds-9t57fa-161045
Overberg water seeks a supplier to provide, install, and support a laboratory information management system (lims) for 36 months to manage water quality testing data, support iso17025:2017 accreditation, and integrate with the department of water and sanitationβs iris system. The system must be web-based, support digital signatures, and include modules for sample management, quality control, and lab equipment integration.
Date & Time
Thursday, 16 July 2026 - 12:00
Venue
null
Categories
Request for Quotation
1 Niblick Way - Firgrove rural - Somerset West - 7137
Tenders in this industry often require registration with these bodies.
Recommended Certifications
Having these can improve your winning chances: CA(SA) - Chartered Accountant, PMI-PMP (Project Management Professional), Prince2 Practitioner, Six Sigma Certification
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Description
Source: RFQ OW-006 2026-27 LIMS FOR 3 YEARS.pdfPurpose: Procure a LIMS system for provision, installation, and support over 36 months to meet ISO17025:2017 standards and support Overberg Waterβs lab accreditation and IRIS integration. Scope: Overberg Water is a Water Services Institution covering ~6,000kmΒ² in the Overberg region, requiring water quality testing and data management for ~30,000 annual tests. Current manual system is non-compliant. Objective: Implement LIMS at one central lab (RΓ»ensveld East, coordinates: -34.076234, 20.245964) within 6 months, with future rollout to satellite labs. Parameters to test (non-exhaustive): Colour, Conductivity, Turbidity, pH, Sulphate, Chloride, Sodium, Nitrate, Nitrite, Iron, Manganese, Aluminium, E.Coli, HPC, Total Coliforms. Data ownership: All LIMS data remains Overberg Waterβs property; must be returned in acceptable format if service ends. ERP integration is not required. Project phases: Initiation, implementation, customisation, training, testing/approval, support. Presentations may be required for clarification (non-negotiable). Overberg Water reserves the right not to appoint if requirements are unmet.
Important Dates
Source: RFQ OW-006 2026-27 LIMS FOR 3 YEARS.pdf (RFQ)Closing date: 16 July 2026 at 12:00. Quotation validity period: 90 days from closing date.
Contact Information
Source: RFQ OW-006 2026-27 LIMS FOR 3 YEARS.pdf (RFQ)Bidding procedure enquiries: Mr S. Mayixhale, Tel: 021 851 2155, Email: [email protected]. Technical enquiries: Mr D. Fransman, Tel: 021 851 2155, Email: [email protected]. Submission address: Tender box, Overberg Water Boardβs Corporate Office, Trident Park 3, Ground Floor, 1 Niblick Street, Somerset West, 7137, Cape Town. CSD helpdesk: Tel: 012 406 9222, Email: [email protected].
Submission Guidelines
Source: RFQ OW-006 2026-27 LIMS FOR 3 YEARS.pdf (RFQ)Submit your quotation in a sealed envelope to the tender box at Overberg Water Boardβs Corporate Office, Trident Park 3, Ground Floor, 1 Niblick Street, Somerset West, 7137, Cape Town. Late submissions will not be accepted. All six (6) Returnable Schedules (SBD1, Annexure A3, SBD4, SBD6.1, BBBEE Certificate/Sworn Affidavit, CSD Report, Certificate of Authority for Signature, Copy of ID, Copy of CIPC Certificate) must be completed, signed, and returned. Quotations must remain valid for 90 days from the closing date. Use official forms provided; do not re-type. Clearly mark the envelope with the quotation number (RFQ OW-006 2026/27) and description. Failure to comply with any mandatory requirement will result in disqualification.
Evaluation Criteria
Source: RFQ OW-006 2026-27 LIMS FOR 3 YEARS.pdf (RFQ)Mandatory
Preference Points
System
80/20 or 90/10 (depends on tender value; likely 80/20 for this RFQ).
Specific Goals
B-BBEE Level 1β2 (EME/QSE)
3
Women Ownership
5
Disability Ownership
5
Youth Ownership (β€35 Years)
5
Location In Western Cape
2
Proof Required
Technical Specifications
Source: RFQ OW-006 2026-27 LIMS FOR 3 YEARS.pdf (RFQ)Provide, install, and support a comprehensive LIMS system conforming to ISO17025:2017 for 36 months. System must support Overberg Waterβs accreditation journey and integrate with the Department of Water and Sanitationβs IRIS system. Key requirements: Secure servers with 5+ years data storage (TTFB <200ms). Web-based, with network/floating licences (if proprietary). Compatible with Chrome, Edge, or Opera. Supports digital signatures, bulk Excel/CSV import/export, custom PDF/Excel COA templates, and integration with lab equipment (e.g., Coliform counters, ICP machines, spectrophotometers). Must include modules for: jobs/orders, sample submission, instrument management, calibration, quality control, document management, digitally signed COAs, configurable calculations, sample/site management, sample differentiation, proficiency testing, client management, complaints, and financial management. Implementation at central lab (RΓ»ensveld East) first, with rollout to satellite labs later. Parameters to test include: Colour, Conductivity, Turbidity, pH, Sulphate, Chloride, Sodium, Nitrate, Nitrite, Iron, Manganese, Aluminium, E.Coli, HPC, Total Coliforms. Data ownership remains with Overberg Water; all data must be returned in acceptable format if service is terminated. Project phases: initiation, implementation, customisation, training, testing/approval, support. Commissioning/testing must be completed within 6 months of award.
