Tender Application Workspace for
Review the deadline, returnables and available preparation tools for this tender.
View public tender detailsProvince
Mpumalanga
Closing Date
18 November 2026 at 10:00
Estimated Value
Value not specified
ESKOM requires civil maintenance services at kendal power station in mpumalanga under a five-year term contract. The appointed contractor carries out ongoing civil maintenance work on site at the power station for the full period. Bids close on 18 november 2026 at 08:00. The term and the site-based nature of the work mean bidders must be able to sustain labour, plant and supervision at kendal for five years before committing to the bid.
Quick Summary
- Eskom
- Mpumalanga
- Closes 18 November 2026 at 10:00 (3 days left)
AI-Analyzed Compliance Requirements
376 pointsPoint-by-point requirements consolidated and deduplicated from 9 analyzed documents.
Submission Requirements
85- Returnable documents
- Local Content Declaration (Annexure G4 / Annex E, supporting schedule to Annex C): declares the local content of the goods or services offered and must be completed and submitted with the bid.
- Valid B-BBEE certificate from a SANAS-accredited verification agency, or a sworn affidavit / CIPC affidavit, to claim preference points.
- Proof of ownership or shareholding, preferably CIPC documentation, including the shareholding breakdown.
- Certified copies of shareholders' identity documents.
- Proof of disability, where applicable.
- Trusts, consortia and joint ventures (including incorporated ones): a consolidated B-BBEE status level verification certificate.
- B-BBEE improvement or retention plan, due within 30 days of contract signature.
- SDL&I Implementation Schedule, completed and returned to the SDL&I representative within 28 days of contract award.
- Quarterly SDL&I compliance reports against the Data Collection Template.
- Consequences
- Omitting the preference-point documentation does not disqualify a bid, but forfeits all specific-goal points and leaves the bid scored on price only.
- Failure to meet the mandatory CIDB Construction Skills Development Goal percentage makes the tender non-responsive.
- Submission channel
- Bids are submitted electronically through Eskom's eTendering portal at https://eTendering.eskom.co.za; physical delivery to Eskom tender offices is no longer used.
- Tenders are advertised on the Tender Bulletin at https://tenderbulletin.eskom.co.za, which links through to the eTendering portal.
- A CSD number is required before the portal can be accessed.
- Registration and access
- Suppliers must register on the portal before bidding; registration captures contact details, organisation, CSD number and cell phone number.
- A one-time PIN is sent to the registered cell phone number and email address for each login.
+ 65 more requirements in the full document analysis
Returnable Documents
21- Failure to complete and submit the form renders the bid non-responsive and disqualifies the bidder from the procurement process.
- Annexures attached to the invitation
- Annexure A: Authorisation Form.
- Annexure D: Integrity Declaration Form; bidders must download and read the Supplier Integrity Pact.
- Annexure I: SBD 6.1 Preference Points Claim Form under the PPPFA 2022 regulations.
- Annexure J: SBD 4 Bidders Disclosure.
- CIDB Contract Skills Development Goals, if applicable.
- Scope of Work in the NEC and the NEC or other Contract.
- Pricing Schedule / BOQ.
- Returnable categories
- Disqualifiable returnables: must be completed, signed where required and submitted by closing, or the bid is disqualified.
- Non-disqualifiable returnables: if missing or incomplete, Eskom requests them in writing and the bidder has 5 working days to deliver, failing which the bid is disqualified.
- Returnables scored at closing: if missing or incomplete, the bid is not disqualified but scores zero.
- Basic compliance returnables
- Electronic copy of the tender in PDF, with the price list in PDF; maximum 500 MB per document and 4 GB per total submission.
- CIDB 7CE or higher.
- Joint venture documents
- Other returnables
- CSD registration.
- Financial statements: latest approved annual financial statements of the tendering company (not the parent or ultimate holding company), including background, signed director's report, signed auditor's/reviewer's/compiler's/accounting officer's report, statement of financial pos…
+ 1 more requirement in the full document analysis
Evaluation Criteria
43- Preference point system
- 90/10 or 80/20 system; a maximum of 10 (90/10) or 20 (80/20) points is awarded for the specific goal.
- Specific-goal points are added to price points and the total rounded to two decimal places.
- Award goes to the bidder with the highest points, subject to section 2(1)(f) of the Preferential Procurement Policy Framework Act.
