Skip to main content
Closed

Appointment of a Professional Service Provider for the Supply and Installation/establishing of a Robust and Efficient Network Infrastructure in a New Office Building

Water Research Commission
Ref:WRC005-2025/26
Official Source: eTendersSource-Backed TenderDocument-BackedSource Snapshot AvailableAI Enhanced

Province

Gauteng

Closing Date

2 March 2026 at 09:00

Estimated Value

Value not specified

AI Summary

Unlock the AI-generated summary for this tender

Already subscribed or have a bundle? Sign in

Quick Summary

  • Water Research Commission
  • Gauteng
  • Closes 2 March 2026 at 09:00 (Closed) — The hardware must be selected based on performance, reliability, and scalability

AI-Analyzed Compliance Requirements

Sign in or upgrade to see 55 deduplicated compliance points across 5 categories — submission and returnable-document rules, technical and financial requirements, B-BBEE / local-content obligations, and evaluation criteria, consolidated from every tender document.

Unlock with a subscription or Action Pack →
Tender Source Evidence
Official Source: eTendersSource-Backed TenderDocument-BackedSource Snapshot AvailableAI Enhanced

Source confidence

High source confidence

Official source

eTenders.gov.za

Documents found

1

Last checked

19 Jul 2026

AI status

Enhanced

Data conflicts

None detected

This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.

Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.

Tender Description

Appointment of a professional service provider for the supply and installation/establishing of a robust and efficient network infrastructure in a new office building

Information and communication

Increase your winning chances

Most bidders are rejected due to compliance gaps. Use our Readiness Engine to verify your status for this specific Information and communication.

Check My Readiness

Important Dates & Timeline

2 key dates

Tender Published

2 February 2026 at 22:00

Past

Tender was published

Tender Closing Date

2 March 2026 at 09:00

Past

Final deadline for submission

Submission Requirements

349 items · 45 mandatory

45 Required
technical

The appointed service provider should provide with the supply and installation/establishing of a robust and efficient

network infrastructure in a new office building covering but not limited to the following:

Network Infrastructure

The network infrastructure should be designed to support high-speed data transfer and reliable connectivity.

Hardware Requirements

The hardware must be selected based on performance, reliability, and scalability:

Required

APPOINTMENT OF A PROFESSIONAL SERVICE PROVIDER FOR THE SUPPLY AND INSTALLATION/ESTABLISHING

OF A ROBUST AND EFFICIENT NETWORK INFRASTRUCTURE IN A NEW OFFICE BUILDING

Switches (similar or equivalent)

• 2 x RUCKUS ICX 8200 Switch, 4810/100/1000 Mbps PoE+ ports, 425 GbE SFP28 stacking/uplink-ports (“or

equivalent”)

• 5 X RUCKUS ICX 8200 Switch, 4810/100/1000 Mbps ports, 425 GbE SFP28 stacking/uplink-ports

• All SFP Modules must be included (“or equivalent”).

Required

• Monitoring and management software must be included for a 3-year licensing period

Required

• Switching should be connected via fibre between the two floors. All hardware to facilitate this connectivity must

Required

be provided.

• The appointed supplier must setup the entire network infrastructure and configure all VLANS, AP’s, and

Required

monitoring software.

• All switches must include manufacture warranty.

Required

• The appointed supplier must liaise with both internal IT as well the appointed ISP to ensure WAN connectivity.

Required

This includes a complete handover to the current LAN/WAN support provider.

• Solution must be setup and designed for highest availability / failover.

Required

• All testing, documentation and handover on completion of the project. (Include a project management step and

include in the pricing schedule as a line item)

• A complete network diagram must accompany the final solution for internal documentation and audit purposes.

Required

(Include a project management step and include in the pricing schedule as a line item)

*Bidders can submit an equivalent specification but must provide additional evidence from a neutral or third party

Required

source, e.g. Gartner report stating that the proposed solution is of Enterprise grade and comparable in performance,

security, management, warranty and after sales support.

Wi-Fi Access Points

Wi-Fi access points must provide comprehensive coverage and support high-density environments:

Required

• 22 x RUCKUS R370 Wi-Fi 7 dual-band (5GHz and 2.4GHz concurrent) 802.11be entry-Level wireless access point

(up to 256 concurrent clients), 2x2:2 streams (2.4GHz/5GHz), PoE support, (“or equivalent”).