Methodology
Source: RFQ OW-006 2026-27 LIMS FOR 3 YEARS.pdfBidder must provide: A clear, short project plan describing deliverables and timeframes. A Gantt chart showing these timeframes. Implementation period scoring: >18 months/no plan = 1 point, β€18 months = 2 points, β€12 months = 3 points, β€9 months = 4 points, β€6 months = 5 points. Project must cover: Project initiation and data gathering, implementation, customisation, training, testing and approval, support. Ad-hoc support: Online (120 hours) and in-person (24 hours) included in pricing schedule.
Experience & Qualifications
Source: RFQ OW-006 2026-27 LIMS FOR 3 YEARS.pdfBidder must demonstrate experience in LIMS provision, installation, and support. Evidence: Signed positive reference letters on client letterheads specifying project timeframes (Letters of Appointment are not acceptable). Experience scoring: β€1 year = 1 point, β€5 years = 2 points, β€10 years = 3 points, β€15 years = 4 points, >15 years = 5 points. If multiple reference letters are submitted, the earliest project date is used. Years are counted consecutively, not cumulatively. Company clientele: 1 reference letter = 1 point, up to 5 letters = 5 points.
Quality Management
Source: RFQ OW-006 2026-27 LIMS FOR 3 YEARS.pdfLIMS must conform to ISO17025:2017. Required features: Quality Control with multi-step verification and non-conformance management. Reference standards must be customisable as new limits are published. Document Management: Full audit trail required. COAs must be digitally signed and secured in PDF format. Configurable calculations and sample/site management (batching, aliquots, partitioning). Sample differentiation (e.g., resample, audit sample, operational sample). Proficiency testing support. Client management, complaints, and financial management modules must be included for future implementation but are part of commissioning/testing/approval. Project phases: Initiation, implementation, customisation, training, testing/approval, support.
Pricing Schedule
Source: RFQ OW-006 2026-27 LIMS FOR 3 YEARS.pdfComplete and sign all pricing forms (Annexure A3, SBD1). Prices must be fixed, all-inclusive, and valid for 90 days. Quote on all line items (except Item 2 where applicable). VAT (15%) must be shown separately. Total Bid Price = Subtotal A (sum of all items) + 10% contingencies + VAT. Bidder warrants: Quotation correctness, rates cover all specified work/items, rates cover all obligations (including disbursements), errors are the bidderβs risk. Required line items: Hardware/hosting (36 months), Network Licence (36 months, if proprietary), Installation/Implementation (sum, includes admin, travel for β₯5 engagements, setup), Customisation (sum), Training (sum), Testing/Commissioning (sum), Ad-hoc online support (per hour, 120 hours), Ad-hoc in-person support (per hour, 24 hours).
Financial Requirements
Source: RFQ OW-006 2026-27 LIMS FOR 3 YEARS.pdf (RFQ)Complete and sign all pricing forms (Annexure A3, SBD1, SBD4, SBD6.1). Prices must be fixed, all-inclusive (training, meetings, etc.), and valid for 90 days. Quote on all line items (except Item 2 where applicable). VAT must be shown separately (15%). Total Bid Price = Subtotal A (sum of all items) + 10% contingencies + VAT. Payment terms: Monthly cycle; invoices dated β€20th of the month paid between 23rd-26th of the next month. Mid-month payments (10th-13th) may be approved at Overberg Waterβs discretion. Errors in pricing are the bidderβs risk. Required line items: Hardware/hosting (36 months), Network Licence (36 months), Installation/Implementation (sum), Customisation (sum), Training (sum), Testing/Commissioning (sum), Ad-hoc online support (per hour, 120 hours), Ad-hoc in-person support (per hour, 24 hours).
Compliance Requirements
Source: RFQ OW-006 2026-27 LIMS FOR 3 YEARS.pdf (RFQ)Mandatory: Registration on National Treasury Central Supplier Database (CSD). Submit CSD Report and CSD number. Tax Compliance: Submit Tax Compliance Status (TCS) PIN (via SARS e-filing) or printed TCS certificate. If no TCS PIN, CSD registration is sufficient. For consortia/joint ventures, each party must submit separate TCS/CSD details. B-BBEE: Submit valid B-BBEE certificate or sworn affidavit. Preference points (20 total) for: Women Ownership (5), Disability Ownership (5), Youth Ownership (5), Location in Western Cape (2), B-BBEE Level 1-2 (QSE/EME, 3). Supporting documents: Full CSD Report (for all goals), medical certificate (disability), valid B-BBEE certificate. No bids accepted from state employees or entities with state-employed directors/members. Complete SBD4 (disclosure of interests) and SBD6.1 (preference points claim). Submit CIPC certificate, ID copy of authorised signatory, and certificate of authority for signature. COIDA: Submit Letter of Good Standing or proof of cover with a licensed insurer.