- Points by B-BBEE status level (90/10 / 80/20)
- Level 1: 10 / 20
- Level 2: 9 / 18
- Level 3: 6 / 14
- Level 4: 5 / 12
- Level 5: 4 / 8
- Level 6: 3 / 6
- Level 7: 2 / 4
- Level 8: 1 / 2
- Non-compliant contributor: 0 / 0
- Bidders who do not submit the preference-point documentation score 0 out of 10/20 for specific goals and are scored on price only.
- SDL&I objectives are not scored, but the commitments become contractual obligations.
- CIDB Construction Skills Development Goal: mandatory target of 0.25%; missing it renders the tender non-responsive.
- Mandatory returnable
- The e-Tendering Training Acknowledgement Form must be fully completed and submitted. A bid submitted without it is non-responsive and is disqualified.
- Evaluation stages
+ 23 more requirements in the full document analysis
Technical Requirements
26- Provision of civil maintenance services at Kendal Power Station.
- Contract period: 5 (five) years.
- Contract term: 5 (five) years.
- Contract duration: 5 years (60 months).
- SDL&I commitments required with the bid
- Local procurement content: proposal against Eskom's 100% target; where local and imported components are combined, split the bid response per the Price Schedule (local content = total spend minus imported component).
- Subcontracting: 25% of procurement from black-owned designated groups; the main contractor must subcontract to capable designated suppliers that are not subsidiaries and in which it holds no shares, preferably local to site from the Kendal feeder areas.
- Job creation: proposal stating the type and number of jobs to be created and retained in South Africa; candidates must reflect South Africa's population demographics and be sourced from the station's vicinity.
- CIDB skills development: indicate whether CIDB compulsory training applies and the applicable Construction Skills Development Goal percentage; Eskom's target is 0.25%.
- The tender is for the whole of the contract; the contract form is NEC3 TSC3.
- Work is executed in an operating power station environment.
- Work covered
- Inspection, investigation, assessment and defect identification.
- Concrete repair and rehabilitation.
- Structural steel repair, replacement, fabrication and installation.
- Building maintenance, roofing, plumbing, drainage, roads, stormwater and associated civil works.
- Excavation, demolition, reinstatement and temporary works where applicable.
- Fire-related works where required, requiring SAQCC Fire registration.
- Plant and equipment
- Bidders must show access to the plant, equipment and tools needed for the duration of the contract, suitable for the nature, extent and duration of the works, and including at least the equipment listed in the Schedule of Plant and Equipment.
+ 6 more requirements in the full document analysis
Methodology
17- A detailed method statement is required, showing understanding of the full scope and the approach to executing the works safely and effectively in an operating power station.
- Minimum content
- Understanding of the scope of work.
- Construction methodology and execution approach.
- Construction sequencing and work execution strategy.
- Resource allocation, including labour, plant and equipment.
- Quality control procedures, inspections, testing and hold points.
- Safety management approach, including risk assessments and permit requirements.
- Environmental controls and housekeeping procedures.
- Supervision, communication and coordination arrangements.
- Emergency response and operational interface management in a live plant.
- Construction programme and/or hourly execution plan for shutdown or critical work.
- Testing, commissioning, close-out, handover and reinstatement methodology.
- Detailed, project-specific statement covering all required aspects: 5.
- Statement showing understanding with minor gaps: 4.
- High-level or generic statement: 2.
- No submission: 0.
Experience & Qualifications
5- Company track record
- At least two similar-scope contracts completed successfully in the last five years, supported by traceable references.
- Each reference must give the project name, client, description of work performed, project cost for the scope performed, project start and end dates, a signed appointment letter, and the name, designation and contact number of a reference person.
- SAQCC Fire
- Scoring: 5 or more years' experience 5; 2 to 4 years 4; under 2 years or none 2; no submission 0.
Quality Management
20- Quality Category 1 requirements
- A valid ISO 9001:2015 certificate (latest applicable revision).
- Latest internal and external management system audit reports, including any non-conformities and the resulting corrective actions.
- A draft contract quality plan specific to the scope, meeting ISO 10005 minimum requirements.
- A draft or example Inspection and Test Plan (ITP) or Quality Control Plan (QCP) from similar or previous work.
- Documented information for control of externally provided processes, products and services.
- Documented roles, responsibilities and authorities within the QMS (organisation charts, job descriptions, work instructions, duty statements, manuals, procedures).
- Records of management review meetings, including agendas, minutes, attendance registers, reports and presentations.
- Tender submission requirements
- Company Quality Management Plan or Quality Policy.
- ITPs or QCPs relevant to the scope.
- Procedures for inspections, testing, approvals and hold points.
