Documents available on tender detail page
Tender Type
Request for Bid(Open-Tender)
Delivery Location
Grootvlei Power Station, between Heidelberg and Villiers next to N3 - Grootvlei - Balfour - 2410
Organization Type
GOVERNMENT
Published
31 Aug 2026
OCDS Reference
ocds-9t57fa-167564
ESKOM seeks a service provider to perform continuous emissions monitoring system (cems) correlation and parallel tests at grootvlei power station over a 5-year period. The single most consequential requirement is sanas accreditation for stack emission testing in accordance with iso/iec 17025:2017, which is a mandatory gatekeeper criterion β failure to provide proof of accreditation results in immediate disqualification.
Closing date and time: 28 October 2026 at 10:00am; electronic submission only via https://etendering.eskom.co.za (PDF and Excel price list, 500 MB per document, 4 GB total).
Mandatory technical gatekeeper: SANAS accreditation certificate for Stack Emission Testing per ISO/IEC 17025:2017 β no certificate means immediate disqualification.
Functionality evaluation: minimum 70% overall weighted score across Company Profile and Capability (30%), Method Statement (25%), Turnaround Time (15%), Test Programme (15%), Skilled Personnel (15%).
Price and Specific Goals evaluated on 80/20 preferential point system; prices inclusive of VAT, scored out of 80 or 90 points; Specific Goals out of 20 or 10 points.
Mandatory returnables at closing (disqualifiable if missing/unsigned): Annexures A, B, C, D, E, F, G1-G4 (if designated materials), H (SBD 1), J (SBD 4), E-tendering Help Manual acknowledgement form.
Mandatory contractual requirement prior to award: CSD registration (CSD number/report).
Additional contractual requirements prior to award: Safety (OHS acknowledgement), Quality (ISO 9001 QMS evidence per Specification 240-105658000), Environmental (documented EMS, Grootvlei compliance, appointed personnel, method statements, waste management, Duty of Care, incident reporting, polluter pays, audit participation), Due Diligence (latest approved annual financial statements with full set of statements and notes, public interest score if not audited, ITA34C current and previous years, each JV/SPV partner submits own financials).
Date & Time
Wednesday, 28 October 2026 - 11:00
Venue
null
Tenders are to be submitted electronically via ESKOM e- tendering site by the stipulated closing date and time. Please note IT is the responsibility of the supplier to ensure that the tender submission is submitted before the closing time
Categories
Request for Bid(Open-Tender)
Grootvlei Power Station, between Heidelberg and Villiers next to N3 - Grootvlei - Balfour - 2410
31 Aug
2026
Tender Published
Tender was published
28 Oct
2026
Closing Date
Tender closing date
These references help suppliers understand the public-procurement framework around this opportunity. They are generated from the tender category, issuing organisation type and procurement context.
SDL&I.pdf
Continue with tenders sharing this issuer, category, or province.
Median Estimate
RΒ 736Β 920
Range
Based on 25 comparable awarded tenders. Companies with similar profiles typically bid near the median.
* Estimates are based on historical data and do not guarantee actual award values.
AI Document Analysis Stages
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically β no action required from you.
Description
Source: Supplier Quality Management Specification.pdfThis document (240-105658000, QM 58, Rev 3) is Eskom's Supplier Quality Management Specification. It specifies minimum quality requirements for all existing and potential Eskom suppliers and sub-suppliers, and defines quality criteria for selection, evaluation, vendor registration, management, monitoring, assessment, and auditing. Eskom's position is to partner with suppliers demonstrating commitment to developing, implementing, and maintaining a QMS conforming to ISO 9001, with continual improvement. The specification applies across all Eskom divisions, subsidiaries, suppliers, and sub-suppliers, and forms part of all RFIs, RFQs, RFPs, and contracts for products and services. Effective from authorisation date (17 October 2021). Next review: October 2024. Compiled by SA Sambo (Chief Advisor Quality Management), supported by P Dondashe (Middle Manager Quality Management), authorised by L Meyer (Acting Senior General Manager Quality Risk and Management Sustainability) and K Pather (Functional Responsibility).
Important Dates
Source: Supplier Quality Management Specification.pdf (unknown)Specification authorised: 17 October 2021. Next review date: October 2024. Tender closing date: 28 October 2026 at 11:00 (from tender record). No mandatory briefing or site visit dates stated in this specification.
Contact Information
Source: Supplier Quality Management Specification.pdf (unknown)Eskom Quality Management function (no named individual, email, or phone provided in this specification). Eskom Holdings SOC Ltd, Reg No 2002/015527/30. For tender-specific enquiries, refer to the tender advertisement or SCM contact in the tender document pack.
Submission Guidelines
Source: Supplier Quality Management Specification.pdf (unknown)Bidders must complete and sign Form A (document 240-68099512) and submit it with the tender returnables listed in the List of Tender Returnables (document 240-12248652). The applicable quality category (Category 1, 2, 3, or 4) will be indicated in Form A by the Eskom quality representative. Bidders must provide all returnable documentation required for the selected category, which may include: a valid ISO 9001 certificate from an accredited certification body; latest internal and external management system audit reports with nonconformities and corrective actions; a draft contract quality plan specific to the scope of work addressing ISO 10005 requirements; an example inspection and test plan (ITP) or quality control plan (QCP) from similar previous work; documented information for control of externally provided processes, products and services; documented information for roles, responsibilities and authorities (organisation charts, job descriptions, procedures); and records of management review meetings (agenda, minutes, attendance registers, reports). Sub-suppliers involved in design, manufacturing, maintenance, testing, storage, delivery, installation, commissioning, or project management must meet equivalent QMS requirements. The main supplier is responsible for defining and managing sub-supplier quality assurance and control elements. Eskom reserves the right to assess sub-supplier facilities.
Evaluation Criteria
Source: Supplier Quality Management Specification.pdf (unknown)Evaluation is based on the supplier's quality management system conforming to ISO 9001 (latest revision) and the requirements of this specification (240-105658000, QM 58). Suppliers are classified into four quality categories (Category 1 to 4) per procurement process; only one category applies. The Eskom quality representative selects the applicable category and completes Form A. Minimum requirements per category:
Capability and capacity assessments are performed pre-award for high-risk operational services, critical plant/equipment work, critical plant items/components, and special processes. PPPFA (Preferential Procurement Policy Framework Act) and CIDB 1004 guideline A4 are referenced for preferential procurement and quality evaluation in tenders. No specific price/functionality split, minimum qualifying scores, or B-BBEE level are stated in this specification.
Technical Specifications
Source: Supplier Quality Management Specification.pdf (unknown)Scope: Continuous Emissions Monitoring System (CEMS) correlation and parallel tests at Grootvlei Power Station for 5 years (from tender title). This specification (240-105658000, QM 58, Rev 3) defines minimum quality requirements for all Eskom suppliers and sub-suppliers. Applies to all Eskom divisions, subsidiaries, suppliers, sub-suppliers and forms part of all RFIs, RFQs, RFPs, and contracts for products and services. Effective date: date of authorisation (17 October 2021).
Normative references: ISO 9001 (QMS requirements), ISO 10005 (quality plan guidelines).
Informative references: ISO 9000, ISO 10006, ISO 9004, Eskom SHEQ Policy (32-727), Eskom Procurement Policy (32-1033) and Procedure (32-1034), PPPFA, CIDB 1004, IAEA GS-R-3.1, SANS 10845-1, List of Tender Returnables (240-12248652).
Key definitions: Hold Point (work cannot proceed without Eskom attendance/authorisation), Witness Point (work may proceed after formal notification and waiver confirmation), Intervention Points (inspection, hold, surveillance, witness, review, verification), Inspection Agency (Eskom-appointed QA/QC body), Level 1/2/3 Plant Items (safety/environment/production impact classification), Special Process (results cannot be fully verified before delivery), Nonconformity (deficiency rendering quality unacceptable or indeterminate).
Abbreviations: AIA, CA, CQP, FIDIC, FMECA, HAZOP, ITP, NC, NDT, PMI, QCP, QMS, PQP, RFI, RFQ, RFP, SHEQ, SETA, WPS, WQR.
Roles: Eskom quality representative selects applicable requirements via Form A; supplier completes and signs Form A; supplier manages sub-supplier quality programmes; Eskom audits application per management system audit schedule.
Quality Plan minimum requirements (3.2): Documented, implemented, reviewed, maintained contract quality plan (CQP) and/or quality control plan (QCP/ITP) where specified in evaluation criteria or tender returnables. Production/service provision per agreed CQP/QCP/ITP. Plan for quality activities and interfaces.
Contract Quality Plan (3.3): Must address ISO 10005 elements plus: records management (material tests, PMI, certifications); free access for inspection; final documentation submission prior to shipment; special welding processes (WQR, WPS, PQR, welder qualification to codes); special installation/fabrication procedures (PWHT, tube rolling, coatings) with personnel qualified/registered per statutory requirements; personnel certification per SETA; training needs identification and implementation; storage/preservation/maintenance instructions prior to receipt; sub-supplier quality monitoring by Eskom/agent; CQP content (QMS aspects applied, resources, communication, authority/responsibility, document/record list, contact details, monitoring procedures). Sub-supplier CQPs submitted per supplier/Eskom review. CQPs submitted before kick-off/pre-fabrication meeting or manufacturing commencement. Eskom CQP template (240-109253698) available as guideline.
Quality Control Plan (3.4): All manufacturing/fabrication/assembly/installation stages controlled by supplier QCP/ITP identifying quality verifications, critical products/services. QCP/ITP reviewed/accepted by Eskom/inspection authority with hold/witness points inserted before work. Changes require Eskom agreement. ITPs cover material certification, fabrication, in-process inspections, final acceptance tests, packaging, preservation, site acceptance, construction/erection, pre-commissioning/commissioning. Sub-supplier QCP/ITP performed using Eskom-accepted supplier QCP/ITP. Codes/standards/acceptance criteria available at work location in English. Separate QCP/ITP per sub-supplier scope. Supplier accountable for all sub-supplier QCP/ITPs. Eskom reserves right to select intervention points, perform surveillance/audits. Signed ITPs/QCPs become contract addendums. QCP/ITP content: contract number/title, supplier order number, work area, description with components/item numbers/dates, unique number, sequence of operations with inspections/tests, specification/drawing/procedure references with criticality risk rating, acceptance criteria with clause references, supplier intervention points, provision for Eskom intervention points, sign-off provisions, inspection/test records generated and provided to Eskom. Sub-supplier QCP/ITPs must include: equipment/location descriptions, quality verification activity/stage, reference documents/procedures/method statements with specific sections/pages, acceptance criteria, certifying documents with Eskom numbering, inspection activities (witness, hold, document review, verification) with sign-off, inspector qualifications, test procedures, acceptance criteria per tolerances, signed acceptance section, intervention points (FAT, PAT, witness, hold). Quality kick-off meeting at contract start and each phase; 14 days' notice to Eskom. Inspection personnel competent per Project Quality Personnel Qualification Specification. Mandatory pre-inspection meetings convened by Eskom/AIA. Eskom may appoint resident quality inspectors at supplier/sub-supplier premises (supplier provides workspace at no cost). Eskom may appoint any organisation as AIA/inspection agency; supplier/sub-suppliers may not object/hinder. Eskom QCP/ITP template (240-109253302) available as guideline.
Methodology
Source: Supplier Quality Management Specification.pdfMethod statements required for special installation/fabrication procedures (post-weld heat treatment, tube rolling, coatings, etc.) and special processes (NDE, welding, coating, heat treatment). Method statements must be reviewed and accepted by supplier prior to manufacture. Quality method statement required for Category 4 suppliers per ISO 9001 specific to scope of work. Method Statement Template available (240-126469599). Sub-supplier QCP/ITPs must include reference documents, procedures, method statements with specific sections/pages. FMECA and HAZOP reports required where applicable for equipment and sub-systems.
Experience & Qualifications
Source: Supplier Quality Management Specification.pdfPersonnel performing special processes must be certified competent via internal training/competency procedures or external accredited providers per SETA requirements. Welders qualified to specified Codes of Construction; records maintained (WQR, WPS, PQR). Inspection personnel (including agency) must be competent and qualified per Project Quality Personnel Qualification Specification. Quality audits carried out by trained, accredited, experienced personnel per documented procedures. Supplier must identify and document training needs for all personnel affecting quality; implement training per company procedures; certificates must meet SETA requirements (unit standard completed, provider accreditation number). Sub-supplier personnel qualifications managed by main supplier.
Quality Management
Source: Supplier Quality Management Specification.pdfQuality Management System Requirements (3.1): Supplier and sub-suppliers must develop, implement, maintain, and improve a formal QMS conforming to latest ISO 9001 and this specification. System must include documented information per ISO 9001 (quality manual, quality plans, procedures, work instructions, method statements, workflow documentation). Valid ISO 9001 certificate from accredited body required unless excluded by quality category. Sub-suppliers performing design, manufacturing, maintenance, testing, storage, delivery, installation, commissioning, or project management must meet equivalent QMS requirements. Supplier must inform Eskom of proposed QMS or staff changes affecting quality prior to implementation. Supplier must implement sub-supplier performance management programme including QMS verification, audits/surveillances, CQP/QCP reviews, nonconformity/defect management, inspection/test plans, risk management.
Quality Plan (3.2): Minimum requirements for quality plan. Documented, implemented, reviewed, maintained CQP and/or QCP/ITP where specified. Production/service per agreed plans. Planning for quality activities and interfaces.
Contract Quality Plan (3.3): Detailed requirements per ISO 10005 plus Eskom-specific additions (records management, access, final documentation, special processes, personnel qualification, training, preservation, sub-supplier monitoring, content structure). Sub-supplier CQPs submitted for review. CQPs due before kick-off/pre-fabrication or manufacturing. Eskom template available.
Quality Control Plan (3.4): Comprehensive requirements for QCP/ITP development, review, acceptance, content, sub-supplier management, Eskom intervention points, kick-off meetings, inspector competence, pre-inspection meetings, resident inspectors, AIA appointment, templates.
Post-Contract Award (3.7): Contract execution per accepted plans. Supplier quality performance monitoring phase. Supplier quality audits by trained, accredited, experienced personnel per documented procedures.
Pricing Schedule
Source: Supplier Quality Management Specification.pdfNo pricing schedule, rates, bill of quantities, or payment schedules provided in this specification. This is a quality management specification; commercial terms are defined in the tender document pack.
Financial Requirements
Source: Supplier Quality Management Specification.pdf (unknown)No pricing format, bonds, guarantees, payment terms, or financial capacity thresholds stated in this specification. Refer to the tender document pack for commercial terms.
Compliance Requirements
Source: Supplier Quality Management Specification.pdf (unknown)Mandatory: CSD registration (implied for all Eskom tenders); valid tax compliance status (SARS PIN); B-BBEE certificate or sworn affidavit for preference points (PPPFA referenced); ISO 9001 certification from accredited body (unless excluded by quality category in Form A); completion and signature of Form A (240-68099512); submission of all category-specific returnable documents per List of Tender Returnables (240-12248652). CIDB registration may be required if construction-related work falls under CIDB Act (CIDB 1004 referenced). Professional registration requirements apply for special processes (e.g., NDE, welding, radiography) per statutory bodies and SETA. Local content requirements not specified in this specification. CIPC registration implied for juristic persons. No specific B-BBEE minimum level stated in this specification.
Health & Safety
Source: Supplier Quality Management Specification.pdfReference to Eskom SHEQ Policy (32-727) and IAEA Safety Standard GS-R-3.1. Level 1 Plant Items definition includes equipment whose failure affects personnel safety/health or causes environmental incidents. Special processes require personnel qualified/registered per statutory requirements (e.g., radiographic workers). No detailed OHS requirements, safety plans, or HSE compliance specifics provided in this specification. Refer to project-specific SHEQ requirements and Eskom SHEQ Policy.
Contractual Terms
Source: Supplier Quality Management Specification.pdfStandard conditions (3.8):
Section
Source: Supplier Quality Management Specification.pdfEvaluation criteria are embedded in the four quality categories (1-4) selected per procurement process via Form A. The Eskom quality representative identifies applicable requirements. Minimum returnable documentation per category:
Capability and capacity assessments conducted pre-award for high-risk services, critical plant work, critical items/components, and special processes. PPPFA and CIDB 1004 guideline A4 referenced for preferential procurement and quality evaluation. Specific tender returnables selected via List of Tender Returnables (240-12248652).