• 4 x RUCKUS R670 Wi-Fi 7 tri-band indoor concurrent wireless access point with 2x2 (2.4GHz) + 2x2 (5GHz) + 2x2

(6GHz) RF configuration. This will cater for higher density areas across the 2 floors, (“or equivalent”).

• Ruckus professional subscription cloud license must be included for a 3-year period, (“or equivalent”). This must

Required

cover all AP’s and switches to allow for centralised management and monitoring.

• All Access points must be configured to run PoE.

Required

• All mounting brackets must be included in the quotation.

Required

• Automated reporting must be configured.

Required

Cabling and Connectivity

Cabling is a critical component of the network infrastructure, requiring careful planning and execution. The below

requirements must be quoted on.

Required

• 175 x Installed network points (CAT 6)

• 2 x 42U Cabinets

• All brush and patch panels

• Installation of complete solution including fibre connectivity between all floors.

• Use Cat6 or higher category cables to support Gigabit Ethernet and future upgrades.

• Implement structured cabling with proper labelling and full documentation for easy maintenance (cables and

network points).

• Ensure each desk has at least one ethernet port.

• A complete network diagram showing each labelled point on floorplan.

APPOINTMENT OF A PROFESSIONAL SERVICE PROVIDER FOR THE SUPPLY AND INSTALLATION/ESTABLISHING

OF A ROBUST AND EFFICIENT NETWORK INFRASTRUCTURE IN A NEW OFFICE BUILDING

Floor plans will be presented to all interested bidders upon receipt of the request made to the [email protected]

mailbox, subject to signing a Non-Disclosure Agreement.

Power

Two x 42U racks must be included. Each rack must include a 10KvA rack mountable UPS with backup battery pack to

Required

ensure the solution is protected from power outages.

4. PROJEC MANAGEMENT REQUIREMENT

• Bidders must provide a detail project management plan that outline project milestones, activities, and resources

Required

required to successfully implement the project.

Required

• A project shall clearly outline timelines from project inception and until the project closure.

• Successful service provider is required to review and update the project plan with the WRC and obtain sign-off

Required

of the project plan.

• Service provider must deliver all deliverables as per the project plan that is aligned to the tender scope.

Required

• Appointed service provider must be able to commence within a week upon appointment and complete the

Required

project within two (2) months, i.e. project complete by end of June 2026.

5. TENDER DELIVERABLES

Successful service provider must:

Required

• Define a detailed project plan and obtain approval from WRC before commencing with the project.

• Procure, supply and implement network infrastructure as outlined in the project scope and pricing schedule.

• Provide weekly project progress report to WRC.

• Conduct networking testing for all network points, switches, routers configure on the new offices.

• Provide detailed document network diagram for the entire network infrastructure implemented at the new

offices.

• Document handover document and present them to WRC for review and acceptance.

• Document and present project closure report that clearly stipulates whether all project deliverables were

delivered and met defined specifications.

6. PERIOD / DURATION OF PROJECT / ASSIGNMENT

The project is expected to be completed on or before end of June 2026.

Appointed service provider must be able to commence within a week upon appointment and complete the project within two

Required

(2) months, i.e. project complete by end of June 2026.

• The solution must make provision for any brake fix items for a period of 12 months post implementation.

Required

• All quotations must include the entire setup cost (parts, spares, implementation, project management, post

Required

implementation fixes and travel).

7. THE SPECIFIC GOALS ALLOCATED POINTS IN TERMS OF THIS TENDER - B-BBEE STATUS LEVEL OF CONTRIBUTOR

80/20 points system shall be applied for this project in line with applied Preferential Procurement Regulations 2022.

8. EVALUATION CRITERIA

The bid will be evaluated in accordance with the PPPFMA as follows:

8.1 Phase 1: Compliance to minimum requirements - bidders are requested to submit the information as listed under phase 1

for admin and verification for compliance purposes.

8.2 Phase 2: Pre-qualification evaluation phase - Only bidders that fully complied with the pre-qualification requirements shall

progress to the next phase of evaluation. Failure to fully meet the set pre-qualification requirements will be eliminated.