Contractual Terms
Source: RFQ OW-006 2026-27 LIMS FOR 3 YEARS.pdfContract commencement: Date of purchase order/letter of appointment issuance. Supplier works at own risk before this date. Overberg Waterβs liability begins only after valid purchase order issuance. Contract duration: 36 months from award. Commissioning/testing must complete within 6 months of award. Payment: Monthly cycle (23rd-26th of the month for invoices dated β€20th). Mid-month payments (10th-13th) may be approved at Overberg Waterβs discretion. Standards: Non-compliance with specifications/standards is a material breach; Overberg Water may cancel the contract per GCC Clause 23. Insurance: Supplier must insure goods against loss/damage (manufacture, transport, storage, delivery) and provide proof to Overberg Water. Applicable law: Supplier must comply with Basic Conditions of Employment Act and all labour-related laws. Abuse of SCM system: Prohibited; may result in rejection, contract cancellation, blacklisting, or legal action. Right to not appoint: Overberg Water may cancel the proposal or not appoint if bids are non-compliant.
Section
Source: RFQ OW-006 2026-27 LIMS FOR 3 YEARS.pdfFunctionality evaluation (100 points total, 75% minimum to qualify). Criteria: Working experience with LIMS provision, installation, and support (40 points): β€1 year = 1, β€5 years = 2, β€10 years = 3, β€15 years = 4, >15 years = 5. Evidence: Signed reference letters on client letterheads with project timeframes (Letters of Appointment not accepted). Company clientele with LIMS experience (40 points): 1 reference = 1, 2 references = 2, up to 5 references = 5. Implementation plan (20 points): >18 months/no plan = 1, β€18 months = 2, β€12 months = 3, β€9 months = 4, β€6 months = 5. Must include a clear project plan with deliverables/timeframes and a Gantt chart.
02 Jul
2026
Tender Published
Tender was published
16 Jul
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
These rules are linked to the type of public body issuing this tender.
Act 71 of 2008
Relevant to governance and reporting obligations for state-owned companies and public entities.
Relevant because this tender appears to involve professional consulting, advisory, research, feasibility, or management services.
These rules are linked to the work category, industry, or regulated service area.
Act 38 of 2001
Relevant to financial services, audit, accounting, KYC and anti-money-laundering obligations.
Relevant because this tender appears to involve professional consulting, advisory, research, feasibility, or management services.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
RFQ OW-006 2026-27 LIMS FOR 3 YEARS.pdf
Overberg Water is requesting quotations for the provision, installation, and 36-month support of a Laboratory Information Management System (LIMS) to manage water quality data, comply with ISO17025:2017, and integrate with the Department of Water and Sanitationβs Water Quality Management System (IRIS). The system must support ~30,000 annual tests, include modules for sample management, quality control, and reporting, and be implemented within 6 months at a central lab (with potential rollout to satellite labs). The contract includes hosting, training, customization, and ad-hoc support.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
Overberg WaterContact Person
SANELISA MAYIXHALE
Phone
+27 21 851 2155
[email protected]
Website
overbergwater.co.za/
Address
3, Ground, Trident Park 2, 1 Niblick Way, Somerset West, Cape Town, 7130, South Africa
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
1
Last checked
02 Jul 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Contact
+27 21 851 2155overbergwater.co.za3, Ground, Trident Park 2, 1 Niblick Way, Somerset West, Cape Town, 7130, South Africa
Provinces Active
Industries
Median Estimate
RΒ 878Β 598
Range
Based on 11 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
Get deep intelligence on Scientific research and development. Unlock full pricing strategies, bid frequency, and historical win rates.
Learn how to submit a winning bid with these related articles
As a procurement specialist for Tenders SA, I am excited to share insights on the critical aspects of software development government contracts, specifically focusing on Service Level Agreements (SLAs), Source Code Escrow, and Intellectual Property (IP) clauses. In the current regulatory environment of 2026, security contractors in Gauteng must navigate a complex landscape of compliance requirements to successfully secure and execute government contracts. Understanding these elements is crucial for ensuring that contracts are not only awarded but also executed efficiently, meeting the needs of both the government and the service providers.
In the high-stakes arena of South African procurement, winning isn't just about what you bid, but where you bid. Discover how provincial tender data is leveling the playing field for SMMEs and driving localized economic transformation.
The Western Cape construction sector is booming in 2026, with over 180 active tenders and 109 registered organizations competing for work. But hereβs the hard truth: without the correct CIDB grading, your bid wonβt even make it past the first compliance check. The Construction Industry Development Board (CIDB) grading system is non-negotiableβit determines the value of contracts you can legally pursue. If your grade doesnβt match the tenderβs financial threshold, youβre disqualified before your technical proposal is even reviewed. This guide cuts through the noise, giving you a clear, actionable roadmap to upgrade your CIDB grade and stay competitive in a crowded market.
From luxury lodge concessions to conservation supplies, SANParks offers a world of opportunity. Learn how to navigate the unique procurement landscape of South Africa's national parks in 2026.
π‘ Want more tendering tips and strategies?
Explore Our Blog