These rules commonly apply to South African public-sector procurement.
Act 53 of 2003
Provides the empowerment-compliance context often used in public-sector supplier evaluation.
Relevant because this is a South African public-sector procurement opportunity.
Act 108 of 1996 (s217)
Sets the constitutional standard for fair, equitable, transparent, competitive and cost-effective public procurement.
Relevant because this is a South African public-sector procurement opportunity.
Act 5 of 2000
Covers preferential procurement and preference-point systems used in public tenders.
Relevant because this is a South African public-sector procurement opportunity.
Act 12 of 2004
Supports anti-corruption controls and supplier integrity in procurement processes.
Relevant because this is a South African public-sector procurement opportunity.
Act 28 of 2024
Provides the national framework for public procurement across government.
Relevant because this is a South African public-sector procurement opportunity.
Act 2 of 2000
Supports access to tender records, award decisions and public-sector procurement information.
Relevant because this is a South African public-sector procurement opportunity.
Act 3 of 2000
Supports lawful, reasonable and procedurally fair administrative tender decisions.
Relevant because this is a South African public-sector procurement opportunity.
This is general procurement context, not legal advice. Always verify requirements in the official tender documents and issuing authority notices.
OHS Legal Requirements.pdf
C1 2b TSC3 Data by Contractor.pdf
SHE Tender Evaluation Template.pdf
Eskom requires a service provider to perform Continuous Emissions Monitoring System (CEMS) correlation and parallel tests at Grootvlei Power Station in Mpumalanga for a five-year period. The tender is classified as high-risk from an occupational health and safety perspective, requiring extensive OHS compliance documentation and competency verification.
Grootvei power Station Tender Technical Evaluation Strategy Final1.pdf
Eskom requires a SANAS-accredited service provider to perform continuous emissions monitoring system (CEMS) correlation and parallel tests at Grootvlei Power Station's North Stack over a five-year period. The scope covers dust monitor correlation tests (isokinetic sampling), gas monitor parallel verification tests (QAL2), spot checks, and biannual isokinetic sampling for PM, SO2, and NOx as per the station's Atmospheric Emission Licence and national standards.
C0 TSC3 Contract cover pages.pdf
Eskom Holdings SOC Ltd is procuring a five-year service contract for continuous emissions monitoring system (CEMS) full correlation and parallel tests at Grootvlei Power Station in Mpumalanga. The contract will be executed under the NEC3 Term Service Contract (TSC3) framework.
C2 TSC3 Pricing Data Option A.pdf
Eskom Holdings SOC Ltd is procuring a five-year service contract for continuous emissions monitoring system (CEMS) full correlation and parallel tests at Grootvlei Power Station in Mpumalanga. The contract uses the NEC3 Term Service Contract (TSC3) Option A pricing model with a priced activity schedule.
Supplier Quality Mangement.pdf
Eskom requires a service provider to perform continuous emissions monitoring system correlation and parallel tests at Grootvlei Power Station in Mpumalanga for a five-year period. The tender includes specific quality management system requirements aligned with ISO 9001:2015 that must be demonstrated through documented evidence.
Tender and Contract Quality.pdf
Eskom requires a service provider to perform Continuous Emissions Monitoring System (CEMS) correlation and parallel tests at Grootvlei Power Station in Mpumalanga for a five-year contract period.
Enivoronmemtal Evaluation Form.pdf
Eskom requires a service provider to perform Continuous Emissions Monitoring System (CEMS) correlation and parallel tests at Grootvlei Power Station in Mpumalanga for a five-year period. The evaluation places significant emphasis on environmental management capabilities, legal compliance, and SANAS accreditation.
C3 1 TSC3 Employers Service Information rev 1.pdf
Eskom requires a contractor to perform Continuous Emissions Monitoring System (CEMS) correlation tests for particulate monitors and parallel tests for gaseous monitors at Grootvlei Power Station over a five-year period. The work is governed by specific international standards (VDI 2066, EN 13284-1, ISO 9096, ISO 12141, EN 14181) and Eskom standards, with strict quality, safety, and environmental compliance requirements.
High Risk Specification.pdf
Eskom requires a contractor to perform Continuous Emissions Monitoring System (CEMS) correlation tests for dust monitors and parallel tests for gas monitors at Grootvlei Power Station in Mpumalanga over a 5-year period. The work must comply with VDI 2066 / ISO 9096 / EN 13284-1 for dust and EN 14181 for gas, with specific test frequencies, sample counts, and quality criteria.
Scope of Work (3).pdf
Eskom requires a contractor to perform Continuous Emissions Monitoring System (CEMS) correlation and parallel tests at Grootvlei Power Station in Mpumalanga for a five-year period. The work covers dust monitor correlations and gaseous monitor parallel tests on the North Stack to ensure compliance with the station's Atmospheric Emission Licence (Dipaleseng/Eskom H SOC Ltd/GPS/0015/2024/F04) and the Eskom Emissions Monitoring and Reporting Standard.
C1 2a TSC3 Data by Employer.pdf
Eskom Holdings SOC Ltd is procuring a five-year service contract for Continuous Emissions Monitoring System (CEMS) correlation and parallel tests at Grootvlei Power Station in Mpumalanga. The contract is based on the NEC3 Term Service Contract (April 2013) with main Option A (Priced contract with price list) and multiple secondary options including price adjustment for inflation, changes in law, low service damages, limitation of liability, and task orders.
Scope of Work (3).pdf
Eskom requires a contractor to perform Continuous Emissions Monitoring System (CEMS) correlation and parallel tests on the North Stack at Grootvlei Power Station in Mpumalanga for a five-year contract period. The work involves correlating dust monitors against manual gravimetric reference methods and verifying gas monitors using Standard Reference Methods to produce calibration functions, ensuring compliance with the station's Atmospheric Emission Licence and Minimum Emission Standards.
Supplier Quality Management Specification.pdf
Eskom requires a supplier to perform Continuous Emissions Monitoring System (CEMS) correlation and parallel tests at Grootvlei Power Station in Mpumalanga for a five-year period. The procurement is governed by Eskom's Supplier Quality Management Specification (240-105658000), which mandates compliance with ISO 9001 and the submission of specific quality documentation based on an assigned quality category.
C1 1 TSC3 Offer Acceptance.pdf
Eskom Holdings SOC Ltd invites offers to perform Continuous Emissions Monitoring System (CEMS) full correlation and parallel tests at Grootvlei Power Station in Mpumalanga for a contract period of 60 months (5 years).
Invitation to Tender (ITT) Correlation and Parallel testing_.pdf
Eskom Holdings SOC Ltd invites tenders for performing Continuous Emissions Monitoring System (CEMS) correlation and parallel tests at Grootvlei Power Station in Mpumalanga for a period of 5 years (60 months). The tender requires a SANAS-accredited service provider for stack emission testing in accordance with ISO/IEC 17025:2017.
To download these documents and access AI-powered analysis, visit the main tender page.
Organization
EskomContact Person
Thandi Mavasa
Phone
051-404-2045
[email protected]
Address
Grootvlei Power Station, between Heidelberg and Villiers next to N3 - Grootvlei - Balfour - 2410
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
18
Last checked
01 Sept 2026
AI status
Enhanced
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Win Eskom tenders with AI Tender Matching, technical document analysis, compliance scoring, and structured bid support for energy and engineering contracts.
Free guidance to prepare before you bid
Not sure if your business is ready for this tender? Check CSD, CIDB, and B-BBEE requirements, run a readiness assessment, and move from opportunity to submission.
Open Supplier Readiness HubDescription
Source: Invitation to Tender (ITT) Correlation and Parallel testing_.pdfPerforming Continuous Emissions Monitoring System (CEMS) correlation and parallel tests at Grootvlei Power Station for a period of 5 years (60 months). Tender number E3454GXMPGRO. Issue date 31 August 2026. Closing date and time 28 October 2026 at 10:00am. Tender validity period 180 days. No clarification meeting. Electronic submission only via https://etendering.eskom.co.za. Open Invitation to Tender. Tender for whole contract.
Important Dates
Source: Invitation to Tender (ITT) Correlation and Parallel testing_.pdf (RFP)Issue date: 31 August 2026. Closing date and time: 28 October 2026 at 10:00am. Tender validity period: 180 days. Clarification meeting: None (not compulsory). Clarification queries deadline: 7 working days before tender submission deadline (i.e. by 17 October 2026).
Contact Information
Source: Invitation to Tender (ITT) Correlation and Parallel testing_.pdf (RFP)Eskom Representative: Thandi Mavasa. Tel: 017 779 8689. Email: [email protected]. Fraud/corruption reporting: 0800 11 2722 or [email protected]. Submission address: https://etendering.eskom.co.za (Eskom e-tendering portal).
Submission Guidelines
Source: Invitation to Tender (ITT) Correlation and Parallel testing_.pdf (RFP)Submission method: electronic only via Eskom e-tendering portal https://etendering.eskom.co.za. No hard copies accepted. Documents must be uploaded in PDF format (price list in both PDF and Excel). Upload size limit: 500 MB per document, total submission 4 GB. No zip/condensed files. Resubmission replaces previous submission entirely; only latest version considered. Submission status must show as complete. Closing date and time: 28 October 2026 at 10:00am. Late tenders not accepted. No clarification meeting. Clarification queries must be submitted in writing to the Eskom Representative at least 7 working days before closing. Alternative tenders not allowed. Returnable forms required at closing (disqualifiable if missing or unsigned): Electronic tender copy (PDF + Excel price list); Annexure A Authorisation Form; Annexure B Acknowledgement Form; Annexure C Tenderer's Particulars; Annexure D Integrity Pact Declaration; Annexure E CPA for local goods/services (if applicable); Annexure F CPA(IG) for imported goods/services (if applicable); Annexure G1-G4 SBD 6.2 Local Production and Content Declaration (if designated materials); Annexure H SBD 1 Invitation to Bid; Annexure J SBD 4 Bidder's Disclosure; E-tendering Help Manual acknowledgement form. Returnables at closing (non-disqualifiable, 5 working days to remedy): Annexure I SBD 6.1 Preference Points Claim Form (PPPFA 2022); Specific Goals evidence (failure scores zero, not disqualification); Tax Clearance Certificates (foreign tenderers with SA footprint not on CSD, local tenderers without SARS e-filing PIN); Tax Evaluation Questionnaire (if personal services contract); Employment Equity Act compliance proof (designated employers, SA tenderers only); CIDB grading proof (if applicable, within 21 working days if agreed); NEC or other Contract completed; Pricing Schedule completed (PDF and Excel); SANAS Accreditation certificate (ISO/IEC 17025:2017). Mandatory contractual requirement prior to award: CSD registration (CSD number/report). Additional contractual requirements prior to award: Safety (Annexure B OHS acknowledgement); Quality (per Supplier Quality Management Specification 240-105658000); Environmental (documented EMS, Grootvlei compliance, appointed personnel, method statements, waste management, Duty of Care, incident reporting, polluter pays, audit participation); Due Diligence/financial analysis (latest approved annual financial statements, not draft, not parent/holding company, including background, signed director's report, signed auditor's report, statement of financial position, comprehensive income, changes in equity, cash flows, notes; public interest score if not audited; ITA34C current and previous years; each JV/SPV partner submits own financials). Joint venture documents: letter of intent or valid JV agreement with rights/obligations/profit-sharing ratios; written confirmation JV operates as single incorporated entity; single designated bank account in JV name independent of partners.
Returnable Documents
Source: Invitation to Tender (ITT) Correlation and Parallel testing_.pdf (RFP)Returnables at tender closing (disqualifiable): Electronic copy of tender in PDF (price list in PDF and Excel, upload size 500MB per document, total 4GB); Annexure A Authorisation Form; Annexure B Acknowledgement Form; Annexure C Tenderers Particulars; Annexure D Integrity Pact Declaration; Annexure E CPA for local goods/services (if applicable); Annexure F CPA(IG) for imported goods/services (if applicable); Annexure G1-G4 SBD 6.2 Declaration for local production and content (if designated materials); Annexure H SBD 1 Invitation to Bid; Annexure J SBD 4 Bidders Disclosure; E-tendering Help Manual acknowledgement form. Returnables at tender closing (non-disqualifiable, 5 working days to remedy): Annexure I SBD 6.1 Preference Points Claim Form (PPPFA 2022); Specific Goals proof (failure scores zero, not disqualification); Tax Clearance Certificates (foreign tenderers with SA footprint not on CSD, local tenderers without SARS e-filing PIN); Tax Evaluation Questionnaire (if personal services contract); Compliance with Employment Equity Act (designated employers, SA tenderers only); CIDB proof of grading (if applicable, within 21 working days if agreed); NEC or other Contract completed; Pricing Schedule completed (PDF and Excel); Additional documents: SANAS Accreditation certificate (ISO/IEC 17025:2017). Mandatory Contractual Requirement: CSD Registration (CSD number/CSD Report). Additional Contractual Requirements: Safety (Annexure B Acknowledgement for Eskom OHS legal requirements); Quality (per Supplier Quality Management Specification 240-105658000, ISO 9001 QMS evidence, method statement, policy, objectives, document control, nonconforming outputs, roles/responsibilities, external provider control, Form A, tools/asset register with calibration certificates); Environmental (documented EMS, compliance with Grootvlei environmental requirements, appointed environmental personnel, method statements for significant impacts, waste management procedure, communication of requirements, allocated funds, Duty of Care per NEMA s28, aspects/impacts register, objectives/targets, incident reporting per Eskom procedure 240-133087117, polluter pays, participation in audits, non-conformances, documentation availability); Due Diligence/financial analysis: latest approved annual financial statements (not draft, not parent/holding company) including background, signed director's report, signed auditor's report, statement of financial position, comprehensive income, changes in equity, cash flows, notes; public interest score (if not audited); ITA34C current and previous years; each JV/SPV partner must submit own financials. Functionality/Technical criteria: Company Profile and Capability (30% weighting) β evidence of historical stack correlation and parallel testing (scoring 0-5 based on number of tests and stack diameter >8m); Method Statement (25% weighting) β step-by-step per 240-56242363, covering correlation and parallel curve development procedures, air-to-gas curves, moisture, O2, CO2 factors (scoring 0-5).
Evaluation Criteria
Source: Invitation to Tender (ITT) Correlation and Parallel testing_.pdf (RFP)Two-stage evaluation: functionality (technical) then price and specific goals. Functionality: weighted score-card, minimum 70% overall weighted score to technically qualify. Mandatory technical criteria are gatekeepers (yes/no) β a 'no' results in immediate disqualification. Mandatory technical criterion: SANAS Accreditation for Stack Emission Testing per ISO/IEC 17025:2017 (proof of certificate required). Functionality criteria and weightings: Company Profile and Capability (30%) β evidence of historical stack correlation and parallel testing (scoring 0-5 based on number of tests and stack diameter >8m); Method Statement (25%) β step-by-step per document 240-56242363 covering correlation and parallel curve development procedures, air-to-gas curves, moisture, O2, CO2 factors (scoring 0-5); Turnaround time from test completion to report issue (15%) β signed letter indicating weeks (scoring 0-5: >6 weeks=0, 5-6=2, 3-4=4, 0-2=5); Test program requirements for correlation and parallel tests (15%) β previous or new drafted program specifying station requirements before/during/after testing (scoring 0-5); Skilled Personnel (15%) β CVs with qualifications, experience, stack tester certification (scoring 0-5: <2 years=0, >2-3=2, >4-5=4, >5=5). Price evaluation: inclusive of VAT; corrected for arithmetical errors; excluding contingencies; adjusted for variations/deviations/alternative tenders; Net Present Value comparison based on tendered programme, prices, Price Adjustment Factors, exchange fluctuations, risk parameters; unconditional discounts considered for evaluation; conditional discounts not considered for evaluation but implemented at payment. Prices scored out of [80 or 90] points. Specific Goals scored out of [20 or 10] points per PPPFA 2022 regulations. Failure to submit Specific Goals evidence scores zero, not disqualification. Ranking: preferential point scoring for [80/20] system β sum of Price and Specific Goals scores, ranked highest to lowest. Objective criteria not applicable. Reverse e-auction not applicable. Contractual requirements (CSD registration, SHEQ, financial viability) assessed after evaluation and ranking; must be met prior to contract award or tenderer regarded as non-responsive.