APPOINTMENT OF A PROFESSIONAL SERVICE PROVIDER FOR THE SUPPLY AND INSTALLATION/ESTABLISHING

OF A ROBUST AND EFFICIENT NETWORK INFRASTRUCTURE IN A NEW OFFICE BUILDING

8.3 Phase 3: Functional evaluation phase as listed in 8.3 below – Only bidders that fully complied with the minimum set

threshold of 75% in this phase shall progress to the next phase of evaluation. Failure to fully meet the set requirements will

be eliminated.

8.4 Phase 4: Pricing and Specific Goals – Only bidders that progressed from the above phase 3 will be eligible for further

evaluation under this phase. Bidder who obtains the highest points shall be recommended for award.

8.5 PHASE 1: SCREENING OF MINIMUM REQUIREMENT CRITERIA

In this phase all bids received will be verified for compliance and completeness of the submitted proposal. No bidders shall be

eliminated under this phase, as the requested information is for administrative purposes. Where clarity or further information

is needed, the WRC reserves the right to request such information for clarity purposes and compliance verification purposes.

• Bid forms must be properly received on the bid closing date and time specified on the invitation, fully completed, dated,

Required

and signed in ink. Late bids will not be accepted for consideration.

• Bid forms must be properly fully completed, dated, signed in ink, and initial every page of the bid.

Required

• Submission of the bid document must be bonded and is without tearing any pages off.

Required

• Invitation to Bid (SBD 1) must be fully completed,

Required

• Submission of a Supplier SARS Tax Compliance Status Verification PIN to enable Water Research Commission to verify Tax

Compliance status on SARS eFilling. NB: Bidders whom their Tax matters are not in order will not be considered for this

bid.

• Submission of fully completed Pricing Schedule

• Submission of fully completed SBD 4 (Declaration of Interest),

• Submission of fully completed SBD 6.1 (Preference Claim Certificate),

• Submission of the original or certified B-BBEE Status Level Verification Certificate or original B-BBEE Sworn Affidavit in case

of EME and QSE)

• Business Registration Certificate e.g. CK 1, certificate of incorporation

• Familiarise yourself and initial every page of the General Condition of Contract

• Submission of Central Supplier Database (CSD) Compliance History Report.

8.1 PHASE 2: PRE-QUALIFICATION EVALUATION PHASE

Bidders are required to submit the below listed requirements in order to comply with Phase 2 of the evaluation;

Required

failure to comply with the pre-qualification shall lead to immediate elimination. Only bidders who complied with

the listed requirements will proceed to the next phase (3) of evaluation.

8.1.1 A minimum of a Ruckus Certified Solution Provider for the proposed hardware – A minimum of a

certification of accreditation or certification is required. A letter or proof of certification from either the

Required

reseller, manufacturer or distributor.

8.1.2 If an equivalent solution is proposed, it is the responsibility of the supplier to provide the equivalent

documentation (certification) for the gatekeeping criteria.

8.1.3 Professional Liability Insurance – provide proof of cover.

APPOINTMENT OF A PROFESSIONAL SERVICE PROVIDER FOR THE SUPPLY AND INSTALLATION/ESTABLISHING

OF A ROBUST AND EFFICIENT NETWORK INFRASTRUCTURE IN A NEW OFFICE BUILDING

8.3 PHASE THREE (3): EVALUATION OF BID RESPONSES USING THE TECHNICAL / FUNCTIONAL REQUIREMENTS:

Criteria Evidence to be submitted for evaluation Weighting

6.3.1 Company Years of Experience providing Bidders to submit company profile clearly indicating the number TOTAL POINTS ALLOCATED FOR EXPERIENCE = 30 POINTS

networking services. of years providing networking services.

• 30 points = More than 10 years’ experience.

• 25 Points = Above 8 up to 10 years of experience.

• 20 Points = Above 6 up to 8 years of experience.

• 15 Points = Above 4 up to 6 years of experience.

• 10 Points = Up to 4 years of experience.

• 0 points = No experience.