- Non-conformance and corrective action procedures.
- Welding quality procedures and welder qualifications where steelwork is in scope.
- Concrete testing and quality control procedures where concrete works are in scope.
- Details of quality personnel responsible for control and inspection.
- Comprehensive, project-specific submission: 5.
- Submission showing understanding with some procedures or details incomplete: 4.
- Limited or generic documentation: 2.
- No quality documentation: 0.
Pricing
5- Pricing format
- Where a contract combines local and imported goods or services, the bid response must be split into its components per the Price Schedule issued with the tender documents.
- A Pricing Schedule / bill of quantities is attached in PDF.
- The completed schedule must be submitted, unless it is already included in the NEC contract.
- For e-tendering the price schedule must be submitted in PDF.
Financial Requirements
17- Penalty: 2% of contract value for failure to meet SDL&I obligations.
- Retention: 2% of every invoice (excluding VAT) is retained for the contract duration as security for SDL&I obligations; released only once all SDL&I obligations are met.
- Pricing: the bid response must be split into local and imported components per the Price Schedule; local procurement content is total spending minus the imported component.
- Retention clauses are invoked if corrective measures are not implemented after Eskom notifies the supplier of unmet SDL&I obligations.
- Payment terms
- Suppliers are paid within 30 days of receipt of undisputed invoices.
- For contracts above R50 000 000 including VAT, payment is within 60 days of receipt of undisputed invoices.
- Performance security
- Where a performance bond or demand guarantee is required, the bidder must nominate at least two financial institutions it is likely to approach from Eskom's list of approved institutions.
- Financial capacity
- Financial analysis is compulsory as a contractual requirement for CIDB-related transactions from R30 000 excluding VAT.
- Latest approved annual financial statements of the tendering company (not the parent or ultimate holding company) are required, including the director's report, auditor's/reviewer's/compiler's report, statement of financial position, statement of comprehensive income, statement…
- Draft statements and management accounts are not accepted.
- South African entities that are not audited must also submit a signed public interest score showing the actual score, whether the company is owner managed, and whether the statements were externally prepared, plus ITA34C copies for the current and previous years of assessment.
- Each partner in an unincorporated JV or SPV must submit its own annual financial statements with the same items.
- Contract skills development
- A Construction Skills Development Goal (CSDG) of 0.25% applies to the CE class of works and is carried in the pricing schedule.
Compliance & Regulatory
73- Local content
- Returnable document: Local Content Declaration Summary Schedule (Annexure G2, Annex C), declaring the local content of the goods or services offered.
- A Local Content Declaration (Annexure G4 / Annex E, supporting schedule to Annex C) forms part of the bid pack and must be completed and signed.
- Mandatory
- CIDB grading: 7CE.
- B-BBEE evidence
- Revenue up to R10 million (EME): sworn affidavit acceptable.
- Revenue up to R50 million (QSE): must meet all applicable QSE scorecard elements unless at least 51% black owned, in which case a sworn affidavit applies.
- Revenue above R50 million: valid B-BBEE certificate required.
- B-BBEE improvement milestones
- Level 1: maintain status.
- Levels 2 and 3: improve or maintain status over the contract period.
- Level 4 at award: reach Level 3 by the end of year one, then improve one level per year.
- Sworn affidavit validity
- Must show the deponent's name and identity number as per the identity document, and designation as director, owner or member.
- Must show the enterprise name per CIPC registration and the business address.
- Must state black ownership, black female ownership and designated group percentages, with no blank spaces; specialised enterprises per Statement 004 must reflect black beneficiary percentages.
- Must state total revenue for the year under review and whether it is based on audited financial statements or management accounts, plus the financial year end used.
- Must reflect a single B-BBEE status level and the empowering supplier status (QSEs must indicate the basis).
- Deponent and Commissioner of Oaths must sign on the same date, in each other's presence, with the Commissioner signing and stamping.
+ 53 more requirements in the full document analysis
B-BBEE
4- Validity of B-BBEE sworn affidavits
- Specific goals are scored out of 20 or 10 points under the PPPFA, within the 90/10 or 80/20 preference point system.
- Main contractors and suppliers are discouraged from subcontracting to their own subsidiaries, as this may be treated as subcontracting with themselves or as fronting.
- A list of potential subcontractors can be drawn from www.csd.gov.za.
Health & Safety
16- Sworn affidavit validity requirements
- Deponent's designation as director, owner or member, showing authority to depose.