Technical Specifications
Source: Invitation to Tender (ITT) Correlation and Parallel testing_.pdf (RFP)Scope: Performing Continuous Emissions Monitoring System (CEMS) correlation and parallel tests at Grootvlei Power Station for a period of 5 years (60 months). Mandatory technical requirement: SANAS accreditation for Stack Emission Testing in accordance with ISO/IEC 17025:2017 (proof of certificate required). Method Statement must detail step-by-step approach based on document 240-56242363 covering: correlation curve development procedures (all 1-4 procedures, calculations to develop curves from measured pollutants, air-to-gas curves, moisture, O2 and CO2 factors); parallel curve development procedures (all 1-4 procedures, calculations to develop curves from measured pollutants). Test program must specify requirements for station before, during and after testing for both correlation and parallel tests. Turnaround time from test completion to full report issue must be indicated in signed letter (target 0-2 weeks for maximum score). Key personnel: Engineering qualification (Grade 12 + Technical Qualification, BSc Engineering or National Diploma in Engineering) and stack tester certification (trained as smokestack tester for correlation and parallel testing). Experience scoring based on years (>5 years for maximum score). Quality Management System: objective evidence of documented QMS compliant with ISO 9001 (not necessarily certified) including Quality Method Statement, Quality Policy, Quality Objectives, document/record control, control of nonconforming outputs, defined roles/responsibilities/authorities (org chart, responsibility matrix including quality function), control of externally provided processes/products/services (evaluation, selection, monitoring, re-evaluation criteria), Form A completed and signed, tools/asset register with maintenance records (e.g. calibration certificates). Environmental Management System: documented and implemented EMS (policy, operational procedures, aspects/impacts register); compliance with Eskom Grootvlei Power Station environmental requirements; appointed personnel with basic environmental knowledge; method statements for activities with significant environmental impacts; adherence to Station Waste management procedure and colour coding; communication of environmental requirements to employees; allocation of funds for environmental implementation; Duty of Care per NEMA Section 28; aspects/impacts identification and documentation; objectives/targets for significant aspects/impacts; incident reporting per Eskom procedure 240-133087117; polluter pays principle; participation in environmental audits; documentation availability for review. Health and Safety: compliance with Eskom contractor Health and Safety requirements standards 32-136, OHS specification/requirements, Occupational Health and Safety Act, Compensation for Occupational Diseases and Illnesses Act; alignment of company processes to Eskom OHS requirements after award; penalties for non-conformance; Eskom induction and company induction for all employees; management of contractors/suppliers (selection criteria, prior notification, adequate resources/competencies, accountability, monitoring via audits/assessments, termination grounds, non-conformance handling, Eskom verification).
Methodology
Source: Invitation to Tender (ITT) Correlation and Parallel testing_.pdfMethod Statement required detailing step-by-step approach based on document 240-56242363. Must cover: correlation curve development procedures (all 1-4 procedures, calculations to develop curves from measured pollutants, air-to-gas curves, moisture, O2 and CO2 factors); parallel curve development procedures (all 1-4 procedures, calculations to develop curves from measured pollutants). Scoring: 0 = no method statement; 1-4 = partial coverage; 5 = all procedures covered with calculations for measured pollutants (50 points for correlation, 50 points for parallel).
Experience & Qualifications
Source: Invitation to Tender (ITT) Correlation and Parallel testing_.pdfCompany Profile and Capability (30% weighting): Evidence of historical stack correlation and parallel testing β previous order/test signed reports with signatures of service provider and client. Scoring: 0 = no submissions; 2 = proof of 1 correlation and 1 parallel test; 4 = proof of 2 correlation and 2 parallel tests completed on stack diameter >8m; 5 = proof of 3 correlation and 3 parallel tests or more. Key personnel: Engineering qualification (Grade 12 + Technical Qualification, BSc Engineering or National Diploma in Engineering) and stack tester certification (trained as smokestack tester for correlation and parallel testing). Experience scoring: 1 = 1-2 years plus criteria 1&2; 2 = >2-3 years plus criteria 1&2; 4 = >4-5 years plus criteria 1&2; 5 = >5 years plus criteria 1&2.
Quality Management
Source: Invitation to Tender (ITT) Correlation and Parallel testing_.pdfQuality requirements per Supplier Quality Management Specification 240-105658000 (Unique Identifier 240-12248652, Revision 7). Section A: Quality Management System per ISO 9001 β objective evidence of documented QMS (not certified but compliant): Quality Method Statement based on scope (template 240-126469599), Quality Policy approved by top management, Quality Objectives approved by top management, Control of documented information (ISO 9001:2015 Clause 7.5), Documented information for Control of nonconforming outputs (Clause 8.7). Section B: Evidence of QMS in operation β Documented information for defined roles/responsibilities/authorities (organisation chart, responsibility matrix including quality management function, Clause 5.3), Documented information for Control of Externally Provided Processes, Products and Services (evaluation, selection, monitoring, re-evaluation criteria, Clause 8.4). Section E: User defined additional requirements β Form A completed and signed, Tools/Asset register with maintenance records (e.g. calibration certificates). Minimum scores: Section A Option 2 = 5, Section B = 2, Section E = 3.
Pricing Schedule
Source: Invitation to Tender (ITT) Correlation and Parallel testing_.pdfPricing Schedule/BOQ required (if not contained in Contract) β PDF and Excel copy. Upload size 500 MB per document, total submission 4 GB. Price evaluation inclusive of VAT, corrected for arithmetical errors, excluding contingencies, adjusted for variations/deviations/alternatives, Net Present Value comparison based on tendered programme, Price Adjustment Factors, exchange fluctuations, risk parameters. Unconditional discounts considered for evaluation; conditional discounts not considered for evaluation but implemented at payment. Prices scored out of [80 or 90] points. Cataloguing line item required in pricing schedule if cataloguing is required (Eskom pays for cataloguing).
Financial Requirements
Source: Invitation to Tender (ITT) Correlation and Parallel testing_.pdf (RFP)Pricing Schedule/BOQ required (if not contained in Contract) β PDF and Excel copy. Upload size 500 MB per document, total submission 4 GB. Price evaluation: inclusive of VAT; corrected for arithmetical errors; excluding contingencies; adjusted for variations/deviations/alternative tenders; Net Present Value comparison based on tendered programme, prices, Price Adjustment Factors, exchange fluctuations, risk parameters; unconditional discounts considered for evaluation; conditional discounts not considered for evaluation but implemented at payment. Prices scored out of [80 or 90] points. Security for performance: performance bond or demand guarantee required from minimum two Eskom-approved financial institutions. Payment terms: contracts valued below R50 million including VAT β 30 days from receipt of undisputed invoice; contracts valued above R50 million including VAT β 60 days from receipt of undisputed invoice. Eskom reserves right to negotiate with preferred bidders if prices not market-related. Financial viability: latest approved annual financial statements (not draft, not parent/holding company) required prior to award, including background, signed director's report, signed auditor's/reviewer's/compiler's/accounting officer's report, statement of financial position, statement of comprehensive income, statement of changes in equity, statement of cash flows, notes to financial statements. Public interest score (if not audited) with actual score, owner-managed status, external preparation confirmation. ITA34C for current and previous years of assessment (if not audited). Each JV/SPV partner must submit own financial statements. Cataloguing: successful tenderer may be required to provide cataloguing information per item after award; materials must be labelled per Eskom specifications; pricing schedule must include cataloguing line item (Eskom pays for cataloguing).
Compliance Requirements
Source: Invitation to Tender (ITT) Correlation and Parallel testing_.pdf (RFP)Eligibility: Tenderers must not be restricted from doing business with Eskom or State-Owned Companies. Ineligible if: nationality of sanctioned country; submit more than one tender; JV/consortium agreement lacks joint and several liability; conflict of interest (common controlling partner/majority shareholder or relationship enabling access to information/influence); signed by non-authorised persons; restricted by National Treasury; on Tender Defaulters list; restricted by Eskom; sub-contracts 100% of Scope of Work. Mandatory registrations: Central Supplier Database (CSD) registration (CSD number/report) β mandatory for all tenders. Tax compliance: foreign tenderers with SA footprint not on CSD must provide tax clearance certificate; local tenderers must provide SARS e-filing PIN or CSD profile for verification; foreign suppliers with no SA footprint complete SBD 1 only, no tax compliance proof required. B-BBEE: proof of B-BBEE status level (certificate from authorised body, sworn affidavit per B-BBEE Codes of Good Practice, or other requirement per B-BBEE Act); SBD 6.1 Preference Points Claim Form (Annexure I) required. Local content: SBD 6.2 Declaration Certificate for Local Production and Content (Annexure G1-G4) applicable if designated materials included. Employment Equity Act: designated employers (SA tenderers only) must furnish proof of compliance including proof of submission of Employment Equity Report to Department of Labour. CIDB: not applicable for this tender. Contract Skills Development Goals (CSDG): not applicable. Contract Participation Goals (CPG): not applicable. Joint ventures: valid JV agreement with joint and several liability, single designated bank account in JV name independent of partners, written confirmation JV operates as single incorporated entity. Subcontracting: main contractors discouraged from subcontracting with subsidiaries (may be interpreted as fronting); if done, must declare in tender documents. Integrity: Annexure D Integrity Pact Declaration required (Supplier Integrity Pact accessible on Eskom Tender Bulletin). Standard forms: SBD 1 (Annexure H), SBD 4 (Annexure J), SBD 6.1 (Annexure I), SBD 6.2 (Annexure G1-G4). Authorisation Form (Annexure A), Acknowledgement Form (Annexure B), Tenderer's Particulars (Annexure C), CPA for local goods/services (Annexure E), CPA(IG) for imported goods/services (Annexure F), E-tendering Help Manual acknowledgement form. Safety: Annexure B Acknowledgement for Eskom OHS legal requirements. Quality: per Supplier Quality Management Specification 240-105658000 (ISO 9001 QMS evidence). Environmental: documented EMS, Grootvlei compliance, appointed personnel, method statements, waste management, Duty of Care, incident reporting, polluter pays, audit participation. Due Diligence: latest approved annual financial statements (not draft, not parent/holding company) with full set of statements and notes; public interest score if not audited; ITA34C current and previous years; each JV/SPV partner submits own financials.
B-BBEE Requirements
Source: Invitation to Tender (ITT) Correlation and Parallel testing_.pdf (RFP)Specific Goals scored per PPPFA 2022 regulations. Proof of B-BBEE status level: certificate from authorised body, sworn affidavit per B-BBEE Codes of Good Practice, or other requirement per Broad-Based Black Economic Empowerment Act. SBD 6.1 Preference Points Claim Form required (Annexure I). Local content: SBD 6.2 Declaration Certificate for Local Production and Content (Annexure G1-G4) applicable if designated materials included.
Health & Safety
Source: Invitation to Tender (ITT) Correlation and Parallel testing_.pdfSafety requirements: Supplier/contractor must comply with Eskom contractor Health and Safety requirements standards 32-136, OHS specification/requirements provided, Occupational Health and Safety Act, Compensation for Occupational Diseases and Illnesses Act. After award, align company processes to Eskom OHS requirements. Penalties for non-conformance (main supplier and its contractors/suppliers). All employees must undergo Eskom induction and company induction. Management of contractors/suppliers: demonstrate selection criteria, notify Eskom prior to appointment, ensure adequate resources/competencies, accountable for compliance, monitor through audits/assessments, grounds for termination of contractor/supplier work, non-conformances dealt with via performance/penalty processes, Eskom may verify and request testimonials/references and contact details of previous clients (including Eskom) for similar work.
Environmental
Source: Invitation to Tender (ITT) Correlation and Parallel testing_.pdfEnvironmental requirements: Documented and implemented environmental management system (policy, operational procedures, aspects/impacts register). Compliance with Eskom Grootvlei Power Station environmental requirements (policies, standards, work instructions). Appoint personnel in writing with basic environmental knowledge to implement environmental/SHE requirements. Method statements for activities with significant environmental impacts (methodology/approach for managing impacts/risks). Adherence to Station Waste management procedure and colour coding. Communication of environmental requirements to employees. Allocation of funds for environmental implementation. Legal compliance: Duty of Care per NEMA Section 28. Aspects and impacts identification and documentation. Objectives and targets for significant aspects/impacts, documented and conveyed to personnel. Incident reporting per Eskom Environmental incident management procedure 240-133087117. Polluter pays principle: polluter cleans spillages and rehabilitates polluted land at own cost. Monitoring and review: client personnel conduct regular environmental audits, contractors participate and execute corrective actions; Grootvlei issues non-conformances for deviations; all environmental documentation/records/reports available for review on request.
Contractual Terms
Source: Invitation to Tender (ITT) Correlation and Parallel testing_.pdfContract conditions: NEC3 Term Service Contract. Security for performance: performance bond or demand guarantee from minimum two Eskom-approved financial institutions. Payment terms: below R50M incl. VAT β 30 days from undisputed invoice; above R50M β 60 days. Eskom may negotiate with preferred bidders if prices not market-related. Subcontracting with subsidiaries discouraged (may be fronting); must declare if done. Joint venture requirements: letter of intent or valid JV agreement with rights/obligations/profit-sharing ratios; written confirmation JV operates as single incorporated entity; single designated bank account in JV name independent of partners. Cataloguing: successful tenderer may be required to provide cataloguing information per item after award; materials labelled per Eskom specifications; pricing schedule to include cataloguing line item (Eskom pays). No public tender opening (e-tendering). Tender validity period: 180 days. Alternative tenders not allowed. Clarification queries close 7 working days before submission deadline. Eskom Standard Conditions of Tender apply (accessible at www.eskom.co.za); Tender Data takes precedence over Standard Conditions in case of ambiguity.
Special Conditions
Source: Invitation to Tender (ITT) Correlation and Parallel testing_.pdf (RFP)Open Invitation to Tender. Tender for whole contract. No clarification meeting. Clarification queries close 7 working days before tender submission deadline. Alternative tenders not allowed. Successful tenderer may be required to provide cataloguing information per item after award, materials labelled per Eskom specifications, pricing schedule to include cataloguing line item (Eskom pays). Security for performance: performance bond or demand guarantee from minimum two Eskom-approved financial institutions. No public tender opening (e-tendering). Contract conditions: NEC3 Term Service Contract. CIDB requirements not applicable. Contract Skills Development Goals (CSDG) not applicable. Contract Participation Goals (CPG) not applicable. Payment terms: contracts below R50M incl. VAT β 30 days from undisputed invoice; above R50M β 60 days. Eskom reserves right to negotiate with preferred bidders if prices not market-related. Main contractors discouraged from subcontracting with subsidiaries (may be interpreted as fronting); if subcontracting with subsidiary, must declare in tender documents. Potential sub-contractors list available at www.csd.gov.za.
Requirements
Source: Invitation to Tender (ITT) Correlation and Parallel testing_.pdf (RFP)Eligibility criteria: Tenderers must not be under restriction to do business with Eskom or State-Owned Companies. Ineligible if: nationality of sanctioned country; submit more than one tender; JV/consortium agreement lacks joint and several liability; conflict of interest (common controlling partner/majority shareholder or relationship enabling access to information/influence); signed by non-authorised persons; restricted by National Treasury; on Tender Defaulters list; restricted by Eskom; sub-contracts 100% of Scope of Work. Basic compliance: meet eligibility criteria; submit original tender (upload all folders); submit complete tender with commercial, financial and technical information; submit mandatory commercial tender returnables by stipulated deadlines. Mandatory tender returnables must be submitted by deadlines or tender deemed non-responsive. Mandatory technical criteria: SANAS Accreditation for Stack Emission Testing per ISO/IEC 17025:2017 (proof of certificate required).
Section
Source: Invitation to Tender (ITT) Correlation and Parallel testing_.pdfFunctionality evaluation: weighted score-card approach, minimum 70% overall weighted score to technically qualify. Mandatory technical criteria are gatekeepers (yes/no) β a 'no' results in immediate disqualification. Price evaluation: inclusive of VAT; corrected for arithmetical errors; excluding contingencies; adjusted for variations/deviations/alternative tenders; comparison of Net Present Value based on tendered programme, prices, Price Adjustment Factors, exchange fluctuations, risk parameters; unconditional discounts considered, conditional discounts not considered for evaluation but implemented at payment. Prices scored out of [80 or 90] points. Specific Goals scored out of [20 or 10] points per PPPFA. Failure to submit evidence for Specific Goals results in 0 points, not disqualification. Ranking: preferential point scoring for [80/20] system β sum of Price and Specific Goals scores, ranked highest to lowest. Objective criteria not applicable. Reverse e-auction not applicable.