6.3.2 Provide detailed project Submit a project plan that outlines how the supply and implementation of network infrastructure in the office will be undertaken.

implementation plan associated timeframes. DELIVERABLES/ ELEMENTS DESCRIPTION POINTS ALLOCATION

(Include roles, responsibilities and 1. Project Plan & Timeframes - Provides a clear, detailed project plan. POINTS ALLOCATED FOR PROJECT PLAN: 20 POINTS

dependencies, time allocation), with specific - Includes realistic and achievable

to a detailed Architecture of proposed timeframes. • Fully detailed plan with logical sequencing and

solution outlining all components. - Shows details activities to be realistic timelines, activities, resources, and

undertaken to implement and test milestones = 20 Points

A complete network diagram showing all network infrastructure at the new offices.

• Plan provided outlines only timelines and

components of the solution including

• Switching setup / connectivity between milestones but not but lacks some detail such as

floors activities per milestones with timelines and

• Marked cabling diagram as per supplied resources required per activities. = 15 Points

Required

floor plan • Basic outline with vague or unrealistic timeframes

• Access Points location = 10 Point

• Project plan not addressed/ submitted = 0 Points

2. Coverage of Key Phases in Addresses all key phases: POINTS ALLOCATED FOR COVERING KEY PHASES IN

the project plan clearly • Project planning THE PROJECT PLAN: 20 POINTS

defined. • Client or relevant stakeholder • All project phases clearly defined and integrated

engagement into the proposal = 20 Points.

• Implementation • Most phases addressed but with limited

• Monitoring or Evaluation

integration or detail in the proposal = 15 Points.

• Project Closure

APPOINTMENT OF A PROFESSIONAL SERVICE PROVIDER FOR THE SUPPLY AND INSTALLATION/ESTABLISHING OF A ROBUST AND EFFICIENT NETWORK INFRASTRUCTURE IN A

NEW OFFICE BUILDING

• Few phases mentioned with minimal explanation

in the proposal = 5 Points.

• 0 – Not addressed = 0 Points.

6.3.3 Signed Reference letters from clients 5 reference letters showing institutional review work must be POINTS ALLOCATED FOR REFERENCE LETTERS: 30 POINTS

Required

(on client letterheads where applicable) for attached.

whom similar work was conducted, specific The service provider should submit reference letters on the letter • One reference letter equals to = 10 points

to Network Configuration and setup head of the referee and signed by the referee (not purchase order • Two reference letters equal to = 15 points

(Switches, AP’s, Cabling) or contracts) to be allocated points under this criterion. • Three reference letters equal to = 20 points

• Four reference letters equal to = 25 points • Information to be included in the NB: WRC reserves the right to directly afford questionnaires to

• Five reference letters equal to = 30 points reference letter should meet the selected clients (references) to rate the service per the afforded

following criteria: reference letter.

• Letter must be in the client’s letterhead.

Required

• Letter signed by the client.

• Letter to indicate the type of

work/services rendered.

• The letter to indicate whether the

services rendered were satisfactory.

• Contact details and email address

Total weighting 100 Points

Minimum Threshold 75%

Minimum Qualification Threshold: Service providers are expected to meet a minimum 75% threshold on the above technical requirements. Only service provider/s who met the

set minimum threshold on the technical evaluation phase will progress to the next phase of evaluation. Suppliers who fail to meet the set minimum threshold shall be considered

non-responsive and shall be eliminated on technical evaluation.

8.4 PHASE 4: PRICE AND SPECIFIC GOALS

Only bidders that progressed from the above phase 3 will be eligible for further evaluation under this phase. Bidder who obtains the highest points shall be recommended for award.

Price Based on formula 80 points

Specific Goals • Woman Owned Businesses, or Youth Owned Businesses, or Businesses 20 points

owned by people with disabilities (5 points)

• B-BBEE Certificate (15 points)

TOTAL POINTS 100 POINTS

APPOINTMENT OF A PROFESSIONAL SERVICE PROVIDER FOR THE SUPPLY AND INSTALLATION/ESTABLISHING OF A ROBUST AND EFFICIENT NETWORK INFRASTRUCTURE IN A

NEW OFFICE BUILDING

PROJECT PRICING SCHEDULE

The bidders should submit their total project amount linked to the total cost per deliverables which shall be applicable for this bid:

NB: The project total cost must be VAT inclusive and disbursement cost (where applicable).