- Enterprise name per CIPC registration documents, where applicable, and business address.
- Financial year end used to determine total revenue, stated by day, month and year.
- The scope is classified high risk and compliance is evaluated against Annexure C1 (7 criteria).
- Returnables
- SHE Plan as per the SHE specification.
- SHE costing.
- Baseline risk assessment.
- Valid letter of good standing (COID certificate).
- SHE policy.
- SHE competencies.
- COIDA original certificate of good standing, or proof of application, from the Compensation Fund or a licensed compensation insurer (South African bidders only).
- Conditions
- SHEQ requirements may be imposed as contractual requirements.
- SHEQ supporting documents are published with the invitation to tender.
Environmental
4- Environmental returnables
- A detailed, signed Contractor's Environmental Management Plan (EMP) covering site-specific activities.
- Emergency preparedness plan.
- Waste management plan.
Contractual Terms
8- SDL&I reporting and monitoring
- Suppliers must submit quarterly compliance reports to Eskom using the Data Collection Template.
- Eskom reviews each report within 30 days of receipt and notifies the supplier in writing of any unmet SDL&I obligations.
- The supplier must implement corrective measures before the next report, failing which the retention clauses are invoked.
- Contract Participation Goals are not applicable.
- Where CSDG applies, the recommended supplier must submit the Targeted Enterprise Declaration Affidavit, Project Interim Report, Project Completion Report and Declaration after award, as required by the Standard for Indirect Targeting for Enterprise Development through Constructi…
- Eskom may negotiate with preferred bidders if tendered prices are not market-related.
- Bidders with the nationality of a sanctioned country are ineligible; this extends to proposed subcontractors and suppliers.
Other Requirements
14- CIDB skills development (objective criteria)
- Where CIDB compulsory training applies, the supplier must match Eskom's target of 0.25%.
- Failure to meet the mandatory CIDB CSDG percentage renders the tender non-responsive.
- Open to a single company or an incorporated or unincorporated joint venture or consortium meeting the eligibility criteria in the Tender Data.
- Ineligible: bidders with the nationality of a sanctioned country (also applies to proposed subcontractors and suppliers); bidders submitting more than one tender individually or as a JV/consortium partner;
- JV or consortium agreements that do not state joint and several liability for the contract; bidders with a conflict of interest, including a controlling partner or majority shareholder in common or a relationship giving access to information about, or influence over, another bid…
- Basic compliance
- Meet the eligibility criteria.
- Submit a complete tender with commercial, financial and technical information.
- Submit the mandatory commercial returnables by the stipulated deadlines.
- For e-tendering, failure to upload the tender documents renders the tender non-responsive.
- Contractual requirements
- Mandatory: CSD registration.
- Failure to meet them by the deadline may render the bid non-responsive and ineligible for award.
Evaluation criteria
1- Functionality applies, with five criteria each weighted 20%: plant and equipment availability; a detailed method statement; relevant company experience; quality management and control; and SAQCC Fire registration and experience.
Contact
17- Eskom Representative
- Name: Shilo Motuku
- Telephone: 013 647 9188
- Email: [email protected]
- All queries and clarifications must be in writing to the Eskom Representative; no other Eskom official may be contacted.
- Clarification queries close 5 working days before the tender submission deadline.
- Procurement contact
- Name: Thandi Mathye
- Role: Procurement Manager, Kendal Power Station
- Telephone: +27 13 647 6816
- Fax: +27 13 647 9190
- Group Commercial Procurement Department
- Kendal Power Station
- Near Ogies, Junction 507 N12 East
- Balmoral/Kendal Off-ramp
- Private Bag X7272
- Witbank 1035
Source confidence
High source confidence
Official source
eTenders.gov.za
Documents found
9
Last checked
16 Nov 2026
AI status
Enhanced
Data conflicts
None detected
This tender has strong source evidence, including source metadata and supporting tender information synced from the government tender portal.
Tenders SA is not the issuing authority. All tenders are automatically synced from the official government tender portal. Always confirm final submission details, closing dates, briefing sessions, eligibility requirements, and documents on the official government portal before applying.
Provision of civil maintenance for a period of 5 (five) years at kendal power station
Increase your winning chances
Most bidders are rejected due to compliance gaps. Use our Readiness Engine to verify your status for this specific construction.