Description
Source: Enivoronmemtal Evaluation Form.pdfEnvironmental evaluation form for the Continuous Emissions Monitoring System correlation and parallel testing service at Grootvlei Power Station. Used to objectively assess supplier/contractor capabilities, expertise, experience, capacity, processes, facilities and equipment. Scoring based on mandatory document submission against a 100-point checklist covering SHE policy, environmental management strategy, legal compliance, SHE officer appointment, and quality assurance/accreditation. All listed documents are mandatory. Form identifiers: Environmental Template 240-43921804 Rev 6, Document GVLF 0183 Rev 1, effective February 2017, review February 2026.
Contact Information
Source: Enivoronmemtal Evaluation Form.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"nmental Management Requirement Checklist Outcome"}
Evaluation Criteria
Source: Enivoronmemtal Evaluation Form.pdf (unknown)Environmental evaluation scoring (total 100%):
Mandatory submissions for full compliance:
All listed documents are mandatory; non-submission or failure to meet minimum requirements scores zero for that criterion.
Technical Specifications
Source: Enivoronmemtal Evaluation Form.pdf (unknown)Service: Continuous Emissions Monitoring System correlation and parallel testing at Grootvlei Power Station for a 5-year period.
Evaluation assesses supplier/contractor capabilities, expertise, experience, capacity, processes, facilities and equipment to deliver the required services.
Key technical requirements:
Compliance Requirements
Source: Enivoronmemtal Evaluation Form.pdf (unknown)Mandatory compliance documents for environmental evaluation:
All documents are mandatory; failure to submit or meet minimum requirements results in zero score for that criterion.
Health & Safety
Source: Enivoronmemtal Evaluation Form.pdfSHE (Safety, Health and Environment) requirements for the service:
All items are mandatory and scored as part of the 100% environmental evaluation.
Environmental
Source: Enivoronmemtal Evaluation Form.pdfEnvironmental Management Requirement Checklist (100% total score):
All documents are mandatory. Non-submission or failure to meet minimum requirements scores zero for that criterion.
Contractual Terms
Source: Enivoronmemtal Evaluation Form.pdfLegal requirement: Letter from top management guaranteeing protection of workers who refuse environmentally hazardous work in terms of Section 29 of the National Environmental Management Act (NEMA), Act 107 of 1998. This is a mandatory submission weighted at 20% of the environmental evaluation score.
Section
Source: Enivoronmemtal Evaluation Form.pdfEnvironmental evaluation scoring checklist (100% total):
Scoring: Full percentage if document submitted and meets minimum requirements; zero if not submitted or does not meet requirements. Comments field for evaluator remarks.
Contact Information
Source: C1 2b TSC3 Data by Contractor.pdf (unknown){"name":null,"email":null,"phone":null,"department":null,"address":"l, according to Options chosen, is essential to create a complete contract."}
Technical Specifications
Source: C1 2b TSC3 Data by Contractor.pdf (unknown)Contractor must provide key personnel details for the contract: for each key person, the name, job title, responsibilities, qualifications, experience, and CVs must be submitted. The location of the Service Information for the Contractor's plan and the plan identified in the Contract Data must be indicated. Matters to be included in the Risk Register must be specified.
Experience & Qualifications
Source: C1 2b TSC3 Data by Contractor.pdfKey personnel must be nominated with full details: name, job title, responsibilities, qualifications, experience, and CVs. Additional key personnel and their CVs must be provided where required.
Financial Requirements
Source: C1 2b TSC3 Data by Contractor.pdf (unknown)Contractor must state the direct fee percentage and subcontracted fee percentage. The location of the price list must be provided. The tendered total of the Prices (in Rand) must be stated.
Compliance Requirements
Source: C1 2b TSC3 Data by Contractor.pdf (unknown)Contractor must provide full legal name and address (Clause 10.1).
Contractual Terms
Source: C1 2b TSC3 Data by Contractor.pdf (unknown)Contract Data Part 2 requires the Contractor to complete the following: Clause 10.1 β Contractor name and address; Clause 11.2(8) β Direct fee percentage and subcontracted fee percentage; Clause 11.2(14) β Matters for the Risk Register; Clause 11.2(15) β Location of Service Information for the Contractor's plan; Clause 21.1 β Location of the plan identified in Contract Data; Clause 24.1 β Key personnel details (names, jobs, responsibilities, qualifications, experience, CVs); Clause 11.2(12) β Location of the price list; Clause 11.2(19) β Tendered total of the Prices (R).
Technical Specifications
Source: OHS Legal Requirements.pdf (unknown)Perform continuous emissions monitoring system correlation and parallel tests at Grootvlei Power Station for a period of 5 years.
Compliance Requirements
Source: OHS Legal Requirements.pdf (unknown)Compliance with the following is mandatory:
Health & Safety
Source: OHS Legal Requirements.pdfOHS legal and other requirements (Effective Date: May 2025, Document 240-77471499 Rev 3):
Contractual Terms
Source: OHS Legal Requirements.pdfMain supplier obligations for contractor/supplier management:
Description
Source: Tender and Contract Quality.pdfTender scope: Performing Continuous Emissions Monitoring System correlation and parallel tests at Grootvlei Power Station for 5 years. Pre-contract award quality Category 4 selected (clause 3.5 of specification 240-105658000). Main Supplier and Sub-supplier Capability and Capacity Assessment required (clause 3 of specification 240-105658000). Post-contract award: Contract Execution and Supplier Quality Performance Monitoring Phase applicable (clause 3.7 of specification 240-105658000).
Evaluation Criteria
Source: Tender and Contract Quality.pdf (unknown)Pre-contract award: Category 4 quality requirements apply (refer to clause 3.5 of specification 240-105658000). Main Supplier and Sub-supplier Capability and Capacity Assessment required (clause 3 of specification 240-105658000). Post-contract award: Contract Execution and Supplier Quality Performance Monitoring Phase applicable (clause 3.7 of specification 240-105658000). Standard conditions: Eskom Rights of Access, Eskom Rights to Information, Preservation, Quality Audits Related Conditions, Management of Nonconformities and Nonconforming Outputs Identified by Eskom, Special Processes (all per clause 3.8 of specification 240-105658000). ISO 9001 clauses 4β10 and quality principles 1β7 must be complied with.
Methodology
Source: Tender and Contract Quality.pdfQuality management approach must align with ISO 9001 clauses: 4 Context of the Organisation, 5 Leadership, 6 Planning, 7 Support, 8 Operation, 9 Performance Evaluations, 10 Improvement. Quality principles to be applied: Customer focus, Leadership, Engagement of people, Process approach, Improvement, Evidence based decision making, Relationship Management. Specific methodology for correlation and parallel testing not detailed in this document; refer to specification 240-105658000.
Quality Management
Source: Tender and Contract Quality.pdfISO 9001:2015 compliance mandatory (clauses 4β10, principles 1β7). Pre-contract Category 4 quality requirements and Main Supplier/Sub-supplier Capability and Capacity Assessment per specification 240-105658000. Post-contract Contract Execution and Supplier Quality Performance Monitoring per specification 240-105658000. Standard conditions: Eskom Rights of Access, Eskom Rights to Information, Preservation, Quality Audits Related Conditions, Management of Nonconformities and Nonconforming Outputs Identified by Eskom, Special Processes (all clause 3.8 of specification 240-105658000). Document effective January 2022, review January 2027.
Compliance Requirements
Source: Tender and Contract Quality.pdf (unknown)ISO 9001 quality management system compliance required (clauses 4β10 and principles 1β7). Pre-contract Category 4 quality requirements and Main Supplier/Sub-supplier Capability and Capacity Assessment per specification 240-105658000. Post-contract quality performance monitoring per specification 240-105658000. No CIDB grading, B-BBEE level, local content thresholds, CSD registration, or tax compliance requirements stated in this document.
Section
Source: Tender and Contract Quality.pdfEvaluation based on compliance with Category 4 pre-contract quality requirements (clause 3.5 of specification 240-105658000), Main Supplier and Sub-supplier Capability and Capacity Assessment (clause 3 of specification 240-105658000), post-contract Contract Execution and Supplier Quality Performance Monitoring (clause 3.7 of specification 240-105658000), standard conditions per clause 3.8 of specification 240-105658000, and full ISO 9001 clauses 4β10 and quality principles 1β7 compliance.
Contact Information
Source: C2 TSC3 Pricing Data Option A.pdf (unknown){"name":null,"email":null,"phone":null,"department":", Expected","address":null}
Evaluation Criteria
Source: C2 TSC3 Pricing Data Option A.pdf (unknown)No eligibility criteria specified
Technical Specifications
Source: C2 TSC3 Pricing Data Option A.pdf (unknown)Provision of Labour
Cost
Measurement Method
expenses
Sub Total Excl VAT
Total of prices Excl Vat
VAT @15% r -
Total Incl. VAT
Part c2: pricing data c2.2 TSC3/A price list
Financial Requirements
Source: C2 TSC3 Pricing Data Option A.pdf (unknown)Pricing structure: NEC3 Term Service Contract (TSC3) Option A β priced contract with Price List containing items as lump sums or expected quantities multiplied by rates.
Price calculation: Price for Services Provided to Date = completed lump sum items + (completed quantities Γ rates). Prices derived from Price column of Price List.
Price List function: Pricing document only β not Service Information. Work instructions are in Service Information (Clause 20.1).
Contractor obligation: Link Price List items to operations on accepted programme (Clause 21.4).
Preparation requirements: Follow TSC3 Guidance Notes (pages 14β15). Items must be inclusive of everything necessary and incidental to Providing the Service per Service Information and correcting Defects not caused by Employer's risk. Unpriced work must be absorbed within rates/prices of listed items.
Lump sum risk: No adjustment to lump sum prices if actual quantities differ from estimates; changes only via compensation events.
Price List format (per TSC3 Guidance Notes appendix):
Price List columns: Description, Unit, Quantity, Rate, Total.
Example line items shown: Fixed Preliminaries and general, PPE, Safety File, Provision of Labour Cost, Measurement Method expenses.
VAT: 15% applied to subtotal.
Compliance Requirements
Source: C2 TSC3 Pricing Data Option A.pdf (unknown)Safety File listed as a priced line item in the Price List, indicating a health and safety compliance deliverable is required.
Health & Safety
Source: C2 TSC3 Pricing Data Option A.pdfSafety File is a priced line item in the Price List, confirming a health and safety deliverable (Safety File) must be provided and priced as part of the contract.
Contact Information
Source: C1 1 TSC3 Offer Acceptance.pdf (unknown)The Employer's agent details are stated to be given in the Contract Data, but are not provided in this document. No SCM or technical contact names, emails, or phones are stated.
Submission Guidelines
Source: C1 1 TSC3 Offer Acceptance.pdf (unknown)Submission is by completing and signing the Form of Offer and Acceptance (C1.1 TSC3). The tenderer must provide the offered total of prices exclusive of VAT, VAT at 15%, and the total inclusive of VAT (in figures and words). The tenderer's CIDB registration number must be stated. The authorised representative must sign, with name, capacity, date, and witness details. Alternative tenders require a separate copy of this form. The completed form, including any Schedule of Deviations, is returned to the Employer. No closing date, time, or submission address is stated in this document.
Evaluation Criteria
Source: C1 1 TSC3 Offer Acceptance.pdf (unknown)The tenderer must be duly authorised to sign the Form of Offer and Acceptance and must have examined the Tender Data and addenda, accepting the Conditions of Tender. A valid CIDB registration number is required. No specific CIDB grading, B-BBEE level, tax clearance, CSD registration, or minimum functionality/price thresholds are stated in this document.
Technical Specifications
Source: C1 1 TSC3 Offer Acceptance.pdf (unknown)Scope: Performing Continuous Emissions Monitoring System full correlation and parallel tests at Grootvlei Power Station for a period of 60 months (5 years). The full scope of work is contained in Part C3: Scope of Work (Service Information), which is not included in this document.
Pricing Schedule
Source: C1 1 TSC3 Offer Acceptance.pdfThe pricing structure requires the tenderer to state: offered total of prices exclusive of VAT (sub-total), VAT at 15%, and offered total inclusive of VAT (in figures and words). The total inclusive of VAT is for the Employer's budgeting purposes only; actual amounts due will be assessed per the conditions of contract. Full pricing details are contained in Part C2: Pricing Data, which is not included in this document.
Financial Requirements
Source: C1 1 TSC3 Offer Acceptance.pdf (unknown)Pricing format: Offered total of prices exclusive of VAT, VAT at 15%, and total inclusive of VAT (for budgeting purposes; actual amounts assessed per contract conditions). The contract comprises Part C1: Agreements and Contract Data, Part C2: Pricing Data, and Part C3: Scope of Work. The tenderer must deliver securities, bonds, guarantees, and proof of insurance as required by the conditions of contract within two weeks of receiving the completed agreement. Failure to do so constitutes repudiation.
Compliance Requirements
Source: C1 1 TSC3 Offer Acceptance.pdf (unknown)CIDB registration number must be provided. CSD registration, tax compliance status, B-BBEE level, and professional registrations are not mentioned in this document. The tenderer must comply with all terms and conditions of the contract as per the Conditions of Tender and Contract Data.
Contractual Terms
Source: C1 1 TSC3 Offer Acceptance.pdfThe agreement comes into effect when the tenderer receives a fully completed and signed original copy of the Form of Offer and Acceptance, including the Schedule of Deviations (if any). The tenderer must, within two weeks, contact the Employer's agent (details in Contract Data) to arrange delivery of securities, bonds, guarantees, proof of insurance, and any other documentation required by the conditions of contract. Failure to fulfil these obligations constitutes repudiation. Deviations from tender documents are limited to those permitted in the Conditions of Tender and must be recorded in the Schedule of Deviations; no other amendments are valid. The contract documents comprise Part C1 (Agreements and Contract Data), Part C2 (Pricing Data), and Part C3 (Scope of Work: Service Information), plus any incorporated drawings and documents.
Important Dates
Source: Supplier Quality Mangement.pdf (unknown)Document issued: 2026-07-13. Tender closing date: 2026-10-28 at 11:00 (from tender record). No briefing or site visit dates specified in the quality management document.
Contact Information
Source: Supplier Quality Mangement.pdf (unknown)Eskom representative: Quality Management Office. No specific contact names, emails or phone numbers provided in the quality management document.
Submission Guidelines
Source: Supplier Quality Mangement.pdf (unknown)Returnable documents required:
Evaluation Criteria
Source: Supplier Quality Mangement.pdf (unknown)Quality management system evaluation scored across three sections:
(Remaining 1 point in Section E not specified in source)
Total quality evaluation score: 10 points. Bidders must demonstrate a documented QMS complying with ISO 9001:2015 (certification not required but objective evidence of compliance is mandatory).
Quality Management
Source: Supplier Quality Mangement.pdf (unknown)Quality management requirements per Eskom Supplier Quality Management Revision 7:
Evaluation: 10-point scoring across Sections A (5 points), B (2 points) and E (3 points)
Compliance Requirements
Source: Supplier Quality Mangement.pdf (unknown)Quality management compliance:
No other eligibility criteria (CSD registration, tax clearance, B-BBEE level, CIDB grading, professional registrations, local content) specified in the quality management document.
Submission Guidelines
Source: C0 TSC3 Contract cover pages.pdf (unknown)Returnable Documents: C1.1 Form of Offer and Acceptance [β]
Evaluation Criteria
Source: C0 TSC3 Contract cover pages.pdf (unknown)The document extract does not specify eligibility criteria, pre-qualification thresholds, mandatory returnable forms, or evaluation methodology. These details would typically be found in the tender invitation, returnable schedules, and Part C1.2 (Contract Data), which are not included in the provided text.
Technical Specifications
Source: C0 TSC3 Contract cover pages.pdf (unknown)Scope: Performing Continuous Emissions Monitoring System full correlation and parallel tests at Grootvlei Power Station for a period of 5 years. Contract type: NEC3 Term Service Contract (TSC3). Employer: Eskom Holdings SOC Ltd (Reg No. 2002/015527/30).