Required

Section Item Specification / Details Qty Unit Unit Rate TOTAL Remarks

(ZAR) (ZAR)

Switching RUCKUS ICX 8200 RUCKUS ICX 8200 Switch, 4810/100/1000 Mbps PoE+ 2 each R R Include all SFPs, fibre

PoE+ ports, 425 GbE SFP28 stacking/uplink-ports, 370 W PoE modules, licenses

budget, three-year remote TAC support. (“or equivalent”).

Switching RUCKUS ICX 8200 non- 4810/100/1000 Mbps ports, 425 GbE SFP28 stacking / 5 each R R Include all SFPs, fibre

PoE uplink-ports, three-year remote TAC support. (“or modules, licenses

equivalent”).

Switching SFP Modules 10G DAC Cable - Stacking 1 lot R R Vendor to size per design

10 Gig Single Mode SFP Modules

1 Gig Single Mode SFP Modules

Switching Fibre Patch Cords & LC-LC/LC-SC single-mode/multi-mode as per design 1 lot R R Per uplink and inter-rack

Pigtails runs

Switching Monitoring & Mgmt 3-year license for switch monitoring/management 1 lot R R Covers all 7 switches

License (Switches) (Cloud/On-prem as proposed)

Switching Network Setup & VLANs, L3, STP, QoS, HA/failover, testing & validation 1 lot R R Includes documentation

Configuration & handover

(Switches)

Wi-Fi RUCKUS R370 AP Wi-Fi 7 dual-band 2.4/5GHz, 2x2:2, up to 256 clients, PoE 22 each R R Include mounting

(“or equivalent”). brackets

Wi-Fi RUCKUS R670 AP Wi-Fi 7 tri-band (2.4/5/6GHz), 2x2+2x2+2x2, PoE (“or 4 each R R High-density areas

equivalent”).

Wi-Fi and Cloud Subscription Ruckus professional cloud license – 3 years for centralized 1 lot R R Covers all APs & switches

Switches (APs & Switches) mgmt & monitoring

Wi-Fi AP Installation & Mounting brackets, cabling, RF tuning, coverage validation, 1 lot R R Includes heatmap

Optimization reporting automation validation

Cabling & CAT6 Points Installed 175x terminated, tested & labelled outlets (incl. faceplates, 175 point R R Include test results &

Connectivity keystones) labels

Cabling & Patch Panels CAT6 24/48-port patch panels with brush panels 1 lot R R Count to suit 175 points

Connectivity

APPOINTMENT OF A PROFESSIONAL SERVICE PROVIDER FOR THE SUPPLY AND INSTALLATION/ESTABLISHING OF A ROBUST AND EFFICIENT NETWORK INFRASTRUCTURE IN A

NEW OFFICE BUILDING

Cabling & 42U Cabinets Floor-standing 42U racks with ventilation, PDU, cable 2 each R R Include rack accessories

Connectivity mgmt

Cabling & Inter-floor Fibre Dual fibre runs between floors + trunking/ducting + 2 run R R For redundancy (A/B

Connectivity Backbone termination paths)

Cabling & Structured Cabling Routing, dressing, labelling, documentation 1 lot R R As-built docs & floorplan

Connectivity Labour diagram

Power Rack-mount UPS 10kVA rack-mount UPS + external battery pack; installation 2 each R R One per rack

& commissioning

Power Rack PDU Intelligent PDUs per rack (redundant A/B) 4 each R R Include rack accessories

Professional Project Management Planning, coordination with internal IT & ISP, milestones & 1 lot R R Includes stakeholder

Services reporting. liaison

Professional Network Diagram & Detailed diagrams, floorplan labels, config backups, SOPs, 1 lot R R For audit & internal

Services Documentation Heatmap records

Professional Testing & Handover End-to-end testing, sign-off, training session 1 lot R R Include test sheets

Services

Compliance Equivalent Solution Neutral-source proof of enterprise grade equivalence 1 lot R R If proposing non-Ruckus

Evidence (performance, security, management, warranty, support)

Subtotal: R

Contingency (10%): R

VAT (15%): R

Grand Total R

APPOINTMENT OF A PROFESSIONAL SERVICE PROVIDER FOR THE SUPPLY AND INSTALLATION/ESTABLISHING OF A ROBUST AND EFFICIENT NETWORK INFRASTRUCTURE IN A

NEW OFFICE BUILDING

This bid will be evaluated on 80/20 preferential points.