Check My ReadinessImportant Dates & Timeline
2 key dates
Tender Closing Date
18 November 2026 at 10:00
3
Days Left
Tender Published
30 September 2026
Tender was published
Tender Closing Date
18 November 2026 at 10:00
Final deadline for submission
Eskom
As the backbone of South Africa's national grid, Eskom issues high-stakes tenders for power generation, transmission, distribution, plant maintenance, and critical infrastructure rehabilitation. However, the sheer volume of engineering-intensive RFQs—combined with strict safety protocols, technical specifications, and compliance schedules—makes manual bid preparation a high-risk gamble. Tenders SA transforms this page into your power-sector command centre. Our AI Tender Matching engine surfaces Eskom opportunities aligned with your engineering, manufacturing, or logistics capacity. Our document analysis instantly decodes dense technical specs, compulsory site briefings, and functionality criteria. Use procurement intelligence to assess project viability against your operational bandwidth, while compliance gap analysis flags missing electrical certifications or safety files before they derail you. Finally, our application assistance helps you compile a meticulous, submission-ready response that meets Eskom's rigorous procurement standards.
Operating Provinces
Key Personnel
AI Document Analysis Stages
- Document read. The full tender notice and its supporting documents are read end-to-end. Key sections, requirements, dates, and contact details are identified and pulled into a working summary you can act on.
- Compliance review. The working summary is checked against South African procurement standards — PFMA, PPPFA, B-BBEE, CIDB, local content, and preferential procurement — so nothing critical is missed before you start your bid response.
- Bid-ready summary. The submission guidelines, evaluation criteria, technical, financial, and compliance sections are refined into professional, easy-to-scan prose. This is the final version you can rely on when preparing your bid or briefing your team.
We refine every tender document through these stages so you can brief your team and prepare your bid with confidence. Anything marked as "in progress" will be upgraded automatically — no action required from you.
- Document read
- Compliance review
- Bid-ready summary
Commmercial - Eskom Standard Conditionsof Tender.pdf
30% Low ConfidenceSDL&I -Annexure G2 - Annex C - Local Content Declaration -Summary Schedule.pdf
35% Low ConfidenceSDL&I -Annexure G4 - Annex E - Local Content Declaration -Supporting Schedule to Annex C.pdf
35% Low ConfidenceSDLI Strategy Setting Template for Bidders - Provision of Civil Maintenance.pdf
72% Medium ConfidenceComercial -E-tendering Help Manual for supplier.docx
35% Low ConfidenceCommercial - E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf
35% Low ConfidenceCommercial -Non-Disclosure Agreement (NDA) Vendors - Civil Maintenance.docx
35% Low ConfidenceCommericial -Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.doc
62% Medium ConfidenceInvitation to Tender (ITT) - Provision of Civil Maintenance -E3568GXMPKEN -30.06.pdf
86% High ConfidenceAI Analysis Summary
Recommended Actions
SDL&I -Annexure G2 - Annex C - Local Content Declaration -Summary Schedule.pdf
SDL&I -Annexure G4 - Annex E - Local Content Declaration -Supporting Schedule to Annex C.pdf
Commmercial - Eskom Standard Conditionsof Tender.pdf
SDLI Strategy Setting Template for Bidders - Provision of Civil Maintenance.pdf
Commercial -Non-Disclosure Agreement (NDA) Vendors - Civil Maintenance.docx
Invitation to Tender (ITT) - Provision of Civil Maintenance -E3568GXMPKEN -30.06.pdf
Commercial - E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf
Comercial -E-tendering Help Manual for supplier.docx
Commericial -Supplier Evaluation Pack for 01 March 2026 to 28 February 2027.doc
Share this tender
PROVISION OF CIVIL MAINTENANCE FOR A PERIOD OF 5 (FIVE) YEARS AT KENDAL POWER STATION
Eskom tender in Mpumalanga. Closing 11/18/2026. PROVISION OF CIVIL MAINTENANCE FOR A PERIOD OF 5 (FIVE) YEARS AT KENDAL POWER STATION...
Smart Assistant
Check if your company qualifies for this tender before you apply.
How it Works
Organization
Eskom
Contact Person
shilo Motuku
Phone
017-612-9156
[email protected]
Address
Kendal Power Station - Kendal - Witbank - 1035
18 November 2026 at 10:00
Location
Mpumalanga
Closing Date
18 November 2026 at 10:00
Organization
Eskom
Urgent: Closing Soon
This tender closes in less than 3 days
Upcoming Deadlines
Some requirements have upcoming deadlines
Are you a news editor or niche publisher? Embed this tender data directly on your site for free.
Get Embed CodeAI-generated Document Analysis for Tender by Eskom. 2 business days remain.