Pricing Schedule
Source: C0 TSC3 Contract cover pages.pdfPricing Data is contained in Part C2 (referenced but not detailed in this document). Contract duration: 5 years. No pricing format, rates, bill of quantities, or payment schedules provided in this extract.
Financial Requirements
Source: C0 TSC3 Contract cover pages.pdf (unknown)Contract structure includes Part C2 Pricing Data (details not provided in this document). Proforma Guarantees are referenced in C1.3 (details not provided).
Compliance Requirements
Source: C0 TSC3 Contract cover pages.pdf (unknown)Returnable documents required at award stage: C1.1 Form of Offer and Acceptance; C1.2b Contract Data provided by the Contractor. Contract Data provided by the Employer (C1.2a) will be issued by Eskom.
Environmental
Source: C0 TSC3 Contract cover pages.pdfService relates to Continuous Emissions Monitoring System correlation and parallel tests at Grootvlei Power Station, implying environmental compliance monitoring. No specific environmental requirements, standards, or sustainability criteria detailed in this document.
Contractual Terms
Source: C0 TSC3 Contract cover pages.pdfContract form: NEC3 Term Service Contract (TSC3). Parties: Eskom Holdings SOC Ltd (Employer) and Contractor (to be inserted at award). Contract number to be assigned at award. Contract Data split: C1.2a provided by Employer, C1.2b provided by Contractor (both inserted at award). Proforma Guarantees referenced in C1.3. Form of Offer and Acceptance (C1.1) to be completed at award.
Important Dates
Source: SHE Tender Evaluation Template.pdf (unknown)Eskom OHS Representative signature date: 07 July 2026 (appears on the evaluation template). No tender closing date, briefing or site visit dates are stated in the provided document.
Contact Information
Source: SHE Tender Evaluation Template.pdf (unknown)Eskom OHS Representative: Maki Mofokeng, Safety Officer OHS. No email, phone, department or submission address provided in the document.
Submission Guidelines
Source: SHE Tender Evaluation Template.pdf (unknown)Returnable documents required with the tender:
Evaluation Criteria
Source: SHE Tender Evaluation Template.pdf (unknown)OHS tender evaluation (high risk) based on the following returnables:
Each returnable is assessed as Yes/No/Not Applicable. Overall recommendation: Recommended / Not Recommended.
Technical Specifications
Source: SHE Tender Evaluation Template.pdf (unknown)Scope of work: Correlation and Parallel testing of Continuous Emissions Monitoring Systems at Grootvlei Power Station for a period of 5 years.
Financial Requirements
Source: SHE Tender Evaluation Template.pdf (unknown)Detailed costing for Health and Safety management must be submitted, broken down (not a lump sum) and based on the overall scope of work/service. No pricing schedule, bonds, guarantees or payment terms are stated in the provided document.
Compliance Requirements
Source: SHE Tender Evaluation Template.pdf (unknown)Mandatory compliance items:
No CIDB grading, B-BBEE level or local content percentage is stated.
Health & Safety
Source: SHE Tender Evaluation Template.pdfMandatory health and safety requirements for this high-risk tender:
Evaluation template signed by Eskom OHS Representative Maki Mofokeng, Safety Officer OHS, dated 07 July 2026.
Section
Source: SHE Tender Evaluation Template.pdfOHS Tender Evaluation Template (High risk) β Annexure C 1 (Document Identifier 240-77471651 Rev 3). Evaluation is based on seven returnables, each scored Yes/No/Not Applicable:
Overall recommendation: Recommended / Not Recommended. Explanatory notes referenced in 240-77433139 Annexure A: Supplier Risk Category.
Important Dates
Source: Grootvei power Station Tender Technical Evaluation Strategy Final1.pdf (unknown){"briefingSession":"{"date":null,"time":null,"venue":"ion Team: Conducts desktop and site evaluations of tenders against technical","is_compulsory":true}"}
Submission Guidelines
Source: Grootvei power Station Tender Technical Evaluation Strategy Final1.pdf (unknown)Mandatory returnable documents that must be completed, signed and submitted with the tender:
Failure to provide any of the above returnables renders the tender non-responsive and it will be rejected.
No submission channel, address, format or closing time is stated in this document; refer to the main tender advertisement for those details.
Evaluation Criteria
Source: Grootvei power Station Tender Technical Evaluation Strategy Final1.pdf (unknown)Two-stage technical evaluation:
Scoring scale: 5 = 100%, 4 = 80%, 2 = 40%, 0 = 0%. Scores of 1 and 3 are not used.
No price/B-BBEE split, CIDB grade, local content threshold or financial capacity requirement is stated in this technical evaluation strategy.
Technical Specifications
Source: Grootvei power Station Tender Technical Evaluation Strategy Final1.pdf (unknown)Scope of work at Grootvlei Power Station (North Stack) for a 5-year period:
Methodology
Source: Grootvei power Station Tender Technical Evaluation Strategy Final1.pdfRequired methodology deliverables:
Experience & Qualifications
Source: Grootvei power Station Tender Technical Evaluation Strategy Final1.pdfExperience and personnel requirements:
Quality Management
Source: Grootvei power Station Tender Technical Evaluation Strategy Final1.pdfQuality management requirements:
Compliance Requirements
Source: Grootvei power Station Tender Technical Evaluation Strategy Final1.pdf (unknown)Mandatory compliance requirements:
Environmental
Source: Grootvei power Station Tender Technical Evaluation Strategy Final1.pdfEnvironmental compliance requirements:
Requirements
Source: Grootvei power Station Tender Technical Evaluation Strategy Final1.pdf (unknown)Mandatory requirements (gatekeepers):
Failure on any mandatory criterion results in immediate disqualification and tender declared non-responsive.
Section
Source: Grootvei power Station Tender Technical Evaluation Strategy Final1.pdfTechnical evaluation uses a weighted scorecard with a 70% minimum threshold. Mandatory gatekeeper: SANAS accreditation per ISO/IEC 17025:2017 for Stack Emission Testing plus submission of all technical returnables. Qualitative criteria weights: Company Profile & Capability 30%, Method Statement 25%, Turnaround Time 15%, Test Programme 15%, Skilled Personnel 15%. Scoring levels: 5 (100%), 4 (80%), 2 (40%), 0 (0%); scores 1 and 3 not used. Two TET members evaluate all mandatory and qualitative criteria.
Description
Source: C3 1 TSC3 Employers Service Information rev 1.pdfGrootvlei Power Station has an installed Continuous Emissions Monitoring System on the stack for monitoring particulate and gaseous emissions to comply with the National Environmental Management: Air Quality Act, 2004. Correlation of dust monitors means correlating monitor output against mass emissions (dynamic calibration). Parallel testing verifies online emissions with a certified parallel test monitor to produce a correlation factor. Eskom adopted VDI 2066 for dust correlation and EN 14181 for gaseous parallel testing. ISO 13284-1, ISO 9096, ISO 12141, and ISO 10155 are acceptable standards. Dust correlation frequency: once every 2 years (recommended 21-23 months); after full bag replacement, full correlation after 3,000 operating hours. Gas monitor parallel test frequency: once every 2 years (recommended 21-23 months); also required after major plant operation change, AMS failure, or spot check.
Important Dates
Source: C3 1 TSC3 Employers Service Information rev 1.pdf (unknown)Contract duration: 5 years. Dust monitor correlation frequency: once every 2 years (recommended 21-23 months); after full bag replacement, full correlation after 3,000 operating hours. Gas monitor parallel test frequency: once every 2 years (recommended 21-23 months); also required after major plant operation change, AMS failure, or spot check. Contractor must submit plan for whole service within 2 weeks of contract date. Contract Quality Plan (CQP) due within 30 days of contract award; no work may commence until CQP approved in writing. Preliminary test report due within 5 days after testing. Completed full report due within 2 weeks. Late reports result in delayed payments and penalties. Contractor must respond to callout within 1 working day and be on site on agreed date per task order; delay damages apply for failure to attend.
Contact Information
Source: C3 1 TSC3 Employers Service Information rev 1.pdf (unknown)No SCM or technical contact names, emails, or phone numbers are provided in this document. The Contract Manager is referenced throughout as the point of contact for instructions, approvals, and meetings. Employer's VAT registration number: 4740101508.
Submission Guidelines
Source: C3 1 TSC3 Employers Service Information rev 1.pdf (unknown)Submission method and address are not stated in this document. The document is the Employer's Service Information (C3.1) and does not contain tender submission instructions, closing time, or returnable forms list. Those details will be in the main tender invitation or Part C1/C2 of the contract pack.
Returnable Documents
Source: C3 1 TSC3 Employers Service Information rev 1.pdf (unknown)Contractor to submit: Contract Quality Plan (CQP) within 30 days of contract award; organogram showing personnel and lines of authority/communication; certified copies of accreditation and qualifications of key personnel (including RPL); proof of similar contracts performed; valid trade test certificates for trade personnel; SABS accreditation certificate for calibration certificates; safety plan; Environmental Management Plan; Data books per Eskom standard and Supplier Quality Management specification (240-105658000); final signed-off quality documents/data packages within 1 week of completion; tax invoices per invoicing requirements; preliminary test report within 5 days after testing; completed full report within 2 weeks.
Evaluation Criteria
Source: C3 1 TSC3 Employers Service Information rev 1.pdf (unknown)No evaluation scoring split, minimum functionality threshold, or preference point system (80/20 or 90/10) is stated in this document. The document sets mandatory technical and compliance requirements that must be met to perform the work, but does not describe how bids will be scored.
Technical Specifications
Source: C3 1 TSC3 Employers Service Information rev 1.pdf (unknown)Scope: Perform Continuous Emissions Monitoring System (CEMS) correlation tests (dust) and parallel tests (gaseous) at Grootvlei Power Station for 5 years.
Dust correlation (VDI 2066 primary; EN 13284-1, ISO 9096, ISO 12141 acceptable; ISO 10155 for regression curves):
Gaseous parallel testing (EN 14181 primary):
Deliverables: All test checks per Eskom Standard GST 36-742; preliminary report within 5 days; full report within 2 weeks.
Callouts: Employer contacts Contractor when test needed; Contractor responds within 1 working day; task order with SAP 45 number issued; Contractor on site on agreed date; delay damages for non-attendance.
Standards and specifications: Occupational Health and Safety Act; Incident Management Procedure (32-95); SABS 1431-1987; Basic Conditions of Employment Act; Eskom Environmental Policy (240-28981069); Waste Management (240-29828394); SHE Specifications for Contractors (240-30008949); Mechanical, Electrical & Personal Protection (240-30008949); Injury/Accident Reports (240-29129309); SHE Organisation (240-30008949); Vehicle Safety (32-93, 32-421); Lifesaving Rules (240-62196227); Non-smoking Policy (240-39405720); SANS 7592, 7531, 1596; CIDB 8ME registration; Grootvlei High Risk SHE Specifications (240-73418055); Emissions Monitoring and Reporting (240-34495848); OHSAS 18001; ISO 14001; Supplier Contract Quality Requirement Specification (240-105658000); Procurement Instruction for Cataloguing (240-1289988974); Environmental Incident Management Procedure (240-133087117).
Site regulations: Comply with all Grootvlei site regulations; site access via main gate with temporary permits (ID documents required); equipment list verified by security; permits returned on staff departure; no firearms, weapons, alcohol, illegal substances, cameras (including camera phones); alcohol testing; no private work for Eskom employees; generator area and units barricaded/out of bounds; no recruitment outside security gate; speed limit 40 km/h; vehicle permit cancelled for traffic violations; inaugural meeting before work starts; Contractor maintains Site Regulations file.
Personnel records: Contractor keeps records of people on site; Contract Manager access at any time.
Health and safety facilities: Contractor provides First Aid service at own cost; Employer's Medical Centre available for serious injuries/life-threatening situations outside office hours; Employer may recover costs.
Equipment: Contractor may use any suitable equipment in good order complying with safety rules; no damage to plant, buildings, roads; clean and remove debris/rubble; building debris dumped at Employer-identified site; no asbestos-based products; only parts meeting original manufacturer requirements used.
SABS accreditation required to issue valid calibration certificates.
Data books completion and submissions per Eskom standard and Supplier Quality Management specification (240-105658000).
Methodology
Source: C3 1 TSC3 Employers Service Information rev 1.pdfDust correlation procedure: minimum 9 successful tests plus 3 additional for failed tests/outliers using quartz fibre filters; isokinetic percentage 95-105%; filter samples sent to accredited lab for particle size distribution, 2 samples to Eskom RT&D for comparison; isokinetic measurements per MES/Eskom approved equivalent (ISO, EN, VDI); EN 13284-1 and ISO 12141 preferred for concentrations below 75 mg/NmΒ³; smaller flat quartz fibre filters recommended for low particulate levels; sample head velocity within Β±10% of approach velocity; correct nozzle orientation to prevent bias; all measurements corrected to standard temperature (0Β°C) and pressure (101.325 kPa) to NmΒ³(d) @ 10% Oβ; sampling time rounded up to nearest hour; testing at normal operating conditions, no leaking bags (FFP visual inspection prior); three zero points included per VDI 2066; if intercept >10% of limit value, add 3 more zero points; if still >10% with 6 zero points, correlation invalid; correlation coefficient (R) >90% for success; efficiency testing of particulate abatement plant after General Overall outage. Parallel test procedure: minimum 15 valid parallel measurements over at least 3 days, 8-10 hours per day, within 4 weeks; SRM measurements per accepted standard; AMS signal period >90% of averaging time; AMS and SRM cover same time; sampling time per pair at least 30 minutes or 4Γ AMS response time; SRM results expressed under same conditions as AMS for calibration function and variability test.
Quality Management
Source: C3 1 TSC3 Employers Service Information rev 1.pdfContractor to demonstrate via Contract Quality Plan (CQP) that organisation monitors and controls all specification requirements. CQP drafted per Supplier Contract Quality Requirement Specification (240-105658000). Quality documents submitted for approval to Contract Manager within 30 days of contract award. No work may commence until CQP approved in writing and copy submitted. Contractor and Contract Manager sign off all Quality Control documents after work completion. Contractor submits final signed-off documents/data packages to Contract Manager within 1 week of completion. Contractor to read and understand Supplier Contract Quality Requirement Specification (240-105658000); copy kept on premises. Contractor subject to scheduled assessments/audits if Eskom deems necessary. Specification remains applicable if contract extended or modified. Contractor acknowledges and agrees to comply with Eskom policies and procedures (current/latest revisions) including Supplier Contract Quality Requirement Specification (240-105658000). Data books completion and submissions per Eskom standard and Supplier Quality Management specification (240-105658000).
Financial Requirements
Source: C3 1 TSC3 Employers Service Information rev 1.pdf (unknown)Pricing: All work valued in accordance with Price List unless otherwise specified; actual quantities determined per Task Order requirements. Contractor provides all necessary information for cost determination at assessment date for monthly costs and each Task Order. Task order accompanied by SAP 45 (order) number for reference when invoicing.
Invoicing: Within 1 week of receiving payment certificate from Contract Manager (core clause 51.1), Contractor provides tax invoice matching certificate amount. Invoice addressed to specified address; includes Contractor and Contract Manager names/addresses, contract number/title, Contractor VAT registration number, Employer VAT registration number (4740101508), description of service per Price List, totals excluding/including VAT.
No bond, guarantee, or insurance amounts stated in this document (section 2.4 references 'Provision of bonds and guarantees' but content is missing).
Compliance Requirements
Source: C3 1 TSC3 Employers Service Information rev 1.pdf (unknown)Mandatory requirements:
Health & Safety
Source: C3 1 TSC3 Employers Service Information rev 1.pdfContractor shall adhere to all OHS legal requirements, Eskom corporate policies, standards, procedures, and issued SHE specification. Contractor to abide by Lifesaving Rules and Grootvlei High Risk SHE Specifications (240-73418055). Approved PPE required: overalls, safety shoes, safety hat, safety goggles, dust mask, gloves. Contractor to cooperate with Incident Management Procedure (32-95); report incidents/accidents to Grootvlei within 24 hours or before end of shift; legal obligation to report to Department of Labour and keep records per OHS Act and COIDA. Contractor implements and maintains safety plan until completion. Contract Manager may stop unsafe work; Contractor resumes only after safety deficiencies corrected to Contract Manager's satisfaction; no claim for delay. Contractor provides First Aid service at own cost; Employer's Medical Centre available for serious injuries; Employer may recover costs for use of its facilities. Contractor complies with health and safety requirements in contract tender package.