Criteria Weight Sub-criteria

Total Price 80/100 Benchmark against lowest quote

Specific Goal 20/100 Specific Goals points will be awarded to bidders according

to their size of the firm as follows:

• Woman or Youth or People with disability Owned

Businesses:

a. 5 points to be awarded to woman owned businesses

(30% and above ownership %).

• B-BBEE Certificate:

a. 15 points to be awarded to bidders based on the BBBEE

status level of contributor as indicated in the BBBEE

accreditation certification in line with the table below.

BBBEE LEVELS SCORES

Level 1 15

Level 2 12

Level 3 8

Level 4 6

Level 5 2

4. CONTRACT PERFORMANCE

4.1. To improve project management and service provider performance, the WRC will conduct regular reviews of service delivery

against the scope of work. This includes evaluating each project deliverable to determine whether the service was rendered

in line with the agreed scope. The WRC reserves the right to cancel the contract should the service provider fail to perform

optimally, after being given an opportunity to address poor performance or quality issues.

4.2. Schedule of payments linked to key outputs.

5. SUPPLIER DUE DILIGENCE

WRC reserves the right to conduct supplier due diligence prior to the final award or at any time during the contract period. This

may include requests for additional information where necessary.

6. CONFIDENTIALITY

All information related to this RFP is to be treated with strict confidence. In this regard Respondents are required to certify that

Required

they have acquainted themselves with the Non-Disclosure Agreement.

All information related to a subsequent contract, both during and after completion thereof, will be treated with strict confidence

and subject to signing of Non-Disclosure Agreement. Should the need however arise to divulge any information related to this

RFP or the subsequent contract, written approval must be obtained from WRC.

Required

7. LIMITATION OF LIABILITY

A bidder participates in this bid process entirely at its own risk and cost. WRC shall not be liable to compensate a bidder on any

grounds whatsoever for any costs incurred or any damages suffered as a result of the Bidder’s participation in this Bid process.

Annex C: PRICING SCHEDULE – FIRM PRICE

This annexure should be completed and signed by the Bidder’s authorised personnel as indicated below:

1 Please indicate your total bid price here: R............................................................................................................................

(Total Bid Amount – All Inclusive)

2 Important: It is mandatory to indicate your total bid price as requested above. This price must be the

Required

same as the total bid price you submit in your pricing schedule. Should the total bid prices differ, the one

indicated above shall be considered the correct price.

3 NOTE: All prices must be VAT inclusive (15% - where applicable) and must be quoted in South African Rand

Required

(ZAR).

4 Are the rates quoted firm for the full period of the contract?

YES NO5 Mandatory: Price must be fixed for the duration of the bid validity.

Required

WRC005-2025/26 APPOINTMENT OF A SERVICE PROVIDER FOR THE SUPPLY AND 28

INSTALLATION/ESTABLISHING OF A ROBUST AND EFFICIENT

NETWORK INFRASTRUCTURE IN A NEW OFFICE BUILDING

Annex D: PRICING SCHEDULE – DECLARATION

Price Declaration Form

To: WRC,

Having read through and examined the Tender Document, Tender no. WRC-005-2025/26 the General Conditions, The

Requirement and all other Annexes to the Tender Document, we offer for the APPOINTMENT OF A PROFESSIONAL

SERVICE PROVIDER TO CONDUCT AN INDEPENDENT INSTITUTIONAL ASSESSMENT OF THE WATER RESEARCH

COMMISSION (WRC) ORGANISATIONAL OPERATING MODEL, for the total tendered contract sum of:

R_________________________________________(including VAT). In Words: _________________________________

___________________________________________________________________________________ (including VAT)

We confirm that this price covers all activities associated with the rendering of the APPOINTMENT OF A SERVICE

PROVIDER FOR THE SUPPLY AND INSTALLATION/ESTABLISHING OF A ROBUST AND EFFICIENT NETWORK

INFRASTRUCTURE IN A NEW OFFICE BUILDING. We undertake to hold this offer open for acceptance for a period of

120 days from the date of submission of offers. We further undertake that upon final acceptance of our offer, we

will commence with delivery when required to do so by the Client.