Environmental
Source: C3 1 TSC3 Employers Service Information rev 1.pdfService Provider shall have documented environmental management system (SHEQ policy, operational procedures). Comply with all Grootvlei environmental policies, standards, work instructions, procedures. Allocate funds for environmental implementation; appoint personnel with basic environmental management knowledge (part-time/full-time). Outline project-specific Environmental Management Plan. Adhere to station waste management work instruction and colour coding for waste segregation. Communicate all environmental requirements to employees. Adhere to 'Duty of Care' per NEMA section 28. Protect employees who refuse hazardous environmental work per NEMA section 29. Adhere to applicable environmental legislation, licences, permits. Secure samples during transport to prevent damage, leaks, accidental release. Vehicles must be roadworthy, free from oil/fuel leaks. Polluter pays principle: polluter cleans spillages and rehabilitates polluted land at own cost. Manage incidents per Eskom Environmental Incident Management Procedure (240-133087117); report environmental incidents per procedure. Non-conformances issued for deviations from Grootvlei work instructions and environmental requirements. Participate in regular environmental audits by Grootvlei personnel. Make all environmental system documentation, records, reports available for review.
Contractual Terms
Source: C3 1 TSC3 Employers Service Information rev 1.pdfContract duration: 5 years. Contractor submits plan for whole service within 2 weeks of contract date. Employer handles/disposes of asbestos. Employer secures statutory work permit per Construction Regulation 2014; statutory fees borne by Employer. Employer conducts baseline risk assessment per OHS Act clause 7.2. Management meetings: Employer and Contractor meet as required; minimum agenda includes progress, planned dates, programme comparison, other activities, technical/commercial issues. Kick-off meeting after award. Specialist meetings as specified. Meeting records submitted to Contract Manager within 5 days. Minutes/register not used for confirming actions/instructions under contract. Documentation control: feedback includes summary of work done, estimated future duration, budget cost, bill of materials, criticality. Invoicing: within 1 week of payment certificate, Contractor provides tax invoice matching certificate amount; invoice addressed to specified address; includes Contractor/Contract Manager names and addresses, contract number/title, VAT registration numbers (Employer VAT: 4740101508), description per Price List, totals excluding/including VAT. Completion requirements: removal/installation/commissioning of works; testing and certification; all quality documentation signed off with no outstanding actions; works in service continuously for at least 2 weeks with no abnormalities; all technical documentation submitted per Employer requirements; Completion after Contract Manager verification. Task Order management: task order issued when test required, accompanied by SAP 45 order number for invoicing; task order format in Annexure A. Contractor provides security for Works until completion. Site access: control points at main gate; temporary permits issued on request with ID documents; equipment list verified by security; permits returned when staff leave; no firearms, weapons, alcohol, illegal substances, cameras (including camera phones); alcohol testing; no private work for Eskom employees; generator area and units barricaded/out of bounds; no recruitment outside security gate; speed limit 40 km/h; vehicle permit cancelled for traffic violations; comply with Grootvlei Site Regulations; inaugural meeting before work starts; Contractor issued Site Regulations file (property of Contract Manager, Contractor maintains/updates). Contractor keeps records of personnel on site; Contract Manager access at any time. Contractor cleans/removes debris/rubble; building debris dumped at Employer-identified site. No asbestos-based products in materials/temporary works/plant/equipment. Site access permit required before work: site-specific induction, medical, paperwork; vehicle access pre-approved by Contract Manager/security. Only parts meeting original manufacturer requirements used.
Requirements
Source: C3 1 TSC3 Employers Service Information rev 1.pdf (unknown)Contractor must have expertise and skilled labour in CEMS correlation and parallel testing. Key personnel: BSc Engineering Degree or National Diploma in Engineering with minimum 5 years' experience in same work. Trade personnel must be qualified with valid trade test certificates. Contractor must furnish certified copies of accreditation and qualifications (including RPL). Must demonstrate capability with proof of similar contracts. Contractor to submit organogram showing personnel and lines of authority/communication. Contractor must be SABS accredited to issue valid calibration certificates. Contractor to submit Contract Quality Plan (CQP) per Supplier Contract Quality Requirement Specification (240-105658000) within 30 days of contract award; no work may commence until CQP approved in writing. Contractor to submit final signed-off quality documents/data packages within 1 week of completion. Contractor subject to scheduled assessments/audits. Contractor to provide PPE (dust mask, goggles, ear plugs, overalls, safety boots, safety harness) compliant to safety standards. Contractor to arrange transport and accommodation for employees. Contractor to implement safety plan with PPE info, safe work procedures, job-specific risk assessments, safety meetings; plan accepted before work commencement. Contractor subject to periodic audits; deviations corrected to Employer's satisfaction. Contract Manager may stop unsafe work; Contractor has no claim for delay. Contractor to have documented environmental management system (SHEQ policy, operational procedures); comply with all Grootvlei environmental requirements; allocate funds for environmental implementation; appoint personnel with environmental management knowledge; outline project-specific Environmental Management Plan; adhere to waste management work instruction and colour coding; communicate environmental requirements to employees; adhere to NEMA Duty of Care (section 28) and section 29 protections; secure samples during transport; use roadworthy vehicles free of oil/fuel leaks; polluter pays principle for spillages; manage incidents per Eskom Environmental Incident Management Procedure (240-133087117); participate in environmental audits; make environmental documentation available for review.
Section
Source: C3 1 TSC3 Employers Service Information rev 1.pdf3 Health and safety, the environment and quality assurance ..................................................................... 8
3.3 Quality assurance requirements .............................................................................................................. 9
Description
Source: Scope of Work (3).pdf (unknown)Scope of Work for Correlation and Parallel Testing of Continuous Emission Monitors on the North Stack at Grootvlei Power Station for a 5-year period. Ensures compliance with Atmospheric Emission Licence (Dipaleseng/Eskom H SOC Ltd/GPS/0015/2024/F04) and Eskom Emissions Monitoring and Reporting Standard (240-56242363). Purpose: ensure correlation and parallel tests are done according to standards requirements and detail each step in correlation and parallel testing. Applicability: applies throughout Grootvlei Power Station.
Evaluation Criteria
Source: Scope of Work (3).pdf (unknown)SANAS accreditation for the specific reference methods used (ISO 9096, ISO 12141, EN 13284-1, VDI 2066, EN 14181, US EPA Method 5). Demonstrated capability to conduct isokinetic stack sampling and gaseous SRM measurements at power station conditions. Compliance with Eskom Environmental, Health, and Safety requirements, policies, and procedures. Valid CSD registration, tax compliance (SARS tax pin/TCS), and B-BBEE certification as per standard Eskom procurement requirements. Minimum B-BBEE Level 2. Quality Assurance Level 2 (QAL2) compliance for continuous emissions monitoring systems. Correlation coefficient (R) must exceed 90% for successful correlation.
Technical Specifications
Source: Scope of Work (3).pdf (unknown)Scope: Correlation and parallel testing of Continuous Emission Monitors (CEMs) on the North Stack at Grootvlei Power Station for a 5-year period. Compliance required with Atmospheric Emission Licence (Dipaleseng/Eskom H SOC Ltd/GPS/0015/2024/F04) and Eskom Emissions Monitoring and Reporting Standard (240-56242363).
Dust Monitor Correlation:
Gas Monitor Parallel Test:
Reporting: Report submitted within 2 weeks after test, including SANAS accreditation certificate approved for the test reference method. Boiler Engineering verifies data, identifies plant deviations, provides boiler process data, and reviews draft report for compliance.
Methodology
Source: Scope of Work (3).pdf (unknown)Dust Monitor Correlation: Eskom adopted VDI 2066 procedure; EN 13284-1, ISO 9096 and/or ISO 12141 standards acceptable if requirements met. ISO 10155 may be considered for regression curves. Prerequisites: minimum 9 successful tests with 3 additional for failed tests/outliers using quartz fibre filters; isokinecity 95β105%; filter samples to accredited laboratory for particle size distribution, 2 samples to Eskom RT&D for PSD comparison; isokinetic measurements per MES/Eskom approved equivalent (ISO, EN, VDI); EN 13284-1 and ISO 12141 preferred for particulate concentrations below 75 mg/NmΒ³; smaller flat quartz fibre filters recommended for low-level particulate; velocity into sample head within Β±10% of approach velocity; correct nozzle orientation to prevent bias; all measurements corrected to standard temperature (0Β°C) and pressure (101.325 kPa) to NmΒ³(d) @ 10% Oβ; sampling time rounded up to nearest hour per test; tests at normal operating conditions, no leaking bags (FFP visual inspection prior); three zero points per VDI 2066; if intercept >10% of limit value, add 3 zero points; if still >10% with 6 zero points, correlation invalid; correlation coefficient (R) >90% for success; efficiency testing of particulate Abatement Control Plant as part of extended full correlation after General Overall (GO) outage. Frequency: once every 2 years (recommended 21β23 months); spot checks as required; after full bag replacement, full correlation after 3,000 operating hours.
Gas Monitor Parallel Test: Eskom adopted EN 14181 procedure. Minimum 15 valid parallel measurements on normal operating conditions, spread over at least 3 days, 8β10 hours per day, within 4 weeks. SRM measurements per accepted standard; AMS signal >90% of averaging time. AMS and SRM as measurement pairs covering same time. Sampling time at least 30 minutes or 4 times AMS response time (whichever greater). SRM results expressed under same conditions as AMS for calibration function and variability test. Additional correction parameters obtained per measurement pair. Frequency: once every 2 years (recommended 21β23 months); major plant operation change; AMS failure; spot checks as required.
Quality Management
Source: Scope of Work (3).pdfISO 9001 Quality Management System required. Quality Assurance Level 2 (QAL2) specifies procedures to ensure continuous emissions monitoring system correctly installed, calibrated by comparing measurements, and independently verified. Normative standards include VDI 2066, VDI 3950, ISO 9096, ISO 10155, ISO 12141, EN 13284-1, BS EN 15259, BS EN 14181, US EPA Method 5. Correlation coefficient (R) must exceed 90% for successful correlation. SANAS accreditation certificate required for test reference method. Filter samples sent to accredited laboratory for particle size distribution; 2 samples to Eskom RT&D for PSD comparison. Isokinetic measurements per MES/Eskom approved equivalent (ISO, EN, or VDI).
Compliance Requirements
Source: Scope of Work (3).pdf (unknown)SANAS accreditation for the specific reference methods used (ISO 9096, ISO 12141, EN 13284-1, VDI 2066, EN 14181, US EPA Method 5). Valid CSD registration. SARS tax compliance (tax pin/TCS). B-BBEE certification (minimum Level 2). Compliance with Eskom Environmental, Health, and Safety requirements, policies, and procedures. ISO 9001 Quality Management System. Compliance with Atmospheric Emission Licence (Dipaleseng/Eskom H SOC Ltd/GPS/0015/2024/F04), National Environmental Management: Air Quality Act (2004), National Environmental Management Act (NEMA), and National Environmental Management: Air Quality Act (NEMAQA). Quality Assurance Level 2 (QAL2) for continuous emissions monitoring systems.
Environmental
Source: Scope of Work (3).pdfCompliance with Atmospheric Emission Licence (Dipaleseng/Eskom H SOC Ltd/GPS/0015/2024/F04), National Environment Management: Air Quality Act (2004), National Environmental Management Act (NEMA), National Environmental Management: Air Quality Act (NEMAQA). Monitoring of flue gas constituents including particulate, gaseous, oxygen, velocity, temperature, pressure. Abatement Plant Control Efficiency expressed as percentage of pollutant emitted to amount entering abatement control plant. Tests conducted at normal operating conditions; no leaking bags (FFP visual inspection prior). All measurements corrected to standard temperature (0Β°C) and pressure (101.325 kPa) to normal cubic meters (dry basis) corrected to 10% oxygen (NmΒ³(d) @ 10% Oβ).
Contractual Terms
Source: Scope of Work (3).pdfContract duration: 5 years. Compliance with Atmospheric Emission Licence (Dipaleseng/Eskom H SOC Ltd/GPS/0015/2024/F04) and Eskom Emissions Monitoring and Reporting Standard (240-56242363). Contractor must comply with Eskom Environmental, Health, and Safety requirements, policies, and procedures. Report submission within 2 weeks after each test, including SANAS accreditation certificate approved for the test reference method. Boiler Engineering responsible for verifying data, identifying plant deviations, providing boiler process data, and reviewing draft report for compliance. Normative standards: ISO 9001, VDI 2066, VDI 3950, ISO 9096, ISO 10155, ISO 12141, EN 13284-1, BS EN 15259, BS EN 14181, US EPA Method 5. Informative references: National Environment Management: Air Quality Act (2004), Atmospheric Emission Licence. Quality Assurance Level 2 (QAL2) applies. Correlation coefficient (R) >90% required for valid correlation. Intercept >10% of limit value with 6 zero points invalidates correlation.
Requirements
Source: Scope of Work (3).pdf (unknown)Contractor must comply with Eskom Environmental, Health, and Safety requirements, policies, and procedures. Report must be submitted within 2 weeks after the test and include SANAS accreditation certificate approved for that test reference method. Boiler Engineering is responsible for verifying data, identifying plant deviations, providing boiler process data, and conducting overall review of draft report for compliance with specified standard. SANAS accreditation for reference methods (ISO 9096, ISO 12141, EN 13284-1, VDI 2066, EN 14181, US EPA Method 5). Demonstrated capability for isokinetic stack sampling and gaseous SRM measurements. Valid CSD registration, SARS tax compliance, B-BBEE certification (minimum Level 2). ISO 9001 Quality Management System. Compliance with Atmospheric Emission Licence and relevant environmental legislation.
Contact Information
Source: C1 2a TSC3 Data by Employer.pdf (unknown)Contract Manager details are not fully specified; placeholders [β] are used for name, address, telephone, fax, and e-mail. Engineering Contract Strategies contact: Tel 011 803 3008, Fax 086 539 1902, www.ecs.co.za (source for NEC3 TSC3 contract document).
Evaluation Criteria
Source: C1 2a TSC3 Data by Employer.pdf (unknown)The Contractor must be registered on the Central Supplier Database (CSD) and have a valid SARS tax clearance (TCS/pin). A valid B-BBEE verification certificate is required; any decrease in status may lead to renegotiation or termination. If the Contractor is a joint venture, consortium, or unincorporated grouping, members are jointly and severally liable and must notify the key authorised person within 2 weeks of Contract Date. The Contractor must not cede, delegate, or assign rights without Employer's written consent. The Contractor must comply with the Value Added Tax Act and include Eskom's VAT number on invoices. No specific CIDB grading or professional body registration is stated in the provided document.
Technical Specifications
Source: C1 2a TSC3 Data by Employer.pdf (unknown)Service: Performing Continuous Emissions Monitoring System (CEMS) correlation and parallel tests at Grootvlei Power Station. Affected Property: Continuous Emissions Monitoring System. Service period: 5 years. Service Information is in Part 3: Scope of Work and all documents and drawings to which it refers. Contractor must submit a first plan for acceptance within 1 week of the Contract start date. Task Order programme must be submitted to the Contract Manager within 2 days of receiving a Task Order. Contractor must comply with Construction Regulations 2014, Occupational Health & Safety Act, and all applicable health, safety, and environmental laws, rules, guidelines, and procedures. Contractor must comply with Eskom's Asbestos Standard 32-303 and Asbestos Regulations (GNR February 2002). OEL for asbestos: 0.2 fibres/ml (4-hour TWA); short-term exposure limit: 0.6 fibres/ml (10-minute TWA). Measurements per HSG248, monitored per HSG173 and OESSM. Contractor may perform parallel measurements at own expense; results evaluated against statutory limits. Asbestos removal and disposal by registered asbestos contractor at Employer's expense per SA legislation.
Financial Requirements
Source: C1 2a TSC3 Data by Employer.pdf (unknown)Contract type: NEC3 Term Service Contract (TSC3) April 2013, Main Option A: Priced contract with price list. Currency: South African Rand. Assessment interval: between the 26th day of each successive month. Payment period: 4 weeks after payment certificate. Interest rate: publicly quoted prime rate of Standard Bank of South Africa Limited (Rands) or LIBOR (other currencies). Price adjustment for inflation (Option X1): base date [β]; proportions: Fixed [β], Labour SEIFSA Table C3-AHPE, Material SEIFSA Table G-1, Transport SEIFSA Table L2-A. Contractor prepares forecasts of final total Prices at intervals no longer than 4 weeks. Low service damages (Option X17): delivery delays 15 days, 2.5% of batch order value. Limitation of liability (Option X18): Contractor's liability for indirect/consequential loss limited to R0.00; for loss/damage to Employer's property limited to insurance deductibles; for design defects limited to greater of total Prices at Contract Date plus unrecoverable insurance amounts plus deductibles; total liability limited to total of Prices (excluding additional excluded matters). Additional excluded matters: design defects, manufacture/fabrication defects outside Affected Property, loss/damage to non-Employer property, death/injury, IP infringement. End of liability date: 12 months after end of service period. Contractor must provide tax invoice within 1 week of receiving payment certificate; late invoice extends payment time. VAT compliance required; include Employer VAT number 4740101508 on invoices. Contractor provides insurances per Insurance Table A from starting date until Completion/termination: loss/damage to Employer's property (replacement cost/Employer's deductible), Plant & Materials (replacement cost/Employer's deductible), Equipment (replacement cost/Employer's deductible), liability for property damage (replacement cost), bodily injury/death (statutory amounts), employee injury/death (statutory amounts). Employer provides insurances per Insurance Table B: Assets All Risk, Contract Works, Environmental Liability, General & Public Liability, Transportation (Marine), Motor Fleet & Mobile Plant, Terrorism, Cyber Liability, Nuclear Material Damage & Business Interruption, Nuclear Material Damage Terrorism β all per policy documents.
Compliance Requirements
Source: C1 2a TSC3 Data by Employer.pdf (unknown)Contractor must be registered on the Central Supplier Database (CSD) and have a valid SARS tax clearance (TCS/pin). A valid B-BBEE verification certificate is required. Contractor must notify Employer within 7 days of any change in B-BBEE status and submit updated verification certificate within 30 days. Decreased B-BBEE status may lead to renegotiation or termination. Failure to notify may constitute reason for termination. If Contractor is a joint venture, consortium, or unincorporated grouping: members are jointly and severally liable; must notify key authorised person within 2 weeks of Contract Date; no composition change without Employer's written consent. Contractor must not cede, delegate, or assign rights without Employer's written consent. Contractor must comply with Value Added Tax Act and include Eskom's VAT number 4740101508 on invoices. Contractor must comply with Construction Regulations 2014, Occupational Health & Safety Act, and all applicable health, safety, and environmental laws. Contractor must comply with Eskom's Asbestos Standard 32-303 and Asbestos Regulations. Contractor must notify compensation events within 8 weeks of becoming aware or lose entitlement. Ethics clause (Z11): Prohibited Actions (coercive, collusive, corrupt, fraudulent, obstructive) are forbidden; Employer may terminate if Prohibited Action occurs; cooperation with investigations required. Termination addition (Z10): business rescue order is a termination event. Contract can be terminated if Grootvlei Power Station closes before Contract end.
Health & Safety
Source: C1 2a TSC3 Data by Employer.pdfContractor undertakes to take all reasonable precautions to maintain health and safety of persons in and about execution of the service. Contractor accepts that Employer may appoint them as Principal Contractor under Construction Regulations 2014 (promulgated under Occupational Health & Safety Act). Contractor warrants that total Prices include sufficient amount for compliance with Construction Regulations, all applicable health & safety laws, regulations, rules, guidelines, and procedures. Contractor must comply with Construction Regulations and all applicable health & safety laws, regulations, rules, guidelines, and procedures, and ensure subcontractors, employees, and others under Contractor's direction and control likewise comply. Contractor must comply with all applicable environmental laws, regulations, rules, guidelines, and procedures, and ensure subcontractor compliance. Asbestos-specific requirements: Employer ensures Ambient Air conforms to SA asbestos standards (OEL 0.2 fibres/ml 4-hour TWA, STEL 0.6 fibres/ml 10-minute TWA per HSG248/HSG173/OESSM). Employer certifies conditions on written request; measurements by SANAS-accredited AAIA. Contractor may perform parallel measurements at own expense; results evaluated against statutory limits. Asbestos identification triggers risk assessment, immediate control measures, and air monitoring. Contractor personnel may stop work and leave contaminated area until declared safe by compliance monitoring or AAIA-approved intervention. Service dates extended by notification periods per Asbestos Regulations 3 & 21. Asbestos removal/disposal by registered asbestos contractor at Employer expense per SA legislation.
Environmental
Source: C1 2a TSC3 Data by Employer.pdfContractor must comply with all applicable environmental laws, regulations, rules, guidelines, and procedures provided for under the contract, and ensure subcontractors, employees, and others under Contractor's direction and control likewise comply. Employer provides Environmental Liability insurance per Insurance Table B (per policy document). Nuclear liability: Employer is operator of Koeberg Nuclear Power Station (KNPS) and holder of nuclear licence; indemnifies Contractor against nuclear damage liabilities except unlawful intent or unauthorized presence at KNPS; waives recourse except for unlawful intent/unauthorized presence; does not waive rights under section 30(7) of Nuclear Energy Act; protection until KNPS decommissioned. Asbestos management: Employer manages asbestos and ACM per Eskom Asbestos Standard 32-303. Ambient Air must conform to SA asbestos standards. Asbestos removal/disposal by registered contractor at Employer expense per SA legislation.
Description
Source: High Risk Specification.pdfProject Name: Correlation and Parallel testing. Scope of work includes correlation of dust monitors (dynamic calibration against mass emissions using VDI 2066, EN 13284-1, ISO 9096, ISO 12141 standards) and parallel testing of gas monitors (verification of online emissions with certified parallel test monitor per EN 14181). Dust correlation requires minimum 9 successful tests with quartz fibre filters, isokinecity 95-105%, correlation coefficient >90%, sampling corrected to NmΒ³(d) @ 10% Oβ. Gas parallel testing requires minimum 15 valid measurements over at least 3 days within 4 weeks, sampling time β₯30 minutes or 4Γ AMS response time. Frequency: every 2 years (recommended 21-23 months), after full bag replacement (3000 operating hours), major plant changes, AMS failure, or spot checks.
Important Dates
Source: High Risk Specification.pdf (unknown)No briefing session, site visit, clarification deadline, or submission closing date and time are stated in this document. The tender record indicates a closing date of 28 October 2026 at 11:00, but the specification itself contains no dates.
Contact Information
Source: High Risk Specification.pdf (unknown)Eskom Contract's Manager/End User: Thabo Mahlangu. Eskom's Acting OHS/SHE Manager: Mukondeleli Mahuluhulu. Eskom's Procurement Manager/Officer: Silindile Mncube. Eskom's OHS/SHE Officer: Maki Mofokeng. No email addresses, phone numbers, or physical submission address are provided in the document.
Submission Guidelines
Source: High Risk Specification.pdf (unknown)Submission method and address are not stated in the provided document. The document is an OHS specification (GVL/0650) that forms part of the tender pack; it does not contain the bid submission instructions, closing venue, or returnable forms list. Bidders must obtain the full tender document for submission details.
Evaluation Criteria
Source: High Risk Specification.pdf (unknown)The document does not specify the evaluation methodology, price/preference split (80/20 or 90/10), minimum functionality scores, or B-BBEE level required for award. It sets mandatory technical and OHS compliance requirements that must be met to be eligible, but does not describe how bids are scored.
Technical Specifications
Source: High Risk Specification.pdf (unknown)Scope: Perform continuous emissions monitoring system (CEMS) correlation and parallel tests at Grootvlei Power Station for a 5-year period.
Dust monitor correlation (dynamic calibration against mass emissions):
Gas monitor parallel testing (verification of online emissions with certified parallel monitor):
Methodology
Source: High Risk Specification.pdf (unknown)Dust monitor correlation procedure: VDI 2066 adopted; EN 13284-1, ISO 9096, ISO 12141 acceptable; ISO 10155 for regression curves. Minimum 9 successful tests + 3 provision for outliers using quartz fibre filters. Isokinecity 95-105%. Filter samples to accredited lab for particle size distribution, 2 samples to Eskom RT&D for comparison. Isokinetic measurements per MES/Eskom approved equivalent. EN13284-1 and ISO 12141 preferred for concentrations <75 mg/NmΒ³. Smaller flat quartz fibre filters for low particulate. Velocity into sample head Β±10% of approach velocity. Correct nozzle orientation to prevent bias. All measurements corrected to standard temperature (0Β°C) and pressure (101.325 kPa) to NmΒ³(d) @ 10% Oβ. Sampling time rounded up to nearest hour per test. Normal operating conditions, no leaking bags (FFP visual inspection prior). Three zero points minimum, add 3 more if intercept >10% limit value, correlation invalid if still >10% with 6 zero points. Correlation coefficient (R) >90%. Efficiency testing of Particulate Abatement Control Plant after GO outage. Gas monitor parallel testing: EN 14181 procedure. Minimum 15 valid parallel measurements on normal operations over β₯3 days within 4 weeks, 8-10h/day spread. SRM measurements per accepted standard, AMS signal >90% averaging time. AMS/SRM measurement pairs covering same time. Sampling time β₯30 minutes or 4Γ AMS response time. SRM results expressed under same conditions as AMS for calibration function and variability test. Additional correction parameters obtained per measurement pair.
Experience & Qualifications
Source: High Risk Specification.pdfMain contractor and appointed contractors must have appropriate qualifications, certificates, and employees must always be under competent supervision. Contractor site supervisor requires training in HIRA, incident investigation, supervisor training, authorised person & PSR, legal liability. Contractor Health & Safety Officer (full-time) requires SAMTRAC, HIRA, incident investigation, legal liability, ISO 45001 knowledge, minimum 2 years experience, OHS Diploma (applicable to 3-5 year contracts). Statutory appointees must meet OHS Act criteria for their respective roles. Non-statutory appointees (Emergency Planning Co-coordinator, H&S Committee Chairperson, Site Manager, Site Supervisor, Risk Assessor, Safety Officer, Working at Heights Planner) must be competent per Eskom requirements.
Quality Management
Source: High Risk Specification.pdfAuditing: approval and compliance of main contractor OHS plan, Eskom OHS audits, contractor audits. Contractor performance monitoring. Contract sign-off. Eskom's right to terminate contract. SHEQ policy required signed by CEO or Section 16(2) appointee, displayed prominently, filed in OHS files and attached to OHS Plan. ISO 45001 referenced as normative standard. Risk assessment per procedure 32-520. Safe work procedures/method statements. Roof work per procedure 32-418. Fire equipment and maintenance. Tools and equipment: hand tools, ladders, scaffolding standards. OHS training: general training, induction training with medical fitness certificates. Contractor site establishment: layout plan with buildings, amenities, storage, electrical installations, colour coding, hygienic facilities. Site roads and vehicle management per procedure 240-62946386.
Pricing Schedule
Source: High Risk Specification.pdfOHS costing must be itemised based on overall project scope (training, PPE, safety equipment purchases, etc.). Contractors expected to establish and complete site within 3 months of contract inception. No bill of quantities, pricing schedule, or payment terms provided in this document.
Financial Requirements
Source: High Risk Specification.pdf (unknown)OHS costing must be itemised (training, PPE, safety equipment purchases, etc.) based on the overall project scope. No pricing schedule, bill of quantities, bond, guarantee, insurance amounts, or payment terms are specified in this document.
Compliance Requirements
Source: High Risk Specification.pdf (unknown)Mandatory compliance and pre-qualification requirements:
Health & Safety
Source: High Risk Specification.pdfEskom Life-Saving Rules apply to all employees, agents, consultants, contractors; cover plant operating above 1000V, vehicle driving on Eskom premises, work without required permit, live work basic principles per High Voltage Live Work procedures. Substance abuse: regular testing, results marked confidential, kept in personal file, pre-commencement testing. First Aid: OHS Act GSR 3 compliance, first aiders trained to Level 2 (provider registered per Section 26(1)), at least Level 1 training, boxes accessible with contact details, provision for after-hours incidents. OHS Communication: statutory H&S committees per Section 19(2)(a), non-statutory committees, record recommendations. Toolbox talks/daily pre-job meetings: attendance registers with topics, weekly toolbox talks based on project OHS issues. Induction training: main contractor employees must attend Eskom OHS induction before site access, appointed contractor induction, visitor induction (visitors remain with inducted host). Working at heights: preference for ground-level work, fall prevention (barricading, work platforms), site-specific fall protection plan by competent person per procedure 32-418, warning signs/barricades for falling objects, drop zones with signage. Confined spaces: comply with Plant Safety Regulation (240-150642762), at least one trained person for work/rescue/risk assessment, station rescue emergency number always available. PPE requirements per section 3.39. Incident investigation per procedure 32-95. Emergency management. Non-conformance and compliance monitoring. OHS files maintenance. Work stoppage authority. Hours of work: normal, night work, overtime provisions.
Environmental
Source: High Risk Specification.pdfDuty of care to environment: prevent pollution/degradation, minimise and rectify if authorised by law. Compliance with National Environmental Management Act 1998, Environment Conservation Act 1989, National Water Act 1998. Environmental Regulations for Workplaces (ERfW). Hazardous Chemical Agents monitoring: Fly Ash, Respirable Dust, Respirable Crystalline Silica. Occupational Hygiene Hazards Identification and Risk Assessment (HIRA). Occupational Hygiene Monitoring Noise. Medical surveillance programme. Information and training on environmental hazards. Medical assessments. COVID-19 policy required signed by senior person, displayed prominently, filed in OHS files. COVID-19 risk assessment and detailed prevention plan required. COVID-19 costs not for profit, Eskom reserves right to accept/decline PPE list. Compliance with National Disaster Management Act including Compliance Officer appointment. COVID-19 costs cease when pandemic declared over. Smoking policy per designated areas. Flammable/combustible liquids: storage volumes per statutory regulations/by-laws, no smoking/open flames, adequate firefighting equipment, diesel tanks in bunded area (110% capacity), refuelling in designated safe areas with drip trays. Housekeeping: cleanliness maintained, scrap removal, work stoppage for non-compliance at contractor cost. Stacking/storage: demarcation, colour coding. Workplace signage and colour coding compliance. Site roads: parking and roadway planning. Vehicle management: secure loads, red flag/light for projections, reverse alarms.
Contractual Terms
Source: High Risk Specification.pdfSection 37(2) agreements required between Eskom and main contractor, and between main contractor and each appointed contractor; originals retained by contractor, copies to project manager and in OHS files. Contractor performance monitoring. Contract sign-off. Eskom's right to terminate contract. Omissions from safety specification do not relieve contractor obligations. Non-conformance and compliance procedures. Work stoppage provisions. Hours of work definitions (normal, night, overtime). COID registration and valid Letter of Good Standing maintained throughout contract. Statutory and non-statutory appointments with training verification before acceptance. Organogram submission and maintenance. Roles and responsibilities for main contractors, site supervisors, H&S officers. Induction training requirements and medical fitness certification. Site establishment requirements. Vehicle management per Eskom procedure 240-62946386. Housekeeping enforcement with cost recovery for non-compliance. Smoking and cellular phone policies. Incident investigation per procedure 32-95. Emergency management. OHS files maintenance.
Requirements
Source: High Risk Specification.pdf (unknown)Contractor must develop OHS plan meeting Eskom Generation minimum requirements and all applicable legislation. Main contractor remains accountable for health and safety programme for their employees and appointed contractor employees. All contractors must have up-to-date OHS Act and regulations available to employees. Contractors must comply with Constitution (Section 24), OHS Act 1993, NEMA 1998, Environment Conservation Act 1989, National Water Act 1998, Civil and Building Work Act, National Road Traffic Act, COID Act, and applicable SANS standards. Section 37(2) agreement must be signed between Eskom and main contractor, and between main contractor and all appointed contractors. Main contractor and appointed contractors must be registered with compensation commissioner and hold valid Letter of Good Standing (LoG) throughout contract. OHS costing must be itemised (training, PPE, safety equipment). Statutory appointments required per OHS Act (Incident Investigator, H&S Committee Members, HCS Co-coordinator, H&S Representative, Machinery Supervision, Pressure Equipment Inspector, First Aiders). Non-statutory appointments required: Emergency Planning Co-coordinator, H&S Committee Chairperson, Site Manager, Site Supervisor, Risk Assessor, Safety Officer, Working at Heights Planner. Main contractor must provide organogram on company letterhead from CEO to supervisors, signed by Section 16(1) or 16(2) appointee. Appointed contractors must provide similar organograms. Contractor site supervisor must be trained in HIRA, incident investigation, supervisor training, authorised person & PSR, legal liability. Contractor H&S Officer (full-time) must have SAMTRAC, HIRA, incident investigation, legal liability, ISO 45001 knowledge, minimum 2 years experience, OHS Diploma (for 3-5 year contracts).