Required

Moreover, we agree that until formal Contract Documents have been prepared and executed, this Form of Tender,

together with a written acceptance from the Client shall constitute a binding agreement between us, governed by

the terms and conditions set out in this Request for Proposals.

We understand that you are not bound to accept the lowest or any offer and that we must bear all costs which we have

Required

incurred in connection with preparing and submitting this tender.

We hereby undertake for the period during which this tender remains open for acceptance not to divulge to any persons,

other than the persons to which the tender is submitted, any information relating to the submission of this tender or the

details therein except where such is necessary for the submission of this tender.

SIGNED DATE

(Print name of signatory)

Designation

FOR AND ON BEHALF OF: COMPANY NAME

Tel No

Email

Cell No

WRC005-2025/26 APPOINTMENT OF A SERVICE PROVIDER FOR THE SUPPLY AND 29

INSTALLATION/ESTABLISHING OF A ROBUST AND EFFICIENT

NETWORK INFRASTRUCTURE IN A NEW OFFICE BUILDING

Annex E : Attach a valid Supplier SARS Tax Compliance Status Verification PIN to enable Water Research Commission to

verify Tax Compliance status on SARS eFiling

WRC005-2025/26 APPOINTMENT OF A SERVICE PROVIDER FOR THE SUPPLY AND 30

INSTALLATION/ESTABLISHING OF A ROBUST AND EFFICIENT

NETWORK INFRASTRUCTURE IN A NEW OFFICE BUILDING

compliance

No specific requirements found

Required

B-BBEE Minimum Level: 1

Required
Government

Water Research Commission

Contact Information

www.wrc.org.za/
+27 12 761 9300
[email protected]
Lynnwood Bridge Office Park, 4 Daventry St, Lynnwood Manor, Pretoria, 0081, South Africa
Document being processed
  1. Document read
  2. Compliance review
  3. Bid-ready summary

AI Document Analysis

Unlock the full AI-extracted sections, compliance review, and bid-ready summaries from this tender's documents

Already subscribed or have a bundle? Sign in

Tender Documents1
Checking access...

TENDER DOCUMENT WRC-005-2025-26 -NETWORK INSTALLATION IN A NEW OFFICE BUILDING.pdf

Unknown sizePDF

Share this tender

APPOINTMENT OF A PROFESSIONAL SERVICE PROVIDER FOR THE SUPPLY AND INSTALLATION/ESTABLISHING OF A ROBUST AND EFFICIENT NETWORK INFRASTRUCTURE IN A NEW OFFICE BUILDING

Water Research Commission tender in Gauteng. Closing 3/2/2026. Appointment of a professional service provider for the supply and installation/establishing of a robust and efficient network infrastructure in a new ...

https://www.tenders-sa.org/tenders/cml812ao80070uaxgw89hbnir
AI Power Tools
Speed up your application process

Implementation Plan

Generate a 6-section delivery plan for this tender instantly.

Smart Assistant

Check if your company qualifies for this tender before you apply.

AI Match Analysis

Sign in to see how well your company matches with this tender.

Contact Information

Organization

Water Research Commission

Contact Person

Supply Chain Management

Phone

+27 12 761 9300

Email

[email protected]

Website

www.wrc.org.za/

Address

Lynnwood Bridge Office Park, 4 Daventry St, Lynnwood Manor, Pretoria, 0081, South Africa

Tender Status
Closed

2 March 2026 at 09:00

349
Requirements
0
Documents
Key Information

Location

Gauteng

Closing Date

2 March 2026 at 09:00

Organization

Water Research Commission

Industry Categories
Information and communication
Important Reminders

Urgent: Closing Soon

This tender closes in less than 3 days

Mandatory Requirements

This tender has mandatory submission requirements

Publisher Connect

Are you a news editor or niche publisher? Embed this tender data directly on your site for free.

Get Embed Code
Partner Network

AI-generated Document Analysis for Tender WRC005-2025/26 by Water Research Commission. 0 business days remain.