Section
Source: High Risk Specification.pdfSection 37(2) of the OHS Act requires Eskom to sign an agreement and include it in the OHS file for evaluation
Health, Environmental, and Quality (SHEQ) Policy and applicable legislative obligations. This OHS
The contractor is and remains accountable for the quality and execution of their health and safety programme
Description
Source: SDL&I.pdfPerforming Continuous Emissions Monitoring System correlation and parallel tests at Grootvlei Power Station for a period of 60 months.
Important Dates
Source: SDL&I.pdf (unknown)Closing date and time: 28 October 2026 at 11:00 (from tender record). No compulsory briefing, site visit, or clarification deadline is mentioned in the document. Contract duration: 60 months. B-BBEE Improvement/Retention Plan due within 30 days of contract signing. SDL&I Implementation Schedule due within 28 days of contract award. Quarterly SDL&I reports thereafter.
Contact Information
Source: SDL&I.pdf (unknown)Buyer: Thandi Mavasa. Business Unit: Grootvlei Power Station, Eskom. SDL&I Senior Advisor: Maluta Mukwevho. No email, phone, or physical submission address provided in the extracted text.
Submission Guidelines
Source: SDL&I.pdf (unknown)Submission method and address are not stated in the provided document. The closing date and time are given in the tender record as 28 October 2026 at 11:00. Returnable documents required with the bid or after award:
Electronic deponent signatures are not accepted on affidavits.
Returnable Documents
Source: SDL&I.pdf (unknown)B-BBEE Improvement/Retention Plan (within 30 days of contract signing); Local Procurement Content proposal; Jobs creation and retention proposal; SDL&I Implementation Schedule (within 28 days of contract award); Quarterly SDL&I compliance reports; Valid B-BBEE certificate (SANAS accredited) / sworn affidavit / CIPS affidavit; Proof of ownership/shareholding (CIPC) with shareholding breakdown; Certified ID copies of shareholders; Proof of Disability (where applicable); Consolidated B-BBEE certificate for trust/consortium/JV.
Evaluation Criteria
Source: SDL&I.pdf (unknown)Preference point system: 80/20 or 90/10 (system to be confirmed in the bid invitation). Specific goals (B-BBEE status level) carry a maximum of 20 points (80/20) or 10 points (90/10). Points for B-BBEE level:
Price points make up the remainder (80 or 90). Total points rounded to two decimal places. Contract awarded to highest total score. Failure to submit B-BBEE documentation does not disqualify but limits score to price points only (80 or 90) and zero specific-goal points. No minimum functionality or technical threshold is stated in the extracted text.
Technical Specifications
Source: SDL&I.pdf (unknown)Scope: Performing Continuous Emissions Monitoring System (CEMS) correlation and parallel tests at Grootvlei Power Station. Duration: 60 months. No detailed technical specifications, standards, service levels, or capacity requirements are provided in the extracted text.
Financial Requirements
Source: SDL&I.pdf (unknown)Pricing format: Price Schedule included with tender documents (not provided). Tender response must separate local and imported components. Local Procurement Content target: 100% (value added in South Africa by South African resources). No bond, guarantee, insurance, or financial capacity thresholds stated.
Compliance Requirements
Source: SDL&I.pdf (unknown)Mandatory for preference points claim:
Electronic deponent signatures not accepted.
B-BBEE certificate or sworn affidavit is a condition for contract award:
Post-award contractual obligations:
CSD registration, tax clearance, CIDB, and professional registrations are not mentioned in the extracted text.
B-BBEE Requirements
Source: SDL&I.pdf (unknown)Documents required for preference points: Valid B-BBEE certificate (SANAS accredited) / sworn affidavit / CIPS affidavit; Proof of ownership/shareholding (CIPC) with shareholding breakdown; Certified ID copies of shareholders; Proof of Disability (where applicable); Consolidated B-BBEE certificate for trust/consortium/JV. Electronic deponent signatures not accepted. B-BBEE certificate or sworn affidavit is a condition for contract award: EME (β€R10M revenue) β sworn affidavit; QSE (β€R50M) β sworn affidavit if β₯51% Black owned, otherwise QSE scorecard; >R50M β valid B-BBEE certificate. Post-award Improvement/Retention Plan due within 30 days of signing: Level 1 maintain; Level 2-3 improve/maintain; Level 4 achieve Level 3 by end of Year 1 then improve one level per year; Level 5-8/Non-compliant achieve Level 4 by end of Year 1 then improve one level per year from Year 2.
Special Conditions
Source: SDL&I.pdf (unknown)SDL&I Penalty and Performance Security: N/A. Reporting and Monitoring: Quarterly reports to Eskom per Data Collection Template; Eskom reviews within 30 days and notifies in writing of non-compliance; Suppliers must implement corrective measures before next report or retention clauses invoked; SDL&I Implementation Schedule must be completed and returned to SDL&I representative within 28 days of contract award for monitoring progress.
Requirements
Source: SDL&I.pdf (unknown)Local Procurement Content target: 100% (value added in South Africa by South African resources). Tenderers must submit proposals for jobs created and retained in South Africa as a direct result of the contract.
Section
Source: SDL&I.pdfPreference point system: 80/20 or 90/10. Specific goals (B-BBEE status level) maximum 20 points (80/20) or 10 points (90/10). Points per level: Level 1 = 20/10; Level 2 = 18/9; Level 3 = 14/6; Level 4 = 12/5; Level 5 = 8/4; Level 6 = 6/3; Level 7 = 4/2; Level 8 = 2/1; Non-compliant = 0/0. Price points comprise the balance. Total rounded to two decimals. Highest total wins. Missing B-BBEE documentation limits score to price points only and zero specific-goal points.
Description
Source: Scope of Work (3).pdf (unknown)Scope of Work for Correlation and Parallel Testing of Continuous Emission Monitors on the North Stack at Grootvlei Power Station for a 5-year period. Defines detailed scope for correlation and parallel testing per Eskom Emissions Monitoring and Reporting Standard (240-56242363) to ensure compliance with Atmospheric Emission Licence (Dipaleseng/Eskom H SOC Ltd/GPS/0015/2024/F04). Purpose: ensure correlation and parallel tests done according to standards requirements and detail each step. Applicability: throughout Grootvlei Power Station.
Evaluation Criteria
Source: Scope of Work (3).pdf (unknown)Bidder must hold valid SANAS accreditation for the reference test methods applied (ISO 9096, ISO 12141, EN 13284-1, VDI 2066, EN 14181, US EPA Method 5). Must demonstrate capability to perform isokinetic manual stack sampling and gaseous SRM measurements at power station conditions. Must comply with Eskom Environmental, Health and Safety requirements, policies and procedures. Must be registered on the National Treasury Central Supplier Database (CSD) and have valid SARS tax clearance (TCS pin). Minimum B-BBEE Level 2 required. Evaluation references ISO 9001 Quality Management Systems, BS EN 14181 Quality Assurance of automated Measuring Systems, and National Environment Management: Air Quality Act, 2004.
Technical Specifications
Source: Scope of Work (3).pdf (unknown)Scope: Correlation and parallel testing of Continuous Emission Monitors (CEMs) on the North Stack at Grootvlei Power Station for a 5-year period, per Eskom Emissions Monitoring and Reporting Standard (240-56242363) and Atmospheric Emission Licence (Dipaleseng/Eskom H SOC Ltd/GPS/0015/2024/F04).
Dust Monitor Correlation (VDI 2066 primary; EN 13284-1, ISO 9096, ISO 12141 acceptable; ISO 10155 for regression curves): Minimum 9 successful tests plus 3 additional for outliers using quartz fibre filters. Isokinetic percentage 95β105%. Filter samples to accredited laboratory for particle size distribution; 2 samples to Eskom RT&D for PSD comparison. EN 13284-1 and ISO 12141 preferred for concentrations below 75 mg/NmΒ³. Smaller flat quartz fibre filters recommended. Sample head velocity within Β±10% of approach velocity. Correct nozzle orientation to prevent bias. All measurements corrected to 0Β°C, 101.325 kPa, dry basis, 10% Oβ (NmΒ³(d) @ 10% Oβ). Sampling time rounded up to nearest hour. Tests at normal operating conditions; no leaking bags (FFP visual inspection prior). Three zero points required; add 3 more if intercept >10% of limit value; correlation invalid if still >10% with 6 zero points. Correlation coefficient (R) >90%. Efficiency testing of particulate abatement control plant as part of extended full correlation after General Overall outage. Frequency: once every 2 years (recommended 21β23 months); spot checks as required; after full bag replacement, full correlation after 3,000 operating hours settling time.
Gas Monitor Parallel Testing (EN 14181): Minimum 15 valid parallel measurements on normal operating conditions spread over at least 3 days, 8β10 hours per day, within 4 weeks. SRM measurements per accepted standard; AMS signal >90% of averaging time. AMS and SRM as measurement pairs covering same time. Sampling time β₯30 minutes or β₯4Γ AMS response time (whichever greater). Results expressed under same conditions for calibration function and variability test. Additional correction parameters obtained per measurement pair. Frequency: once every 2 years (recommended 21β23 months); major plant operation change; AMS failure; spot checks as required.
Reporting: Contractor report submitted within 2 weeks after test, including SANAS accreditation certificate approved for the test reference method. Boiler Engineering verifies data, identifies plant deviations, provides boiler process data, and reviews draft report for standard compliance.
Methodology
Source: Scope of Work (3).pdf (unknown)Dust Monitor Correlation: Eskom adopted VDI 2066; EN 13284-1, ISO 9096, ISO 12141 acceptable if meeting requirements; ISO 10155 for regression curves. Minimum 9 successful tests plus 3 additional for failed/outliers using quartz fibre filters. Isokinetic percentage 95β105%. Filter samples to accredited lab for particle size distribution; 2 samples to Eskom RT&D for PSD comparison. Isokinetic measurements per MES/Eskom approved equivalent (ISO, EN, VDI). EN 13284-1 and ISO 12141 preferred for concentrations below 75 mg/NmΒ³. Smaller flat quartz fibre filters recommended. Sample head velocity within Β±10% of approach velocity. Correct nozzle orientation. All measurements corrected to 0Β°C, 101.325 kPa, dry basis, 10% Oβ. Sampling time rounded up to nearest hour. Tests at normal operating conditions; no leaking bags (FFP visual inspection prior). Three zero points required; add 3 more if intercept >10% of limit value; correlation invalid if still >10% with 6 zero points. Correlation coefficient (R) >90%. Efficiency testing of particulate abatement control plant as part of extended full correlation after General Overall outage. Frequency: once every 2 years (recommended 21β23 months); spot checks as required; after full bag replacement, full correlation after 3,000 operating hours settling time.
Gas Monitor Parallel Testing: Eskom adopted EN 14181. Minimum 15 valid parallel measurements on normal operating conditions spread over at least 3 days, 8β10 hours per day, within 4 weeks. SRM measurements per accepted standard; AMS signal >90% averaging time. AMS and SRM as measurement pairs covering same time. Sampling time β₯30 minutes or β₯4Γ AMS response time (whichever greater). Results expressed under same conditions for calibration function and variability test. Additional correction parameters obtained per measurement pair. Frequency: once every 2 years (recommended 21β23 months); major plant operation change; AMS failure; spot checks as required.
Experience & Qualifications
Source: Scope of Work (3).pdf (unknown)Contractor must have SANAS accreditation for test reference methods (ISO 9096, ISO 12141, EN 13284-1, VDI 2066, EN 14181, US EPA Method 5). Boiler Engineering responsible for verifying data, identifying plant deviations, providing boiler process data, and overall review of draft report for standard compliance.
Quality Management
Source: Scope of Work (3).pdfNormative References: ISO 9001 Quality Management Systems; VDI 2066 Particulate Matter Measurement; VDI 3950 Calibration of Automatic Emission Measuring Instruments; ISO 9096 Stationary Source Emissions β Manual Determination of Mass Concentration of Particulate Matter; ISO 10155 Automated monitoring of mass concentrations of particles; ISO 12141 Determination of mass concentration of particulate matter at low concentrations; EN 13284-1 Determination of low range mass concentration; BS EN 15259 Requirements for Measurement Sections; BS EN 14181 Quality Assurance of automated Measuring Systems; US EPA Method 5 Determination of Particulate Matter Emissions from Stationary Sources. Quality Assurance Level 2 (QAL2) specified for continuous emissions monitoring system installation, calibration, and independent verification. Contractor report must include SANAS accreditation certificate approved for test reference method, submitted within 2 weeks after test.
Compliance Requirements
Source: Scope of Work (3).pdf (unknown)CSD registration and valid SARS tax clearance (TCS pin) mandatory. Minimum B-BBEE Level 2. SANAS accreditation for applicable test reference methods (ISO 9096, ISO 12141, EN 13284-1, VDI 2066, EN 14181, US EPA Method 5). Compliance with Eskom Environmental, Health and Safety requirements, policies and procedures. Compliance with Atmospheric Emission Licence (Dipaleseng/Eskom H SOC Ltd/GPS/0015/2024/F04) and National Environment Management: Air Quality Act, 2004. Normative standards: ISO 9001, VDI 2066, VDI 3950, ISO 9096, ISO 10155, ISO 12141, EN 13284-1, BS EN 15259, BS EN 14181, US EPA Method 5.
Health & Safety
Source: Scope of Work (3).pdf (unknown)Contractor must ensure compliance with Eskom Environmental, Health, and Safety requirements, policies and procedures.
Environmental
Source: Scope of Work (3).pdfCompliance with Atmospheric Emission Licence (Dipaleseng/Eskom H SOC Ltd/GPS/0015/2024/F04). Informative References: National Environment Management: Air Quality Act, 2004 (Act No.); Atmospheric Emission License β Dipaleseng/Eskom/ H SOC Ltd/GPS/0015/2024/F04. Monitoring of flue gas constituents and parameters including particulate, gaseous, and process monitors (oxygen, velocity, temperature, pressure). Abatement Plant Control Efficiency expressed as percentage of pollutant emitted to amount entering abatement control plant.
Contractual Terms
Source: Scope of Work (3).pdfContract governed by Eskom Emissions Monitoring and Reporting Standard (240-56242363) and Atmospheric Emission Licence (Dipaleseng/Eskom H SOC Ltd/GPS/0015/2024/F04). Normative standards: ISO 9001, VDI 2066, VDI 3950, ISO 9096, ISO 10155, ISO 12141, EN 13284-1, BS EN 15259, BS EN 14181, US EPA Method 5. Informative references: National Environment Management: Air Quality Act, 2004; Atmospheric Emission Licence. Quality Assurance Level 2 (QAL2) specified for CEMS installation, calibration, and independent verification. Contractor report must include SANAS accreditation certificate approved for test reference method, submitted within 2 weeks after test. Boiler Engineering responsible for data verification, plant deviation identification, boiler process data provision, and draft report review for standard compliance. Contractor must comply with Eskom Environmental, Health and Safety requirements, policies and procedures. Document revision 1 compiled February 2026 for Correlation and Parallel contract.
Section
Source: Scope of Work (3).pdfEvaluation references ISO 9001 Quality Management Systems, BS EN 14181 Quality Assurance of automated Measuring Systems, and National Environment Management: Air Quality Act, 2004. Bidder must hold valid SANAS accreditation for reference test methods and demonstrate capability for isokinetic manual stack sampling and gaseous SRM measurements at power station conditions. Compliance with Eskom Environmental, Health and Safety requirements, CSD registration, valid SARS tax clearance, and minimum B-BBEE Level 2 are prerequisites.
Data conflicts
None detected